Return to District Map


Nebraska Department of Roads
Estimate Summary to Contractor
Vendor ID:0083 WERNER CONSTRUCTION, INC.
Contract ID:4623X
Estimate Number:0013
Pay Period End Date:01.22.2003
Contract Location:
MILLIGAN SOUTHEstimate Type:PROG
Contractor:
WERNER CONSTRUCTION, INC.Date Let:04.18.2002
129 E 2ND STDate Awarded:04.29.2002
PO BOX 1087Date Contract Executed:05.14.2002
Date Notice to Proceed:05.14.2002
HASTINGS NE 68902-1087Date Work Began:06.17.2002
Phone:Date Physical Work Completed:
(402)463-4545Date Accepted:
Escrow Agent:
Surety Co:
UNIVERSAL SURETY COMPANY
Counties
FILLMORE
Project Number PCT Fed State Project Number Description
41623 000  0.000 EACSTPE-2755(4)  GR CULV BIT
42105 000  0.000 EACSTPE-2755(6)  GR CULV BIT
Total to DatePrev to DateThis Estimate
Current Contract AmtTotal Earnings$1,479,520.10$1,479,520.10$.00
$1,475,834.58Stockpiled Materials$.00$.00$.00
Original Contract AmtGross Earnings$1,479,520.10$1,479,520.10$.00
$1,451,353.53Retainage$-14,795.20$-14,795.20$.00
Escrow Amount$.00$.00$.00
Percent CompleteSecurities Encumbered$.00$.00$.00
100.25%Net Earnings$1,464,724.90$1,464,724.90$.00
Liquidated Damages-$3,072.00-$7,168.00$4,096.00
Incentives$.00$.00$.00
Disincentives$.00$.00$.00
Other Contract Adj$.00$.00$.00
Appl of Training Adj$.00$.00$.00
Training Rates Adj$.00$.00$.00
Fuel Adj$177.26$177.26$.00
Bituminous Adj$.00$.00$.00
Autopay Adj$.00$.00$.00
Gasoline Adj$.00$.00$.00
Other Adj$.00$.00$.00
Price Adj$.00$.00$.00
Substandard Item Adj$.00$.00$.00
Asphalt Adj$.00$.00$.00
Diesel Fuel Adj$.00$.00$.00
Petrol Adj$.00$.00$.00
Total for Adjustments-$2,894.74-$6,990.74$4,096.00
Payment$1,461,830.16$1,457,734.16$4,096.00
Project ManagerDiv. Head/Dist. Eng.
Anderson, Tom01.23.2003Heermann, Dennis01.23.2003
Constr. Estimate Eng.Materials Eng.
Bartos, Steve01.24.2003
Controller Div. Processed
Burling, Laurie01.24.2003
Detailed breakdown of stockpiled materials
Total remaining for contract:0.00
1. Contracted
2. Current
3. To date
Item Nbr        Item CodeUnit Price4. This Est
Item DescriptionUnitsQtyAmount
GROUP 1 GRADING
0001                          L006.00 50.0023.0001,150.00
COVER CROP SEEDING ACRE23.0001,150.00
23.0001,150.00
0.0000.00

0002                          0030.10 4,686.021.0004,686.02
MOBILIZATION LS 1.0004,686.02
1.0004,686.02
0.0000.00

0003                          1000.00 200.001.000200.00
LARGE TREE REMOVAL EACH19.0003,800.00
19.0003,800.00
0.0000.00

0004                          1009.00 3,000.001.0003,000.00
GENERAL CLEARING AND GRUBBING LS 1.0003,000.00
FOR PROJECT EACSTPE-2755(4) 1.0003,000.00
0.0000.00

0006                          1010.01 1.0768,057.00072,820.99
EXCAVATION (ESTABLISHED QUANTITY) CY 68,057.00072,820.99
68,057.00072,820.99
0.0000.00

