Nebraska Department of Roads
Estimate Summary to Contractor
Vendor ID:1730 WILKE CONTRACTING CORPORATION
Contract ID:7984
Estimate Number:0002
Pay Period End Date:09.13.2003
Contract Location:
CURTIS WEST & EUSTIS EASTEstimate Type:PROG
Contractor:
WILKE CONTRACTING CORPORATIONDate Let:05.22.2003
27705 115TH RDDate Awarded:05.29.2003
PO BOX 1205Date Contract Executed:06.06.2003
Date Notice to Proceed:06.06.2003
KEARNEY NE 68848Date Work Began:08.11.2003
Phone:Date Physical Work Completed:
(308)236-9014Date Accepted:
Escrow Agent:
Surety Co:
AMERICAN CASUALTY COMPANY OF READING, PENNSYLVANIA
Counties
FRONTIER
GOSPER
Project Number PCT Fed State Project Number Description
70984 000  0.000 STPP-23-2(122)  GRAD BR GDRL
Total to DatePrev to DateThis Estimate
Current Contract AmtTotal Earnings$71,822.00$26,251.70$45,570.30
$184,046.60Stockpiled Materials$.00$.00$.00
Original Contract AmtGross Earnings$71,822.00$26,251.70$45,570.30
$184,046.60Retainage$-718.22$-262.52$-455.70
Escrow Amount$.00$.00$.00
Percent CompleteSecurities Encumbered$.00$.00$.00
39.02%Net Earnings$71,103.78$25,989.18$45,114.60
Liquidated Damages$.00$.00$.00
Incentives$.00$.00$.00
Disincentives$.00$.00$.00
Other Contract Adj$.00$.00$.00
Appl of Training Adj$.00$.00$.00
Training Rates Adj$.00$.00$.00
Fuel Adj$.00$.00$.00
Bituminous Adj$.00$.00$.00
Autopay Adj$.00$.00$.00
Gasoline Adj$.00$.00$.00
Other Adj$.00$.00$.00
Price Adj$.00$.00$.00
Substandard Item Adj$.00$.00$.00
Asphalt Adj$.00$.00$.00
Diesel Fuel Adj$.00$.00$.00
Petrol Adj$.00$.00$.00
Total for Adjustments$.00$.00$.00
Payment$71,103.78$25,989.18$45,114.60
Project ManagerDiv. Head/Dist. Eng.
Collins, Duane09.15.2003Knott, James09.18.2003
Constr. Estimate Eng.Materials Eng.
Bartos, Steve09.19.2003
Controller Div. Processed
Burling, Laurie09.19.2003
Detailed breakdown of stockpiled materials
Total remaining for contract:0.00
1. Contracted
2. Current
3. To date
Item Nbr        Item CodeUnit Price4. This Est
Item DescriptionUnitsQtyAmount
GROUP 1 GRADING
0001                          0030.10 5,600.001.0005,600.00
MOBILIZATION LS 1.0005,600.00
0.5002,800.00
0.5002,800.00

0002                          1000.00 125.002.000250.00
LARGE TREE REMOVAL EACH2.000250.00
2.000250.00
2.000250.00

0003                          1009.00 2,000.001.0002,000.00
GENERAL CLEARING AND GRUBBING LS 1.0002,000.00
0.5001,000.00
0.5001,000.00

0004                          1011.00 6.0054.000324.00
WATER MGAL54.000324.00
0.0000.00
0.0000.00

0005                          1030.00 5.852,382.00013,934.70
EARTHWORK MEASURED IN EMBANKMENT CY 2,382.00013,934.70
0.0000.00
0.0000.00

0006                          7017.00 1.501,119.0001,678.50
REMOVE GUARDRAIL LF 1,119.0001,678.50
663.000994.50
663.000994.50

0007                          9110.01 50.005.000250.00
RENTAL OF LOADER, FULLY OPERATED HOUR5.000250.00
0.0000.00
0.0000.00

0008                          9110.03 50.005.000250.00
RENTAL OF DUMP TRUCK, FULLY OPERATED HOUR5.000250.00
0.0000.00
0.0000.00

0009                          9110.06 50.005.000250.00
RENTAL OF BACKHOE, FULLY OPERATED HOUR5.000250.00
0.0000.00
0.0000.00

0010                          9110.07 40.005.000200.00
RENTAL OF SKID LOADER, FULLY OPERATED HOUR5.000200.00
0.0000.00
0.0000.00

0011                          9188.50 42.00389.00016,338.00
SURFACING UNDER GUARDRAIL SY 389.00016,338.00
0.0000.00
0.0000.00

0012                          L020.00 2.002,950.0005,900.00
EROSION CONTROL SY 2,950.0005,900.00
0.0000.00
0.0000.00

0013                          L022.11 4.00155.000620.00
FABRIC SILT FENCE-LOW POROSITY LF 155.000620.00
0.0000.00
0.0000.00

GROUP 1 GRADINGContracted47,595.20
Current47,595.20
In place5,044.50
This Estimate5,044.50

