Return to District Map


Nebraska Department of Roads
Estimate Summary to Contractor
Vendor ID:2252 PAULSEN, INC.
Contract ID:6944
Estimate Number:0001
Pay Period End Date:04.05.2003
Contract Location:
OCONTO NORTHEstimate Type:PROG
Contractor:
PAULSEN, INC.Date Let:02.06.2003
1116 EAST HWY 30Date Awarded:02.13.2003
P O BOX 17Date Contract Executed:02.18.2003
Date Notice to Proceed:02.18.2003
COZAD NE 69130Date Work Began:03.31.2003
Phone:Date Physical Work Completed:
(308)784-3333Date Accepted:
Escrow Agent:
Surety Co:
ST. PAUL FIRE AND MARINE INSURANCE COMPANY
Counties
CUSTER
Project Number PCT Fed State Project Number Description
60944 000  0.000 EACSTPD-EACBH-21-3(103)  GRAD CULV SEED BR GDRL BIT
Total to DatePrev to DateThis Estimate
Current Contract AmtTotal Earnings$33,943.36$.00$33,943.36
$9,181,360.56Stockpiled Materials$.00$.00$.00
Original Contract AmtGross Earnings$33,943.36$.00$33,943.36
$9,181,360.56Retainage$-339.43$.00$-339.43
Escrow Amount$.00$.00$.00
Percent CompleteSecurities Encumbered$.00$.00$.00
0.37%Net Earnings$33,603.93$.00$33,603.93
Liquidated Damages$.00$.00$.00
Incentives$.00$.00$.00
Disincentives$.00$.00$.00
Other Contract Adj$.00$.00$.00
Appl of Training Adj$.00$.00$.00
Training Rates Adj$.00$.00$.00
Fuel Adj$.00$.00$.00
Bituminous Adj$.00$.00$.00
Autopay Adj$.00$.00$.00
Gasoline Adj$.00$.00$.00
Other Adj$.00$.00$.00
Price Adj$.00$.00$.00
Substandard Item Adj$.00$.00$.00
Asphalt Adj$.00$.00$.00
Diesel Fuel Adj$.00$.00$.00
Petrol Adj$.00$.00$.00
Total for Adjustments$.00$.00$.00
Payment$33,603.93$.00$33,603.93
Project ManagerDiv. Head/Dist. Eng.
White, Dennis04.07.2003O'Donnell, Les04.08.2003
Constr. Estimate Eng.Materials Eng.
Bartos, Steve04.08.2003
Controller Div. Processed
Burling, Laurie04.08.2003
Detailed breakdown of stockpiled materials
Total remaining for contract:0.00
1. Contracted
2. Current
3. To date
Item Nbr        Item CodeUnit Price4. This Est
Item DescriptionUnitsQtyAmount
GROUP 1 GRADING
0001                          0030.10 129,000.001.000129,000.00
MOBILIZATION LS 1.000129,000.00
0.0000.00
0.0000.00

0002                          1000.00 50.00110.0005,500.00
LARGE TREE REMOVAL EACH110.0005,500.00
0.0000.00
0.0000.00

0003                          1009.00 14,900.001.00014,900.00
GENERAL CLEARING AND GRUBBING LS 1.00014,900.00
0.0000.00
0.0000.00

0004                          1010.00 1.111,720,248.0001,909,475.28
EXCAVATION m3 1,720,248.0001,909,475.28
0.0000.00
0.0000.00

0005                          1010.01 1.0614,890.00015,783.40
EXCAVATION (ESTABLISHED QUANTITY) m3 14,890.00015,783.40
0.0000.00
0.0000.00

0006                          1010.50 2.002,761.0005,522.00
REMOVAL OF UNSUITABLE MATERIAL m3 2,761.0005,522.00
0.0000.00
0.0000.00

0007                          1011.00 1.9544,826.00087,410.70
WATER kL 44,826.00087,410.70
0.0000.00
0.0000.00

0008                          1012.00 54.00242.00013,068.00
RIGHT-OF-WAY MARKERS EACH242.00013,068.00
109.0005,886.00
109.0005,886.00

0009                          1016.00 250.0022.0005,500.00
RE-ESTABLISH PROPERTY CORNER EACH22.0005,500.00
0.0000.00
0.0000.00

0010                          1017.00 133,112.001.000133,112.00
CONSTRUCTION STAKING AND SURVEYING LS 1.000133,112.00
0.0000.00
0.0000.00

0011                          1021.10 1.00244.000244.00
REMOVE DELINEATOR UNITS EACH244.000244.00
0.0000.00
0.0000.00

0012                          1042.00 0.306,030.0001,809.00
SALVAGING AND PLACING HYDRIC SOIL m2 6,030.0001,809.00
0.0000.00
0.0000.00

0013                          1090.00 500.005.0002,500.00
ABANDON WELLS EACH5.0002,500.00
0.0000.00
0.0000.00

0014                          1102.00 2.25176.000396.00
REMOVE ASPHALT SURFACE m2 176.000396.00
0.0000.00
0.0000.00

0015                          1701.18 37.4313.500505.31
450 mm DRIVEWAY CULVERT PIPE, TYPE 2,3,4,5,6,7 OR 8 m 13.500505.31
0.0000.00
0.0000.00

