Return to District Map


Nebraska Department of Roads
Estimate Summary to Contractor
Vendor ID:2283 PERRETT CONSTRUCTION LTD.
Contract ID:5985
Estimate Number:0002
Pay Period End Date:08.23.2003
Contract Location:
HARRISON NORTHEASTEstimate Type:PROG
Contractor:
PERRETT CONSTRUCTION LTD.Date Let:12.19.2002
120 S MACOMB STDate Awarded:01.17.2003
PO BOX 32Date Contract Executed:02.11.2003
Date Notice to Proceed:02.11.2003
VALENTINE NE 69201Date Work Began:
Phone:Date Physical Work Completed:
(402)376-3797Date Accepted:
Escrow Agent:
Surety Co:
UNITED STATES FIDELITY AND GUARANTY COMPANY
Counties
SIOUX
Project Number PCT Fed State Project Number Description
50985 000B  0.000 BR-1105(2)  BRIDGE
Total to DatePrev to DateThis Estimate
Current Contract AmtTotal Earnings$23,856.00$4,650.00$19,206.00
$448,691.06Stockpiled Materials$.00$.00$.00
Original Contract AmtGross Earnings$23,856.00$4,650.00$19,206.00
$448,691.06Retainage$-238.56$-46.51$-192.05
Escrow Amount$.00$.00$.00
Percent CompleteSecurities Encumbered$.00$.00$.00
5.32%Net Earnings$23,617.44$4,603.49$19,013.95
Liquidated Damages$.00$.00$.00
Incentives$.00$.00$.00
Disincentives$.00$.00$.00
Other Contract Adj$.00$.00$.00
Appl of Training Adj$.00$.00$.00
Training Rates Adj$.00$.00$.00
Fuel Adj$.00$.00$.00
Bituminous Adj$.00$.00$.00
Autopay Adj$.00$.00$.00
Gasoline Adj$.00$.00$.00
Other Adj$.00$.00$.00
Price Adj$.00$.00$.00
Substandard Item Adj$.00$.00$.00
Asphalt Adj$.00$.00$.00
Diesel Fuel Adj$.00$.00$.00
Petrol Adj$.00$.00$.00
Total for Adjustments$.00$.00$.00
Payment$23,617.44$4,603.49$19,013.95
Project ManagerProject Engineer
Rigg, Ryan09.02.2003Gardner, Jerrold09.03.2003
Div. Head/Dist. Eng.Constr. Estimate Eng.
Hoevet, Doug09.03.2003Bartos, Steve09.04.2003
Controller Div. Processed
Burling, Laurie09.05.2003
Detailed breakdown of stockpiled materials
Total remaining for contract:0.00
1. Contracted
2. Current
3. To date
Item Nbr        Item CodeUnit Price4. This Est
Item DescriptionUnitsQtyAmount
GROUP 6 BRIDGE AT STA. 1+53.500
0001                          0001.10 1.001,416.0001,416.00
BARRICADE, TYPE III BDAY1,416.0001,416.00
0.0000.00
0.0000.00

0002                          0001.90 0.252,006.000501.50
SIGN DAY EACH2,006.000501.50
24.0006.00
24.0006.00

0003                          0001.98 1.00472.000472.00
CONTRACTOR FURNISHED SIGN EACH472.000472.00
0.0000.00
0.0000.00

0004                          0030.60 46,500.001.00046,500.00
MOBILIZATION LS 1.00046,500.00
0.1004,650.00
0.0000.00

0005                          1000.00 500.001.000500.00
LARGE TREE REMOVAL EACH1.000500.00
1.000500.00
1.000500.00

0006                          1009.00 7,500.001.0007,500.00
GENERAL CLEARING AND GRUBBING LS 1.0007,500.00
0.2001,500.00
0.2001,500.00

0007                          1010.01 4.001,900.0007,600.00
EXCAVATION (ESTABLISHED QUANTITY) m3 1,900.0007,600.00
0.0000.00
0.0000.00

0008                          1011.00 1.00464.000464.00
WATER kL 464.000464.00
0.0000.00
0.0000.00

0009                          1020.03 15.0023.000345.00
DELINEATOR, TYPE III EACH23.000345.00
0.0000.00
0.0000.00

0010                          1020.20 30.006.000180.00
INSTALL CHEVRONS EACH6.000180.00
0.0000.00
0.0000.00

0011                          1021.10 5.0023.000115.00
REMOVE DELINEATOR UNITS EACH23.000115.00
0.0000.00
0.0000.00

0012                          1030.00 6.504,640.00030,160.00
EARTHWORK MEASURED IN EMBANKMENT m3 4,640.00030,160.00
1,800.00011,700.00
1,800.00011,700.00

