|  |  | Detailed breakdown of stockpiled materials |  |  | 
|---|
| Est Nbr: | 0005 |  |  |  | 
| Item Nbr | Item Cd | Item Desc | Adj Amt | Invoice Nbr | 
| 0057 | 6071.11 | STEEL SUPERSTRUCTURE |  |  | 
|  |  | S.P. Initial Payment | 157,980.00 | 13-S-01 | 
|  |  | STEEL SUPERSTURCTURE |  |  | 
| 0058 | 6080.00 | STRUCTURAL STEEL FOR SUBSTRUCTURE |  |  | 
|  |  | S.P. Initial Payment | 9,000.00 | 13-S-01 | 
|  |  | STRUCTURAL STEEL FOR SUBSTRUCTURE |  |  | 
| 0104 | 6071.11 | STEEL SUPERSTRUCTURE |  |  | 
|  |  | S.P. Initial Payment | 353,500.00 | 14-S-01 | 
|  |  | STEEL SUPERSTRUCTURE |  |  | 
| 0105 | 6080.00 | STRUCTURAL STEEL FOR SUBSTRUCTURE |  |  | 
|  |  | S.P. Initial Payment | 6,450.00 | 14-S-01 | 
|  |  | STRUCTURAL STEEL FOR SUBSTRUCTURE |  |  | 
|  |  | Total for estimate 0005: | 526,930.00 |  | 
| Est Nbr: | 0007 |  |  |  | 
| Item Nbr | Item Cd | Item Desc | Adj Amt | Invoice Nbr | 
| 0058 | 6080.00 | STRUCTURAL STEEL FOR SUBSTRUCTURE |  |  | 
|  |  | S.P. Adjustment | -9,000.00 | 13-S-01 | 
|  |  | STRUCTURAL STEEL FOR SUBSTRUCTURE |  |  | 
| 0099 | 6005.78 | EXPANSION BEARING, TFE TYPE |  |  | 
|  |  | S.P. Initial Payment | 10,200.00 | E20011 | 
|  |  | Expansion Bearing TFE Type |  |  | 
|  |  | Total for estimate 0007: | 1,200.00 |  | 
| Est Nbr: | 0008 |  |  |  | 
| Item Nbr | Item Cd | Item Desc | Adj Amt | Invoice Nbr | 
| 0057 | 6071.11 | STEEL SUPERSTRUCTURE |  |  | 
|  |  | S.P. Adjustment | -157,980.00 | 13-S-01 | 
|  |  | STEEL SUPERSTURCTURE |  |  | 
| 0104 | 6071.11 | STEEL SUPERSTRUCTURE |  |  | 
|  |  | S.P. Adjustment | -88,375.00 | 14-S-01 | 
|  |  | STEEL SUPERSTRUCTURE |  |  | 
|  |  | Total for estimate 0008: | -246,355.00 |  | 
| Est Nbr: | 0009 |  |  |  | 
| Item Nbr | Item Cd | Item Desc | Adj Amt | Invoice Nbr | 
| 0099 | 6005.78 | EXPANSION BEARING, TFE TYPE |  |  | 
|  |  | S.P. Adjustment | -10,200.00 | E20011 | 
|  |  | Expansion Bearing TFE Type |  |  | 
| 0104 | 6071.11 | STEEL SUPERSTRUCTURE |  |  | 
|  |  | S.P. Adjustment | -265,125.00 | 14-S-01 | 
|  |  | STEEL SUPERSTRUCTURE |  |  | 
|  |  | Total for estimate 0009: | -275,325.00 |  | 
| Est Nbr: | 0012 |  |  |  | 
| Item Nbr | Item Cd | Item Desc | Adj Amt | Invoice Nbr | 
| 0105 | 6080.00 | STRUCTURAL STEEL FOR SUBSTRUCTURE |  |  | 
|  |  | S.P. Adjustment | -6,450.00 | 14-S-01 | 
|  |  | STRUCTURAL STEEL FOR SUBSTRUCTURE |  |  | 
|  |  | Total for estimate 0012: | -6,450.00 |  | 
|  |  | Total remaining for contract: | 0.00 |  | 
|---|
|  |  |  | 1. Contracted | 
|---|
|  |  |  | 2. Current | 
|---|
|  |  |  | 3. To date | 
|---|
| Item Nbr            Item Code | Unit Price |  | 4. This Est | 
|---|
| Item Description | Units | Qty | Amount | 
|---|
| GROUP 1 GRADING |  |  |  | 