0016                          1701.24 44.31393.00017,413.83
600 mm DRIVEWAY CULVERT PIPE, TYPE 2,3,4,5,6,7 OR 8 m 393.00017,413.83
0.0000.00
0.0000.00

0017                          1701.36 72.1430.0002,164.20
900 mm DRIVEWAY CULVERT PIPE, TYPE 2,3,4,5,6,7 OR 8 m 30.0002,164.20
0.0000.00
0.0000.00

0018                          1703.42 100.2932.5003,259.43
1050 mm DRIVEWAY CULVERT PIPE, TYPE 2,3,4 OR 5 m 32.5003,259.43
0.0000.00
0.0000.00

0019                          1703.72 190.5022.0004,191.00
1800 mm DRIVEWAY CULVERT PIPE 2,3,4 OR 5 m 22.0004,191.00
0.0000.00
0.0000.00

0020                          3017.50 100.0029.0002,900.00
INTERLOCKING CONCRETE PAVER BLOCK m2 29.0002,900.00
0.0000.00
0.0000.00

0021                          7017.00 3.30352.0001,161.60
REMOVE GUARDRAIL m 352.0001,161.60
0.0000.00
0.0000.00

0022                          L006.00 150.0087.00013,050.00
COVER CROP SEEDING ha 87.00013,050.00
0.0000.00
0.0000.00

0023                          L006.50 2,000.002.0004,000.00
TEMPORARY SEEDING ha 2.0004,000.00
0.0000.00
0.0000.00

0024                          L020.01 5.0012,768.00063,840.00
EROSION CONTROL, TYPE A m2 12,768.00063,840.00
0.0000.00
0.0000.00

0025                          L020.07 4.006,030.00024,120.00
EROSION CONTROL, TYPE B-1 m2 6,030.00024,120.00
0.0000.00
0.0000.00

0026                          L020.08 5.1520,175.000103,901.25
EROSION CONTROL, TYPE AA m2 20,175.000103,901.25
0.0000.00
0.0000.00

0027                          L020.09 9.0010,612.00095,508.00
EROSION CONTROL, TYPE AAA m2 10,612.00095,508.00
0.0000.00
0.0000.00

0028                          L020.10 1.2511,811.00014,763.75
EROSION CONTROL, TYPE HV m2 11,811.00014,763.75
0.0000.00
0.0000.00

0029                          L021.01 22.00625.00013,750.00
EROSION CHECKS, TYPE A BALE625.00013,750.00
0.0000.00
0.0000.00

0030                          L021.06 20.00885.00017,700.00
EROSION CHECKS, TYPE HV BALE885.00017,700.00
0.0000.00
0.0000.00

0031                          L021.11 24.00230.0005,520.00
EROSION CHECKS, TYPE ST-A BALE230.0005,520.00
0.0000.00
0.0000.00

0032                          L021.13 26.00306.0007,956.00
EROSION CHECKS, TYPE ST-AA BALE306.0007,956.00
0.0000.00
0.0000.00

0033                          L021.15 22.00855.00018,810.00
EROSION CHECKS, TYPE ST-HV BALE855.00018,810.00
0.0000.00
0.0000.00

0034                          L021.16 27.0075.0002,025.00
EROSION CHECKS, TYPE ST-AAA BALE75.0002,025.00
0.0000.00
0.0000.00

0035                          L021.21 24.001,776.00042,624.00
EROSION CHECKS, TYPE AA BALE1,776.00042,624.00
0.0000.00
0.0000.00

0036                          L021.22 25.00646.00016,150.00
EROSION CHECKS, TYPE AAA BALE646.00016,150.00
0.0000.00
0.0000.00

0037                          L022.11 8.504,322.50036,741.25
FABRIC SILT FENCE-LOW POROSITY m 4,322.50036,741.25
0.0000.00
0.0000.00

0038                          L022.12 10.50180.0001,890.00
FABRIC SILT FENCE-HIGH POROSITY m 180.0001,890.00
0.0000.00
0.0000.00

0039                          P300.30 67.0015.0001,005.00
750 mm CULVERT PIPE, TYPE 3,4 OR 5 m 15.0001,005.00
0.0000.00
0.0000.00

0040                          P300.36 75.0016.4001,230.00
900 mm CULVERT PIPE, TYPE 3,4 OR 5 m 16.4001,230.00
0.0000.00
0.0000.00

GROUP 1 GRADINGContracted2,840,399.99
Current2,840,399.99
In place5,886.00
This Estimate5,886.00

GROUP 4 CULVERTS
0041                          0030.40 44,000.001.00044,000.00
MOBILIZATION LS 1.00044,000.00
0.0000.00
0.0000.00

0042                          1043.50 2.001,635.0003,270.00
RIPRAP FILTER FABRIC m2 1,635.0003,270.00
0.0000.00
0.0000.00

0043                          4040.00 75.0060.0004,500.00
REMOVE HEADWALLS FROM CULVERTS EACH60.0004,500.00
0.0000.00
0.0000.00

0044                          4044.00 2,000.001.0002,000.00
PREPARATION OF STRUCTURE EACH1.0002,000.00
AT STA 10+04 0.0000.00
0.0000.00

0045                          4045.00 1,000.001.0001,000.00
REMOVE STRUCTURE EACH1.0001,000.00
AT STA. 18+83 0.0000.00
0.0000.00

