| | | 1. Contracted
|
|---|
| | | 2. Current
|
|---|
| | | 3. To date
|
|---|
| Item Nbr Item Code | Unit Price | | 4. This Est
|
|---|
| Item Description | Units | Qty | Amount
|
|---|
| GROUP 6 BRIDGE AT STA. 1020+36.45 | | |
|
| 0001 L020.10 | 2.00 | 2,188.000 | 4,376.00
|
| EROSION CONTROL, TYPE HV | SY | 2,188.000 | 4,376.00
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 0002 L022.11 | 5.50 | 200.000 | 1,100.00
|
| FABRIC SILT FENCE-LOW POROSITY | LF | 200.000 | 1,100.00
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 0003 0001.08 | 0.50 | 684.000 | 342.00
|
| BARRICADE, TYPE II | BDAY | 684.000 | 342.00
|
| | | 330.000 | 165.00
|
| | 90.000 | 45.00
|
| | |
|
| 0004 0001.10 | 2.80 | 456.000 | 1,276.80
|
| BARRICADE, TYPE III | BDAY | 456.000 | 1,276.80
|
| | | 208.000 | 582.40
|
| | 60.000 | 168.00
|
| | |
|
| 0005 0001.90 | 0.60 | 3,876.000 | 2,325.60
|
| SIGN DAY | EACH | 3,876.000 | 2,325.60
|
| | | 2,009.000 | 1,205.40
|
| | 570.000 | 342.00
|
| | |
|
| 0006 0002.30 | 0.80 | 155.000 | 124.00
|
| PAVEMENT MARKING REMOVAL | LF | 155.000 | 124.00
|
| | | 355.000 | 284.00
|
| | 0.000 | 0.00
|
| | |
|
| 0007 0002.39 | 1.70 | 2,000.000 | 3,400.00
|
| TEMPORARY PAVEMENT MARKING, TYPE II | LF | 2,000.000 | 3,400.00
|
| | | 4,579.000 | 7,784.30
|
| | 0.000 | 0.00
|
| | |
|
| 0008 0002.47 | 2.10 | 1,000.000 | 2,100.00
|
| TEMPORARY PAVEMENT MARKING SURFACE PREPARATION | LF | 1,000.000 | 2,100.00
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 0009 0003.51 | 14.00 | 470.000 | 6,580.00
|
| INSTALL CONCRETE PROTECTION BARRIER | LF | 470.000 | 6,580.00
|
| | | 460.000 | 6,440.00
|
| | 0.000 | 0.00
|
| | |
|
| 0010 0003.56 | 4.00 | 470.000 | 1,880.00
|
| RELOCATE CONCRETE PROTECTION BARRIER | LF | 470.000 | 1,880.00
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 0011 0010.04 | 1,500.00 | 1.000 | 1,500.00
|
| FIELD OFFICE | EACH | 1.000 | 1,500.00
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 0012 0030.60 | 7,800.00 | 1.000 | 7,800.00
|
| MOBILIZATION | LS | 1.000 | 7,800.00
|
| | | 1.000 | 7,800.00
|
| | 0.000 | 0.00
|
| | |
|
| 0013 1009.00 | 1,150.00 | 1.000 | 1,150.00
|
| GENERAL CLEARING AND GRUBBING | LS | 1.000 | 1,150.00
|
| | | 0.500 | 575.00
|
| | 0.000 | 0.00
|
| | |
|
| 0014 1010.01 | 18.00 | 225.000 | 4,050.00
|
| EXCAVATION (ESTABLISHED QUANTITY) | CY | 225.000 | 4,050.00
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 0015 1011.00 | 18.00 | 12.000 | 216.00
|
| WATER | MGAL | 12.000 | 216.00
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 0016 1030.00 | 9.60 | 517.000 | 4,963.20
|
| EARTHWORK MEASURED IN EMBANKMENT | CY | 517.000 | 4,963.20
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 0017 1043.50 | 1.85 | 80.000 | 148.00
|
| RIPRAP FILTER FABRIC | SY | 80.000 | 148.00
|
| | | 72.500 | 134.13
|
| | 0.000 | 0.00
|
| | |
|
| 0018 1101.00 | 7.70 | 551.000 | 4,242.70
|
| REMOVE PAVEMENT | SY | 551.000 | 4,242.70
|
| | | 82.850 | 637.95