| 0001                                       L020.01 | 7.30 | 192.000 | 1,401.60 | 
| EROSION CONTROL, TYPE A | m2 | 192.000 | 1,401.60 | 
|  |  | 192.000 | 1,401.60 | 
|  |  | 0.000 | 0.00 | 
| 
 |  |  |  | 
| 0002                                       L020.07 | 3.50 | 3,441.000 | 12,043.50 | 
| EROSION CONTROL, TYPE B-1 | m2 | 3,441.000 | 12,043.50 | 
|  |  | 3,441.000 | 12,043.50 | 
|  |  | 0.000 | 0.00 | 
| 
 |  |  |  | 
| 0003                                       L022.25 | 11.20 | 1,434.000 | 16,060.80 | 
| FABRIC SILT FENCE, TYPE COIR FIBER | m | 1,434.000 | 16,060.80 | 
|  |  | 1,300.000 | 14,560.00 | 
|  |  | 0.000 | 0.00 | 
| 
 |  |  |  | 
| 0004                                       P402.15 | 100.00 | 77.000 | 7,700.00 | 
| 375 mm CULVERT PIPE, TYPE 3,4,5 OR 6 | m | 77.000 | 7,700.00 | 
|  |  | 77.000 | 7,700.00 | 
|  |  | 0.000 | 0.00 | 
| 
 |  |  |  | 
| 0005                                       0030.10 | 23,000.00 | 1.000 | 23,000.00 | 
| MOBILIZATION | LS | 1.000 | 23,000.00 | 
|  |  | 1.000 | 23,000.00 | 
|  |  | 0.000 | 0.00 | 
| 
 |  |  |  | 
| 0006                                       1009.00 | 1,000.00 | 1.000 | 1,000.00 | 
| GENERAL CLEARING AND GRUBBING | LS | 1.000 | 1,000.00 | 
|  |  | 1.000 | 1,000.00 | 
|  |  | 0.000 | 0.00 | 
| 
 |  |  |  | 
| 0007                                       1011.00 | 1.79 | 745.000 | 1,333.55 | 
| WATER | kL | 745.000 | 1,333.55 | 
|  |  | 0.000 | 0.00 | 
|  |  | 0.000 | 0.00 | 
| 
 |  |  |  | 
| 0008                                       1012.00 | 74.00 | 10.000 | 740.00 | 
| RIGHT-OF-WAY MARKERS | EACH | 10.000 | 740.00 | 
|  |  | 13.000 | 962.00 | 
|  |  | 0.000 | 0.00 | 
| 
 |  |  |  | 
| 0009                                       1030.00 | 4.80 | 18,416.000 | 88,396.80 | 
| EARTHWORK MEASURED IN EMBANKMENT | m3 | 18,416.000 | 88,396.80 | 
|  |  | 18,416.000 | 88,396.80 | 
|  |  | 0.000 | 0.00 | 
| 
 |  |  |  | 
| 0010                                       1040.00 | 0.47 | 21,240.000 | 9,982.80 | 
| SLOPE PROTECTION | m2 | 21,240.000 | 9,982.80 | 
|  |  | 26,510.100 | 12,459.75 | 
|  |  | 0.000 | 0.00 | 
| 
 |  |  |  | 
| 0011                                       1040.06 | 80.00 | 24.000 | 1,920.00 | 
| SLOPE PROTECTION MULCH | Mg | 24.000 | 1,920.00 | 
|  |  | 26.816 | 2,145.28 | 
|  |  | 0.000 | 0.00 | 
| 
 |  |  |  | 
| 0012                                       1102.00 | 2.86 | 2,867.000 | 8,199.62 | 
| REMOVE ASPHALT SURFACE | m2 | 2,867.000 | 8,199.62 | 
|  |  | 2,867.000 | 8,199.62 | 
|  |  | 0.000 | 0.00 | 
| 
 |  |  |  | 
| 0013                                       1109.00 | 5.00 | 84.000 | 420.00 | 
| REMOVE CURB | m | 84.000 | 420.00 | 
|  |  | 84.000 | 420.00 | 
|  |  | 0.000 | 0.00 | 
| 
 |  |  |  | 