0046                          4045.01 1,000.001.0001,000.00
REMOVE STRUCTURE EACH1.0001,000.00
AT STA. 29+24 0.0000.00
0.0000.00

0047                          4045.02 1,000.001.0001,000.00
REMOVE STRUCTURE EACH1.0001,000.00
AT STA. 36+87 0.0000.00
0.0000.00

0048                          4045.03 1,000.001.0001,000.00
REMOVE STRUCTURE EACH1.0001,000.00
AT STA. 48+92 0.0000.00
0.0000.00

0049                          4045.04 1,000.001.0001,000.00
REMOVE STRUCTURE EACH1.0001,000.00
AT STA. 51+49 0.0000.00
0.0000.00

0050                          4045.05 1,000.001.0001,000.00
REMOVE STRUCTURE EACH1.0001,000.00
AT STA. 56+20 0.0000.00
0.0000.00

0051                          4045.06 1,000.001.0001,000.00
REMOVE STRUCTURE EACH1.0001,000.00
AT STA. 61+81 0.0000.00
0.0000.00

0052                          4045.07 1,000.001.0001,000.00
REMOVE STRUCTURE EACH1.0001,000.00
AT STA. 74+01 0.0000.00
0.0000.00

0053                          4045.08 1,000.001.0001,000.00
REMOVE STRUCTURE EACH1.0001,000.00
AT STA. 78+36 0.0000.00
0.0000.00

0054                          4045.09 1,000.001.0001,000.00
REMOVE STRUCTURE EACH1.0001,000.00
AT STA. 87+34 0.0000.00
0.0000.00

0055                          4045.10 1,000.001.0001,000.00
REMOVE STRUCTURE EACH1.0001,000.00
AT STA. 101+88 0.0000.00
0.0000.00

0056                          4045.11 1,000.001.0001,000.00
REMOVE STRUCTURE EACH1.0001,000.00
AT STA. 138+60 0.0000.00
0.0000.00

0057                          4045.12 1,000.001.0001,000.00
REMOVE STRUCTURE EACH1.0001,000.00
AT STA. 144+17 0.0000.00
0.0000.00

0058                          4050.01 12.005,084.00061,008.00
EXCAVATION FOR PIPE, PIPE-ARCH CULVERTS, AND HEADWALLS m3 5,084.00061,008.00
0.0000.00
0.0000.00

0059                          4051.01 12.002,478.00029,736.00
EXCAVATION FOR BOX CULVERTS m3 2,478.00029,736.00
156.1601,873.92
156.1601,873.92

0060                          4100.06 1,000.002.4002,400.00
CLASS 47B-20 OR AX-20 CONCRETE FOR HEADWALL m3 2.4002,400.00
0.0000.00
0.0000.00

0061                          4101.06 320.001,639.340524,588.80
CLASS 47B-20 OR AX-20 CONCRETE FOR BOX CULVERT m3 1,639.340524,588.80
67.00021,440.00
67.00021,440.00

0062                          4150.00 2.00176.000352.00
REINFORCING STEEL FOR HEADWALL kg 176.000352.00
0.0000.00
0.0000.00

0063                          4151.00 1.40104,920.000146,888.00
REINFORCING STEEL FOR BOX CULVERT kg 104,920.000146,888.00
3,225.9604,516.34
3,225.9604,516.34

0064                          4310.24 150.0043.0006,450.00
600 mm FLARED-END SECTION EACH43.0006,450.00
0.0000.00
0.0000.00

0065                          4310.30 250.0018.0004,500.00
750 mm FLARED-END SECTION EACH18.0004,500.00
0.0000.00
0.0000.00

0066                          4310.42 650.0016.00010,400.00
1050 mm FLARED-END SECTION EACH16.00010,400.00
0.0000.00
0.0000.00

0067                          4310.48 700.002.0001,400.00
1200 mm FLARED-END SECTION EACH2.0001,400.00
0.0000.00
0.0000.00

0068                          4310.54 800.002.0001,600.00
1350 mm FLARED-END SECTION EACH2.0001,600.00
0.0000.00
0.0000.00

0069                          4310.60 1,100.006.0006,600.00
1500 mm FLARED-END SECTION EACH6.0006,600.00
0.0000.00
0.0000.00

0070                          4310.66 1,200.002.0002,400.00
1650 mm FLARED-END SECTION EACH2.0002,400.00
0.0000.00
0.0000.00

0071                          6105.01 39.50482.00019,039.00
ROCK RIPRAP, TYPE A Mg 482.00019,039.00
0.0000.00
0.0000.00

0072                          6105.02 39.50704.00027,808.00
ROCK RIPRAP, TYPE B Mg 704.00027,808.00
0.0000.00
0.0000.00

0073                          P255.24 78.00109.2008,517.60
600 mm CULVERT PIPE, TYPE 4 OR 5 m 109.2008,517.60
0.0000.00
0.0000.00

0074                          P255.30 116.00125.60014,569.60
750 mm CULVERT PIPE, TYPE 4 OR 5 m 125.60014,569.60
0.0000.00
0.0000.00

0075                          P255.42 207.00296.50061,375.50
1050 mm CULVERT PIPE, TYPE 4 OR 5 m 296.50061,375.50
0.0000.00
0.0000.00

