Estimate Summary to Contractor
Vendor ID:0805 COHRON & SON, INC./A. M.
Contract ID:8738
Estimate Number:0006
Pay Period End Date:09.06.2003
Contract Location:
CHAMBERS NORTHWESTEstimate Type:PROG
Contractor:
COHRON & SON, INC./A. M.Date Let:12.19.2002
62180 GREAT RIVER RDDate Awarded:01.07.2003
PO BOX 479Date Contract Executed:01.31.2003
Date Notice to Proceed:01.31.2003
ATLANTIC IA 50022Date Work Began:
Phone:Date Physical Work Completed:
(712)243-2448Date Accepted:
Escrow Agent:
Surety Co:
MERCHANTS BONDING COMPANY (MUTUAL)
Counties
HOLT
Project Number PCT Fed State Project Number Description
80738 000  0.000 BR-1970(2)  GRADING BRIDGES GUARDRAIL
Total to DatePrev to DateThis Estimate
Current Contract AmtTotal Earnings$172,376.39$129,603.18$42,773.21
$445,608.07Stockpiled Materials$.00$.00$.00
Original Contract AmtGross Earnings$172,376.39$129,603.18$42,773.21
$431,778.07Retainage$-1,723.76$-1,296.03$-427.73
Escrow Amount$.00$.00$.00
Percent CompleteSecurities Encumbered$.00$.00$.00
38.68%Net Earnings$170,652.63$128,307.15$42,345.48
Liquidated Damages$.00$.00$.00
Incentives$.00$.00$.00
Disincentives$.00$.00$.00
Other Contract Adj$.00$.00$.00
Appl of Training Adj$.00$.00$.00
Training Rates Adj$.00$.00$.00
Fuel Adj$.00$.00$.00
Bituminous Adj$.00$.00$.00
Autopay Adj$.00$.00$.00
Gasoline Adj$.00$.00$.00
Other Adj$.00$.00$.00
Price Adj$.00$.00$.00
Substandard Item Adj$.00$.00$.00
Asphalt Adj$.00$.00$.00
Diesel Fuel Adj$.00$.00$.00
Petrol Adj$.00$.00$.00
Total for Adjustments$.00$.00$.00
Payment$170,652.63$128,307.15$42,345.48
Project ManagerProject Engineer
Smith, Lloyd09.08.2003Colfack, Gene09.09.2003
Div. Head/Dist. Eng.Constr. Estimate Eng.
Kovar, Mark09.18.2003Bartos, Steve09.18.2003
Controller Div. Processed
Burling, Laurie09.18.2003
Detailed breakdown of stockpiled materials
Total remaining for contract:0.00
1. Contracted
2. Current
3. To date
Item Nbr        Item CodeUnit Price4. This Est
Item DescriptionUnitsQtyAmount
GROUP 1 GRADING
0001                          0030.10 6,065.391.0006,065.39
MOBILIZATION LS 1.0006,065.39
0.100606.54
0.0000.00

0002                          1000.00 179.431.000179.43
LARGE TREE REMOVAL EACH1.000179.43
0.0000.00
0.0000.00

0003                          1009.00 1,076.581.0001,076.58
GENERAL CLEARING AND GRUBBING LS 1.0001,076.58
0.0000.00
0.0000.00

0004                          1011.00 7.1721.000150.57
WATER MGAL21.000150.57
0.0000.00
0.0000.00

0005                          1030.00 3.406,869.00023,354.60
EARTHWORK MEASURED IN EMBANKMENT CY 6,869.00023,354.60
0.0000.00
0.0000.00

0006                          1300.24 20.4436.000735.84
24" DRIVEWAY CULVERT PIPE LF 36.000735.84
0.0000.00
0.0000.00

0007                          2001.00 9.79223.0002,183.17
GRAVEL SURFACE COURSE CY 223.0002,183.17
0.0000.00
0.0000.00

0008                          2005.50 8.48795.0006,741.60
CLAY SURFACE COURSE CY 795.0006,741.60
0.0000.00
0.0000.00

0009                          L006.00 150.772.000301.54
COVER CROP SEEDING ACRE2.000301.54
0.0000.00
0.0000.00

GROUP 1 GRADINGContracted40,788.72
Current40,788.72
In place606.54
This Estimate0.00

GROUP 6 BRIDGE AT STA. 10+20
0010                          0030.60 18,000.001.00018,000.00
MOBILIZATION LS 1.00018,000.00
0.2003,600.00
0.0000.00

0011                          6000.10 3,000.001.0003,000.00
ABUTMENT NO.1 EXCAVATION LS 1.0003,000.00
1.0003,000.00
0.0000.00

0012                          6000.11 3,000.001.0003,000.00
ABUTMENT NO.2 EXCAVATION LS 1.0003,000.00
1.0003,000.00
0.0000.00

0013                          6010.22 335.0069.70023,349.50
CLASS 47B-3000 CONCRETE FOR BRIDGE CY 69.70023,349.50
0.0000.00
0.0000.00

0014                          6010.26 345.0047.40016,353.00
CLASS 47BD-4000 CONCRETE FOR BRIDGE CY 47.40016,353.00
0.0000.00
0.0000.00