| 0014                                       1120.00 | 400.00 | 7.000 | 2,800.00 | 
| REMOVE DISCHARGE STRUCTURE | EACH | 7.000 | 2,800.00 | 
|  |  | 7.000 | 2,800.00 | 
|  |  | 0.000 | 0.00 | 
| 
 |  |  |  | 
| 0015                                       3075.11 | 34.50 | 575.000 | 19,837.50 | 
| 155 mm CONCRETE PAVEMENT, CLASS 47B-25 | m2 | 575.000 | 19,837.50 | 
|  |  | 575.000 | 19,837.50 | 
|  |  | 0.000 | 0.00 | 
| 
 |  |  |  | 
| 0016                                       3075.45 | 48.65 | 2,047.000 | 99,586.55 | 
| 230 mm DOWELED CONCRETE PAVEMENT, CLASS 47B-25 | m2 | 2,047.000 | 99,586.55 | 
|  |  | 2,120.600 | 103,167.19 | 
|  |  | 0.000 | 0.00 | 
| 
 |  |  |  | 
| 0017                                       4024.73 | 2,500.00 | 4.000 | 10,000.00 | 
| CONCRETE FLUME, TYPE IV | EACH | 4.000 | 10,000.00 | 
|  |  | 4.000 | 10,000.00 | 
|  |  | 0.000 | 0.00 | 
| 
 |  |  |  | 
| 0018                                       7017.00 | 7.20 | 1,181.000 | 8,503.20 | 
| REMOVE GUARDRAIL | m | 1,181.000 | 8,503.20 | 
|  |  | 1,181.000 | 8,503.20 | 
|  |  | 0.000 | 0.00 | 
| 
 |  |  |  | 
| 0019                                       8029.84 | 2.10 | 2,835.000 | 5,953.50 | 
| BITUMINOUS FOUNDATION COURSE 100 mm | m2 | 2,835.000 | 5,953.50 | 
|  |  | 2,835.000 | 5,953.50 | 
|  |  | 0.000 | 0.00 | 
| 
 |  |  |  | 
| 0020                                       9110.01 | 60.00 | 40.000 | 2,400.00 | 
| RENTAL OF LOADER, FULLY OPERATED | HOUR | 40.000 | 2,400.00 | 
|  |  | 0.000 | 0.00 | 
|  |  | 0.000 | 0.00 | 
| 
 |  |  |  | 
| 0021                                       9110.03 | 50.00 | 40.000 | 2,000.00 | 
| RENTAL OF DUMP TRUCK, FULLY OPERATED | HOUR | 40.000 | 2,000.00 | 
|  |  | 0.000 | 0.00 | 
|  |  | 0.000 | 0.00 | 
| 
 |  |  |  | 
| 0022                                       9110.07 | 45.00 | 40.000 | 1,800.00 | 
| RENTAL OF SKID LOADER, FULLY OPERATED | HOUR | 40.000 | 1,800.00 | 
|  |  | 0.000 | 0.00 | 
|  |  | 0.000 | 0.00 | 
| 
 |  |  |  | 
| 0023                                       9170.00 | 180.00 | 5.484 | 987.12 | 
| EARTH SHOULDER CONSTRUCTION | StaM | 5.484 | 987.12 | 
|  |  | 5.484 | 987.12 | 
|  |  | 5.484 | 987.12 | 
| 
 |  |  |  | 
| 0024                                       9173.20 | 2.30 | 2,835.000 | 6,520.50 | 
| SUBGRADE PREPARATION | m2 | 2,835.000 | 6,520.50 | 
|  |  | 2,835.000 | 6,520.50 | 
|  |  | 0.000 | 0.00 | 
| 
 |  |  |  | 
| 0025                                       9188.50 | 15.00 | 205.000 | 3,075.00 | 
| SURFACING UNDER GUARDRAIL | m2 | 205.000 | 3,075.00 | 
|  |  | 205.000 | 3,075.00 | 
|  |  | 0.000 | 0.00 | 
| 
 |  |  |  | 
| GROUP 1 GRADING |  | Contracted | 335,662.04 | 
|  |  | Current | 335,662.04 | 
|  |  | In place | 333,132.56 | 
|  |  | This Estimate | 987.12 | 
| 
 |  |  |  | 
