Return to District Map


Nebraska Department of Roads
Estimate Summary to Contractor
Vendor ID:0462 WEBB CONTRACTOR, INC./L. J.
Contract ID:7697
Estimate Number:0001
Pay Period End Date:02.08.2003
Contract Location:
HUNTLEY SOUTHEASTEstimate Type:PROG
Contractor:
WEBB CONTRACTOR, INC./L. J.Date Let:12.19.2002
918 N 13TH STDate Awarded:01.08.2003
PO BOX 386Date Contract Executed:01.24.2003
Date Notice to Proceed:01.24.2003
GENEVA NE 68361-0386Date Work Began:01.27.2003
Phone:Date Physical Work Completed:
(402)759-4160Date Accepted:
Escrow Agent:
Surety Co:
UNIVERSAL SURETY COMPANY
Counties
HARLAN
Project Number PCT Fed State Project Number Description
70697 000  0.000 BRO-7042(8)  BRIDGE
Total to DatePrev to DateThis Estimate
Current Contract AmtTotal Earnings$7,118.42$.00$7,118.42
$383,928.04Stockpiled Materials$.00$.00$.00
Original Contract AmtGross Earnings$7,118.42$.00$7,118.42
$383,928.04Retainage$-71.18$.00$-71.18
Escrow Amount$.00$.00$.00
Percent CompleteSecurities Encumbered$.00$.00$.00
1.85%Net Earnings$7,047.24$.00$7,047.24
Liquidated Damages$.00$.00$.00
Incentives$.00$.00$.00
Disincentives$.00$.00$.00
Other Contract Adj$.00$.00$.00
Appl of Training Adj$.00$.00$.00
Training Rates Adj$.00$.00$.00
Fuel Adj$.00$.00$.00
Bituminous Adj$.00$.00$.00
Autopay Adj$.00$.00$.00
Gasoline Adj$.00$.00$.00
Other Adj$.00$.00$.00
Price Adj$.00$.00$.00
Substandard Item Adj$.00$.00$.00
Asphalt Adj$.00$.00$.00
Diesel Fuel Adj$.00$.00$.00
Petrol Adj$.00$.00$.00
Total for Adjustments$.00$.00$.00
Payment$7,047.24$.00$7,047.24
Project ManagerDiv. Head/Dist. Eng.
Kuhn, Kenton02.10.2003Knott, James02.10.2003
Constr. Estimate Eng.Materials Eng.
Bartos, Steve02.11.2003
Controller Div. Processed
Burling, Laurie02.11.2003
Detailed breakdown of stockpiled materials
Total remaining for contract:0.00
1. Contracted
2. Current
3. To date
Item Nbr        Item CodeUnit Price4. This Est
Item DescriptionUnitsQtyAmount
GROUP 6 BRIDGE AT STA. 9+40
0001                          0001.10 1.351,584.0002,138.40
BARRICADE, TYPE III BDAY1,584.0002,138.40
26.00035.10
26.00035.10

0002                          0001.90 0.401,848.000739.20
SIGN DAY EACH1,848.000739.20
52.00020.80
52.00020.80

0003                          0001.98 1.50792.0001,188.00
CONTRACTOR FURNISHED SIGN EACH792.0001,188.00
0.0000.00
0.0000.00

0004                          0030.60 23,000.001.00023,000.00
MOBILIZATION LS 1.00023,000.00
0.0000.00
0.0000.00

0005                          1009.00 12,500.001.00012,500.00
GENERAL CLEARING AND GRUBBING LS 1.00012,500.00
0.5657,062.50
0.5657,062.50

0006                          1011.00 7.50100.000750.00
WATER kL 100.000750.00
0.0000.00
0.0000.00

0007                          1030.00 3.506,732.00023,562.00
EARTHWORK MEASURED IN EMBANKMENT m3 6,732.00023,562.00
0.0000.00
0.0000.00

0008                          1136.01 500.004.0002,000.00
REMOVE EACH4.0002,000.00
CONCRETE FILLED STEEL CAISSONS 0.0000.00
0.0000.00

0009                          1300.24 72.5632.0002,321.92
600 mm DRIVEWAY CULVERT PIPE m 32.0002,321.92
0.0000.00
0.0000.00

0010                          6001.50 5,000.001.0005,000.00
BENT NO.1 EXCAVATION LS 1.0005,000.00
0.0000.00
0.0000.00

0011                          6001.51 5,000.001.0005,000.00
BENT NO.2 EXCAVATION LS 1.0005,000.00
0.0000.00
0.0000.00

0012                          6005.60 60.0048.0002,880.00
ELASTOMERIC BEARING EACH48.0002,880.00
0.0000.00
0.0000.00

0013                          6010.22 392.38142.66055,976.93
CLASS 47B-20 CONCRETE FOR BRIDGE m3 142.66055,976.93
0.0000.00
0.0000.00

0014                          6010.26 457.7882.58037,803.47
CLASS 47BD-30 CONCRETE FOR BRIDGE m3 82.58037,803.47
0.0000.00
0.0000.00

0015                          6011.11 65,000.001.00065,000.00
PRECAST/PRESTRESSED CONCRETE SUPERSTRUCTURE LS 1.00065,000.00
AT STA. 9+40 0.0000.00
0.0000.00

0016                          6020.00 1.3210,426.00013,762.32
REINFORCING STEEL FOR BRIDGE kg 10,426.00013,762.32
0.0000.00
0.0000.00

0017                          6040.00 10,000.001.00010,000.00
REMOVE STRUCTURE EACH1.00010,000.00
AT STA. 10+98.3 0.0000.00
0.0000.00

0018                          6080.00 5.51708.0003,901.08
STRUCTURAL STEEL FOR SUBSTRUCTURE kg 708.0003,901.08
0.0000.00
0.0000.00

0019                          6105.02 39.68700.00027,776.00
ROCK RIPRAP, TYPE B Mg 700.00027,776.00
0.0000.00
0.0000.00

0020                          6200.00 82.02426.40034,973.33
CONCRETE PILING m 426.40034,973.33
0.0000.00
0.0000.00

0021                          6310.00 129.17367.00047,405.39
STEEL SHEET PILING m2 367.00047,405.39
0.0000.00
0.0000.00

0022                          7020.00 1,500.002.0003,000.00
BRIDGE APPROACH SECTIONS EACH2.0003,000.00
0.0000.00
0.0000.00

0023                          7021.47 1,500.002.0003,000.00
MELT EACH2.0003,000.00
0.0000.00
0.0000.00

0024                          L006.00 250.001.000250.00
COVER CROP SEEDING ha 1.000250.00
0.0000.00
0.0000.00

GROUP 6 BRIDGE AT STA. 9+40Contracted383,928.04
Current383,928.04
In place7,118.40
This Estimate7,118.40

Totals for contractContracted383,928.04
Current383,928.04
In place7,118.40
This Estimate7,118.40