| | | 1. Contracted
|
---|
| | | 2. Current
|
---|
| | | 3. To date
|
---|
Item Nbr Item Code | Unit Price | | 4. This Est
|
---|
Item Description | Units | Qty | Amount
|
---|
GROUP 9 BITUMINOUS | | |
|
0001 0001.08 | 0.50 | 36,000.000 | 18,000.00
|
BARRICADE, TYPE II | BDAY | 36,000.000 | 18,000.00
|
| | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0002 0001.10 | 4.00 | 500.000 | 2,000.00
|
BARRICADE, TYPE III | BDAY | 500.000 | 2,000.00
|
| | 366.000 | 1,464.00
|
| | 42.000 | 168.00
|
| | |
|
0003 0001.75 | 5.00 | 770.000 | 3,850.00
|
TEMPORARY SIGN DAY | EACH | 770.000 | 3,850.00
|
| | 533.000 | 2,665.00
|
| | -112.000 | -560.00
|
| | |
|
0004 0001.90 | 0.80 | 10,325.000 | 8,260.00
|
SIGN DAY | EACH | 10,325.000 | 8,260.00
|
| | 10,135.000 | 8,108.00
|
| | 1,238.000 | 990.40
|
| | |
|
0005 0002.55 | 7.00 | 2,940.060 | 20,580.42
|
OVERLAY BROKEN LINES | STA | 2,940.060 | 20,580.42
|
| | 3,548.060 | 24,836.42
|
| | 694.500 | 4,861.50
|
| | |
|
0006 0002.60 | 7.00 | 5,880.120 | 41,160.84
|
OVERLAY SOLID LINES | STA | 5,880.120 | 41,160.84
|
| | 4,894.360 | 34,260.52
|
| | 1,405.500 | 9,838.50
|
| | |
|
0007 0003.10 | 200.00 | 110.000 | 22,000.00
|
FLAGGING | DAY | 110.000 | 22,000.00
|
| | 84.000 | 16,800.00
|
| | 20.000 | 4,000.00
|
| | |
|
0008 0003.20 | 300.00 | 55.000 | 16,500.00
|
FURNISHING AND OPERATING PILOT VEHICLE | DAY | 55.000 | 16,500.00
|
| | 35.000 | 10,500.00
|
| | 6.000 | 1,800.00
|
| | |
|
0009 0010.04 | 2,000.00 | 1.000 | 2,000.00
|
FIELD OFFICE | EACH | 1.000 | 2,000.00
|
| | 1.000 | 2,000.00
|
| | 0.000 | 0.00
|
| | |
|
0010 0030.90 | 75,000.00 | 1.000 | 75,000.00
|
MOBILIZATION | LS | 1.000 | 75,000.00
|
| | 1.000 | 75,000.00
|
| | 1.000 | 75,000.00
|
| | |
|
0011 8022.00 | 136.00 | 636.000 | 86,496.00
|
HYDRATED LIME | TON | 636.000 | 86,496.00
|
| | 512.113 | 69,647.37
|
| | 0.000 | 0.00
|
| | |
|
0012 8110.50 | 340.00 | 982.022 | 333,887.48
|
HYDRATED LIME SLURRY STABILIZATION | STA | 982.022 | 333,887.48
|
| | 996.156 | 338,693.04
|
| | 0.000 | 0.00
|
| | |
|
0013 9000.75 | 16.50 | 100.000 | 1,650.00
|
ASPHALTIC CONCRETE FOR STATE MAINTENANCE PATCHING, TYPE | TON | 100.000 | 1,650.00
|
SP4 (0.375) | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0014 9005.00 | 23.00 | 400.000 | 9,200.00
|
ASPHALTIC CONCRETE FOR PATCHING, TYPE | TON | 400.000 | 9,200.00
|
SP4 (0.375) | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0015 9005.44 | 19.25 | 36,300.000 | 698,775.00
|
ASPHALTIC CONCRETE, TYPE SP4(0.375) | TON | 36,300.000 | 698,775.00
|
| | 23,957.490 | 461,181.68
|
| | 12,540.290 | 241,400.58
|
| | |
|
0016 9020.91 | 160.00 | 5.400 | 864.00
|
PERFORMANCE GRADED BINDER (64-22) FOR STATE MAINTENANCEPATCHING | TON | 5.400 | 864.00
|
| | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0017 9021.01 | 160.00 | 1,981.800 | 317,088.00
|
PERFORMANCE GRADED BINDER (64-22) | TON | 1,981.800 | 317,088.00
|
| | 1,387.067 | 221,930.72
|
| | 729.856 | 116,776.96
|
| | |
|
0018 9052.15 | 0.90 | 155,090.000 | 139,581.00
|
EMULSIFIED ASPHALT FOR HYDRATED LIME SLURRY STABILIZATION | GAL | 155,090.000 | 139,581.00
|
| | 181,131.021 | 163,017.92
|
| | 0.000 | 0.00
|
| | |
|
0019 9053.00 | 1.00 | 51,990.000 | 51,990.00
|
TACK COAT | GAL | 51,990.000 | 51,990.00
|
| | 17,853.000 | 17,853.00
|
| | 8,632.500 | 8,632.50
|
| | |
|
0020 9110.01 | 55.00 | 90.000 | 4,950.00
|
RENTAL OF LOADER, FULLY OPERATED | HOUR | 90.000 | 4,950.00
|
| | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0021 9110.02 | 55.00 | 90.000 | 4,950.00
|
RENTAL OF MOTOR GRADER, FULLY OPERATED | HOUR | 90.000 | 4,950.00
|
| | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0022 9110.03 | 40.00 | 90.000 | 3,600.00
|
RENTAL OF DUMP TRUCK, FULLY OPERATED | HOUR | 90.000 | 3,600.00
|
| | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0023 9110.07 | 35.00 | 90.000 | 3,150.00
|
RENTAL OF SKID LOADER, FULLY OPERATED | HOUR | 90.000 | 3,150.00
|
| | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0024 9111.00 | 8.00 | 491.000 | 3,928.00
|
WATER | MGAL | 491.000 | 3,928.00
|
| | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0025 9170.00 | 40.00 | 1,964.044 | 78,561.76
|
EARTH SHOULDER CONSTRUCTION | STA | 1,964.044 | 78,561.76
|
| | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0026 9179.23 | 302.00 | 51.870 | 15,664.74
|
COLD MILLING, CLASS 3 | STA | 51.870 | 15,664.74
|
| | 53.660 | 16,205.32
|
| | 0.000 | 0.00
|
| | |
|
0027 9300.52 | 4,500.00 | 1.000 | 4,500.00
|
ASPHALT PAVEMENT SMOOTHNESS TESTING I/D | LS | 1.000 | 4,500.00
|
| | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0028 L001.02 | 475.00 | 54.000 | 25,650.00
|
SEEDING, TYPE B | ACRE | 54.000 | 25,650.00
|
| | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0029 L032.75 | 110.00 | 121.500 | 13,365.00
|
MULCH | TON | 121.500 | 13,365.00
|
| | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
GROUP 9 BITUMINOUS | | Contracted | 2,007,202.24
|
| | Current | 2,007,202.24
|
| | In place | 1,464,162.99
|
| | This Estimate | 462,908.44
|
| | |
|
Totals for contract | | Contracted | 2,007,202.24
|
---|
| | Current | 2,007,202.24
|
---|
| | In place | 1,464,162.99
|
---|
| | This Estimate | 462,908.44
|
---|