Return to District Map


Nebraska Department of Roads
Estimate Summary to Contractor
Vendor ID:2017 BRB CONTRACTORS, INC.
Contract ID:6669
Estimate Number:0005
Pay Period End Date:01.04.2003
Contract Location:
GOTHENBURG EASTEstimate Type:PROG
Contractor:
BRB CONTRACTORS, INC.Date Let:09.05.2002
3805 NW 25TH STDate Awarded:09.20.2002
PO BOX 750940Date Contract Executed:10.01.2002
Date Notice to Proceed:10.01.2002
TOPEKA KS 66675-0940Date Work Began:
Phone:Date Physical Work Completed:
(785)232-1245Date Accepted:
Escrow Agent:
Surety Co:
TRAVELERS CASUALTY AND SURETY COMPANY OF AMERICA
Counties
DAWSON
Project Number PCT Fed State Project Number Description
60669 000  0.000 EACIM-80-4(81)  CONC PAVE BR GDRL
Total to DatePrev to DateThis Estimate
Current Contract AmtTotal Earnings$442,754.87$192,964.81$249,790.06
$1,686,320.59Stockpiled Materials$.00$.00$.00
Original Contract AmtGross Earnings$442,754.87$192,964.81$249,790.06
$1,686,626.59Retainage$-4,427.55$-1,929.65$-2,497.90
Escrow Amount$.00$.00$.00
Percent CompleteSecurities Encumbered$.00$.00$.00
26.26%Net Earnings$438,327.32$191,035.16$247,292.16
Liquidated Damages$.00$.00$.00
Incentives$.00$.00$.00
Disincentives$.00$.00$.00
Other Contract Adj$.00$.00$.00
Appl of Training Adj$.00$.00$.00
Training Rates Adj$.00$.00$.00
Fuel Adj$.00$.00$.00
Bituminous Adj$.00$.00$.00
Autopay Adj$.00$.00$.00
Gasoline Adj$.00$.00$.00
Other Adj$.00$.00$.00
Price Adj$.00$.00$.00
Substandard Item Adj$.00$.00$.00
Asphalt Adj$.00$.00$.00
Diesel Fuel Adj$.00$.00$.00
Petrol Adj$.00$.00$.00
Total for Adjustments$.00$.00$.00
Payment$438,327.32$191,035.16$247,292.16
Project ManagerDiv. Head/Dist. Eng.
Brinker, Gary01.06.2003O'Donnell, Les01.06.2003
Constr. Estimate Eng.Materials Eng.
Bartos, Steve01.07.2003
Controller Div. Processed
Burling, Laurie01.07.2003
Detailed breakdown of stockpiled materials
Total remaining for contract:0.00
1. Contracted
2. Current
3. To date
Item Nbr        Item CodeUnit Price4. This Est
Item DescriptionUnitsQtyAmount
GROUP 3 CONCRETE PAVEMENT
0001                          L001.02 2,648.000.5001,324.00
SEEDING, TYPE B ACRE0.5001,324.00
0.0000.00
0.0000.00

0002                          L020.00 1.98968.2001,917.04
EROSION CONTROL SY 968.2001,917.04
0.0000.00
0.0000.00

0003                          L032.75 150.001.125168.75
MULCH TON 1.125168.75
0.0000.00
0.0000.00

0004                          0030.10 0.001.0000.00
MOBILIZATION LS 1.0000.00
0.0000.00
0.0000.00

0005                          1101.00 7.00910.5006,373.50
REMOVE PAVEMENT SY 910.5006,373.50
0.0000.00
0.0000.00

0006                          1111.00 2.50583.0001,457.50
REMOVE FENCE LF 583.0001,457.50
0.0000.00
0.0000.00

0007                          3008.05 7.00170.0001,190.00
TIE BARS EACH170.0001,190.00
0.0000.00
0.0000.00

0008                          3075.72 50.00493.30024,665.00
12" CONCRETE PAVEMENT, CLASS 47B-3500 SY 493.30024,665.00
0.0000.00
0.0000.00