|
| | 0.000 | 0.00
|
| | |
|
| 0019 3050.15 | 292.00 | 191.700 | 55,976.40
|
| CONCRETE FOR PAVEMENT APPROACHES CLASS 47BD-4000 | CY | 191.700 | 55,976.40
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 0020 3051.10 | 0.60 | 21,470.000 | 12,882.00
|
| EPOXY COATED REINFORCING STEEL FOR PAVEMENT APPROACHES | LB | 21,470.000 | 12,882.00
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 0021 6000.10 | 1,500.00 | 1.000 | 1,500.00
|
| ABUTMENT NO.1 EXCAVATION | LS | 1.000 | 1,500.00
|
| | | 1.000 | 1,500.00
|
| | 0.000 | 0.00
|
| | |
|
| 0022 6000.11 | 1,500.00 | 1.000 | 1,500.00
|
| ABUTMENT NO.2 EXCAVATION | LS | 1.000 | 1,500.00
|
| | | 1.000 | 1,500.00
|
| | 0.000 | 0.00
|
| | |
|
| 0023 6005.35 | 52.00 | 107.000 | 5,564.00
|
| PRECOMPRESSED POLYURETHANE FOAM JOINT | LF | 107.000 | 5,564.00
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 0024 6005.78 | 544.00 | 6.000 | 3,264.00
|
| EXPANSION BEARING, TFE TYPE | EACH | 6.000 | 3,264.00
|
| | | 3.000 | 1,632.00
|
| | 0.000 | 0.00
|
| | |
|
| 0025 6005.83 | 324.00 | 6.000 | 1,944.00
|
| FIXED BEARING | EACH | 6.000 | 1,944.00
|
| | | 3.000 | 972.00
|
| | 0.000 | 0.00
|
| | |
|
| 0026 6010.22 | 426.00 | 54.000 | 23,004.00
|
| CLASS 47B-3000 CONCRETE FOR BRIDGE | CY | 54.000 | 23,004.00
|
| | | 13.820 | 5,887.32
|
| | 6.000 | 2,556.00
|
| | |
|
| 0027 6010.26 | 426.00 | 87.600 | 37,317.60
|
| CLASS 47BD-4000 CONCRETE FOR BRIDGE | CY | 87.600 | 37,317.60
|
| | | 33.970 | 14,471.22
|
| | 29.070 | 12,383.82
|
| | |
|
| 0028 6030.00 | 11,400.00 | 1.000 | 11,400.00
|
| PREPARATION OF BRIDGE | EACH | 1.000 | 11,400.00
|
| AT STA. 1020+36.45 | | 0.500 | 5,700.00
|
| | 0.000 | 0.00
|
| | |
|
| 0029 6071.12 | 38,270.00 | 1.000 | 38,270.00
|
| STEEL SUPERSTRUCTURE | LS | 1.000 | 38,270.00
|
| AT STA. 1020+36.45 | | 0.500 | 19,135.00
|
| | 0.000 | 0.00
|
| | |
|
| 0030 6105.01 | 47.00 | 25.000 | 1,175.00
|
| ROCK RIPRAP, TYPE A | TON | 25.000 | 1,175.00
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 0031 6105.02 | 36.00 | 205.000 | 7,380.00
|
| ROCK RIPRAP, TYPE B | TON | 205.000 | 7,380.00
|
| | | 88.900 | 3,200.40
|
| | 0.000 | 0.00
|
| | |
|
| 0032 6131.50 | 0.69 | 20,625.000 | 14,231.25
|
| EPOXY COATED REINFORCING STEEL | LB | 20,625.000 | 14,231.25
|
| | | 5,428.667 | 3,745.78
|
| | 4,499.667 | 3,104.77
|
| | |
|
| 0033 6210.12 | 26.00 | 1,040.000 | 27,040.00
|
| HP 10"X42# STEEL PILING | LF | 1,040.000 | 27,040.00
|
| | | 295.000 | 7,670.00
|
| | 225.000 | 5,850.00
|
| | |
|
| 0034 6510.55 | 3,600.00 | 1.000 | 3,600.00
|
| TEMPORARY BRIDGE SHORING | LS | 1.000 | 3,600.00
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 0035 7011.20 | 18.00 | 100.000 | 1,800.00
|
| W-BEAM GUARDRAIL | LF | 100.000 | 1,800.00
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 0036 7017.00 | 3.00 | 281.000 | 843.00
|
| REMOVE GUARDRAIL | LF | 281.000 | 843.00
|
| | | 144.000 | 432.00
|
| | 0.000 | 0.00
|
| | |
|
