Return to District Map


Nebraska Department of Roads
Estimate Summary to Contractor
Vendor ID:0462 WEBB CONTRACTOR, INC./L. J.
Contract ID:7813
Estimate Number:0001
Pay Period End Date:09.13.2003
Contract Location:
CULBERTSON SOUTHWESTEstimate Type:PROG
Contractor:
WEBB CONTRACTOR, INC./L. J.Date Let:03.13.2003
918 N 13TH STDate Awarded:04.09.2003
PO BOX 386Date Contract Executed:04.29.2003
Date Notice to Proceed:04.29.2003
GENEVA NE 68361-0386Date Work Began:
Phone:Date Physical Work Completed:
(402)759-4160Date Accepted:
Escrow Agent:
Surety Co:
UNIVERSAL SURETY COMPANY
Counties
HITCHCOCK
Project Number PCT Fed State Project Number Description
70813 000  0.000 BR-1525(5)  BRIDGE
Total to DatePrev to DateThis Estimate
Current Contract AmtTotal Earnings$88,930.80$.00$88,930.80
$336,766.75Stockpiled Materials$.00$.00$.00
Original Contract AmtGross Earnings$88,930.80$.00$88,930.80
$336,766.75Retainage$-889.31$.00$-889.31
Escrow Amount$.00$.00$.00
Percent CompleteSecurities Encumbered$.00$.00$.00
26.41%Net Earnings$88,041.49$.00$88,041.49
Liquidated Damages$.00$.00$.00
Incentives$.00$.00$.00
Disincentives$.00$.00$.00
Other Contract Adj$.00$.00$.00
Appl of Training Adj$.00$.00$.00
Training Rates Adj$.00$.00$.00
Fuel Adj$.00$.00$.00
Bituminous Adj$.00$.00$.00
Autopay Adj$.00$.00$.00
Gasoline Adj$.00$.00$.00
Other Adj$.00$.00$.00
Price Adj$.00$.00$.00
Substandard Item Adj$.00$.00$.00
Asphalt Adj$.00$.00$.00
Diesel Fuel Adj$.00$.00$.00
Petrol Adj$.00$.00$.00
Total for Adjustments$.00$.00$.00
Payment$88,041.49$.00$88,041.49
Project ManagerProject Engineer
Stadler, Lisa09.15.2003Ziebell, Roger09.16.2003
Div. Head/Dist. Eng.Constr. Estimate Eng.
Knott, James09.18.2003Bartos, Steve09.19.2003
Controller Div. Processed
Burling, Laurie09.19.2003
Detailed breakdown of stockpiled materials
Total remaining for contract:0.00
1. Contracted
2. Current
3. To date
Item Nbr        Item CodeUnit Price4. This Est
Item DescriptionUnitsQtyAmount
GROUP 6 BRIDGE AT STA. 6+57
0001                          0001.10 1.501,180.0001,770.00
BARRICADE, TYPE III BDAY1,180.0001,770.00
285.000427.50
285.000427.50

0002                          0001.90 0.751,416.0001,062.00
SIGN DAY EACH1,416.0001,062.00
171.000128.25
171.000128.25

0003                          0001.99 1.00708.000708.00
CONTRACTOR FURNISHED SIGN DAY EACH708.000708.00
76.00076.00
76.00076.00

0004                          0030.60 34,200.001.00034,200.00
MOBILIZATION LS 1.00034,200.00
0.98533,687.00
0.98533,687.00

0005                          1000.00 250.001.000250.00
LARGE TREE REMOVAL EACH1.000250.00
0.0000.00
0.0000.00

0006                          1009.00 1,500.001.0001,500.00
GENERAL CLEARING AND GRUBBING LS 1.0001,500.00
0.500750.00
0.500750.00

0007                          1010.01 5.001,573.0007,865.00
EXCAVATION (ESTABLISHED QUANTITY) m3 1,573.0007,865.00
0.0000.00
0.0000.00

0008                          1011.00 3.00197.000591.00
WATER kL 197.000591.00
0.0000.00
0.0000.00

0009                          6001.50 6,500.001.0006,500.00
BENT NO.1 EXCAVATION LS 1.0006,500.00
1.0006,500.00
1.0006,500.00

0010                          6001.51 6,500.001.0006,500.00
BENT NO.2 EXCAVATION LS 1.0006,500.00
1.0006,500.00
1.0006,500.00

0011                          6010.22 490.49119.95058,834.28
CLASS 47B-20 CONCRETE FOR BRIDGE m3 119.95058,834.28
40.55019,889.37
40.55019,889.37

0012                          6010.26 516.63133.99069,223.25
CLASS 47BD-30 CONCRETE FOR BRIDGE m3 133.99069,223.25
0.0000.00
0.0000.00

0013                          6020.00 1.4323,717.00033,915.31
REINFORCING STEEL FOR BRIDGE kg 23,717.00033,915.31
0.0000.00
0.0000.00

0014                          6040.00 7,500.001.0007,500.00
REMOVE STRUCTURE EACH1.0007,500.00
AT STA. 6+59.5 0.7005,250.00
0.7005,250.00

0015                          6080.00 6.61676.0004,468.36
STRUCTURAL STEEL FOR SUBSTRUCTURE kg 676.0004,468.36
338.0002,234.18
338.0002,234.18

0016                          6105.02 43.00461.00019,823.00
ROCK RIPRAP, TYPE B Mg 461.00019,823.00
0.0000.00
0.0000.00

0017                          6210.12 78.74195.20015,370.05
HP 250 mm X 62 kg STEEL PILING m 195.20015,370.05
0.0000.00
0.0000.00

0018                          6210.14 85.30164.20014,006.26
HP 310 mm X 79 kg STEEL PILING m 164.20014,006.26
158.13013,488.49
158.13013,488.49

0019                          6310.00 129.17322.00041,592.74
STEEL SHEET PILING m2 322.00041,592.74
0.0000.00
0.0000.00

0020                          7020.00 1,250.004.0005,000.00
BRIDGE APPROACH SECTIONS EACH4.0005,000.00
0.0000.00
0.0000.00

0021                          7021.47 1,500.004.0006,000.00
MELT EACH4.0006,000.00
0.0000.00
0.0000.00

0022                          L006.00 175.000.50087.50
COVER CROP SEEDING ha 0.50087.50
0.0000.00
0.0000.00

GROUP 6 BRIDGE AT STA. 6+57Contracted336,766.75
Current336,766.75
In place88,930.79
This Estimate88,930.79

Totals for contractContracted336,766.75
Current336,766.75
In place88,930.79
This Estimate88,930.79