Return to District Map


Nebraska Department of Roads
Estimate Summary to Contractor
Vendor ID:2252 PAULSEN, INC.
Contract ID:6316X
Estimate Number:0005
Pay Period End Date:01.31.2003
Contract Location:
WESTERN CANAL BR CROSSOVERSEstimate Type:FINL
Contractor:
PAULSEN, INC.Date Let:08.07.2002
1116 EAST HWY 30Date Awarded:08.08.2002
P O BOX 17Date Contract Executed:08.15.2002
Date Notice to Proceed:08.15.2002
COZAD NE 69130Date Work Began:09.23.2002
Phone:Date Physical Work Completed:
(308)784-3333Date Accepted:12.16.2002
Escrow Agent:
Surety Co:
ST. PAUL FIRE AND MARINE INSURANCE COMPANY
Counties
KEITH
Project Number PCT Fed State Project Number Description
61316 000  0.000 ER-80-3(127)  BITUMINOUS
Total to DatePrev to DateThis Estimate
Current Contract AmtTotal Earnings$301,326.06$301,326.06$.00
$299,446.95Stockpiled Materials$.00$.00$.00
Original Contract AmtGross Earnings$301,326.06$301,326.06$.00
$294,279.45Retainage$.00$-3,013.26$3,013.26
Escrow Amount$.00$.00$.00
Percent CompleteSecurities Encumbered$.00$.00$.00
100.63%Net Earnings$301,326.06$298,312.80$3,013.26
Liquidated Damages$.00$.00$.00
Incentives$.00$.00$.00
Disincentives$.00$.00$.00
Other Contract Adj$.00$.00$.00
Appl of Training Adj$.00$.00$.00
Training Rates Adj$.00$.00$.00
Fuel Adj$.00$.00$.00
Bituminous Adj$.00$.00$.00
Autopay Adj$.00$.00$.00
Gasoline Adj$.00$.00$.00
Other Adj$.00$.00$.00
Price Adj$.00$.00$.00
Substandard Item Adj$.00$.00$.00
Asphalt Adj$.00$.00$.00
Diesel Fuel Adj$.00$.00$.00
Petrol Adj$.00$.00$.00
Total for Adjustments$.00$.00$.00
Payment$301,326.06$298,312.80$3,013.26
Project ManagerDiv. Head/Dist. Eng.
Brinker, Gary02.07.2003O'Donnell, Les02.18.2003
Constr. Estimate Eng.Materials Eng.
Davis, Carl02.24.2003Hall, David02.24.2003
Controller Div. Processed
Harring, Joyce04.02.2003
Detailed breakdown of stockpiled materials
Total remaining for contract:0.00
1. Contracted
2. Current
3. To date
Item Nbr        Item CodeUnit Price4. This Est
Item DescriptionUnitsQtyAmount
GROUP 9 BITUMINOUS
0001                          A780.10 20,000.001.00020,000.00
CROSSOVER LIGHTING SYSTEM EACH1.00020,000.00
AT STA. 1332+00 1.00020,000.00
0.0000.00

0002                          A780.11 20,000.001.00020,000.00
CROSSOVER LIGHTING SYSTEM EACH1.00020,000.00
AT STA. 1365+00 1.00020,000.00
0.0000.00

0003                          P600.12 13.40500.0006,700.00
12" CULVERT PIPE, TYPE 2,3,4,5,7 OR 8 LF 500.0006,700.00
500.0006,700.00
0.0000.00

0004                          0001.08 0.501,760.000880.00
BARRICADE, TYPE II BDAY1,760.000880.00
8,862.0004,431.00
0.0000.00

0005                          0001.10 2.65246.000651.90
BARRICADE, TYPE III BDAY246.000651.90
278.000736.70
0.0000.00

0006                          0001.75 6.75480.0003,240.00
TEMPORARY SIGN DAY EACH480.0003,240.00
470.0003,172.50
0.0000.00

0007                          0001.90 0.90984.000885.60
SIGN DAY EACH984.000885.60
1,384.0001,245.60
0.0000.00

0008                          0002.97 58.0040.0002,320.00
FLASHING ARROW PANEL DAY 40.0002,320.00
45.0002,610.00
0.0000.00

0009                          0003.10 190.0010.0001,900.00
FLAGGING DAY 10.0001,900.00
0.0000.00
0.0000.00

0010                          0030.90 29,500.001.00029,500.00
MOBILIZATION LS 1.00029,500.00
1.00029,500.00
0.0000.00

0011                          1033.00 1,700.0026.22044,574.00
ROADWAY GRADING STA 26.22044,574.00
26.37044,829.00
0.0000.00

0012                          1101.00 3.851,045.0004,023.25
REMOVE PAVEMENT SY 1,045.0004,023.25
919.0003,538.15
0.0000.00

0013                          4310.12 120.002.000240.00
12" FLARED-END SECTION EACH2.000240.00
2.000240.00
0.0000.00

0014                          9188.25 25.306,299.000159,364.70
MEDIAN CROSSOVER SURFACING SY 6,299.000159,364.70
6,299.000159,364.70
0.0000.00

4001                          1101.25 1.250.0000.00
SAWING PAVEMENT LF 3,350.0004,187.50
3,182.7003,978.38
0.0000.00

4002                          4976.05 980.000.0000.00
ADDITIONAL WORK LS 1.000980.00
1.000980.00
0.0000.00

GROUP 9 BITUMINOUSContracted294,279.45
Current299,446.95
In place301,326.03
This Estimate0.00

Totals for contractContracted294,279.45
Current299,446.95
In place301,326.03
This Estimate0.00