| | | 1. Contracted
|
---|
| | | 2. Current
|
---|
| | | 3. To date
|
---|
Item Nbr Item Code | Unit Price | | 4. This Est
|
---|
Item Description | Units | Qty | Amount
|
---|
GROUP 4 CULVERT AT STA. 2+46.60 | | |
|
0001 A009.14 | 2,600.00 | 1.000 | 2,600.00
|
STREET LIGHTING UNIT, TYPE SL-BT-12.2-3.7-0.25 | EACH | 1.000 | 2,600.00
|
| | 1.000 | 2,600.00
|
| | 0.000 | 0.00
|
| | |
|
0002 A020.10 | 850.00 | 1.000 | 850.00
|
LIGHTING CONTROL CENTER, TYPE D | EACH | 1.000 | 850.00
|
| | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0003 A070.10 | 10.00 | 14.000 | 140.00
|
38 mm CONDUIT IN TRENCH | m | 14.000 | 140.00
|
| | 14.000 | 140.00
|
| | 0.000 | 0.00
|
| | |
|
0004 A080.22 | 1.30 | 14.000 | 18.20
|
STREET LIGHTING CABLE, NO. 6 BARE | m | 14.000 | 18.20
|
| | 14.000 | 18.20
|
| | 0.000 | 0.00
|
| | |
|
0005 A080.24 | 1.45 | 28.000 | 40.60
|
STREET LIGHTING CABLE, NO. 6 USE | m | 28.000 | 40.60
|
| | 28.000 | 40.60
|
| | 0.000 | 0.00
|
| | |
|
0006 A600.00 | 350.00 | 1.000 | 350.00
|
REMOVE LIGHTING UNIT | EACH | 1.000 | 350.00
|
| | 1.000 | 350.00
|
| | 0.000 | 0.00
|
| | |
|
0007 L020.00 | 2.00 | 917.000 | 1,834.00
|
EROSION CONTROL | m2 | 917.000 | 1,834.00
|
| | 3,420.150 | 6,840.30
|
| | 0.000 | 0.00
|
| | |
|
0008 L022.11 | 13.00 | 99.000 | 1,287.00
|
FABRIC SILT FENCE-LOW POROSITY | m | 99.000 | 1,287.00
|
| | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0009 0001.10 | 1.50 | 789.000 | 1,183.50
|
BARRICADE, TYPE III | BDAY | 789.000 | 1,183.50
|
| | 566.000 | 849.00
|
| | 0.000 | 0.00
|
| | |
|
0010 0001.30 | 2.00 | 118.000 | 236.00
|
TYPE B HIGH INTENSITY WARNING LIGHT | LDAY | 118.000 | 236.00
|
| | 166.000 | 332.00
|
| | 0.000 | 0.00
|
| | |
|
0011 0001.90 | 0.50 | 3,539.000 | 1,769.50
|
SIGN DAY | EACH | 3,539.000 | 1,769.50
|
| | 3,246.000 | 1,623.00
|
| | 0.000 | 0.00
|
| | |
|
0012 0002.30 | 3.00 | 300.000 | 900.00
|
PAVEMENT MARKING REMOVAL | m | 300.000 | 900.00
|
| | 205.000 | 615.00
|
| | 0.000 | 0.00
|
| | |
|
0013 0002.39 | 2.00 | 440.000 | 880.00
|
TEMPORARY PAVEMENT MARKING, TYPE II | m | 440.000 | 880.00
|
| | 475.000 | 950.00
|
| | 0.000 | 0.00
|
| | |
|
0014 0003.10 | 125.00 | 20.000 | 2,500.00
|
FLAGGING | DAY | 20.000 | 2,500.00
|
| | 6.000 | 750.00
|
| | 0.000 | 0.00
|
| | |
|
0015 0003.51 | 36.00 | 165.000 | 5,940.00
|
INSTALL CONCRETE PROTECTION BARRIER | m | 165.000 | 5,940.00
|
| | 152.400 | 5,486.40
|
| | 0.000 | 0.00
|
| | |
|