0076                          P255.48 236.0042.50010,030.00
1200 mm CULVERT PIPE, TYPE 4 OR 5 m 42.50010,030.00
0.0000.00
0.0000.00

0077                          P255.60 366.0029.50010,797.00
1500 mm CULVERT PIPE, TYPE 4 OR 5 m 29.50010,797.00
0.0000.00
0.0000.00

0078                          P255.66 402.0050.00020,100.00
1650 mm CULVERT PIPE, TYPE 4 OR 5 m 50.00020,100.00
0.0000.00
0.0000.00

0079                          P300.24 56.0058.9003,298.40
600 mm CULVERT PIPE, TYPE 3,4 OR 5 m 58.9003,298.40
0.0000.00
0.0000.00

0080                          P310.42 207.0074.50015,421.50
1050 mm CULVERT PIPE, TYPE 2,4 OR 5 m 74.50015,421.50
0.0000.00
0.0000.00

0081                          P310.54 270.0033.5009,045.00
1350 mm CULVERT PIPE, TYPE 2,4 OR 5 m 33.5009,045.00
0.0000.00
0.0000.00

0082                          P310.60 366.0073.00026,718.00
1500 mm CULVERT PIPE, TYPE 2,4 OR 5 m 73.00026,718.00
0.0000.00
0.0000.00

0083                          P402.24 56.00139.8007,828.80
600 mm CULVERT PIPE, TYPE 3,4,5 OR 6 m 139.8007,828.80
0.0000.00
0.0000.00

0084                          P500.24 78.00353.00027,534.00
600 mm CULVERT PIPE, TYPE 2,4,5,7 OR 8 m 353.00027,534.00
0.0000.00
0.0000.00

0085                          P500.30 116.00214.20024,847.20
750 mm CULVERT PIPE, TYPE 2,4,5,7 or 8 m 214.20024,847.20
0.0000.00
0.0000.00

GROUP 4 CULVERTSContracted1,152,022.40
Current1,152,022.40
In place27,830.26
This Estimate27,830.26

GROUP 4A CONCRETE BOX CULVERT AT STA. 18+90
0086                          0030.40 3,500.001.0003,500.00
MOBILIZATION LS 1.0003,500.00
0.0000.00
0.0000.00

0087                          4051.01 10.00672.0006,720.00
EXCAVATION FOR BOX CULVERTS m3 672.0006,720.00
0.0000.00
0.0000.00

0088                          4054.65 7,000.001.0007,000.00
TEMPORARY SHORING LS 1.0007,000.00
AT STA. 18+90 0.0000.00
0.0000.00

0089                          4101.06 320.00174.18055,737.60
CLASS 47B-20 OR AX-20 CONCRETE FOR BOX CULVERT m3 174.18055,737.60
0.0000.00
0.0000.00

0090                          4151.00 1.4012,765.00017,871.00
REINFORCING STEEL FOR BOX CULVERT kg 12,765.00017,871.00
0.0000.00
0.0000.00

GROUP 4A CONCRETE BOX CULVERT AT STA. 18+90Contracted90,828.60
Current90,828.60
In place0.00
This Estimate0.00

GROUP 4B CONCRETE BOX CULVERT AT STA. 139+10
0091                          0030.40 1,500.001.0001,500.00
MOBILIZATION LS 1.0001,500.00
0.0000.00
0.0000.00

0092                          4051.01 10.00884.0008,840.00
EXCAVATION FOR BOX CULVERTS m3 884.0008,840.00
0.0000.00
0.0000.00

0093                          4101.06 320.00239.08076,505.60
CLASS 47B-20 OR AX-20 CONCRETE FOR BOX CULVERT m3 239.08076,505.60
0.0000.00
0.0000.00

0094                          4151.00 1.4015,208.00021,291.20
REINFORCING STEEL FOR BOX CULVERT kg 15,208.00021,291.20
0.0000.00
0.0000.00

GROUP 4B CONCRETE BOX CULVERT AT STA. 139+10Contracted108,136.80
Current108,136.80
In place0.00
This Estimate0.00

GROUP 5 SEEDING
0095                          0030.50 4,000.001.0004,000.00
MOBILIZATION LS 1.0004,000.00
0.0000.00
0.0000.00

0096                          L001.01 1,150.0076.00087,400.00
SEEDING, TYPE A ha 76.00087,400.00
0.0000.00
0.0000.00

0097                          L001.02 950.0011.00010,450.00
SEEDING, TYPE B ha 11.00010,450.00
0.0000.00
0.0000.00

0098                          L010.00 12.00540.0006,480.00
SODDING m2 540.0006,480.00
0.0000.00
0.0000.00

0099                          L020.00 1.2534,898.00043,622.50
EROSION CONTROL m2 34,898.00043,622.50
0.0000.00
0.0000.00

0100                          L032.75 110.00435.00047,850.00
MULCH Mg 435.00047,850.00
0.0000.00
0.0000.00

GROUP 5 SEEDINGContracted199,802.50
Current199,802.50
In place0.00
This Estimate0.00

GROUP 6 BRIDGE AT STA. 9802+00
0101                          0030.60 30,500.001.00030,500.00
MOBILIZATION LS 1.00030,500.00
0.0000.00
0.0000.00