0007                          1011.00 10.00651.0006,510.00
WATER MGAL651.0006,510.00
347.2003,472.00
0.0000.00

0008                          1101.25 2.5027.00067.50
SAWING PAVEMENT LF 27.00067.50
54.000135.00
0.0000.00

0009                          1102.00 2.50105.000262.50
REMOVE ASPHALT SURFACE SY 105.000262.50
13.33333.33
0.0000.00

0010                          1103.00 2.50287.000717.50
REMOVE BRICK SURFACE SY 287.000717.50
287.000717.50
0.0000.00

0011                          1108.00 3.40208.000707.20
REMOVE COMBINATION CURB AND GUTTER LF 208.000707.20
208.000707.20
0.0000.00

0012                          1300.18 12.0032.000384.00
18" DRIVEWAY CULVERT PIPE LF 32.000384.00
32.000384.00
0.0000.00

0013                          1300.24 14.00182.0002,548.00
24" DRIVEWAY CULVERT PIPE LF 182.0002,548.00
150.0002,100.00
0.0000.00

0014                          1300.30 18.7540.000750.00
30" DRIVEWAY CULVERT PIPE LF 40.000750.00
40.000750.00
0.0000.00

0015                          1305.18 12.69108.0001,370.52
18" ROUND EQUIVALENT DRIVEWAY CULVERT PIPE LF 108.0001,370.52
108.0001,370.52
0.0000.00

4008                          1010.42 3.210.0000.00
REPLACEMENT OF UNSUITABLE MATERIAL CY 120.000385.20
Section 205.05 paragraph 10 A of Standard Specifications 1,037.0003,328.77
0.0000.00

4009                          1101.00 4.410.0000.00
REMOVING PAVEMENT SY 287.0001,265.67
Additional Concrete Pavement Removal @ 2161+50 Lt. 287.0001,265.67
0.0000.00

GROUP 1 GRADINGContracted95,174.23
Current100,425.10
In place99,721.00
This Estimate0.00

GROUP 4 CULVERT
0017                          0030.40 3,671.551.0003,671.55
MOBILIZATION LS 1.0003,671.55
1.0003,671.55
0.0000.00

0018                          4043.00 2.00498.000996.00
REMOVE CULVERT PIPE LF 498.000996.00
473.000946.00
0.0000.00

0019                          4045.00 1,500.001.0001,500.00
REMOVE STRUCTURE EACH1.0001,500.00
AT STA. 13+83 1.0001,500.00
0.0000.00

0020                          4050.01 11.101,065.00011,821.50
EXCAVATION FOR PIPE, PIPE-ARCH CULVERTS, AND HEADWALLS CY 1,065.00011,821.50
1,106.00012,276.60
0.0000.00

0021                          4051.01 18.00990.00017,820.00
EXCAVATION FOR BOX CULVERTS CY 990.00017,820.00
1,039.00018,702.00
0.0000.00

0022                          4101.06 249.00206.54051,428.46
CLASS 47B-3000 OR AX-3000 CONCRETE FOR BOX CULVERT CY 206.54051,428.46
206.54051,428.46
0.0000.00

0023                          4151.00 0.6519,314.00012,554.10
REINFORCING STEEL FOR BOX CULVERT LB 19,314.00012,554.10
19,314.00012,554.10
0.0000.00

0024                          4300.24 17.7540.000710.00
24" CULVERT PIPE LF 40.000710.00
40.000710.00
0.0000.00

0026                          4300.42 40.0046.0001,840.00
42" CULVERT PIPE LF 46.0001,840.00
46.0001,840.00
0.0000.00

0027                          4310.24 175.001.000175.00
24" FLARED-END SECTION EACH1.000175.00
1.000175.00
0.0000.00

0029                          4310.42 700.001.000700.00
42" FLARED-END SECTION EACH1.000700.00
1.000700.00
0.0000.00

0030                          4450.48 69.50124.0008,618.00
48" REINFORCED CONCRETE PIPE LF 124.0008,618.00
124.0008,618.00
0.0000.00