0016 0003.56 | 15.00 | 165.000 | 2,475.00
|
RELOCATE CONCRETE PROTECTION BARRIER | m | 165.000 | 2,475.00
|
| | 82.300 | 1,234.50
|
| | 0.000 | 0.00
|
| | |
|
0017 0003.75 | 5,800.00 | 1.000 | 5,800.00
|
TEMPORARY TRAFFIC SIGNAL | EACH | 1.000 | 5,800.00
|
| | 1.000 | 5,800.00
|
| | 0.000 | 0.00
|
| | |
|
0018 0030.40 | 31,000.00 | 1.000 | 31,000.00
|
MOBILIZATION | LS | 1.000 | 31,000.00
|
| | 1.000 | 31,000.00
|
| | 0.000 | 0.00
|
| | |
|
0019 1009.00 | 1,825.00 | 1.000 | 1,825.00
|
GENERAL CLEARING AND GRUBBING | LS | 1.000 | 1,825.00
|
| | 1.000 | 1,825.00
|
| | 0.000 | 0.00
|
| | |
|
0020 1010.01 | 5.00 | 177.000 | 885.00
|
EXCAVATION (ESTABLISHED QUANTITY) | m3 | 177.000 | 885.00
|
| | 177.000 | 885.00
|
| | 0.000 | 0.00
|
| | |
|
0021 1011.00 | 10.00 | 59.000 | 590.00
|
WATER | kL | 59.000 | 590.00
|
| | 16.139 | 161.39
|
| | 0.000 | 0.00
|
| | |
|
0022 1012.00 | 80.00 | 6.000 | 480.00
|
RIGHT-OF-WAY MARKERS | EACH | 6.000 | 480.00
|
| | 6.000 | 480.00
|
| | 0.000 | 0.00
|
| | |
|
0023 1030.00 | 14.00 | 443.000 | 6,202.00
|
EARTHWORK MEASURED IN EMBANKMENT | m3 | 443.000 | 6,202.00
|
| | 443.000 | 6,202.00
|
| | 0.000 | 0.00
|
| | |
|
0024 1040.05 | 1.00 | 513.000 | 513.00
|
TEMPORARY SLOPE PROTECTION | m2 | 513.000 | 513.00
|
| | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0025 1102.00 | 11.00 | 325.000 | 3,575.00
|
REMOVE ASPHALT SURFACE | m2 | 325.000 | 3,575.00
|
| | 325.000 | 3,575.00
|
| | 0.000 | 0.00
|
| | |
|
0026 2020.75 | 1,800.00 | 1.947 | 3,504.60
|
CRUSHED CONCRETE SURFACING | StaM | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0027 4040.00 | 100.00 | 1.000 | 100.00
|
REMOVE HEADWALLS FROM CULVERTS | EACH | 1.000 | 100.00
|
| | 1.000 | 100.00
|
| | 0.000 | 0.00
|
| | |
|
0028 4043.50 | 100.00 | 1.000 | 100.00
|
REMOVE SEWER PIPE | m | 1.000 | 100.00
|
| | 1.000 | 100.00
|
| | 0.000 | 0.00
|
| | |
|
0029 4050.01 | 100.00 | 1.000 | 100.00
|
EXCAVATION FOR PIPE, PIPE-ARCH CULVERTS, AND HEADWALLS | m3 | 1.000 | 100.00
|
| | 1.000 | 100.00
|
| | 0.000 | 0.00
|
| | |
|
0030 4051.01 | 13.00 | 485.000 | 6,305.00
|
EXCAVATION FOR BOX CULVERTS | m3 | 485.000 | 6,305.00
|
| | 485.000 | 6,305.00
|
| | 0.000 | 0.00
|
| | |
|
0031 4101.06 | 310.00 | 329.480 | 102,138.80
|
CLASS 47B-20 OR AX-20 CONCRETE FOR BOX CULVERT | m3 | 329.480 | 102,138.80
|
| | 329.480 | 102,138.80
|
| | 0.000 | 0.00
|
| | |
|
0032 4151.00 | 1.12 | 24,647.000 | 27,604.64
|