| GROUP 6A BRIDGE AT STA. 102+51.50 |  |  |  | 
| 0046                                       0030.60 | 10,000.00 | 1.000 | 10,000.00 | 
| MOBILIZATION | LS | 1.000 | 10,000.00 | 
|  |  | 1.000 | 10,000.00 | 
|  |  | 0.000 | 0.00 | 
| 
 |  |  |  | 
| 0047                                       1010.01 | 15.00 | 341.000 | 5,115.00 | 
| EXCAVATION (ESTABLISHED QUANTITY) | m3 | 341.000 | 5,115.00 | 
|  |  | 341.000 | 5,115.00 | 
|  |  | 0.000 | 0.00 | 
| 
 |  |  |  | 
| 0048                                       1043.50 | 3.00 | 2,400.000 | 7,200.00 | 
| RIPRAP FILTER FABRIC | m2 | 2,400.000 | 7,200.00 | 
|  |  | 2,400.000 | 7,200.00 | 
|  |  | 0.000 | 0.00 | 
| 
 |  |  |  | 
| 0049                                       3050.15 | 275.00 | 115.600 | 31,790.00 | 
| CONCRETE FOR PAVEMENT APPROACHES CLASS 47BD-30 | m3 | 115.600 | 31,790.00 | 
|  |  | 115.600 | 31,790.00 | 
|  |  | 0.000 | 0.00 | 
| 
 |  |  |  | 
| 0050                                       3051.10 | 1.25 | 7,647.000 | 9,558.75 | 
| EPOXY COATED REINFORCING STEEL FOR PAVEMENT APPROACHES | kg | 7,647.000 | 9,558.75 | 
|  |  | 7,647.000 | 9,558.75 | 
|  |  | 0.000 | 0.00 | 
| 
 |  |  |  | 
| 0051                                       6000.10 | 6,000.00 | 1.000 | 6,000.00 | 
| ABUTMENT NO.1 EXCAVATION | LS | 1.000 | 6,000.00 | 
|  |  | 1.000 | 6,000.00 | 
|  |  | 0.000 | 0.00 | 
| 
 |  |  |  | 
| 0052                                       6000.11 | 6,000.00 | 1.000 | 6,000.00 | 
| ABUTMENT NO.2 EXCAVATION | LS | 1.000 | 6,000.00 | 
|  |  | 1.000 | 6,000.00 | 
|  |  | 0.000 | 0.00 | 
| 
 |  |  |  | 
| 0053                                       6005.60 | 600.00 | 8.000 | 4,800.00 | 
| ELASTOMERIC BEARING | EACH | 8.000 | 4,800.00 | 
|  |  | 8.000 | 4,800.00 | 
|  |  | 0.000 | 0.00 | 
| 
 |  |  |  | 
| 0054                                       6010.22 | 375.00 | 114.000 | 42,750.00 | 
| CLASS 47B-20 CONCRETE FOR BRIDGE | m3 | 114.000 | 42,750.00 | 
|  |  | 114.000 | 42,750.01 | 
|  |  | 0.000 | 0.00 | 
| 
 |  |  |  | 
| 0055                                       6010.26 | 385.00 | 194.000 | 74,690.00 | 
| CLASS 47BD-30 CONCRETE FOR BRIDGE | m3 | 194.000 | 74,690.00 | 
|  |  | 194.000 | 74,690.00 | 
|  |  | 0.000 | 0.00 | 
| 
 |  |  |  | 
| 0056                                       6040.00 | 35,000.00 | 1.000 | 35,000.00 | 
| REMOVE STRUCTURE | EACH | 1.000 | 35,000.00 | 
| AT STA. 102+46.5 |  | 1.000 | 35,000.00 | 
|  |  | 0.000 | 0.00 | 
| 
 |  |  |  | 
| 0057                                       6071.11 | 185,000.00 | 1.000 | 185,000.00 | 
| STEEL SUPERSTRUCTURE | LS | 1.000 | 185,000.00 | 
| AT STA. 102+51.5 |  | 1.000 | 185,000.00 | 
|  |  | 0.000 | 0.00 | 
| 
 |  |  |  | 
| 0058                                       6080.00 | 4.00 | 3,305.000 | 13,220.00 | 