0102                          3050.15 274.00127.30034,880.20
CONCRETE FOR PAVEMENT APPROACHES CLASS 47BD-30 m3 127.30034,880.20
0.0000.00
0.0000.00

0103                          3051.10 1.498,130.00012,113.70
EPOXY COATED REINFORCING STEEL FOR PAVEMENT APPROACHES kg 8,130.00012,113.70
0.0000.00
0.0000.00

0104                          6000.10 5,980.001.0005,980.00
ABUTMENT NO.1 EXCAVATION LS 1.0005,980.00
0.0000.00
0.0000.00

0105                          6000.11 5,980.001.0005,980.00
ABUTMENT NO.2 EXCAVATION LS 1.0005,980.00
0.0000.00
0.0000.00

0106                          6001.50 6,900.001.0006,900.00
BENT NO.1 EXCAVATION LS 1.0006,900.00
0.0000.00
0.0000.00

0107                          6001.51 6,900.001.0006,900.00
BENT NO.2 EXCAVATION LS 1.0006,900.00
0.0000.00
0.0000.00

0108                          6010.22 488.0060.30029,426.40
CLASS 47B-20 CONCRETE FOR BRIDGE m3 60.30029,426.40
0.0000.00
0.0000.00

0109                          6010.26 494.0068.50033,839.00
CLASS 47BD-30 CONCRETE FOR BRIDGE m3 68.50033,839.00
0.0000.00
0.0000.00

0110                          6011.11 54,800.001.00054,800.00
PRECAST/PRESTRESSED CONCRETE SUPERSTRUCTURE LS 1.00054,800.00
AT STA. 9802+00 0.0000.00
0.0000.00

0111                          6030.00 31,340.001.00031,340.00
PREPARATION OF BRIDGE EACH1.00031,340.00
AT STA. 9802+00 0.0000.00
0.0000.00

0112                          6080.00 3.00175.000525.00
STRUCTURAL STEEL FOR SUBSTRUCTURE kg 175.000525.00
0.0000.00
0.0000.00

0113                          6131.50 1.4513,165.00019,089.25
EPOXY COATED REINFORCING STEEL kg 13,165.00019,089.25
0.0000.00
0.0000.00

0114                          8091.00 23.0045.0001,035.00
GRANULAR BACKFILL m3 45.0001,035.00
0.0000.00
0.0000.00

GROUP 6 BRIDGE AT STA. 9802+00Contracted273,308.55
Current273,308.55
In place0.00
This Estimate0.00

GROUP 6B BRIDGE AT STA. 22+60
0131                          0030.60 31,000.001.00031,000.00
MOBILIZATION LS 1.00031,000.00
0.0000.00
0.0000.00

0132                          1043.50 7.00328.0002,296.00
RIPRAP FILTER FABRIC m2 328.0002,296.00
0.0000.00
0.0000.00

0133                          3050.15 274.00126.50034,661.00
CONCRETE FOR PAVEMENT APPROACHES CLASS 47BD-30 m3 126.50034,661.00
0.0000.00
0.0000.00

0134                          3051.10 1.508,250.00012,375.00
EPOXY COATED REINFORCING STEEL FOR PAVEMENT APPROACHES kg 8,250.00012,375.00
0.0000.00
0.0000.00

0135                          6000.10 1,840.001.0001,840.00
ABUTMENT NO.1 EXCAVATION LS 1.0001,840.00
0.0000.00
0.0000.00

0136                          6000.11 1,840.001.0001,840.00
ABUTMENT NO.2 EXCAVATION LS 1.0001,840.00
0.0000.00
0.0000.00

0137                          6010.22 498.0059.50029,631.00
CLASS 47B-20 CONCRETE FOR BRIDGE m3 59.50029,631.00
0.0000.00
0.0000.00

0138                          6010.26 501.0076.10038,126.10
CLASS 47BD-30 CONCRETE FOR BRIDGE m3 76.10038,126.10
0.0000.00
0.0000.00

0139                          6040.00 7,360.001.0007,360.00
REMOVE STRUCTURE EACH1.0007,360.00
AT STA. 22+42.7 0.0000.00
0.0000.00

0140                          6071.12 67,915.001.00067,915.00
STEEL SUPERSTRUCTURE LS 1.00067,915.00
AT STA. 22+60 0.0000.00
0.0000.00

0141                          6080.00 3.501,510.0005,285.00
STRUCTURAL STEEL FOR SUBSTRUCTURE kg 1,510.0005,285.00
0.0000.00
0.0000.00

0142                          6105.02 46.50317.00014,740.50
ROCK RIPRAP, TYPE B Mg 317.00014,740.50
0.0000.00
0.0000.00

0143                          6131.50 1.6014,555.00023,288.00
EPOXY COATED REINFORCING STEEL kg 14,555.00023,288.00
0.0000.00
0.0000.00

0144                          6210.50 100.20667.80066,913.56
PIPE PILING m 667.80066,913.56
0.0000.00
0.0000.00

0145                          6310.00 160.70367.90059,121.53
STEEL SHEET PILING m2 367.90059,121.53
0.0000.00
0.0000.00

0146                          8091.00 20.50260.0005,330.00
GRANULAR BACKFILL m3 260.0005,330.00
0.0000.00
0.0000.00

GROUP 6B BRIDGE AT STA. 22+60Contracted401,722.69
Current401,722.69
In place0.00
This Estimate0.00