0009                          7017.00 2.001,512.5003,025.00
REMOVE GUARDRAIL LF 1,512.5003,025.00
0.0000.00
0.0000.00

0010                          7100.00 6.00628.0003,768.00
RIGHT-OF-WAY FENCE LF 628.0003,768.00
0.0000.00
0.0000.00

0011                          7103.00 200.006.0001,200.00
END POSTS EACH6.0001,200.00
0.0000.00
0.0000.00

0012                          7105.00 200.005.0001,000.00
CORNER POSTS EACH5.0001,000.00
0.0000.00
0.0000.00

0013                          7106.12 750.002.0001,500.00
12' VEHICLE GATE EACH2.0001,500.00
0.0000.00
0.0000.00

0014                          7130.00 10.00120.0001,200.00
BARBED WIRE FENCE LF 120.0001,200.00
0.0000.00
0.0000.00

0015                          9188.50 40.00290.00011,600.00
SURFACING UNDER GUARDRAIL SY 290.00011,600.00
0.0000.00
0.0000.00

GROUP 3 CONCRETE PAVEMENTContracted60,388.79
Current60,388.79
In place0.00
This Estimate0.00

GROUP 6 BRIDGE AT STA. 2125+40.00 RT.
0016                          0030.60 110,000.001.000110,000.00
MOBILIZATION LS 1.000110,000.00
0.62668,860.00
0.62668,860.00

0017                          3050.15 200.00183.20036,640.00
CONCRETE FOR PAVEMENT APPROACHES CLASS 47BD-4000 CY 183.20036,640.00
0.0000.00
0.0000.00

0018                          3051.10 0.7720,130.00015,500.10
EPOXY COATED REINFORCING STEEL FOR PAVEMENT APPROACHES LB 20,130.00015,500.10
0.0000.00
0.0000.00

0019                          6000.10 4,000.001.0004,000.00
ABUTMENT NO.1 EXCAVATION LS 1.0004,000.00
1.0004,000.00
0.0000.00

0020                          6000.11 4,000.001.0004,000.00
ABUTMENT NO.2 EXCAVATION LS 1.0004,000.00
1.0004,000.00
1.0004,000.00

0021                          6000.60 26,000.001.00026,000.00
PIER NO.1 EXCAVATION LS 1.00026,000.00
1.00026,000.00
0.0000.00

0022                          6001.50 20,000.001.00020,000.00
BENT NO.1 EXCAVATION LS 1.00020,000.00
1.00020,000.00
0.0000.00

0023                          6001.51 20,000.001.00020,000.00
BENT NO.2 EXCAVATION LS 1.00020,000.00
1.00020,000.00
0.0000.00

0024                          6005.35 48.00125.4006,019.20
PRECOMPRESSED POLYURETHANE FOAM JOINT LF 125.4006,019.20
0.0000.00
0.0000.00

0025                          6005.78 510.0012.0006,120.00
EXPANSION BEARING, TFE TYPE EACH12.0006,120.00
0.0000.00
0.0000.00

0026                          6005.83 230.0012.0002,760.00
FIXED BEARING EACH12.0002,760.00
0.0000.00
0.0000.00

0027                          6010.22 520.00122.50063,700.00
CLASS 47B-3000 CONCRETE FOR BRIDGE CY 122.50063,700.00
60.92031,678.40
0.0000.00

0028                          6010.26 360.00390.200140,472.00
CLASS 47BD-4000 CONCRETE FOR BRIDGE CY 390.200140,472.00
0.0000.00
0.0000.00

0029                          6011.11 48,000.001.00048,000.00
PRECAST/PRESTRESSED CONCRETE SUPERSTRUCTURE LS 1.00048,000.00
AT STA. 2125+84 0.0000.00
0.0000.00

0030                          6030.00 85,000.001.00085,000.00
PREPARATION OF BRIDGE EACH1.00085,000.00
AT STA. 2125+84 0.30025,500.00
0.20017,000.00

0031                          6080.00 3.00780.0002,340.00
STRUCTURAL STEEL FOR SUBSTRUCTURE LB 780.0002,340.00
780.0002,340.00
780.0002,340.00

0032                          6104.00 9.00210.0001,890.00
BROKEN CONCRETE RIPRAP TON 210.0001,890.00
0.0000.00
0.0000.00

0033                          6131.50 0.8490,250.00075,810.00
EPOXY COATED REINFORCING STEEL LB 90,250.00075,810.00
4,770.2804,007.03
0.0000.00

0034                          6139.50 35.0085.0002,975.00
SUBSURFACE DRAINAGE MATTING SY 85.0002,975.00
0.0000.00
0.0000.00

