| | | 1. Contracted
|
---|
| | | 2. Current
|
---|
| | | 3. To date
|
---|
Item Nbr Item Code | Unit Price | | 4. This Est
|
---|
Item Description | Units | Qty | Amount
|
---|
GROUP 9 BITUMINOUS | | |
|
0001 L020.00 | 2.00 | 1,000.000 | 2,000.00
|
EROSION CONTROL | SY | 1,000.000 | 2,000.00
|
| | 5,102.946 | 10,205.89
|
| | 3,595.935 | 7,191.87
|
| | |
|
0002 0001.00 | 485.00 | 118.000 | 57,230.00
|
SURVEILLANCE OF TEMPORARY TRAFFIC CONTROL DEVICES | CDAY | 118.000 | 57,230.00
|
| | 59.000 | 28,615.00
|
| | 0.000 | 0.00
|
| | |
|
0003 0001.08 | 0.50 | 18,750.000 | 9,375.00
|
BARRICADE, TYPE II | BDAY | 18,750.000 | 9,375.00
|
| | 35,373.000 | 17,686.50
|
| | 57.000 | 28.50
|
| | |
|
0004 0001.10 | 2.50 | 933.000 | 2,332.50
|
BARRICADE, TYPE III | BDAY | 933.000 | 2,332.50
|
| | 1,383.000 | 3,457.50
|
| | 35.000 | 87.50
|
| | |
|
0005 0001.30 | 2.60 | 858.000 | 2,230.80
|
TYPE B HIGH INTENSITY WARNING LIGHT | LDAY | 858.000 | 2,230.80
|
| | 450.000 | 1,170.00
|
| | 10.000 | 26.00
|
| | |
|
0006 0001.75 | 7.05 | 1,980.000 | 13,959.00
|
TEMPORARY SIGN DAY | EACH | 1,980.000 | 13,959.00
|
| | 1,536.000 | 10,828.80
|
| | 28.000 | 197.40
|
| | |
|
0007 0001.90 | 0.60 | 5,664.000 | 3,398.40
|
SIGN DAY | EACH | 5,664.000 | 3,398.40
|
| | 4,832.000 | 2,899.20
|
| | 123.000 | 73.80
|
| | |
|
0008 0002.55 | 8.50 | 2,117.000 | 17,994.50
|
OVERLAY BROKEN LINES | STA | 2,117.000 | 17,994.50
|
| | 2,188.582 | 18,602.95
|
| | 705.108 | 5,993.42
|
| | |
|
0009 0002.60 | 8.50 | 3,697.000 | 31,424.50
|
OVERLAY SOLID LINES | STA | 3,697.000 | 31,424.50
|
| | 2,756.896 | 23,433.62
|
| | 28.050 | 238.43
|
| | |
|
0010 0002.61 | 26.00 | 884.000 | 22,984.00
|
PLOWABLE PAVEMENT MARKER | EACH | 884.000 | 22,984.00
|
| | 988.000 | 25,688.00
|
| | 0.000 | 0.00
|
| | |
|
0011 0002.97 | 45.00 | 75.000 | 3,375.00
|
FLASHING ARROW PANEL | DAY | 75.000 | 3,375.00
|
| | 99.000 | 4,455.00
|
| | 2.000 | 90.00
|
| | |
|
0012 0003.10 | 200.00 | 60.000 | 12,000.00
|
FLAGGING | DAY | 60.000 | 12,000.00
|
| | 64.000 | 12,800.00
|
| | 0.000 | 0.00
|
| | |
|
0013 0010.04 | 2,000.00 | 1.000 | 2,000.00
|
FIELD OFFICE | EACH | 1.000 | 2,000.00
|
| | 1.000 | 2,000.00
|
| | 0.000 | 0.00
|
| | |
|
0014 0030.90 | 26,000.00 | 1.000 | 26,000.00
|
MOBILIZATION | LS | 1.000 | 26,000.00
|
| | 1.000 | 26,000.00
|
| | 0.000 | 0.00
|
| | |
|
0015 3040.11 | 180.00 | 13.400 | 2,412.00
|
CONCRETE PAVEMENT REPAIR, TYPE A, FULL DEPTH | SY | 13.400 | 2,412.00
|
| | 30.554 | 5,499.72
|
| | 0.000 | 0.00
|
| | |
|
0016 3040.12 | 160.00 | 46.900 | 7,504.00
|
CONCRETE PAVEMENT REPAIR, TYPE B, FULL DEPTH | SY | 46.900 | 7,504.00
|
| | 99.003 | 15,840.48
|
| | 0.000 | 0.00
|
| | |
|
0017 3040.13 | 140.00 | 37.800 | 5,292.00
|
CONCRETE PAVEMENT REPAIR, TYPE C, FULL DEPTH | SY | 37.800 | 5,292.00
|
| | 85.483 | 11,967.62
|
| | 0.000 | 0.00
|
| | |
|
0018 3221.05 | 160.00 | 174.200 | 27,872.00
|
CONCRETE PAVEMENT, CLASS PR-3625 | SY | 174.200 | 27,872.00