0031                          4450.60 106.00170.00018,020.00
60" REINFORCED CONCRETE PIPE LF 170.00018,020.00
170.00018,020.00
0.0000.00

0032                          4460.48 770.004.0003,080.00
48" CONCRETE FLARED-END SECTION EACH4.0003,080.00
4.0003,080.00
0.0000.00

0033                          4460.60 1,200.004.0004,800.00
60" CONCRETE FLARED-END SECTION EACH4.0004,800.00
4.0004,800.00
0.0000.00

0034                          4500.24 35.00108.0003,780.00
24" ROUND EQUIVALENT REINFORCED CONCRETE PIPE LF 108.0003,780.00
108.0003,780.00
0.0000.00

0035                          4500.30 47.50132.0006,270.00
30" ROUND EQUIVALENT REINFORCED CONCRETE PIPE LF 132.0006,270.00
132.0006,270.00
0.0000.00

0036                          4500.42 63.5056.0003,556.00
42" ROUND EQUIVALENT REINFORCED CONCRETE PIPE LF 56.0003,556.00
56.0003,556.00
0.0000.00

0037                          4510.24 400.004.0001,600.00
24" ROUND EQUIVALENT CONCRETE FLARED-END SECTION EACH4.0001,600.00
4.0001,600.00
0.0000.00

0038                          4510.30 475.004.0001,900.00
30" ROUND EQUIVALENT CONCRETE FLARED-END SECTION EACH4.0001,900.00
4.0001,900.00
0.0000.00

0039                          4510.42 860.002.0001,720.00
42" ROUND EQUIVALENT CONCRETE FLARED-END SECTION EACH2.0001,720.00
2.0001,720.00
0.0000.00

4007                          4051.12 24.900.0000.00
GRANULAR MATERIAL FOR FOUNDATIONS OF BOX CULVERTS CY 19.000473.10
Section 702.05 Paragraph 6A of Standard Specifications 48.8001,215.12
0.0000.00

GROUP 4 CULVERTContracted156,560.61
Current157,033.71
In place159,062.83
This Estimate0.00

GROUP 4A CULVERT AT STA. 41+40
0040                          0030.40 2,000.001.0002,000.00
MOBILIZATION LS 1.0002,000.00
1.0002,000.00
0.0000.00

0041                          4050.01 18.00460.0008,280.00
EXCAVATION FOR PIPE, PIPE-ARCH CULVERTS, AND HEADWALLS CY 460.0008,280.00
460.0008,280.00
0.0000.00

0042                          4101.06 249.00125.47031,242.03
CLASS 47B-3000 OR AX-3000 CONCRETE FOR BOX CULVERT CY 125.47031,242.03
125.47031,242.03
0.0000.00

0043                          4151.00 0.6512,373.0008,042.45
REINFORCING STEEL FOR BOX CULVERT LB 12,373.0008,042.45
12,373.0008,042.45
0.0000.00

GROUP 4A CULVERT AT STA. 41+40Contracted49,564.48
Current49,564.48
In place49,564.48
This Estimate0.00

GROUP 9 BITUMINOUS
0044                          0002.55 9.7566.540648.77
OVERLAY BROKEN LINES STA 66.540648.77
127.4401,242.54
0.0000.00

0045                          0002.60 9.75133.0801,297.53
OVERLAY SOLID LINES STA 133.0801,297.53
254.8802,485.08
0.0000.00

0046                          0030.90 16,514.921.00016,514.92
MOBILIZATION LS 1.00016,514.92
1.00016,514.92
0.0000.00

0047                          2009.51 200.008.0101,602.00
CRUSHED ROCK EMBEDMENT STA 8.0101,602.00
8.0101,602.00
0.0000.00

0048                          2010.00 22.00236.0005,192.00
CRUSHED ROCK SURFACE COURSE CY 236.0005,192.00
411.1809,045.96
0.0000.00

0049                          2020.00 6.00129.000774.00
SPECIAL SURFACE COURSE FOR MAILBOX TURNOUTS SY 129.000774.00
101.000606.00
0.0000.00

