Return to District Map


Nebraska Department of Roads
Estimate Summary to Contractor
Vendor ID:0477 WESTERN ENGINEERING COMPANY, INC.
Contract ID:5243
Estimate Number:0004
Pay Period End Date:09.20.2003
Contract Location:
DIX EASTEstimate Type:PROG
Contractor:
WESTERN ENGINEERING COMPANY, INC.Date Let:05.22.2003
1149 WEST HIGHWAY 44Date Awarded:05.29.2003
PO BOX 350Date Contract Executed:06.05.2003
Date Notice to Proceed:06.05.2003
HARLAN IA 51537Date Work Began:
Phone:Date Physical Work Completed:
(712)755-5191Date Accepted:
Escrow Agent:
Surety Co:
HARTFORD FIRE INSURANCE COMPANY
Counties
KIMBALL
Project Number PCT Fed State Project Number Description
51243 000  0.000 PEP-30-1(1022)  BITUIMINOUS
51244 000  0.000 PEP-L53C(1002)  BITUMINOUS
51245 000  0.000 PEP-L53A(1003)  BITUMINOUS
Total to DatePrev to DateThis Estimate
Current Contract AmtTotal Earnings$597,476.18$593,829.97$3,646.21
$653,625.42Stockpiled Materials$.00$.00$.00
Original Contract AmtGross Earnings$597,476.18$593,829.97$3,646.21
$527,443.92Retainage$-5,974.77$-5,938.31$-36.46
Escrow Amount$.00$.00$.00
Percent CompleteSecurities Encumbered$.00$.00$.00
91.41%Net Earnings$591,501.41$587,891.66$3,609.75
Liquidated Damages$.00$.00$.00
Incentives$.00$.00$.00
Disincentives$.00$.00$.00
Other Contract Adj$.00$.00$.00
Appl of Training Adj$.00$.00$.00
Training Rates Adj$.00$.00$.00
Fuel Adj$.00$.00$.00
Bituminous Adj$.00$.00$.00
Autopay Adj$.00$.00$.00
Gasoline Adj$.00$.00$.00
Other Adj$.00$.00$.00
Price Adj$.00$.00$.00
Substandard Item Adj$.00$.00$.00
Asphalt Adj$.00$.00$.00
Diesel Fuel Adj$.00$.00$.00
Petrol Adj$.00$.00$.00
Total for Adjustments$.00$.00$.00
Payment$591,501.41$587,891.66$3,609.75
Project ManagerDiv. Head/Dist. Eng.
Gardner, Jerrold09.22.2003Hoevet, Doug09.22.2003
Constr. Estimate Eng.Materials Eng.
Bartos, Steve09.22.2003
Controller Div. Processed
Burling, Laurie09.23.2003
Detailed breakdown of stockpiled materials
Total remaining for contract:0.00
1. Contracted
2. Current
3. To date
Item Nbr        Item CodeUnit Price4. This Est
Item DescriptionUnitsQtyAmount
GROUP 9 BITUMINOUS
0001                          0001.10 3.0088.000264.00
BARRICADE, TYPE III BDAY88.000264.00
34.000102.00
0.0000.00

0002                          0001.75 4.00264.0001,056.00
TEMPORARY SIGN DAY EACH264.0001,056.00
300.0001,200.00
0.0000.00

0003                          0001.90 0.80814.000651.20
SIGN DAY EACH814.000651.20
136.000108.80
0.0000.00

0004                          0002.55 7.00327.0002,289.00
OVERLAY BROKEN LINES STA 327.0002,289.00
314.7582,203.31
0.0000.00

0005                          0002.60 7.00654.0004,578.00
OVERLAY SOLID LINES STA 654.0004,578.00
621.5164,350.61
0.0000.00

0006                          0003.10 225.0022.0004,950.00
FLAGGING DAY 22.0004,950.00
12.0002,700.00
0.0000.00

0007                          0003.20 335.0011.0003,685.00
FURNISHING AND OPERATING PILOT VEHICLE DAY 11.0003,685.00
0.0000.00
0.0000.00

0008                          0010.04 1,000.000.330330.00
FIELD OFFICE EACH0.330330.00
0.0000.00
0.0000.00

0009                          0030.90 6,097.826091.0006,097.83
MOBILIZATION LS 1.0006,097.83
1.0006,097.82
0.0000.00

0011                          9005.00 25.00100.0002,500.00
ASPHALTIC CONCRETE FOR PATCHING, TYPE TON 100.0002,500.00
SP4(0.5) 0.0000.00
0.0000.00

0015                          9005.45 19.004,750.00090,250.00
ASPHALTIC CONCRETE, TYPE SP4(0.5) TON 4,750.00090,250.00
5,236.51099,493.69
0.0000.00

0017                          9021.01 176.00261.90046,094.40
PERFORMANCE GRADED BINDER (64-22) TON 261.90046,094.40
268.22047,206.72
0.0000.00