|
JOINT REPAIR | | 203.985 | 32,637.60
|
| | 0.000 | 0.00
|
| | |
|
0019 7011.20 | 14.41 | 300.000 | 4,323.00
|
W-BEAM GUARDRAIL | LF | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0020 7011.30 | 17.88 | 387.500 | 6,928.50
|
THRIE-BEAM GUARDRAIL | LF | 387.500 | 6,928.50
|
| | 387.500 | 6,928.50
|
| | 0.000 | 0.00
|
| | |
|
0021 7017.00 | 2.80 | 750.000 | 2,100.00
|
REMOVE GUARDRAIL | LF | 650.000 | 1,820.00
|
| | 650.000 | 1,820.00
|
| | 0.000 | 0.00
|
| | |
|
0022 7022.50 | 4,680.00 | 4.000 | 18,720.00
|
BULLNOSE-12.5' | EACH | 4.000 | 18,720.00
|
| | 4.000 | 18,720.00
|
| | 0.000 | 0.00
|
| | |
|
0023 7024.25 | 1,906.50 | 2.000 | 3,813.00
|
GUARDRAIL END TREATMENT, TYPE I | EACH | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0024 7490.03 | 0.35 | 74,300.000 | 26,005.00
|
4" YELLOW THERMOPLASTIC | LF | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0025 7490.04 | 0.35 | 92,000.000 | 32,200.00
|
4" WHITE THERMOPLASTIC | LF | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0026 7490.12 | 1.00 | 2,000.000 | 2,000.00
|
12" WHITE THERMOPLASTIC | LF | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0027 9000.75 | 7.44 | 500.000 | 3,720.00
|
ASPHALTIC CONCRETE FOR STATE MAINTENANCE PATCHING, TYPE | TON | 500.000 | 3,720.00
|
SPS | | 364.670 | 2,713.14
|
| | 0.000 | 0.00
|
| | |
|
0028 9005.00 | 24.20 | 500.000 | 12,100.00
|
ASPHALTIC CONCRETE FOR PATCHING, TYPE | TON | 500.000 | 12,100.00
|
SP5(0.5) | | 7.000 | 169.40
|
| | 0.000 | 0.00
|
| | |
|
0029 9005.23 | 9.50 | 9,180.000 | 87,210.00
|
ASPHALTIC CONCRETE, TYPE SPS | TON | 9,180.000 | 87,210.00
|
| | 9,274.010 | 88,103.10
|
| | 0.000 | 0.00
|
| | |
|
0030 9005.55 | 17.41 | 36,130.000 | 629,023.30
|
ASPHALTIC CONCRETE, TYPE SP5(0.5) | TON | 36,130.000 | 629,023.30
|
| | 36,719.960 | 639,294.52
|
| | 0.000 | 0.00
|
| | |
|
0031 9009.00 | 2.00 | 630.000 | 1,260.00
|
PLACEMENT OF ASPHALTIC CONCRETE FOR DRIVEWAYS ANDINTERSECTIONS | SY | 630.000 | 1,260.00
|
| | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0032 9020.92 | 171.60 | 27.000 | 4,633.20
|
PERFORMANCE GRADED BINDER (58-28) FOR STATE MAINTENANCEPATCHING | TON | 27.000 | 4,633.20
|
| | 11.378 | 1,952.46
|
| | 0.000 | 0.00
|
| | |
|
0033 9021.03 | 171.60 | 495.720 | 85,065.55
|
PERFORMANCE GRADED BINDER (58-28) | TON | 495.720 | 85,065.55
|
| | 292.178 | 50,137.74
|
| | 0.000 | 0.00
|
| | |
|
0034 9021.04 | 237.00 | 1,981.800 | 469,686.60
|
PERFORMANCE GRADED BINDER (70-28) | TON | 1,981.800 | 469,686.60
|
| | 1,589.899 | 376,806.07
|
| | 0.000 | 0.00
|
| | |
|
0035 9053.00 | 1.00 | 51,810.000 | 51,810.00
|
TACK COAT | GAL | 51,810.000 | 51,810.00
|
| | 58,555.000 | 58,555.00
|
| | 0.000 | 0.00
|
| | |
|
0036 9110.01 | 55.00 | 70.000 | 3,850.00
|
RENTAL OF LOADER, FULLY OPERATED | HOUR | 70.000 | 3,850.00
|
| | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0037 9110.02 | 55.00 | 70.000 | 3,850.00
|
