| | | 1. Contracted
|
---|
| | | 2. Current
|
---|
| | | 3. To date
|
---|
Item Nbr Item Code | Unit Price | | 4. This Est
|
---|
Item Description | Units | Qty | Amount
|
---|
GROUP 6 BRIDGE AT STA. 1+53.500 | | |
|
0001 0001.10 | 1.00 | 1,416.000 | 1,416.00
|
BARRICADE, TYPE III | BDAY | 1,416.000 | 1,416.00
|
| | 114.000 | 114.00
|
| | 114.000 | 114.00
|
| | |
|
0002 0001.90 | 0.25 | 2,006.000 | 501.50
|
SIGN DAY | EACH | 2,006.000 | 501.50
|
| | 300.000 | 75.00
|
| | 276.000 | 69.00
|
| | |
|
0003 0001.98 | 1.00 | 472.000 | 472.00
|
CONTRACTOR FURNISHED SIGN | EACH | 472.000 | 472.00
|
| | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0004 0030.60 | 46,500.00 | 1.000 | 46,500.00
|
MOBILIZATION | LS | 1.000 | 46,500.00
|
| | 1.000 | 46,500.00
|
| | 0.900 | 41,850.00
|
| | |
|
0005 1000.00 | 500.00 | 1.000 | 500.00
|
LARGE TREE REMOVAL | EACH | 1.000 | 500.00
|
| | 1.000 | 500.00
|
| | 0.000 | 0.00
|
| | |
|
0006 1009.00 | 7,500.00 | 1.000 | 7,500.00
|
GENERAL CLEARING AND GRUBBING | LS | 1.000 | 7,500.00
|
| | 0.500 | 3,750.00
|
| | 0.300 | 2,250.00
|
| | |
|
0007 1010.01 | 4.00 | 1,900.000 | 7,600.00
|
EXCAVATION (ESTABLISHED QUANTITY) | m3 | 1,900.000 | 7,600.00
|
| | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0008 1011.00 | 1.00 | 464.000 | 464.00
|
WATER | kL | 464.000 | 464.00
|
| | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0009 1020.03 | 15.00 | 23.000 | 345.00
|
DELINEATOR, TYPE III | EACH | 23.000 | 345.00
|
| | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0010 1020.20 | 30.00 | 6.000 | 180.00
|
INSTALL CHEVRONS | EACH | 6.000 | 180.00
|
| | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0011 1021.10 | 5.00 | 23.000 | 115.00
|
REMOVE DELINEATOR UNITS | EACH | 23.000 | 115.00
|
| | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0012 1030.00 | 6.50 | 4,640.000 | 30,160.00
|
EARTHWORK MEASURED IN EMBANKMENT | m3 | 4,640.000 | 30,160.00
|
| | 1,800.000 | 11,700.00
|
| | 0.000 | 0.00
|
| | |
|
0013 1043.50 | 4.00 | 1,425.000 | 5,700.00
|
RIPRAP FILTER FABRIC | m2 | 1,425.000 | 5,700.00
|
| | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0014 2001.00 | 28.00 | 262.000 | 7,336.00
|
GRAVEL SURFACE COURSE | m3 | 262.000 | 7,336.00
|
| | 135.000 | 3,780.00
|
| | 135.000 | 3,780.00
|
| | |
|
0015 2009.10 | 500.00 | 1.296 | 648.00
|
GRAVEL EMBEDMENT | StaM | 1.296 | 648.00
|
| | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0016 4043.00 | 22.00 | 20.000 | 440.00
|
REMOVE CULVERT PIPE | m | 20.000 | 440.00
|
| | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0017 4050.01 | 15.00 | 115.000 | 1,725.00
|
EXCAVATION FOR PIPE, PIPE-ARCH CULVERTS, AND HEADWALLS | m3 | 115.000 | 1,725.00
|
| | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0018 4350.48 | 275.00 | 20.000 | 5,500.00
|
1200 mm CORRUGATED METAL PIPE | m | 20.000 | 5,500.00
|
| | 20.000 | 5,500.00
|
| | 0.000 | 0.00
|
| | |
|
