Rulo Bridge Study

download Acrobat Reader
link to help with PDFs for those with visual disabilities
Return to Projects Page
Return to Main NDOR Page

Rulo Bridge Study
Project # STPD-159-7(105), C.N. 12381
Project Contacts:

Steve McBeth, NDOR Planning & Project Development Division (402) 479-4417
Renate Wilkinson, Missouri DOT (816) 387-2434

The aerial photos are in DjVu format. Even though these formats reduce file size dramatically, some of the files are still quite large. Please allow adequate time for download if you have a dial-up connection. If you do not have DjVu, please download the FREE READER by clicking on the DjVu button above.

Aerial Showing Alternatives
(then use the DjVu toolbar "rotate" button to orient the image)

Aerial Showing Alignments
(then use the DjVu toolbar "rotate" button to orient the image)

Location Map of Rulo

Proposed Construction: Replace the Rulo Bridge over the Missouri River between Rulo, Nebraska and Holt County, Missouri. The existing bridge is aging, too narrow for modern standards, and has poor approaches. A new, wider bridge with improved geometric approaches is planned. The preferred alignment, called Alternative 2, for a new structure is approximately 625 feet south of the existing bridge.

Lighting/Signals: There are no traffic signals currently, and none planned. Roadway lighting and signing will be evaluated during detailed design phase. In Rulo, left-turn lanes are proposed at 1st Street and at the relocated Commercial Street intersections.

Related Studies: None

Right of Way: Acquisition of private property will be required to construct the project. Possible acquisitions for the bridge replacement project in Rulo include one commercial establishment and five residences, one of which is a historic residence.

Phasing: Much of the new bridge will be constructed while traffic is maintained on the existing bridge. In Rulo, some detours will be necessary in order to maintain access to Ash Street and to build the relocated Commercial Street.

Schedule: Construction is planned to take place over three years, and is not expected to begin for another seven to ten years.

Estimated Cost: Approximately $24 million