Estimate Summary to Contractor
Vendor ID:0013 DIAMOND ENGINEERING COMPANY/THE
Contract ID:6062
Estimate Number:0008
Pay Period End Date:01.03.2003
Contract Location:
BREWSTER SOUTHEASTEstimate Type:FINL
Contractor:
DIAMOND ENGINEERING COMPANY/THEDate Let:02.07.2002
1521 W ANNADate Awarded:02.27.2002
PO BOX 1327Date Contract Executed:04.03.2002
Date Notice to Proceed:04.03.2002
GRAND ISLAND NE 68802Date Work Began:05.20.2002
Phone:Date Physical Work Completed:
(308)382-8362Date Accepted:09.04.2002
Escrow Agent:
Surety Co:
TRAVELERS CASUALTY AND SURETY COMPANY OF AMERICA
Counties
BLAINE
Project Number PCT Fed State Project Number Description
61062 000  0.000 BRO-7005(2)  BRIDGE
Total to DatePrev to DateThis Estimate
Current Contract AmtTotal Earnings$355,150.96$355,150.96$.00
$359,886.95Stockpiled Materials$.00$.00$.00
Original Contract AmtGross Earnings$355,150.96$355,150.96$.00
$357,009.72Retainage$.00$-3,551.51$3,551.51
Escrow Amount$.00$.00$.00
Percent CompleteSecurities Encumbered$.00$.00$.00
98.68%Net Earnings$355,150.96$351,599.45$3,551.51
Liquidated Damages$.00$.00$.00
Incentives$.00$.00$.00
Disincentives$.00$.00$.00
Other Contract Adj$.00$.00$.00
Appl of Training Adj$.00$.00$.00
Training Rates Adj$.00$.00$.00
Fuel Adj$111.50$111.50$.00
Bituminous Adj$.00$.00$.00
Autopay Adj$.00$.00$.00
Gasoline Adj$.00$.00$.00
Other Adj$.00$.00$.00
Price Adj$.00$.00$.00
Substandard Item Adj$.00$.00$.00
Asphalt Adj$.00$.00$.00
Diesel Fuel Adj$.00$.00$.00
Petrol Adj$.00$.00$.00
Total for Adjustments$111.50$111.50$.00
Payment$355,262.46$351,710.95$3,551.51
Project ManagerDiv. Head/Dist. Eng.
White, Dennis01.03.2003Thayer, Gary01.07.2003
Constr. Estimate Eng.Materials Eng.
Davis, Carl01.08.2003Hall, David01.15.2003
Controller Div. Processed
Harring, Joyce01.31.2003
Detailed breakdown of stockpiled materials
Total remaining for contract:0.00
1. Contracted
2. Current
3. To date
Item Nbr        Item CodeUnit Price4. This Est
Item DescriptionUnitsQtyAmount
GROUP 6 BRIDGE AT STA. 5+52.5
0001                          L006.00 400.001.100440.00
COVER CROP SEEDING ha 1.100440.00
1.100440.00
0.0000.00

0002                          0001.10 3.001,750.0005,250.00
BARRICADE, TYPE III BDAY1,750.0005,250.00
972.0002,916.00
0.0000.00

0003                          0001.30 3.50250.000875.00
TYPE B HIGH INTENSITY WARNING LIGHT LDAY250.000875.00
241.000843.50
0.0000.00

0004                          0001.90 0.601,250.000750.00
SIGN DAY EACH1,250.000750.00
972.000583.20
0.0000.00

0005                          0030.60 24,500.001.00024,500.00
MOBILIZATION LS 1.00024,500.00
1.00024,500.00
0.0000.00

0006                          1000.00 500.001.000500.00
LARGE TREE REMOVAL EACH1.000500.00
0.0000.00
0.0000.00

0007                          1009.00 1,500.001.0001,500.00
GENERAL CLEARING AND GRUBBING LS 1.0001,500.00
1.0001,500.00
0.0000.00

0008                          1010.01 6.501,245.0008,092.50
EXCAVATION (ESTABLISHED QUANTITY) m3 1,245.0008,092.50
1,245.0008,092.50
0.0000.00

0009                          1011.00 3.00100.000300.00
WATER kL 100.000300.00
15.00045.00
0.0000.00

0010                          1030.00 10.502,530.00026,565.00
EARTHWORK MEASURED IN EMBANKMENT m3 2,530.00026,565.00
2,530.00026,565.00
0.0000.00

0011                          4050.01 50.004.000200.00
EXCAVATION FOR PIPE, PIPE-ARCH CULVERTS, AND HEADWALLS m3 4.000200.00
4.000200.00
0.0000.00

0012                          4350.36 200.004.400880.00
900 mm CORRUGATED METAL PIPE m 4.400880.00
3.000600.00
0.0000.00

0013                          6000.10 1,425.001.0001,425.00
ABUTMENT NO.1 EXCAVATION LS 1.0001,425.00
1.0001,425.00
0.0000.00

0014                          6000.11 1,425.001.0001,425.00
ABUTMENT NO.2 EXCAVATION LS 1.0001,425.00
1.0001,425.00
0.0000.00

0015                          6010.22 492.0056.76027,925.92
CLASS 47B-20 CONCRETE FOR BRIDGE m3 56.76027,925.92
56.76027,925.92
0.0000.00

0016                          6010.26 453.00103.47046,871.91
CLASS 47BD-30 CONCRETE FOR BRIDGE m3 103.47046,871.91
103.47046,871.91
0.0000.00

0017                          6011.11 108,500.001.000108,500.00
PRECAST/PRESTRESSED CONCRETE SUPERSTRUCTURE LS 1.000108,500.00
AT STA. 5+52.5 1.000108,500.00
0.0000.00

0018                          6020.00 1.299,858.00012,716.82
REINFORCING STEEL FOR BRIDGE kg 9,858.00012,716.82
12,190.00015,725.10
0.0000.00

0019                          6040.00 5,500.001.0005,500.00
REMOVE STRUCTURE EACH1.0005,500.00
AT STA. 5+46 1.0005,500.00
0.0000.00

0020                          6080.00 3.33209.000695.97
STRUCTURAL STEEL FOR SUBSTRUCTURE kg 209.000695.97
209.000695.97
0.0000.00

0021                          6105.02 49.00510.00024,990.00
ROCK RIPRAP, TYPE B Mg 510.00024,990.00
522.62025,608.38
0.0000.00

0022                          6210.50 116.00226.60026,285.60
PIPE PILING m 226.60026,285.60
212.41524,640.14
0.0000.00

0023                          6310.00 119.00259.00030,821.00
STEEL SHEET PILING m2 259.00030,821.00
232.53027,671.07
0.0000.00

4001                          6210.60 69.600.0000.00
PAY CUT-OFF FOR PIPE PILE m 14.185987.28
14.185987.28
0.0000.00

4002                          6310.15 71.400.0000.00
PAY CUT-OFF FOR STEEL SHEET PILING m2 26.4701,889.96
26.4701,889.96
0.0000.00

4003                          0096.00 -167.310.0000.00
DEDUCTION LS 1.000-167.31
1.000-167.31
1.000-167.31

4004                          0096.00 167.310.0000.00
DEDUCTION LS 1.000167.31
1.000167.31
1.000167.31

GROUP 6 BRIDGE AT STA. 5+52.5Contracted357,009.72
Current359,886.95
In place355,150.93
This Estimate0.00

Totals for contractContracted357,009.72
Current359,886.95
In place355,150.93