0019                          9053.00 1.106,540.0007,194.00
TACK COAT GAL 6,540.0007,194.00
2,629.1252,892.03
334.885368.37

0020                          9179.23 120.00163.68019,641.60
COLD MILLING, CLASS 3 STA 163.68019,641.60
157.38018,885.60
0.0000.00

0022                          9300.50 1,177.215191.0001,177.22
ASPHALT PAVEMENT SMOOTHNESS TESTING LS 1.0001,177.22
1.0001,177.22
0.0000.00

4030                          9005.45 19.000.0000.00
ASPHALTIC CONCRETE, TYPE SP4(0.5) TON 1,200.00022,800.00
US-30 REPAIR 1,108.94021,069.86
0.0000.00

4031                          9021.01 176.000.0000.00
PERFORMANCE GRADED BINDER (64-22) TON 66.00011,616.00
US-30 REPAIR 55.0309,685.28
0.0000.00

4032                          9179.25 705.000.0000.00
COLD MILLING, CLASS 5 STA 16.30011,491.50
US-30 REPAIR 16.21011,428.05
0.0000.00

0001                          0001.10 3.0088.000264.00
BARRICADE, TYPE III BDAY88.000264.00
0.0000.00
0.0000.00

0002                          0001.75 4.00264.0001,056.00
TEMPORARY SIGN DAY EACH264.0001,056.00
142.000568.00
0.0000.00

0003                          0001.90 0.80660.000528.00
SIGN DAY EACH660.000528.00
80.00064.00
0.0000.00

0004                          0002.55 7.00379.0002,653.00
OVERLAY BROKEN LINES STA 379.0002,653.00
369.7602,588.32
0.0000.00

0005                          0002.60 7.00758.0005,306.00
OVERLAY SOLID LINES STA 758.0005,306.00
748.4905,239.43
0.0000.00

0006                          0003.10 225.0022.0004,950.00
FLAGGING DAY 22.0004,950.00
12.0002,700.00
0.0000.00

0007                          0003.20 335.0011.0003,685.00
FURNISHING AND OPERATING PILOT VEHICLE DAY 11.0003,685.00
0.0000.00
0.0000.00

0008                          0010.04 1,000.000.340340.00
FIELD OFFICE EACH0.340340.00
0.0000.00
0.0000.00

0009                          0030.90 6,974.637681.0006,974.64
MOBILIZATION LS 1.0006,974.64
1.0006,974.64
0.0000.00

0010                          9000.75 17.50100.0001,750.00
ASPHALTIC CONCRETE FOR STATE MAINTENANCE PATCHING, TYPE TON 100.0001,750.00
SP4(0.375) 21.870382.73
0.0000.00

0012                          9005.01 26.00100.0002,600.00
ASPHALTIC CONCRETE FOR PATCHING, TYPE TON 100.0002,600.00
SP4(0.375) 0.0000.00
0.0000.00

0013                          9005.23 15.501,900.00029,450.00
ASPHALTIC CONCRETE, TYPE SPS TON 1,900.00029,450.00
1,816.80028,160.40
0.0000.00

0014                          9005.44 19.504,670.00091,065.00
ASPHALTIC CONCRETE, TYPE SP4(0.375) TON 4,670.00091,065.00
4,901.64095,581.98
0.0000.00

0016                          9020.92 176.005.7001,003.20
PERFORMANCE GRADED BINDER (58-28) FOR STATE MAINTENANCEPATCHING TON 5.7001,003.20
1.081190.26
0.0000.00

0017                          9021.01 176.00257.58045,334.08
PERFORMANCE GRADED BINDER (64-22) TON 257.58045,334.08
334.09758,801.07
0.0000.00

0019                          9053.00 1.1011,880.00013,068.00
TACK COAT GAL 11,880.00013,068.00
4,479.2504,927.18
81.66089.83

0020                          9179.23 120.00126.33515,160.20
COLD MILLING, CLASS 3 STA 126.33515,160.20
129.86315,583.56
0.0000.00

0023                          9300.52 1,500.001.0001,500.00
ASPHALT PAVEMENT SMOOTHNESS TESTING I/D LS 1.0001,500.00
1.0001,500.00
1.0001,500.00

0001                          0001.10 3.0030.00090.00
BARRICADE, TYPE III BDAY30.00090.00
10.00030.00
0.0000.00

0002                          0001.75 4.00180.000720.00
TEMPORARY SIGN DAY EACH180.000720.00
82.000328.00
0.0000.00

0003                          0001.90 0.80360.000288.00
SIGN DAY EACH360.000288.00
72.00057.60
0.0000.00

0004                          0002.55 7.0090.000630.00
OVERLAY BROKEN LINES STA 90.000630.00
88.700620.90
0.0000.00

0005                          0002.60 7.00180.0001,260.00
OVERLAY SOLID LINES STA 180.0001,260.00
115.800810.60
0.0000.00

