Estimate Summary to Contractor
Vendor ID:2126 CEMENT PRODUCTS, INC.
Contract ID:6143
Estimate Number:0001
Pay Period End Date:07.19.2003
Contract Location:
HERSHEY - NORTH PLATTEEstimate Type:PROG
Contractor:
CEMENT PRODUCTS, INC.Date Let:12.19.2002
601 EAST 7THDate Awarded:12.27.2002
PO BOX 1091Date Contract Executed:01.15.2003
Date Notice to Proceed:01.15.2003
NORTH PLATTE NE 69103Date Work Began:
Phone:Date Physical Work Completed:
(308)532-0240Date Accepted:
Escrow Agent:
Surety Co:
TRAVELERS CASUALTY AND SURETY COMPANY OF AMERICA
Counties
LINCOLN
Project Number PCT Fed State Project Number Description
61143 000  0.000 EACSTPD-30-2(136)  GR CULV BIT
Total to DatePrev to DateThis Estimate
Current Contract AmtTotal Earnings$30,852.80$.00$30,852.80
$370,058.98Stockpiled Materials$.00$.00$.00
Original Contract AmtGross Earnings$30,852.80$.00$30,852.80
$370,058.98Retainage$-308.53$.00$-308.53
Escrow Amount$.00$.00$.00
Percent CompleteSecurities Encumbered$.00$.00$.00
8.34%Net Earnings$30,544.27$.00$30,544.27
Liquidated Damages$.00$.00$.00
Incentives$.00$.00$.00
Disincentives$.00$.00$.00
Other Contract Adj$.00$.00$.00
Appl of Training Adj$.00$.00$.00
Training Rates Adj$.00$.00$.00
Fuel Adj$.00$.00$.00
Bituminous Adj$.00$.00$.00
Autopay Adj$.00$.00$.00
Gasoline Adj$.00$.00$.00
Other Adj$.00$.00$.00
Price Adj$.00$.00$.00
Substandard Item Adj$.00$.00$.00
Asphalt Adj$.00$.00$.00
Diesel Fuel Adj$.00$.00$.00
Petrol Adj$.00$.00$.00
Total for Adjustments$.00$.00$.00
Payment$30,544.27$.00$30,544.27
Project ManagerDiv. Head/Dist. Eng.
Thomsen, Toby07.21.2003O'Donnell, Les07.22.2003
Constr. Estimate Eng.Materials Eng.
Bartos, Steve07.22.2003
Controller Div. Processed
Burling, Laurie07.24.2003
Detailed breakdown of stockpiled materials
Total remaining for contract:0.00
1. Contracted
2. Current
3. To date
Item Nbr        Item CodeUnit Price4. This Est
Item DescriptionUnitsQtyAmount
GROUP 1 GRADING
0001                          0030.10 5,400.001.0005,400.00
MOBILIZATION LS 1.0005,400.00
1.0005,400.00
1.0005,400.00

0002                          1009.00 1,500.001.0001,500.00
GENERAL CLEARING AND GRUBBING LS 1.0001,500.00
0.570855.00
0.570855.00

0003                          1010.01 4.003,328.00013,312.00
EXCAVATION (ESTABLISHED QUANTITY) CY 3,328.00013,312.00
0.0000.00
0.0000.00

0004                          1010.50 10.00530.0005,300.00
REMOVAL OF UNSUITABLE MATERIAL CY 530.0005,300.00
0.0000.00
0.0000.00

0005                          1011.00 1.0066.00066.00
WATER MGAL66.00066.00
0.0000.00
0.0000.00

0006                          1012.00 100.003.000300.00
RIGHT-OF-WAY MARKERS EACH3.000300.00
0.0000.00
0.0000.00

0007                          1030.00 4.004,440.00017,760.00
EARTHWORK MEASURED IN EMBANKMENT CY 4,440.00017,760.00
1,650.0006,600.00
1,650.0006,600.00