GROUP 6 BRIDGE AT STA. 249+14.58
0014                          0030.60 1,500.001.0001,500.00
MOBILIZATION LS 1.0001,500.00
1.0001,500.00
0.0000.00

0015                          6010.26 480.0048.50023,280.00
CLASS 47BD-4000 CONCRETE FOR BRIDGE CY 48.50023,280.00
48.50023,280.00
48.50023,280.00

0016                          6020.00 0.725,590.0004,024.80
REINFORCING STEEL FOR BRIDGE LB 5,590.0004,024.80
5,590.0004,024.80
5,590.0004,024.80

0017                          6030.00 8,500.001.0008,500.00
PREPARATION OF BRIDGE EACH1.0008,500.00
AT STA. 249+14.58 1.0008,500.00
0.5004,250.00

GROUP 6 BRIDGE AT STA. 249+14.58Contracted37,304.80
Current37,304.80
In place37,304.80
This Estimate31,554.80

GROUP 6A BRIDGE AT STA. 287+78.64
0018                          0030.60 1,500.001.0001,500.00
MOBILIZATION LS 1.0001,500.00
0.0000.00
0.0000.00

0019                          6010.26 480.0029.80014,304.00
CLASS 47BD-4000 CONCRETE FOR BRIDGE CY 29.80014,304.00
0.0000.00
0.0000.00

0020                          6020.00 0.723,180.0002,289.60
REINFORCING STEEL FOR BRIDGE LB 3,180.0002,289.60
0.0000.00
0.0000.00

0021                          6030.01 6,200.001.0006,200.00
PREPARATION OF BRIDGE EACH1.0006,200.00
AT STA. 287+78.64 0.0000.00
0.0000.00

GROUP 6A BRIDGE AT STA. 287+78.64Contracted24,293.60
Current24,293.60
In place0.00
This Estimate0.00

GROUP 7 GUARDRAIL
0022                          0030.70 3,200.001.0003,200.00
MOBILIZATION LS 1.0003,200.00
0.0000.00
0.0000.00

0023                          7011.20 14.32337.5004,833.00
W-BEAM GUARDRAIL LF 337.5004,833.00
0.0000.00
0.0000.00

0024                          7020.00 1,700.008.00013,600.00
BRIDGE APPROACH SECTIONS EACH8.00013,600.00
0.0000.00
0.0000.00

0025                          7024.27 1,500.008.00012,000.00
GUARDRAIL END TREATMENT, TYPE II EACH8.00012,000.00
0.0000.00
0.0000.00

GROUP 7 GUARDRAILContracted33,633.00
Current33,633.00
In place0.00
This Estimate0.00

GROUP 10 GENERAL ITEMS
0026                          0001.08 0.501,848.000924.00
BARRICADE, TYPE II BDAY1,848.000924.00
175.00087.50
133.00066.50

0027                          0001.10 2.00726.0001,452.00
BARRICADE, TYPE III BDAY726.0001,452.00
206.000412.00
156.000312.00

0028                          0001.75 2.0080.000160.00
TEMPORARY SIGN DAY EACH80.000160.00
0.0000.00
0.0000.00

0029                          0001.90 1.002,214.0002,214.00
SIGN DAY EACH2,214.0002,214.00
1,083.0001,083.00
797.000797.00

0030                          0002.30 1.001,500.0001,500.00
PAVEMENT MARKING REMOVAL LF 1,500.0001,500.00
1,355.0001,355.00
0.0000.00

0031                          0002.39 1.002,200.0002,200.00
TEMPORARY PAVEMENT MARKING, TYPE II LF 2,200.0002,200.00
2,204.0002,204.00
535.000535.00

0032                          0002.47 0.301,000.000300.00
TEMPORARY PAVEMENT MARKING SURFACE PREPARATION LF 1,000.000300.00
2,204.000661.20
535.000160.50

0033                          0003.10 200.0040.0008,000.00
FLAGGING DAY 40.0008,000.00
0.0000.00
0.0000.00

0034                          0003.51 16.00470.0007,520.00
INSTALL CONCRETE PROTECTION BARRIER LF 470.0007,520.00
470.0007,520.00
0.0000.00

0035                          0003.56 5.00470.0002,350.00
RELOCATE CONCRETE PROTECTION BARRIER LF 470.0002,350.00
470.0002,350.00
470.0002,350.00

0036                          0003.70 200.004.000800.00
TEMPORARY RUMBLE STRIP EACH4.000800.00
4.000800.00
0.0000.00

0037                          0003.75 9,500.001.0009,500.00
TEMPORARY TRAFFIC SIGNAL EACH1.0009,500.00
1.0009,500.00
0.5004,750.00

0038                          0010.04 800.001.000800.00
FIELD OFFICE EACH1.000800.00
0.0000.00
0.0000.00

0039                          0030.00 3,500.001.0003,500.00
MOBILIZATION LS 1.0003,500.00
1.0003,500.00
0.0000.00

GROUP 10 GENERAL ITEMSContracted41,220.00
Current41,220.00
In place29,472.70
This Estimate8,971.00

Totals for contractContracted184,046.60
Current184,046.60
In place71,822.00
This Estimate45,570.30