0019 6000.10 | 10,000.00 | 1.000 | 10,000.00
|
ABUTMENT NO.1 EXCAVATION | LS | 1.000 | 10,000.00
|
| | 0.800 | 8,000.00
|
| | 0.800 | 8,000.00
|
| | |
|
0020 6000.11 | 10,000.00 | 1.000 | 10,000.00
|
ABUTMENT NO.2 EXCAVATION | LS | 1.000 | 10,000.00
|
| | 0.800 | 8,000.00
|
| | 0.800 | 8,000.00
|
| | |
|
0021 6005.78 | 750.00 | 8.000 | 6,000.00
|
EXPANSION BEARING, TFE TYPE | EACH | 8.000 | 6,000.00
|
| | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0022 6005.83 | 600.00 | 8.000 | 4,800.00
|
FIXED BEARING | EACH | 8.000 | 4,800.00
|
| | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0023 6010.22 | 495.00 | 76.900 | 38,065.50
|
CLASS 47B-20 CONCRETE FOR BRIDGE | m3 | 76.900 | 38,065.50
|
| | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0024 6010.26 | 495.00 | 95.900 | 47,470.50
|
CLASS 47BD-30 CONCRETE FOR BRIDGE | m3 | 95.900 | 47,470.50
|
| | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0025 6040.00 | 5,000.00 | 1.000 | 5,000.00
|
REMOVE STRUCTURE | EACH | 1.000 | 5,000.00
|
AT STA. 1+53.43 | | 1.000 | 5,000.00
|
| | 1.000 | 5,000.00
|
| | |
|
0026 6071.12 | 60,000.00 | 1.000 | 60,000.00
|
STEEL SUPERSTRUCTURE | LS | 1.000 | 60,000.00
|
AT STA. 1+53.50 | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0027 6080.00 | 2.50 | 8,460.000 | 21,150.00
|
STRUCTURAL STEEL FOR SUBSTRUCTURE | kg | 8,460.000 | 21,150.00
|
| | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0028 6105.01 | 34.00 | 1,391.000 | 47,294.00
|
ROCK RIPRAP, TYPE A | Mg | 1,391.000 | 47,294.00
|
| | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0029 6131.50 | 1.35 | 14,385.000 | 19,419.75
|
EPOXY COATED REINFORCING STEEL | kg | 14,385.000 | 19,419.75
|
| | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0030 6139.50 | 65.00 | 4.000 | 260.00
|
SUBSURFACE DRAINAGE MATTING | m2 | 4.000 | 260.00
|
| | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0031 6210.12 | 82.00 | 405.600 | 33,259.20
|
HP 250 mm X 62 kg STEEL PILING | m | 405.600 | 33,259.20
|
| | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0032 6310.00 | 145.00 | 181.000 | 26,245.00
|
STEEL SHEET PILING | m2 | 181.000 | 26,245.00
|
| | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0033 L001.01 | 1,760.00 | 0.983 | 1,730.08
|
SEEDING, TYPE A | ha | 0.983 | 1,730.08
|
| | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0034 L006.00 | 250.00 | 0.983 | 245.75
|
COVER CROP SEEDING | ha | 0.983 | 245.75
|
| | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0035 L032.75 | 132.00 | 4.915 | 648.78
|
MULCH | Mg | 4.915 | 648.78
|
| | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
GROUP 6 BRIDGE AT STA. 1+53.500 | | Contracted | 448,691.06
|
| | Current | 448,691.06
|
| | In place | 92,919.00
|
| | This Estimate | 69,063.00
|
| | |
|
Totals for contract | | Contracted | 448,691.06
|
---|
| | Current | 448,691.06
|
---|
| | In place | 92,919.00
|
---|
| | This Estimate | 69,063.00
|
---|