GROUP 6D BRIDGE AT STA. 157+16.4
0163                          0030.60 31,000.001.00031,000.00
MOBILIZATION LS 1.00031,000.00
0.0000.00
0.0000.00

0164                          1043.50 6.05600.0003,630.00
RIPRAP FILTER FABRIC m2 600.0003,630.00
0.0000.00
0.0000.00

0165                          3050.15 274.00126.50034,661.00
CONCRETE FOR PAVEMENT APPROACHES CLASS 47BD-30 m3 126.50034,661.00
0.0000.00
0.0000.00

0166                          3051.10 1.728,155.00014,026.60
EPOXY COATED REINFORCING STEEL FOR PAVEMENT APPROACHES kg 8,155.00014,026.60
0.0000.00
0.0000.00

0167                          6000.10 1,840.001.0001,840.00
ABUTMENT NO.1 EXCAVATION LS 1.0001,840.00
0.0000.00
0.0000.00

0168                          6000.11 1,840.001.0001,840.00
ABUTMENT NO.2 EXCAVATION LS 1.0001,840.00
0.0000.00
0.0000.00

0169                          6010.22 496.0054.30026,932.80
CLASS 47B-20 CONCRETE FOR BRIDGE m3 54.30026,932.80
0.0000.00
0.0000.00

0170                          6010.26 507.0071.60036,301.20
CLASS 47BD-30 CONCRETE FOR BRIDGE m3 71.60036,301.20
0.0000.00
0.0000.00

0171                          6040.00 7,360.001.0007,360.00
REMOVE STRUCTURE EACH1.0007,360.00
AT STA. 157+21.9 0.0000.00
0.0000.00

0172                          6071.12 51,720.001.00051,720.00
STEEL SUPERSTRUCTURE LS 1.00051,720.00
AT STA. 157+16.4 0.0000.00
0.0000.00

0173                          6080.00 3.301,805.0005,956.50
STRUCTURAL STEEL FOR SUBSTRUCTURE kg 1,805.0005,956.50
0.0000.00
0.0000.00

0174                          6105.02 46.00633.00029,118.00
ROCK RIPRAP, TYPE B Mg 633.00029,118.00
0.0000.00
0.0000.00

0175                          6131.50 1.4813,155.00019,469.40
EPOXY COATED REINFORCING STEEL kg 13,155.00019,469.40
0.0000.00
0.0000.00

0176                          6210.50 106.00621.00065,826.00
PIPE PILING m 621.00065,826.00
0.0000.00
0.0000.00

0177                          6310.00 165.75402.20066,664.65
STEEL SHEET PILING m2 402.20066,664.65
0.0000.00
0.0000.00

0178                          8091.00 21.00325.0006,825.00
GRANULAR BACKFILL m3 325.0006,825.00
0.0000.00
0.0000.00

GROUP 6D BRIDGE AT STA. 157+16.4Contracted403,171.15
Current403,171.15
In place0.00
This Estimate0.00

GROUP 6E BRIDGE AT STA. 92+93.5
0179                          0030.60 33,900.001.00033,900.00
MOBILIZATION LS 1.00033,900.00
0.0000.00
0.0000.00

0180                          1043.50 6.30405.0002,551.50
RIPRAP FILTER FABRIC m2 405.0002,551.50
0.0000.00
0.0000.00

0181                          3050.15 270.00126.50034,155.00
CONCRETE FOR PAVEMENT APPROACHES CLASS 47BD-30 m3 126.50034,155.00
0.0000.00
0.0000.00

0182                          3051.10 1.498,095.00012,061.55
EPOXY COATED REINFORCING STEEL FOR PAVEMENT APPROACHES kg 8,095.00012,061.55
0.0000.00
0.0000.00

0183                          6000.10 3,220.001.0003,220.00
ABUTMENT NO.1 EXCAVATION LS 1.0003,220.00
0.0000.00
0.0000.00

0184                          6000.11 3,220.001.0003,220.00
ABUTMENT NO.2 EXCAVATION LS 1.0003,220.00
0.0000.00
0.0000.00

0185                          6001.50 9,890.001.0009,890.00
BENT NO.1 EXCAVATION LS 1.0009,890.00
0.0000.00
0.0000.00

0186                          6001.51 9,890.001.0009,890.00
BENT NO.2 EXCAVATION LS 1.0009,890.00
0.0000.00
0.0000.00

0187                          6010.22 515.00130.40067,156.00
CLASS 47B-20 CONCRETE FOR BRIDGE m3 130.40067,156.00
0.0000.00
0.0000.00

0188                          6010.26 461.00120.00055,320.00
CLASS 47BD-30 CONCRETE FOR BRIDGE m3 120.00055,320.00
0.0000.00
0.0000.00

0189                          6011.11 131,420.001.000131,420.00
PRECAST/PRESTRESSED CONCRETE SUPERSTRUCTURE LS 1.000131,420.00
AT STA. 92+93.50 0.0000.00
0.0000.00

0190                          6040.00 36,216.001.00036,216.00
REMOVE STRUCTURE EACH1.00036,216.00
AT STA. 92+92.9 0.0000.00
0.0000.00

