Estimate Summary to Contractor
Vendor ID:3482 MOOSMAN ENTERPRISES, LLC
Contract ID:5089
Estimate Number:0001
Pay Period End Date:05.10.2002
Contract Location:
HARRISON SOUTHWESTEstimate Type:PROG
Contractor:
MOOSMAN ENTERPRISES, LLCDate Let:03.14.2002
717 N WOOD STDate Awarded:04.03.2002
Date Contract Executed:05.03.2002
Date Notice to Proceed:05.03.2002
VALENTINE NE 69201Date Work Began:
Phone:Date Physical Work Completed:
(402)376-2544Date Accepted:
Escrow Agent:
Surety Co:
STATEWIDE INSURANCE COMPANY
Counties
SIOUX
Project Number PCT Fed State Project Number Description
51089 000  0.000 BRO-7083(3)  CULVERTS
Total to DatePrev to DateThis Estimate
Current Contract AmtTotal Earnings$.00$.00$.00
$88,309.37Stockpiled Materials$2,208.00$.00$2,208.00
Original Contract AmtGross Earnings$2,208.00$.00$2,208.00
$88,309.37Retainage$.00$.00$.00
Escrow Amount$.00$.00$.00
Percent CompleteSecurities Encumbered$.00$.00$.00
0.00%Net Earnings$2,208.00$.00$2,208.00
Liquidated Damages$.00$.00$.00
Incentives$.00$.00$.00
Disincentives$.00$.00$.00
Other Contract Adj$.00$.00$.00
Appl of Training Adj$.00$.00$.00
Training Rates Adj$.00$.00$.00
Fuel Adj$.00$.00$.00
Bituminous Adj$.00$.00$.00
Autopay Adj$.00$.00$.00
Gasoline Adj$.00$.00$.00
Other Adj$.00$.00$.00
Price Adj$.00$.00$.00
Substandard Item Adj$.00$.00$.00
Asphalt Adj$.00$.00$.00
Diesel Fuel Adj$.00$.00$.00
Petrol Adj$.00$.00$.00
Total for Adjustments$.00$.00$.00
Payment$2,208.00$.00$2,208.00
Project ManagerDiv. Head/Dist. Eng.
Applegate, Joe05.10.2002Lind, Craig05.10.2002
Constr. Estimate Eng.Materials Eng.
Bartos, Steve05.13.2002
Controller Div. Processed
Burling, Laurie05.14.2002
Detailed breakdown of stockpiled materials
Est Nbr:0001
Item NbrItem CdItem DescAdj AmtInvoice Nbr
00050030.40 MOBILIZATION
S.P. Initial Payment2,208.0016086
Performance and Payment Bond
Total for estimate 0001:2,208.00
Total remaining for contract:2,208.00
1. Contracted
2. Current
3. To date
Item Nbr        Item CodeUnit Price4. This Est
Item DescriptionUnitsQtyAmount
GROUP 4 CONCRETE BOX CULVERT AT STA. 1+55.583
0001                          L006.00 1,000.001.0001,000.00
COVER CROP SEEDING ha 1.0001,000.00
0.0000.00
0.0000.00

0002                          0001.10 1.00744.000744.00
BARRICADE, TYPE III BDAY744.000744.00
0.0000.00
0.0000.00

0003                          0001.30 2.00124.000248.00
TYPE B HIGH INTENSITY WARNING LIGHT LDAY124.000248.00
0.0000.00
0.0000.00

0004                          0001.90 0.501,240.000620.00
SIGN DAY EACH1,240.000620.00
0.0000.00
0.0000.00

0005                          0030.40 10,000.001.00010,000.00
MOBILIZATION LS 1.00010,000.00
0.0000.00
0.0000.00

0006                          1000.00 1.001.0001.00
LARGE TREE REMOVAL EACH1.0001.00
0.0000.00
0.0000.00

0007                          1009.00 1,000.001.0001,000.00
GENERAL CLEARING AND GRUBBING LS 1.0001,000.00
0.0000.00
0.0000.00

0008                          1011.00 2.00260.000520.00
WATER kL 260.000520.00
0.0000.00
0.0000.00

0009                          1030.00 8.002,602.00020,816.00
EARTHWORK MEASURED IN EMBANKMENT m3 2,602.00020,816.00
0.0000.00
0.0000.00

0010                          4051.01 5.00287.0001,435.00
EXCAVATION FOR BOX CULVERTS m3 287.0001,435.00
0.0000.00
0.0000.00

0011                          4101.06 366.00111.07040,651.62
CLASS 47B-20 OR AX-20 CONCRETE FOR BOX CULVERT m3 111.07040,651.62
0.0000.00
0.0000.00

0012                          4151.00 1.257,419.0009,273.75
REINFORCING STEEL FOR BOX CULVERT kg 7,419.0009,273.75
0.0000.00
0.0000.00

0013                          6040.00 2,000.001.0002,000.00
REMOVE STRUCTURE EACH1.0002,000.00
AT STA. 1+55.583 0.0000.00
0.0000.00

GROUP 4 CONCRETE BOX CULVERT AT STA. 1+55.583Contracted88,309.37
Current88,309.37
In place0.00
This Estimate0.00

Totals for contractContracted88,309.37
Current88,309.37
In place0.00
This Estimate0.00