| STRUCTURAL STEEL FOR SUBSTRUCTURE | kg | 3,305.000 | 13,220.00 | 
|  |  | 3,305.000 | 13,220.00 | 
|  |  | 0.000 | 0.00 | 
| 
 |  |  |  | 
| 0059                                       6104.00 | 28.00 | 1,920.500 | 53,774.00 | 
| BROKEN CONCRETE RIPRAP | Mg | 1,920.500 | 53,774.00 | 
|  |  | 1,920.500 | 53,774.01 | 
|  |  | 581.687 | 16,287.24 | 
| 
 |  |  |  | 
| 0060                                       6131.50 | 1.25 | 20,004.000 | 25,005.00 | 
| EPOXY COATED REINFORCING STEEL | kg | 20,004.000 | 25,005.00 | 
|  |  | 20,004.000 | 25,005.00 | 
|  |  | 0.000 | 0.00 | 
| 
 |  |  |  | 
| 0061                                       6139.50 | 35.00 | 55.500 | 1,942.50 | 
| SUBSURFACE DRAINAGE MATTING | m2 | 55.500 | 1,942.50 | 
|  |  | 55.500 | 1,942.50 | 
|  |  | 0.000 | 0.00 | 
| 
 |  |  |  | 
| 0062                                       6210.50 | 100.00 | 524.000 | 52,400.00 | 
| PIPE PILING | m | 524.000 | 52,400.00 | 
|  |  | 459.360 | 45,936.00 | 
|  |  | 0.000 | 0.00 | 
| 
 |  |  |  | 
| 0063                                       6310.00 | 125.00 | 257.900 | 32,237.50 | 
| STEEL SHEET PILING | m2 | 257.900 | 32,237.50 | 
|  |  | 257.900 | 32,237.50 | 
|  |  | 0.000 | 0.00 | 
| 
 |  |  |  | 
| 0064                                       8091.00 | 35.00 | 215.000 | 7,525.00 | 
| GRANULAR BACKFILL | m3 | 215.000 | 7,525.00 | 
|  |  | 215.000 | 7,525.00 | 
|  |  | 0.000 | 0.00 | 
| 
 |  |  |  | 
| 4001                                       6210.60 | 60.00 | 0.000 | 0.00 | 
| PAY CUT-OFF FOR PIPE PILE | m | 25.000 | 1,500.00 | 
| PILE CUTOFF FOR PIPE PILING |  | 64.640 | 3,878.40 | 
|  |  | 0.000 | 0.00 | 
| 
 |  |  |  | 
| 4002                                       6020.06 | 579.93 | 0.000 | 0.00 | 
| REINFORCING STEEL FOR BRIDGES | LS | 1.000 | 579.93 | 
| Invoice #464358 Perrett Const. |  | 0.000 | 0.00 | 
|  |  | 0.000 | 0.00 | 
| 
 |  |  |  | 
| GROUP 6A BRIDGE AT STA. 102+51.50 |  | Contracted | 604,007.75 | 
|  |  | Current | 606,087.68 | 
|  |  | In place | 601,422.17 | 
|  |  | This Estimate | 16,287.24 | 
| 
 |  |  |  | 
| GROUP 6C BRIDGE AT STA. 12+64.0 |  |  |  | 
| 0089                                       0030.60 | 85,000.00 | 1.000 | 85,000.00 | 
| MOBILIZATION | LS | 1.000 | 85,000.00 | 
|  |  | 1.000 | 85,000.00 | 
|  |  | 0.000 | 0.00 | 
| 
 |  |  |  | 
| 0090                                       1010.01 | 5.00 | 1,050.000 | 5,250.00 | 
| EXCAVATION (ESTABLISHED QUANTITY) | m3 | 1,050.000 | 5,250.00 | 
|  |  | 1,050.000 | 5,250.00 | 
|  |  | 0.000 | 0.00 | 
| 
 |  |  |  | 
| 0091                                       1043.50 | 2.00 | 656.000 | 1,312.00 | 
| RIPRAP FILTER FABRIC | m2 | 656.000 | 1,312.00 | 
|  |  | 656.000 | 1,312.00 | 
|  |  | 0.000 | 0.00 | 
| 
 |  |  |  | 