| 0037 7020.00 | 1,260.00 | 4.000 | 5,040.00
|
| BRIDGE APPROACH SECTIONS | EACH | 4.000 | 5,040.00
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 0038 7024.27 | 1,750.00 | 4.000 | 7,000.00
|
| GUARDRAIL END TREATMENT, TYPE II | EACH | 4.000 | 7,000.00
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 0039 7503.04 | 4.10 | 200.000 | 820.00
|
| 4" YELLOW PREFORMED PAVEMENT MARKING, TYPE 4 | LF | 200.000 | 820.00
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 0040 8091.00 | 11.00 | 85.000 | 935.00
|
| GRANULAR BACKFILL | CY | 85.000 | 935.00
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 0041 9005.30 | 80.00 | 180.000 | 14,400.00
|
| ASPHALTIC CONCRETE, TYPE SP2(0.5) | TON | 180.000 | 14,400.00
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 0042 9009.75 | 40.00 | 51.000 | 2,040.00
|
| TEMPORARY SURFACING | SY | 51.000 | 2,040.00
|
| | | 135.800 | 5,432.00
|
| | 0.000 | 0.00
|
| | |
|
| 0043 9021.01 | 340.00 | 9.720 | 3,304.80
|
| PERFORMANCE GRADED BINDER (64-22) | TON | 9.720 | 3,304.80
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 0044 9110.01 | 50.00 | 10.000 | 500.00
|
| RENTAL OF LOADER, FULLY OPERATED | HOUR | 10.000 | 500.00
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 0045 9110.03 | 50.00 | 10.000 | 500.00
|
| RENTAL OF DUMP TRUCK, FULLY OPERATED | HOUR | 10.000 | 500.00
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 0046 9110.06 | 40.00 | 10.000 | 400.00
|
| RENTAL OF BACKHOE, FULLY OPERATED | HOUR | 10.000 | 400.00
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 0047 9110.07 | 30.00 | 10.000 | 300.00
|
| RENTAL OF SKID LOADER, FULLY OPERATED | HOUR | 10.000 | 300.00
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 0048 9188.50 | 42.00 | 94.000 | 3,948.00
|
| SURFACING UNDER GUARDRAIL | SY | 94.000 | 3,948.00
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 4001 0003.10 | 208.00 | 0.000 | 0.00
|
| FLAGGING | DAY | 10.000 | 2,080.00
|
| | | 5.000 | 1,040.00
|
| | 0.000 | 0.00
|
| | |
|
| 4003 0001.75 | 2.00 | 0.000 | 0.00
|
| TEMPORARY SIGN DAY | EACH | 40.000 | 80.00
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 4005 1101.25 | 2.50 | 0.000 | 0.00
|
| SAWING PAVEMENT | LF | 90.000 | 225.00
|
| | | 172.000 | 430.00
|
| | 0.000 | 0.00
|
| | |
|
| GROUP 6 BRIDGE AT STA. 1020+36.45 | | Contracted | 335,453.35
|
| | Current | 337,838.35
|
| | In place | 98,355.90
|
| | This Estimate | 24,449.59
|
| | |
|
| GROUP 6A BRIDGE AT STA. 175+57 | | |
|
| 0049 L020.00 | 3.30 | 847.000 | 2,795.10
|
| EROSION CONTROL | SY | 847.000 | 2,795.10
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 0050 0001.08 | 0.50 | 186.000 | 93.00
|
| BARRICADE, TYPE II | BDAY | 186.000 | 93.00
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 0051 0001.10 | 2.80 | 124.000 | 347.20
|
| BARRICADE, TYPE III | BDAY | 124.000 | 347.20
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 0052 0001.90 | 0.60 | 1,054.000 | 632.40
|