0191                          6080.00 3.501,820.0006,370.00
STRUCTURAL STEEL FOR SUBSTRUCTURE kg 1,820.0006,370.00
0.0000.00
0.0000.00

0192                          6105.01 45.0032.0001,440.00
ROCK RIPRAP, TYPE A Mg 32.0001,440.00
0.0000.00
0.0000.00

0193                          6105.02 45.00251.00011,295.00
ROCK RIPRAP, TYPE B Mg 251.00011,295.00
0.0000.00
0.0000.00

0194                          6131.50 1.4617,945.00026,199.70
EPOXY COATED REINFORCING STEEL kg 17,945.00026,199.70
0.0000.00
0.0000.00

0195                          6210.50 99.00750.20074,269.80
PIPE PILING m 750.20074,269.80
0.0000.00
0.0000.00

0196                          6310.00 169.50357.20060,545.40
STEEL SHEET PILING m2 357.20060,545.40
0.0000.00
0.0000.00

0197                          8091.00 21.00100.0002,100.00
GRANULAR BACKFILL m3 100.0002,100.00
0.0000.00
0.0000.00

GROUP 6E BRIDGE AT STA. 92+93.5Contracted581,219.95
Current581,219.95
In place0.00
This Estimate0.00

GROUP 7 GUARDRAIL
0198                          0030.70 2,200.001.0002,200.00
MOBILIZATION LS 1.0002,200.00
0.0000.00
0.0000.00

0199                          7011.20 36.55244.0008,918.20
W-BEAM GUARDRAIL m 244.0008,918.20
0.0000.00
0.0000.00

0200                          7020.00 1,978.0016.00031,648.00
BRIDGE APPROACH SECTIONS EACH16.00031,648.00
0.0000.00
0.0000.00

0201                          7024.27 1,443.0016.00023,088.00
GUARDRAIL END TREATMENT, TYPE II EACH16.00023,088.00
0.0000.00
0.0000.00

GROUP 7 GUARDRAILContracted65,854.20
Current65,854.20
In place0.00
This Estimate0.00

GROUP 9 BITUMINOUS
0202                          0002.55 18.45155.9002,876.36
OVERLAY BROKEN LINES StaM155.9002,876.36
0.0000.00
0.0000.00

0203                          0002.60 18.20311.8005,674.76
OVERLAY SOLID LINES StaM311.8005,674.76
0.0000.00
0.0000.00

0204                          0030.90 41,000.001.00041,000.00
MOBILIZATION LS 1.00041,000.00
0.0000.00
0.0000.00

0205                          1020.03 13.50166.0002,241.00
DELINEATOR, TYPE III EACH166.0002,241.00
0.0000.00
0.0000.00

0206                          1020.20 21.0078.0001,638.00
INSTALL CHEVRONS EACH78.0001,638.00
0.0000.00
0.0000.00

0207                          2001.00 15.65848.00013,271.20
GRAVEL SURFACE COURSE m3 848.00013,271.20
0.0000.00
0.0000.00

0208                          2021.00 50.003.000150.00
MAILBOX POST EACH3.000150.00
0.0000.00
0.0000.00

0209                          7512.14 107.009.000963.00
600 mm WHITE PREFORMED PAVEMENT MARKING, TYPE 4, GROOVED m 9.000963.00
0.0000.00
0.0000.00

0210                          9000.75 21.25200.0004,250.00
ASPHALTIC CONCRETE FOR STATE MAINTENANCE PATCHING, TYPE Mg 200.0004,250.00
SP4(12.5) 0.0000.00
0.0000.00

0211                          9005.00 25.50100.0002,550.00
ASPHALTIC CONCRETE FOR PATCHING, TYPE Mg 100.0002,550.00
SP4(12.5) 0.0000.00
0.0000.00

0212                          9005.45 21.2564,050.0001,361,062.50
ASPHALTIC CONCRETE, TYPE SP4(12.5) Mg 64,050.0001,361,062.50
0.0000.00
0.0000.00

0213                          9009.00 1.951,902.0003,708.90
PLACEMENT OF ASPHALTIC CONCRETE FOR DRIVEWAYS ANDINTERSECTIONS m2 1,902.0003,708.90
0.0000.00
0.0000.00

0214                          9020.94 293.8010.8003,173.04
PERFORMANCE GRADED BINDER (64-28) FOR STATE MAINTENANCEPATCHING Mg 10.8003,173.04
0.0000.00
0.0000.00

0215                          9021.08 293.803,464.1001,017,752.58
PERFORMANCE GRADED BINDER (64-28) Mg 3,464.1001,017,752.58
0.0000.00
0.0000.00

0216                          9034.00 2.301,902.0004,374.60
PREPARATION OF INTERSECTIONS AND DRIVEWAYS m2 1,902.0004,374.60
0.0000.00
0.0000.00

0217                          9053.00 0.2167,260.00014,124.60
TACK COAT L 67,260.00014,124.60
0.0000.00
0.0000.00

0218                          9111.00 2.202,870.0006,314.00
WATER kL 2,870.0006,314.00
0.0000.00
0.0000.00

0219                          9170.00 78.50328.89025,817.87
EARTH SHOULDER CONSTRUCTION StaM328.89025,817.87
0.0000.00
0.0000.00