0035                          6200.00 40.00360.00014,400.00
CONCRETE PILING LF 360.00014,400.00
355.00014,200.00
0.0000.00

0036                          6616.65 115.008.000920.00
BEARING DEVICE REPLACEMENT EACH8.000920.00
0.0000.00
0.0000.00

0037                          8091.00 15.00121.0001,815.00
GRANULAR BACKFILL CY 121.0001,815.00
0.0000.00
0.0000.00

4003                          6200.50 24.000.0000.00
PAY CUT-OFF FOR CONCRETE PILING LF 5.000120.00
5.000120.00
0.0000.00

GROUP 6 BRIDGE AT STA. 2125+40.00 RT.Contracted688,361.30
Current688,481.30
In place220,705.43
This Estimate92,200.00

GROUP 6A BRIDGE AT STA. 2125+40.00 LT.
0038                          0030.60 93,000.001.00093,000.00
MOBILIZATION LS 1.00093,000.00
0.72267,146.00
0.72267,146.00

0039                          3050.15 200.00183.20036,640.00
CONCRETE FOR PAVEMENT APPROACHES CLASS 47BD-4000 CY 183.20036,640.00
0.0000.00
0.0000.00

0040                          3051.10 0.7720,130.00015,500.10
EPOXY COATED REINFORCING STEEL FOR PAVEMENT APPROACHES LB 20,130.00015,500.10
0.0000.00
0.0000.00

0041                          6000.10 4,000.001.0004,000.00
ABUTMENT NO.1 EXCAVATION LS 1.0004,000.00
1.0004,000.00
1.0004,000.00

0042                          6000.11 4,000.001.0004,000.00
ABUTMENT NO.2 EXCAVATION LS 1.0004,000.00
1.0004,000.00
1.0004,000.00

0043                          6000.60 26,000.001.00026,000.00
PIER NO.1 EXCAVATION LS 1.00026,000.00
1.00026,000.00
1.00026,000.00

0044                          6001.50 20,000.001.00020,000.00
BENT NO.1 EXCAVATION LS 1.00020,000.00
1.00020,000.00
0.0000.00

0045                          6001.51 20,000.001.00020,000.00
BENT NO.2 EXCAVATION LS 1.00020,000.00
1.00020,000.00
1.00020,000.00

0046                          6005.35 48.00125.4006,019.20
PRECOMPRESSED POLYURETHANE FOAM JOINT LF 125.4006,019.20
0.0000.00
0.0000.00

0047                          6005.78 510.0012.0006,120.00
EXPANSION BEARING, TFE TYPE EACH12.0006,120.00
0.0000.00
0.0000.00

0048                          6005.83 230.0012.0002,760.00
FIXED BEARING EACH12.0002,760.00
0.0000.00
0.0000.00

0049                          6010.22 520.00122.50063,700.00
CLASS 47B-3000 CONCRETE FOR BRIDGE CY 122.50063,700.00
60.92031,678.40
9.3304,851.60

0050                          6010.26 360.00390.200140,472.00
CLASS 47BD-4000 CONCRETE FOR BRIDGE CY 390.200140,472.00
0.0000.00
0.0000.00

0051                          6011.11 48,000.001.00048,000.00
PRECAST/PRESTRESSED CONCRETE SUPERSTRUCTURE LS 1.00048,000.00
AT STA. 2124+96 0.0000.00
0.0000.00

0052                          6030.00 85,000.001.00085,000.00
PREPARATION OF BRIDGE EACH1.00085,000.00
AT STA. 2124+96 0.30025,500.00
0.30025,500.00

0053                          6080.00 3.00780.0002,340.00
STRUCTURAL STEEL FOR SUBSTRUCTURE LB 780.0002,340.00
780.0002,340.00
780.0002,340.00

0054                          6104.00 9.00210.0001,890.00
BROKEN CONCRETE RIPRAP TON 210.0001,890.00
0.0000.00
0.0000.00

0055                          6131.50 0.8490,250.00075,810.00
EPOXY COATED REINFORCING STEEL LB 90,250.00075,810.00
4,770.2804,007.03
1,363.8801,145.66

0056                          6139.50 35.0085.0002,975.00
SUBSURFACE DRAINAGE MATTING SY 85.0002,975.00
0.0000.00
0.0000.00

0057                          6200.00 40.00360.00014,400.00
CONCRETE PILING LF 360.00014,400.00
340.50013,620.00
0.0000.00