0008                          1101.00 5.001,182.6005,913.00
REMOVE PAVEMENT SY 1,182.6005,913.00
0.0000.00
0.0000.00

0009                          7017.00 3.00275.000825.00
REMOVE GUARDRAIL LF 275.000825.00
0.0000.00
0.0000.00

0010                          9110.01 50.0010.000500.00
RENTAL OF LOADER, FULLY OPERATED HOUR10.000500.00
0.0000.00
0.0000.00

0011                          9110.03 45.0010.000450.00
RENTAL OF DUMP TRUCK, FULLY OPERATED HOUR10.000450.00
0.0000.00
0.0000.00

0012                          9110.06 50.0010.000500.00
RENTAL OF BACKHOE, FULLY OPERATED HOUR10.000500.00
0.0000.00
0.0000.00

0013                          9110.07 35.0010.000350.00
RENTAL OF SKID LOADER, FULLY OPERATED HOUR10.000350.00
0.0000.00
0.0000.00

0014                          L020.00 2.25890.0002,002.50
EROSION CONTROL SY 890.0002,002.50
0.0000.00
0.0000.00

0015                          L021.06 18.00152.0002,736.00
EROSION CHECKS, TYPE HV BALE152.0002,736.00
0.0000.00
0.0000.00

0016                          L022.11 3.50500.0001,750.00
FABRIC SILT FENCE-LOW POROSITY LF 500.0001,750.00
116.000406.00
116.000406.00

0017                          P300.48 61.25240.00014,700.00
48" CULVERT PIPE, TYPE 3,4 OR 5 LF 240.00014,700.00
280.00017,150.00
280.00017,150.00

GROUP 1 GRADINGContracted73,364.50
Current73,364.50
In place30,411.00
This Estimate30,411.00

GROUP 3 CONCRETE PAVEMENT
0018                          0002.30 0.50500.000250.00
PAVEMENT MARKING REMOVAL LF 500.000250.00
0.0000.00
0.0000.00

0019                          0002.39 0.653,700.0002,405.00
TEMPORARY PAVEMENT MARKING, TYPE II LF 3,700.0002,405.00
0.0000.00
0.0000.00

0020                          0002.47 1.101,600.0001,760.00
TEMPORARY PAVEMENT MARKING SURFACE PREPARATION LF 1,600.0001,760.00
0.0000.00
0.0000.00

0021                          0030.30 23,500.001.00023,500.00
MOBILIZATION LS 1.00023,500.00
0.0000.00
0.0000.00

0022                          2020.50 10.50645.0006,772.50
SURFACING SY 645.0006,772.50
0.0000.00
0.0000.00

0023                          3075.12 25.00322.8008,070.00
6" CONCRETE PAVEMENT, CLASS 47B-3500 SY 322.8008,070.00
0.0000.00
0.0000.00

0024                          3075.36 27.00484.10013,070.70
8" DOWELED CONCRETE PAVEMENT, CLASS 47B-3500 SY 484.10013,070.70
0.0000.00
0.0000.00

0025                          3089.25 19.553,470.00067,838.50
TEMPORARY SURFACING SY 3,470.00067,838.50
0.0000.00
0.0000.00

0026                          8029.75 7.25807.0005,850.75
BITUMINOUS FOUNDATION COURSE SY 807.0005,850.75
0.0000.00
0.0000.00

0027                          8111.00 350.003.6301,270.50
SHOULDER SUBGRADE PREPARATION STA 3.6301,270.50
0.0000.00
0.0000.00

0028                          9111.00 8.1012.00097.20
WATER MGAL12.00097.20
0.0000.00
0.0000.00

0029                          9173.00 375.001.815680.63
SUBGRADE PREPARATION STA 1.815680.63
0.0000.00
0.0000.00

0030                          L001.01 675.002.0001,350.00
SEEDING, TYPE A ACRE2.0001,350.00
0.0000.00
0.0000.00

0031                          L001.02 600.000.600360.00
SEEDING, TYPE B ACRE0.600360.00
0.0000.00
0.0000.00

0032                          L006.50 3,000.000.9002,700.00
TEMPORARY SEEDING ACRE0.9002,700.00
0.0000.00
0.0000.00

0033                          L032.75 110.006.000660.00
MULCH TON 6.000660.00
0.0000.00
0.0000.00

GROUP 3 CONCRETE PAVEMENTContracted136,635.78
Current136,635.78
In place0.00
This Estimate0.00