0006                          0003.10 225.0014.0003,150.00
FLAGGING DAY 14.0003,150.00
4.000900.00
0.0000.00

0008                          0010.04 1,000.000.330330.00
FIELD OFFICE EACH0.330330.00
0.0000.00
0.0000.00

0009                          0030.90 3,427.536231.0003,427.54
MOBILIZATION LS 1.0003,427.54
1.0003,427.54
0.0000.00

0011                          9005.00 25.00750.00018,750.00
ASPHALTIC CONCRETE FOR PATCHING, TYPE TON 750.00018,750.00
SP4(0.5) 0.0000.00
0.0000.00

0013                          9005.23 15.50750.00011,625.00
ASPHALTIC CONCRETE, TYPE SPS TON 750.00011,625.00
517.4508,020.48
0.0000.00

0015                          9005.45 19.001,590.00030,210.00
ASPHALTIC CONCRETE, TYPE SP4(0.5) TON 1,590.00030,210.00
1,607.91030,550.29
0.0000.00

0017                          9021.01 176.0091.26016,061.76
PERFORMANCE GRADED BINDER (64-22) TON 91.26016,061.76
80.95614,248.26
0.0000.00

0018                          9021.03 176.0040.5007,128.00
PERFORMANCE GRADED BINDER (58-28) TON 40.5007,128.00
0.0000.00
0.0000.00

0019                          9053.00 1.103,750.0004,125.00
TACK COAT GAL 3,750.0004,125.00
3,164.6883,481.15
1,534.5581,688.01

0020                          9179.23 120.0055.3756,645.00
COLD MILLING, CLASS 3 STA 55.3756,645.00
44.3505,322.00
0.0000.00

0021                          9179.43 90.0058.1725,235.48
COLD MILLING, CLASS 3 STA 58.1725,235.48
TYPE "A" 88.7007,983.00
0.0000.00

0022                          9300.50 322.784811.000322.78
ASPHALT PAVEMENT SMOOTHNESS TESTING LS 1.000322.78
1.000322.78
0.0000.00

4001                          0001.10 3.000.0000.00
BARRICADE, TYPE III BDAY20.00060.00
LINK L53E 18.00054.00
0.0000.00

4002                          0001.75 4.000.0000.00
TEMPORARY SIGN DAY EACH150.000600.00
LINK L53E 94.000376.00
0.0000.00

4003                          0001.90 0.800.0000.00
SIGN DAY EACH250.000200.00
LINK L53E 72.00057.60
0.0000.00

4004                          0002.55 7.000.0000.00
OVERLAY BROKEN LINES STA 55.000385.00
LINK L53E 96.320674.24
0.0000.00

4005                          0002.60 7.000.0000.00
OVERLAY SOLID LINES STA 110.000770.00
LINK L53E 219.3201,535.24
0.0000.00

4006                          0003.10 225.000.0000.00
FLAGGING DAY 10.0002,250.00
LINK L53E 8.0001,800.00
0.0000.00

4007                          0003.20 335.000.0000.00
FURNISHING AND OPERATING PILOT VEHICLE DAY 5.0001,675.00
LINK L53E 0.0000.00
0.0000.00

4011                          9005.00 25.000.0000.00
ASPHALTIC CONCRETE FOR PATCHING, TYPE TON 50.0001,250.00
LINK L53E 0.0000.00
0.0000.00

4013                          9005.23 15.500.0000.00
ASPHALTIC CONCRETE, TYPE SPS TON 630.0009,765.00
LINK L53E 733.50011,369.25
0.0000.00

4015                          9005.45 19.000.0000.00
ASPHALTIC CONCRETE, TYPE SP4(0.5) TON 1,490.00028,310.00
LINK L53E 1,310.79024,905.01
0.0000.00

4017                          9021.01 176.000.0000.00
PERFORMANCE GRADED BINDER (64-22) TON 85.00014,960.00
LINK L53E 89.97015,834.72
0.0000.00

4018                          9021.03 176.000.0000.00
PERFORMANCE GRADED BINDER (58-28) TON 34.0005,984.00
LINK L53E 0.0000.00
0.0000.00

4019                          9053.00 1.100.0000.00
EMULSIFIED ASPHALT FOR TACK COAT, APPLIED GAL 2,750.0003,025.00
LINK L53E 1,773.9651,951.36
0.0000.00

4020                          9179.23 120.000.0000.00
COLD MILLING, CLASS 3 STA 53.0006,360.00
LINK L53E 52.1606,259.20
0.0000.00

4021                          9179.43 90.000.0000.00
COLD MILLING, CLASS 3 STA 52.0004,680.00
LINK L53EType A Milling 52.1604,694.40
0.0000.00

GROUP 9 BITUMINOUSContracted527,443.92
Current653,625.42
In place597,476.18
This Estimate3,646.21

Totals for contractContracted527,443.92
Current653,625.42
In place597,476.18
This Estimate3,646.21