0013                          1043.50 4.001,425.0005,700.00
RIPRAP FILTER FABRIC m2 1,425.0005,700.00
0.0000.00
0.0000.00

0014                          2001.00 28.00262.0007,336.00
GRAVEL SURFACE COURSE m3 262.0007,336.00
0.0000.00
0.0000.00

0015                          2009.10 500.001.296648.00
GRAVEL EMBEDMENT StaM1.296648.00
0.0000.00
0.0000.00

0016                          4043.00 22.0020.000440.00
REMOVE CULVERT PIPE m 20.000440.00
0.0000.00
0.0000.00

0017                          4050.01 15.00115.0001,725.00
EXCAVATION FOR PIPE, PIPE-ARCH CULVERTS, AND HEADWALLS m3 115.0001,725.00
0.0000.00
0.0000.00

0018                          4350.48 275.0020.0005,500.00
1200 mm CORRUGATED METAL PIPE m 20.0005,500.00
20.0005,500.00
20.0005,500.00

0019                          6000.10 10,000.001.00010,000.00
ABUTMENT NO.1 EXCAVATION LS 1.00010,000.00
0.0000.00
0.0000.00

0020                          6000.11 10,000.001.00010,000.00
ABUTMENT NO.2 EXCAVATION LS 1.00010,000.00
0.0000.00
0.0000.00

0021                          6005.78 750.008.0006,000.00
EXPANSION BEARING, TFE TYPE EACH8.0006,000.00
0.0000.00
0.0000.00

0022                          6005.83 600.008.0004,800.00
FIXED BEARING EACH8.0004,800.00
0.0000.00
0.0000.00

0023                          6010.22 495.0076.90038,065.50
CLASS 47B-20 CONCRETE FOR BRIDGE m3 76.90038,065.50
0.0000.00
0.0000.00

0024                          6010.26 495.0095.90047,470.50
CLASS 47BD-30 CONCRETE FOR BRIDGE m3 95.90047,470.50
0.0000.00
0.0000.00

0025                          6040.00 5,000.001.0005,000.00
REMOVE STRUCTURE EACH1.0005,000.00
AT STA. 1+53.43 0.0000.00
0.0000.00

0026                          6071.12 60,000.001.00060,000.00
STEEL SUPERSTRUCTURE LS 1.00060,000.00
AT STA. 1+53.50 0.0000.00
0.0000.00

0027                          6080.00 2.508,460.00021,150.00
STRUCTURAL STEEL FOR SUBSTRUCTURE kg 8,460.00021,150.00
0.0000.00
0.0000.00

0028                          6105.01 34.001,391.00047,294.00
ROCK RIPRAP, TYPE A Mg 1,391.00047,294.00
0.0000.00
0.0000.00

0029                          6131.50 1.3514,385.00019,419.75
EPOXY COATED REINFORCING STEEL kg 14,385.00019,419.75
0.0000.00
0.0000.00

0030                          6139.50 65.004.000260.00
SUBSURFACE DRAINAGE MATTING m2 4.000260.00
0.0000.00
0.0000.00

0031                          6210.12 82.00405.60033,259.20
HP 250 mm X 62 kg STEEL PILING m 405.60033,259.20
0.0000.00
0.0000.00

0032                          6310.00 145.00181.00026,245.00
STEEL SHEET PILING m2 181.00026,245.00
0.0000.00
0.0000.00

0033                          L001.01 1,760.000.9831,730.08
SEEDING, TYPE A ha 0.9831,730.08
0.0000.00
0.0000.00

0034                          L006.00 250.000.983245.75
COVER CROP SEEDING ha 0.983245.75
0.0000.00
0.0000.00

0035                          L032.75 132.004.915648.78
MULCH Mg 4.915648.78
0.0000.00
0.0000.00

GROUP 6 BRIDGE AT STA. 1+53.500Contracted448,691.06
Current448,691.06
In place23,856.00
This Estimate19,206.00

Totals for contractContracted448,691.06
Current448,691.06
In place23,856.00
This Estimate19,206.00