| 0092                                       3050.15 | 325.00 | 116.000 | 37,700.00 | 
| CONCRETE FOR PAVEMENT APPROACHES CLASS 47BD-30 | m3 | 116.000 | 37,700.00 | 
|  |  | 116.000 | 37,700.00 | 
|  |  | 0.000 | 0.00 | 
| 
 |  |  |  | 
| 0093                                       3051.10 | 1.10 | 7,605.000 | 8,365.50 | 
| EPOXY COATED REINFORCING STEEL FOR PAVEMENT APPROACHES | kg | 7,605.000 | 8,365.50 | 
|  |  | 7,605.000 | 8,365.50 | 
|  |  | 0.000 | 0.00 | 
| 
 |  |  |  | 
| 0094                                       6000.10 | 10,000.00 | 1.000 | 10,000.00 | 
| ABUTMENT NO.1 EXCAVATION | LS | 1.000 | 10,000.00 | 
|  |  | 1.000 | 10,000.00 | 
|  |  | 0.000 | 0.00 | 
| 
 |  |  |  | 
| 0095                                       6000.11 | 10,000.00 | 1.000 | 10,000.00 | 
| ABUTMENT NO.2 EXCAVATION | LS | 1.000 | 10,000.00 | 
|  |  | 1.000 | 10,000.00 | 
|  |  | 0.000 | 0.00 | 
| 
 |  |  |  | 
| 0096                                       6000.60 | 35,000.00 | 1.000 | 35,000.00 | 
| PIER NO.1 EXCAVATION | LS | 1.000 | 35,000.00 | 
|  |  | 1.000 | 35,000.00 | 
|  |  | 0.000 | 0.00 | 
| 
 |  |  |  | 
| 0097                                       6000.61 | 35,000.00 | 1.000 | 35,000.00 | 
| PIER NO.2 EXCAVATION | LS | 1.000 | 35,000.00 | 
|  |  | 1.000 | 35,000.00 | 
|  |  | 0.000 | 0.00 | 
| 
 |  |  |  | 
| 0098                                       6005.35 | 150.00 | 23.000 | 3,450.00 | 
| PRECOMPRESSED POLYURETHANE FOAM JOINT | m | 23.000 | 3,450.00 | 
|  |  | 23.000 | 3,450.00 | 
|  |  | 0.000 | 0.00 | 
| 
 |  |  |  | 
| 0099                                       6005.78 | 850.00 | 12.000 | 10,200.00 | 
| EXPANSION BEARING, TFE TYPE | EACH | 12.000 | 10,200.00 | 
|  |  | 12.000 | 10,200.00 | 
|  |  | 0.000 | 0.00 | 
| 
 |  |  |  | 
| 0100                                       6005.83 | 950.00 | 4.000 | 3,800.00 | 
| FIXED BEARING | EACH | 4.000 | 3,800.00 | 
|  |  | 4.000 | 3,800.00 | 
|  |  | 0.000 | 0.00 | 
| 
 |  |  |  | 
| 0101                                       6010.22 | 385.00 | 233.400 | 89,859.00 | 
| CLASS 47B-20 CONCRETE FOR BRIDGE | m3 | 233.400 | 89,859.00 | 
|  |  | 233.400 | 89,859.00 | 
|  |  | 0.000 | 0.00 | 
| 
 |  |  |  | 
| 0102                                       6010.26 | 395.00 | 379.600 | 149,942.00 | 
| CLASS 47BD-30 CONCRETE FOR BRIDGE | m3 | 379.600 | 149,942.00 | 
|  |  | 379.600 | 149,942.00 | 
|  |  | 0.000 | 0.00 | 
| 
 |  |  |  | 
| 0103                                       6040.00 | 96,375.00 | 1.000 | 96,375.00 | 
| REMOVE STRUCTURE | EACH | 1.000 | 96,375.00 | 
| AT STA. 12+56.4 |  | 1.000 | 96,375.00 | 
|  |  | 0.000 | 0.00 | 
| 
 |  |  |  | 
| 0104                                       6071.11 | 400,000.00 | 1.000 | 400,000.00 | 