GROUP 4 CULVERT
0034                          0030.40 1,500.001.0001,500.00
MOBILIZATION LS 1.0001,500.00
0.0000.00
0.0000.00

0035                          4050.01 12.0076.000912.00
EXCAVATION FOR PIPE, PIPE-ARCH CULVERTS, AND HEADWALLS CY 76.000912.00
0.0000.00
0.0000.00

0036                          4310.24 500.001.000500.00
24" FLARED-END SECTION EACH1.000500.00
0.0000.00
0.0000.00

0037                          4310.36 750.001.000750.00
36" FLARED-END SECTION EACH1.000750.00
0.0000.00
0.0000.00

0038                          6040.00 5,000.001.0005,000.00
REMOVE STRUCTURE EACH1.0005,000.00
AT STA. 1893+60.10 0.0000.00
0.0000.00

0039                          P120.24 35.0066.0002,310.00
24" CULVERT PIPE, TYPE 2 LF 66.0002,310.00
0.0000.00
0.0000.00

0040                          P120.36 60.0024.0001,440.00
36" CULVERT PIPE, TYPE 2 LF 24.0001,440.00
0.0000.00
0.0000.00

GROUP 4 CULVERTContracted12,412.00
Current12,412.00
In place0.00
This Estimate0.00

GROUP 4A CONCRETE BOX CULVERT AT STA.1893+60.10
0041                          0030.40 5,000.001.0005,000.00
MOBILIZATION LS 1.0005,000.00
0.0000.00
0.0000.00

0042                          4051.01 15.00113.0001,695.00
EXCAVATION FOR BOX CULVERTS CY 113.0001,695.00
0.0000.00
0.0000.00

0043                          4101.06 250.00392.01098,002.50
CLASS 47B-3000 OR AX-3000 CONCRETE FOR BOX CULVERT CY 392.01098,002.50
0.0000.00
0.0000.00

0044                          4151.00 0.6041,140.00024,684.00
REINFORCING STEEL FOR BOX CULVERT LB 41,140.00024,684.00
0.0000.00
0.0000.00

GROUP 4A CONCRETE BOX CULVERT AT STA.1893+60.10Contracted129,381.50
Current129,381.50
In place0.00
This Estimate0.00

GROUP 10 GENERAL ITEMS
0045                          0001.08 0.501,940.000970.00
BARRICADE, TYPE II BDAY1,940.000970.00
0.0000.00
0.0000.00

0046                          0001.10 1.30692.000899.60
BARRICADE, TYPE III BDAY692.000899.60
10.00013.00
10.00013.00

0047                          0001.90 0.602,576.0001,545.60
SIGN DAY EACH2,576.0001,545.60
48.00028.80
48.00028.80

0048                          0001.99 2.50332.000830.00
CONTRACTOR FURNISHED SIGN DAY EACH332.000830.00
0.0000.00
0.0000.00

0049                          0003.10 200.0016.0003,200.00
FLAGGING DAY 16.0003,200.00
2.000400.00
2.000400.00

0050                          0005.10 60.0097.0005,820.00
TRAFFIC CONTROL MANAGEMENT DAY 97.0005,820.00
0.0000.00
0.0000.00

0051                          0010.04 2,500.001.0002,500.00
FIELD OFFICE EACH1.0002,500.00
0.0000.00
0.0000.00

0052                          0030.10 2,500.001.0002,500.00
MOBILIZATION LS 1.0002,500.00
0.0000.00
0.0000.00

GROUP 10 GENERAL ITEMSContracted18,265.20
Current18,265.20
In place441.80
This Estimate441.80

Totals for contractContracted370,058.98
Current370,058.98
In place30,852.80
This Estimate30,852.80