REINFORCING STEEL FOR BOX CULVERT | kg | 24,647.000 | 27,604.64
|
| | 24,647.000 | 27,604.64
|
| | 0.000 | 0.00
|
| | |
|
0033 4350.18 | 75.00 | 8.900 | 667.50
|
450 mm CORRUGATED METAL PIPE | m | 8.900 | 667.50
|
| | 9.900 | 742.50
|
| | 0.000 | 0.00
|
| | |
|
0034 6040.00 | 10,000.00 | 1.000 | 10,000.00
|
REMOVE STRUCTURE | EACH | 1.000 | 10,000.00
|
AT STA. 2+45.60 | | 1.000 | 10,000.00
|
| | 0.000 | 0.00
|
| | |
|
0035 7017.00 | 5.00 | 68.600 | 343.00
|
REMOVE GUARDRAIL | m | 68.600 | 343.00
|
| | 68.600 | 343.00
|
| | 0.000 | 0.00
|
| | |
|
0036 9005.30 | 49.00 | 310.000 | 15,190.00
|
ASPHALTIC CONCRETE, TYPE SP2(12.5) | Mg | 310.000 | 15,190.00
|
| | 507.370 | 24,861.13
|
| | 0.000 | 0.00
|
| | |
|
0037 9021.01 | 157.00 | 16.740 | 2,628.18
|
PERFORMANCE GRADED BINDER (64-22) | Mg | 16.740 | 2,628.18
|
| | 25.119 | 3,943.68
|
| | 0.000 | 0.00
|
| | |
|
0038 9053.00 | 35.50 | 70.000 | 2,485.00
|
TACK COAT | L | 70.000 | 2,485.00
|
| | 473.000 | 16,791.50
|
| | 0.000 | 0.00
|
| | |
|
0039 9110.01 | 65.00 | 15.000 | 975.00
|
RENTAL OF LOADER, FULLY OPERATED | HOUR | 15.000 | 975.00
|
| | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0040 9110.03 | 50.00 | 5.000 | 250.00
|
RENTAL OF DUMP TRUCK, FULLY OPERATED | HOUR | 5.000 | 250.00
|
| | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0041 9110.07 | 35.00 | 5.000 | 175.00
|
RENTAL OF SKID LOADER, FULLY OPERATED | HOUR | 5.000 | 175.00
|
| | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0042 9170.00 | 275.00 | 3.893 | 1,070.58
|
EARTH SHOULDER CONSTRUCTION | StaM | 3.893 | 1,070.58
|
| | 3.893 | 1,070.58
|
| | 0.000 | 0.00
|
| | |
|
0043 9173.20 | 1.00 | 519.000 | 519.00
|
SUBGRADE PREPARATION | m2 | 519.000 | 519.00
|
| | 519.000 | 519.00
|
| | 0.000 | 0.00
|
| | |
|
4000 2020.75 | 2,992.50 | 0.000 | 0.00
|
CRUSHED CONCRETE SURFACING | StaM | 1.947 | 5,826.40
|
Furnish, Haul and Place Crushed Concrete | | 1.947 | 5,826.40
|
| | 0.000 | 0.00
|
| | |
|
4001 2020.75 | 892.50 | 0.000 | 0.00
|
CRUSHED CONCRETE SURFACING | StaM | 1.947 | 1,737.70
|
Load, Haul and Stockpile Crushed Concrete Material | | 1.947 | 1,737.70
|
| | 0.000 | 0.00
|
| | |
|
GROUP 4 CULVERT AT STA. 2+46.60 | | Contracted | 248,030.10
|
| | Current | 252,089.59
|
| | In place | 273,941.32
|
| | This Estimate | 0.00
|
| | |
|
Totals for contract | | Contracted | 248,030.10
|
---|
| | Current | 252,089.59
|
---|
| | In place | 273,941.32
|
---|
| | This Estimate | 0.00
|
---|