| STEEL SUPERSTRUCTURE | LS | 1.000 | 400,000.00 | 
| AT STA. 12+64.0 |  | 1.000 | 400,000.00 | 
|  |  | 0.000 | 0.00 | 
| 
 |  |  |  | 
| 0105                                       6080.00 | 6.00 | 1,365.000 | 8,190.00 | 
| STRUCTURAL STEEL FOR SUBSTRUCTURE | kg | 1,365.000 | 8,190.00 | 
|  |  | 1,365.000 | 8,190.00 | 
|  |  | 0.000 | 0.00 | 
| 
 |  |  |  | 
| 0106                                       6104.00 | 17.00 | 556.000 | 9,452.00 | 
| BROKEN CONCRETE RIPRAP | Mg | 556.000 | 9,452.00 | 
|  |  | 139.000 | 2,363.00 | 
|  |  | 0.000 | 0.00 | 
| 
 |  |  |  | 
| 0107                                       6105.02 | 35.00 | 384.000 | 13,440.00 | 
| ROCK RIPRAP, TYPE B | Mg | 384.000 | 13,440.00 | 
|  |  | 0.000 | 0.00 | 
|  |  | 0.000 | 0.00 | 
| 
 |  |  |  | 
| 0108                                       6131.50 | 1.15 | 57,580.000 | 66,217.00 | 
| EPOXY COATED REINFORCING STEEL | kg | 57,580.000 | 66,217.00 | 
|  |  | 57,580.000 | 66,217.01 | 
|  |  | 0.000 | 0.00 | 
| 
 |  |  |  | 
| 0109                                       6139.50 | 40.00 | 48.000 | 1,920.00 | 
| SUBSURFACE DRAINAGE MATTING | m2 | 48.000 | 1,920.00 | 
|  |  | 48.000 | 1,920.00 | 
|  |  | 0.000 | 0.00 | 
| 
 |  |  |  | 
| 0110                                       6210.12 | 65.00 | 1,325.500 | 86,157.50 | 
| HP 250 mm X 62 kg STEEL PILING | m | 1,325.500 | 86,157.50 | 
|  |  | 1,262.690 | 82,074.85 | 
|  |  | 0.000 | 0.00 | 
| 
 |  |  |  | 
| 0111                                       6310.00 | 105.00 | 186.800 | 19,614.00 | 
| STEEL SHEET PILING | m2 | 186.800 | 19,614.00 | 
|  |  | 186.800 | 19,614.00 | 
|  |  | 0.000 | 0.00 | 
| 
 |  |  |  | 
| 0112                                       8091.00 | 50.00 | 185.000 | 9,250.00 | 
| GRANULAR BACKFILL | m3 | 185.000 | 9,250.00 | 
|  |  | 185.000 | 9,250.00 | 
|  |  | 0.000 | 0.00 | 
| 
 |  |  |  | 
| 4000                                       6210.59 | 39.00 | 0.000 | 0.00 | 
| PILE CUT-OFF | m | 21.000 | 819.00 | 
| PILE CUTOFF FOR HP250 X 62 GROUP 6C |  | 62.880 | 2,452.32 | 
|  |  | 0.000 | 0.00 | 
| 
 |  |  |  | 
| GROUP 6C BRIDGE AT STA. 12+64.0 |  | Contracted | 1,195,494.00 | 
|  |  | Current | 1,196,313.00 | 
|  |  | In place | 1,173,334.68 | 
|  |  | This Estimate | 0.00 | 
| 
 |  |  |  | 
| GROUP 7 GUARDRAIL |  |  |  | 
| 0113                                       0030.70 | 1,200.00 | 1.000 | 1,200.00 | 
| MOBILIZATION | LS | 1.000 | 1,200.00 | 
|  |  | 1.000 | 1,200.00 | 
|  |  | 0.000 | 0.00 | 
| 
 |  |  |  | 
| 0114                                       7011.20 | 44.41 | 152.360 | 6,766.31 | 
| W-BEAM GUARDRAIL | m | 152.360 | 6,766.31 | 
|  |  | 152.360 | 6,766.31 | 
|  |  | 0.000 | 0.00 | 
| 
 |  |  |  | 
| 0115                                       7020.00 | 1,081.00 | 8.000 | 8,648.00 | 