0058                          6616.65 115.008.000920.00
BEARING DEVICE REPLACEMENT EACH8.000920.00
0.0000.00
0.0000.00

0059                          8091.00 15.00121.0001,815.00
GRANULAR BACKFILL CY 121.0001,815.00
0.0000.00
0.0000.00

4002                          6200.50 24.000.0000.00
PAY CUT-OFF FOR CONCRETE PILING LF 13.500324.00
19.500468.00
0.0000.00

GROUP 6A BRIDGE AT STA. 2125+40.00 LT.Contracted671,361.30
Current671,685.30
In place218,759.43
This Estimate154,983.26

GROUP 7 GUARDRAIL
0060                          0030.70 1,150.001.0001,150.00
MOBILIZATION LS 1.0001,150.00
0.0000.00
0.0000.00

0061                          1033.00 1,100.009.45010,395.00
ROADWAY GRADING STA 9.45010,395.00
0.0000.00
0.0000.00

0062                          7011.20 12.00687.5008,250.00
W-BEAM GUARDRAIL LF 687.5008,250.00
0.0000.00
0.0000.00

0063                          7020.00 1,250.004.0005,000.00
BRIDGE APPROACH SECTIONS EACH4.0005,000.00
0.0000.00
0.0000.00

0064                          7024.25 2,150.004.0008,600.00
GUARDRAIL END TREATMENT, TYPE I EACH4.0008,600.00
0.0000.00
0.0000.00

GROUP 7 GUARDRAILContracted33,395.00
Current33,395.00
In place0.00
This Estimate0.00

GROUP 10 GENERAL ITEMS
0065                          0001.00 350.00362.000126,700.00
SURVEILLANCE OF TEMPORARY TRAFFIC CONTROL DEVICES CDAY362.000126,700.00
0.0000.00
0.0000.00

0066                          0001.08 0.5013,424.0006,712.00
BARRICADE, TYPE II BDAY13,424.0006,712.00
0.0000.00
0.0000.00

0067                          0001.10 0.902,002.0001,801.80
BARRICADE, TYPE III BDAY2,002.0001,801.80
300.000270.00
56.00050.40

0068                          0001.75 5.00120.000600.00
TEMPORARY SIGN DAY EACH120.000600.00
0.0000.00
0.0000.00

0069                          0001.90 0.9513,762.00013,073.90
SIGN DAY EACH13,762.00013,073.90
600.000570.00
112.000106.40

0070                          0002.30 0.457,500.0003,375.00
PAVEMENT MARKING REMOVAL LF 7,500.0003,375.00
0.0000.00
0.0000.00

0071                          0002.39 0.857,500.0006,375.00
TEMPORARY PAVEMENT MARKING, TYPE II LF 7,500.0006,375.00
0.0000.00
0.0000.00

0072                          0002.97 35.00372.00013,020.00
FLASHING ARROW PANEL DAY 372.00013,020.00
0.0000.00
0.0000.00

0073                          0003.50 58.00700.00040,600.00
CONCRETE PROTECTION BARRIER LF 700.00040,600.00
0.0000.00
0.0000.00

0074                          0003.56 4.501,925.0008,662.50
RELOCATE CONCRETE PROTECTION BARRIER LF 1,925.0008,662.50
0.0000.00
0.0000.00

0075                          0003.58 3,800.002.0007,600.00
INERTIAL BARRIER SYSTEM EACH2.0007,600.00
0.0000.00
0.0000.00

0076                          0003.64 300.002.000600.00
REPLACEMENT MODULE EACH2.000600.00
0.0000.00
0.0000.00

0077                          0010.04 3,200.001.0003,200.00
FIELD OFFICE EACH0.0000.00
0.0000.00
0.0000.00

0078                          0020.00 0.801,000.000800.00
TRAINING HOUR1,000.000800.00
0.0000.00
0.0000.00

0079                          0030.10 0.001.0000.00
MOBILIZATION LS 1.0000.00
0.0000.00
0.0000.00

4001                          0010.04 2,450.000.0000.00
FIELD OFFICE EACH1.0002,450.00
1.0002,450.00
1.0002,450.00

GROUP 10 GENERAL ITEMSContracted233,120.20
Current232,370.20
In place3,290.00
This Estimate2,606.80

Totals for contractContracted1,686,626.59
Current1,686,320.59
In place442,754.86
This Estimate249,790.06