0015                          6011.11 34,000.001.00034,000.00
PRECAST/PRESTRESSED CONCRETE SUPERSTRUCTURE LS 1.00034,000.00
AT STA. 10+20 0.0000.00
0.0000.00

0016                          6020.00 0.4511,795.0005,307.75
REINFORCING STEEL FOR BRIDGE LB 11,795.0005,307.75
0.0000.00
0.0000.00

0017                          6040.00 9,000.001.0009,000.00
REMOVE STRUCTURE EACH1.0009,000.00
AT STA. 10+20 0.100900.00
0.0000.00

0018                          6080.00 1.652,490.0004,108.50
STRUCTURAL STEEL FOR SUBSTRUCTURE LB 2,490.0004,108.50
0.0000.00
0.0000.00

0019                          6200.00 28.50660.00018,810.00
CONCRETE PILING LF 660.00018,810.00
567.65016,178.03
567.65016,178.03

0020                          6310.00 8.804,125.00036,300.00
STEEL SHEET PILING SF 4,125.00036,300.00
0.0000.00
0.0000.00

GROUP 6 BRIDGE AT STA. 10+20Contracted171,228.75
Current171,228.75
In place26,678.03
This Estimate16,178.03

GROUP 6A BRIDGE AT STA. 15+35
0021                          0030.60 18,000.001.00018,000.00
MOBILIZATION LS 1.00018,000.00
0.2003,600.00
0.0000.00

0022                          6000.10 3,000.001.0003,000.00
ABUTMENT NO.1 EXCAVATION LS 1.0003,000.00
1.0003,000.00
0.0000.00

0023                          6000.11 3,000.001.0003,000.00
ABUTMENT NO.2 EXCAVATION LS 1.0003,000.00
0.0000.00
0.0000.00

0024                          6010.22 335.0052.60017,621.00
CLASS 47B-3000 CONCRETE FOR BRIDGE CY 52.60017,621.00
52.60017,621.00
0.0000.00

0025                          6010.26 345.0069.50023,977.50
CLASS 47BD-4000 CONCRETE FOR BRIDGE CY 69.50023,977.50
0.0000.00
0.0000.00

0026                          6011.11 49,500.001.00049,500.00
PRECAST/PRESTRESSED CONCRETE SUPERSTRUCTURE LS 1.00049,500.00
AT STA. 15+35 1.00049,500.00
0.50024,750.00

0027                          6020.00 0.4516,910.0007,609.50
REINFORCING STEEL FOR BRIDGE LB 16,910.0007,609.50
4,590.0002,065.51
0.0000.00

0028                          6040.00 18,000.001.00018,000.00
REMOVE STRUCTURE EACH1.00018,000.00
AT STA. 15+35 1.00018,000.00
0.0000.00

0029                          6080.00 1.651,020.0001,683.00
STRUCTURAL STEEL FOR SUBSTRUCTURE LB 1,020.0001,683.00
0.0000.00
0.0000.00

0030                          6200.00 28.501,060.00030,210.00
CONCRETE PILING LF 1,060.00030,210.00
898.50025,607.25
0.0000.00

0031                          6310.00 8.802,417.00021,269.60
STEEL SHEET PILING SF 2,417.00021,269.60
1,784.81015,706.33
0.0000.00

6001                          6210.90 17.100.0000.00
PAY CUT-OFF FOR CONCRETE PILING, TYPE I LF 500.0008,550.00
252.8504,323.74
92.3501,579.19

6002                          6310.15 5.280.0000.00
PAY CUT-OFF FOR STEEL SHEET PILING SF 1,000.0005,280.00
667.2303,522.97
0.0000.00

GROUP 6A BRIDGE AT STA. 15+35Contracted193,870.60
Current207,700.60
In place142,946.80
This Estimate26,329.19

GROUP 7 GUARDRAIL
0032                          0030.70 800.001.000800.00
MOBILIZATION LS 1.000800.00
0.900720.00
0.0000.00

0033                          7020.00 1,075.008.0008,600.00
BRIDGE APPROACH SECTIONS EACH8.0008,600.00
0.0000.00
0.0000.00

0034                          7021.47 1,060.008.0008,480.00
MELT EACH8.0008,480.00
0.0000.00
0.0000.00

GROUP 7 GUARDRAILContracted17,880.00
Current17,880.00
In place720.00
This Estimate0.00

GROUP 10 GENERAL ITEMS
0035                          0001.10 1.501,920.0002,880.00
BARRICADE, TYPE III BDAY1,920.0002,880.00
659.000988.50
126.000189.00

0036                          0001.90 0.502,240.0001,120.00
SIGN DAY EACH2,240.0001,120.00
803.000401.50
154.00077.00

0037                          0001.98 1.00960.000960.00
CONTRACTOR FURNISHED SIGN EACH960.000960.00
0.0000.00
0.0000.00

0038                          0010.04 2,700.001.0002,700.00
FIELD OFFICE EACH1.0002,700.00
0.0000.00
0.0000.00

0039                          0030.00 350.001.000350.00
MOBILIZATION LS 1.000350.00
0.10035.00
0.0000.00

GROUP 10 GENERAL ITEMSContracted8,010.00
Current8,010.00
In place1,425.00
This Estimate266.00

Totals for contractContracted431,778.07
Current445,608.07
In place172,376.37
This Estimate42,773.22