| BRIDGE APPROACH SECTIONS | EACH | 8.000 | 8,648.00 | 
|  |  | 8.000 | 8,648.00 | 
|  |  | 0.000 | 0.00 | 
| 
 |  |  |  | 
| 0116                                       7021.70 | 1,601.00 | 4.000 | 6,404.00 | 
| GUARDRAIL END TREATMENT, SRT-350 | EACH | 4.000 | 6,404.00 | 
|  |  | 4.000 | 6,404.00 | 
|  |  | 0.000 | 0.00 | 
| 
 |  |  |  | 
| 0117                                       7024.25 | 1,945.00 | 4.000 | 7,780.00 | 
| GUARDRAIL END TREATMENT, TYPE 1 | EACH | 4.000 | 7,780.00 | 
|  |  | 4.000 | 7,780.00 | 
|  |  | 0.000 | 0.00 | 
| 
 |  |  |  | 
| GROUP 7 GUARDRAIL |  | Contracted | 30,798.31 | 
|  |  | Current | 30,798.31 | 
|  |  | In place | 30,798.31 | 
|  |  | This Estimate | 0.00 | 
| 
 |  |  |  | 
| GROUP 10 GENERAL ITEMS |  |  |  | 
| 0118                                       0001.08 | 0.50 | 210.000 | 105.00 | 
| BARRICADE, TYPE II | BDAY | 210.000 | 105.00 | 
|  |  | 0.000 | 0.00 | 
|  |  | 0.000 | 0.00 | 
| 
 |  |  |  | 
| 0119                                       0001.10 | 2.00 | 3,986.000 | 7,972.00 | 
| BARRICADE, TYPE III | BDAY | 3,986.000 | 7,972.00 | 
|  |  | 4,393.000 | 8,786.00 | 
|  |  | 54.000 | 108.00 | 
| 
 |  |  |  | 
| 0120                                       0001.30 | 2.25 | 474.000 | 1,066.50 | 
| TYPE B HIGH INTENSITY WARNING LIGHT | LDAY | 474.000 | 1,066.50 | 
|  |  | 935.000 | 2,103.75 | 
|  |  | 36.000 | 81.00 | 
| 
 |  |  |  | 
| 0121                                       0001.90 | 0.50 | 7,072.000 | 3,536.00 | 
| SIGN DAY | EACH | 7,072.000 | 3,536.00 | 
|  |  | 4,180.000 | 2,090.00 | 
|  |  | 90.000 | 45.00 | 
| 
 |  |  |  | 
| 0122                                       0003.10 | 150.00 | 42.000 | 6,300.00 | 
| FLAGGING | DAY | 42.000 | 6,300.00 | 
|  |  | 4.000 | 600.00 | 
|  |  | 4.000 | 600.00 | 
| 
 |  |  |  | 
| 0123                                       0010.04 | 3,500.00 | 1.000 | 3,500.00 | 
| FIELD OFFICE | EACH | 1.000 | 3,500.00 | 
|  |  | 1.000 | 3,500.00 | 
|  |  | 0.000 | 0.00 | 
| 
 |  |  |  | 
| 0124                                       0020.00 | 0.80 | 1,000.000 | 800.00 | 
| TRAINING | HOUR | 1,000.000 | 800.00 | 
|  |  | 573.000 | 458.40 | 
|  |  | 573.000 | 458.40 | 
| 
 |  |  |  | 
| 0125                                       0030.10 | 15,000.00 | 1.000 | 15,000.00 | 
| MOBILIZATION | LS | 1.000 | 15,000.00 | 
|  |  | 1.000 | 15,000.00 | 
|  |  | 0.000 | 0.00 | 
| 
 |  |  |  | 
| GROUP 10 GENERAL ITEMS |  | Contracted | 38,279.50 | 
|  |  | Current | 38,279.50 | 
|  |  | In place | 32,538.15 | 
|  |  | This Estimate | 1,292.40 | 
| 
 |  |  |  | 
| Totals for contract |  | Contracted | 2,204,241.60 | 
|---|
|  |  | Current | 2,207,140.53 | 
|---|
|  |  | In place | 2,171,225.87 | 
|---|
|  |  | This Estimate | 18,566.76 | 
|---|