0220                          9173.00 425.00156.91166,687.18
SUBGRADE PREPARATION StaM156.91166,687.18
0.0000.00
0.0000.00

0221                          9173.15 345.0011.4003,933.00
TRENCHED WIDENING StaM11.4003,933.00
0.0000.00
0.0000.00

0222                          9179.21 538.003.2501,748.50
COLD MILLING, CLASS 1 StaM3.2501,748.50
0.0000.00
0.0000.00

0223                          9179.23 550.0012.6966,982.80
COLD MILLING, CLASS 3 StaM12.6966,982.80
0.0000.00
0.0000.00

0224                          9179.24 1,310.80165.040216,334.43
COLD MILLING, CLASS 4 StaM165.040216,334.43
0.0000.00
0.0000.00

0225                          9188.50 22.50502.00011,295.00
SURFACING UNDER GUARDRAIL m2 502.00011,295.00
0.0000.00
0.0000.00

0226                          9300.52 3,000.001.0003,000.00
ASPHALT PAVEMENT SMOOTHNESS TESTING I/D LS 1.0003,000.00
0.0000.00
0.0000.00

GROUP 9 BITUMINOUSContracted2,820,923.31
Current2,820,923.31
In place0.00
This Estimate0.00

GROUP 10 GENERAL ITEMS
0227                          0001.08 0.503,376.0001,688.00
BARRICADE, TYPE II BDAY3,376.0001,688.00
0.0000.00
0.0000.00

0228                          0001.10 3.0018,744.00056,232.00
BARRICADE, TYPE III BDAY18,744.00056,232.00
42.000126.00
42.000126.00

0229                          0001.75 5.10270.0001,377.00
TEMPORARY SIGN DAY EACH270.0001,377.00
0.0000.00
0.0000.00

0230                          0001.90 0.3626,882.0009,677.52
SIGN DAY EACH26,882.0009,677.52
272.00097.92
272.00097.92

0231                          0001.98 0.534,600.0002,438.00
CONTRACTOR FURNISHED SIGN EACH4,600.0002,438.00
6.0003.18
6.0003.18

0232                          0002.30 1.60500.000800.00
PAVEMENT MARKING REMOVAL m 500.000800.00
0.0000.00
0.0000.00

0233                          0002.39 2.605,000.00013,000.00
TEMPORARY PAVEMENT MARKING, TYPE II m 5,000.00013,000.00
0.0000.00
0.0000.00

0234                          0002.47 1.702,500.0004,250.00
TEMPORARY PAVEMENT MARKING SURFACE PREPARATION m 2,500.0004,250.00
0.0000.00
0.0000.00

0235                          0003.10 163.0060.0009,780.00
FLAGGING DAY 60.0009,780.00
0.0000.00
0.0000.00

0236                          0003.51 34.25265.2009,083.10
INSTALL CONCRETE PROTECTION BARRIER m 265.2009,083.10
0.0000.00
0.0000.00

0237                          0003.56 11.50265.2003,049.80
RELOCATE CONCRETE PROTECTION BARRIER m 265.2003,049.80
0.0000.00
0.0000.00

0238                          0003.70 325.002.000650.00
TEMPORARY RUMBLE STRIP EACH2.000650.00
0.0000.00
0.0000.00

0239                          0003.75 11,250.002.00022,500.00
TEMPORARY TRAFFIC SIGNAL EACH2.00022,500.00
0.0000.00
0.0000.00

0240                          0005.10 90.00486.00043,740.00
TRAFFIC CONTROL MANAGEMENT DAY 486.00043,740.00
0.0000.00
0.0000.00

0241                          0010.04 1,300.001.0001,300.00
FIELD OFFICE EACH1.0001,300.00
0.0000.00
0.0000.00

0242                          0020.00 0.801,000.000800.00
TRAINING HOUR1,000.000800.00
0.0000.00
0.0000.00

0243                          0030.00 4,300.001.0004,300.00
MOBILIZATION LS 1.0004,300.00
0.0000.00
0.0000.00

0244                          9110.01 44.00110.0004,840.00
RENTAL OF LOADER, FULLY OPERATED HOUR110.0004,840.00
0.0000.00
0.0000.00

0245                          9110.02 134.00210.00028,140.00
RENTAL OF MOTOR GRADER, FULLY OPERATED HOUR210.00028,140.00
0.0000.00
0.0000.00

0246                          9110.03 38.00110.0004,180.00
RENTAL OF DUMP TRUCK, FULLY OPERATED HOUR110.0004,180.00
0.0000.00
0.0000.00

0247                          9110.06 42.00100.0004,200.00
RENTAL OF BACKHOE, FULLY OPERATED HOUR100.0004,200.00
0.0000.00
0.0000.00

0248                          9110.07 29.50110.0003,245.00
RENTAL OF SKID LOADER, FULLY OPERATED HOUR110.0003,245.00
0.0000.00
0.0000.00

0249                          9110.09 70.00210.00014,700.00
RENTAL OF TRACTOR AND SCRAPER, FULLY OPERATED HOUR210.00014,700.00
0.0000.00
0.0000.00

GROUP 10 GENERAL ITEMSContracted243,970.42
Current243,970.42
In place227.10
This Estimate227.10

Totals for contractContracted9,181,360.56
Current9,181,360.56
In place33,943.36
This Estimate33,943.36