NOTE: You
will need to download and install the FREE
DjVu Reader to access most of these
files. Please use Internet
Explorer to view the DjVu files.
Although the files on these pages have been formatted
in a highly compressed manner using DjVu, some of the files are
still relatively large. If you are using a dial-up modem to access
the files, you will have to be patient while the files load. Alternatively,
you may right click on the file link and download it to your machine
and view it later using the free DjVu Reader.
PROJECT OVERVIEW
An informational
open house on this project was held on May 16th in Omaha, NE. The
information available at that time is presented on these web pages.
- This project involves reconstructing West
Dodge Road between 129th Street and Interstate 680.
- It includes construction of two elevated expressway
viaducts between 121st Street and I-680.
- The existing 120th Street interchange
will be removed as part of the project. Intersections will be
rebuilt at 114th Street, North Bridge Road and South
Bridge Road. Frontage roads within the project area will
be rebuilt.
- Right-of-way property acquisition and temporary
easements will be required along West Dodge Road and adjacent
frontage roads for construction and utility relocation.
One home must be acquired as a result of the project.
Go
Directly to the List of Design Drawings & Renderings
Comments/Questions
about the Project?
Questions
on using DjVu?
|