RENTAL OF MOTOR GRADER, FULLY OPERATED | HOUR | 70.000 | 3,850.00
|
| | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0038 9110.03 | 40.00 | 70.000 | 2,800.00
|
RENTAL OF DUMP TRUCK, FULLY OPERATED | HOUR | 70.000 | 2,800.00
|
| | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0039 9110.07 | 35.00 | 70.000 | 2,450.00
|
RENTAL OF SKID LOADER, FULLY OPERATED | HOUR | 70.000 | 2,450.00
|
| | 6.000 | 210.00
|
| | 0.000 | 0.00
|
| | |
|
0040 9179.23 | 86.25 | 705.736 | 60,869.73
|
COLD MILLING, CLASS 3 | STA | 705.736 | 60,869.73
|
| | 705.107 | 60,815.48
|
| | 0.000 | 0.00
|
| | |
|
0041 9179.43 | 60.90 | 705.736 | 42,979.32
|
COLD MILLING, CLASS 3 | STA | 705.736 | 42,979.32
|
A | | 651.002 | 39,646.02
|
| | 0.000 | 0.00
|
| | |
|
0042 9179.63 | 150.00 | 77.875 | 11,681.25
|
COLD MILLING, CLASS 3 | STA | 77.875 | 11,681.25
|
B | | 96.375 | 14,456.25
|
| | 0.000 | 0.00
|
| | |
|
0043 9179.65 | 130.50 | 705.736 | 92,098.55
|
COLD MILLING, CLASS 3 | STA | 705.736 | 92,098.55
|
C | | 705.107 | 92,016.47
|
| | 0.000 | 0.00
|
| | |
|
0044 9185.76 | 8.05 | 1,410.800 | 11,356.94
|
RUMBLE STRIPS, ASPHALT | STA | 1,410.800 | 11,356.94
|
| | 1,355.228 | 10,909.59
|
| | 0.000 | 0.00
|
| | |
|
0045 9188.50 | 15.00 | 321.000 | 4,815.00
|
SURFACING UNDER GUARDRAIL | SY | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0046 9300.50 | 6,500.00 | 1.000 | 6,500.00
|
ASPHALT PAVEMENT SMOOTHNESS TESTING | LS | 1.000 | 6,500.00
|
| | 1.000 | 6,500.00
|
| | 0.000 | 0.00
|
| | |
|
4000 0003.35 | 1,050.00 | 0.000 | 0.00
|
MOBILE TRAFFIC CONTROL OPERATION | DAY | 4.000 | 4,200.00
|
| | 4.000 | 4,200.00
|
| | 0.000 | 0.00
|
| | |
|
4001 3041.25 | 210.00 | 0.000 | 0.00
|
BITUMINOUS PATCHING | TON | 12.000 | 2,520.00
|
| | 11.510 | 2,417.10
|
| | 0.000 | 0.00
|
| | |
|
4002 9300.46 | -1,000.00 | 0.000 | 0.00
|
LIQUIDATED DAMAGES | LS | 1.000 | -1,000.00
|
Failure To Correct Traffic Control Deficiencies 5/22/02. | | 1.000 | -1,000.00
|
| | 0.000 | 0.00
|
| | |
|
4003 9300.56 | 0.552 | 0.000 | 0.00
|
SUPERPAVE QUALITY INCENTIVE | TON | 35,726.960 | 19,721.28
|
Asphaltic Concrete, Type SP5(0.5) | | 35,726.960 | 19,721.28
|
| | 35,726.960 | 19,721.28
|
| | |
|
4004 9300.60 | 0.827 | 0.000 | 0.00
|
SMOOTHNESS INCENTIVE-ASPHALTIC CONCRETE | TON | 22,627.000 | 18,712.53
|
Smoothness Pay Factor = 104.75% | | 22,627.000 | 18,712.53
|
| | 22,627.000 | 18,712.53
|
| | |
|
4005 9300.77 | 11.258 | 0.000 | 0.00
|
SMOOTHNESS INCENTIVE-PERFORMANCE GRADED BINDER | TON | 1,108.723 | 12,482.00
|
Smoothness Pay Factor = 104.75% | | 1,108.723 | 12,482.00
|
| | 1,108.723 | 12,482.00
|
| | |
|
GROUP 9 BITUMINOUS | | Contracted | 1,933,232.64
|
| | Current | 1,916,432.46
|
| | In place | 1,780,074.53
|
| | This Estimate | 64,842.73
|
| | |
|
Totals for contract | | Contracted | 1,933,232.64
|
---|
| | Current | 1,916,432.46
|
---|
| | In place | 1,780,074.53
|
---|
| | This Estimate | 64,842.73
|
---|