| SIGN DAY | EACH | 1,054.000 | 632.40
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 0053 0002.30 | 0.80 | 2,000.000 | 1,600.00
|
| PAVEMENT MARKING REMOVAL | LF | 2,000.000 | 1,600.00
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 0054 0002.31 | 0.60 | 1,250.000 | 750.00
|
| TEMPORARY PAVEMENT MARKING | LF | 1,250.000 | 750.00
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 0055 0002.47 | 2.20 | 750.000 | 1,650.00
|
| TEMPORARY PAVEMENT MARKING SURFACE PREPARATION | LF | 750.000 | 1,650.00
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 0056 0003.56 | 10.00 | 800.000 | 8,000.00
|
| RELOCATE CONCRETE PROTECTION BARRIER | LF | 800.000 | 8,000.00
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 0057 0030.60 | 2,600.00 | 1.000 | 2,600.00
|
| MOBILIZATION | LS | 1.000 | 2,600.00
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 0058 1009.00 | 800.00 | 1.000 | 800.00
|
| GENERAL CLEARING AND GRUBBING | LS | 1.000 | 800.00
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 0059 1033.00 | 2,950.00 | 2.710 | 7,994.50
|
| ROADWAY GRADING | STA | 2.710 | 7,994.50
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 0060 1102.00 | 5.00 | 262.000 | 1,310.00
|
| REMOVE ASPHALT SURFACE | SY | 262.000 | 1,310.00
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 0061 6010.26 | 550.00 | 23.900 | 13,145.00
|
| CLASS 47BD-4000 CONCRETE FOR BRIDGE | CY | 23.900 | 13,145.00
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 0062 6020.00 | 0.76 | 2,515.000 | 1,911.40
|
| REINFORCING STEEL FOR BRIDGE | LB | 2,515.000 | 1,911.40
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 0063 7011.20 | 20.00 | 68.750 | 1,375.00
|
| W-BEAM GUARDRAIL | LF | 68.750 | 1,375.00
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 0064 7017.00 | 3.00 | 400.000 | 1,200.00
|
| REMOVE GUARDRAIL | LF | 400.000 | 1,200.00
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 0065 7020.00 | 1,250.00 | 4.000 | 5,000.00
|
| BRIDGE APPROACH SECTIONS | EACH | 4.000 | 5,000.00
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 0066 7024.27 | 1,800.00 | 4.000 | 7,200.00
|
| GUARDRAIL END TREATMENT, TYPE II | EACH | 4.000 | 7,200.00
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 0067 9188.50 | 33.00 | 241.000 | 7,953.00
|
| SURFACING UNDER GUARDRAIL | SY | 241.000 | 7,953.00
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 4002 0003.10 | 208.00 | 0.000 | 0.00
|
| FLAGGING | DAY | 10.000 | 2,080.00
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 4004 0001.75 | 2.00 | 0.000 | 0.00
|
| TEMPORARY SIGN DAY | EACH | 40.000 | 80.00
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| GROUP 6A BRIDGE AT STA. 175+57 | | Contracted | 66,356.60
|
| | Current | 68,516.60
|
| | In place | 0.00
|
| | This Estimate | 0.00
|
| | |
|
| Totals for contract | | Contracted | 401,809.95
|
|---|
| | Current | 406,354.95
|
|---|
| | In place | 98,355.90
|
|---|
| | This Estimate | 24,449.59
|
|---|