0050                          2021.00 50.006.000300.00
MAILBOX POST EACH6.000300.00
4.000200.00
0.0000.00

0051                          3014.12 13.50917.00012,379.50
COMBINATION CONCRETE CLASS 47B-3625 CURB AND GUTTER LF 917.00012,379.50
926.00012,501.00
0.0000.00

0052                          9005.30 16.8716,850.000284,259.50
ASPHALTIC CONCRETE, TYPE SP2(0.5) TON 16,850.000284,259.50
17,035.150287,382.98
0.0000.00

0053                          9009.00 3.352,360.0007,906.00
PLACEMENT OF ASPHALTIC CONCRETE FOR DRIVEWAYS ANDINTERSECTIONS SY 2,360.0007,906.00
2,674.0008,957.90
0.0000.00

0054                          9021.01 181.00909.900164,691.90
PERFORMANCE GRADED BINDER (64-22) TON 909.900164,691.90
851.126154,053.81
0.0000.00

0055                          9034.00 2.502,630.0006,575.00
PREPARATION OF INTERSECTIONS AND DRIVEWAYS SY 2,630.0006,575.00
2,674.0006,685.00
0.0000.00

0056                          9053.00 1.003,890.0003,890.00
TACK COAT GAL 3,890.0003,890.00
6,970.0006,970.00
0.0000.00

0057                          9111.00 8.00191.0001,528.00
WATER MGAL191.0001,528.00
0.0000.00
0.0000.00

0058                          9170.00 28.00254.6067,128.97
EARTH SHOULDER CONSTRUCTION STA 254.6067,128.97
254.6067,128.97
0.0000.00

0059                          9173.00 175.00127.30322,278.03
SUBGRADE PREPARATION STA 127.30322,278.03
127.35022,286.25
0.0000.00

GROUP 9 BITUMINOUSContracted536,966.11
Current536,966.11
In place537,662.41
This Estimate0.00

GROUP 10 GENERAL ITEMS
0060                          0001.10 2.501,460.0003,650.00
BARRICADE, TYPE III BDAY1,460.0003,650.00
5,284.00013,210.00
0.0000.00

0061                          0001.30 2.50146.000365.00
TYPE B HIGH INTENSITY WARNING LIGHT LDAY146.000365.00
110.000275.00
0.0000.00

0062                          0001.90 0.853,212.0002,730.20
SIGN DAY EACH2,336.0001,985.60
3,100.0002,635.00
0.0000.00

0063                          0010.04 1,000.000.590590.00
FIELD OFFICE EACH0.590590.00
0.590590.00
0.0000.00

0064                          0030.10 2,824.071.0002,824.07
MOBILIZATION LS 1.0002,824.07
1.0002,824.07
0.0000.00

4005                          0001.99 0.790.0000.00
CONTRACTOR FURNISHED SIGN DAY EACH876.000692.04
Plastic signs furnished to go on barricades 798.000630.42
0.0000.00

GROUP 10 GENERAL ITEMSContracted10,159.27
Current10,106.71
In place20,164.49
This Estimate0.00

GROUP 1 GRADING
0001                          L006.00 50.008.000400.00
COVER CROP SEEDING ACRE8.000400.00
8.000400.00
0.0000.00

0002                          0030.10 2,313.981.0002,313.98
MOBILIZATION LS 1.0002,313.98
1.0002,313.98
0.0000.00

0003                          1000.00 200.001.000200.00
LARGE TREE REMOVAL EACH36.0007,200.00
36.0007,200.00
0.0000.00

0005                          1009.01 3,000.001.0003,000.00
GENERAL CLEARING AND GRUBBING LS 1.0003,000.00
FOR PROJECT EACSTPE-2755(6) 1.0003,000.00
0.0000.00

0006                          1010.01 1.0730,356.00032,480.92
EXCAVATION (ESTABLISHED QUANTITY) CY 30,356.00032,480.92
30,356.00032,480.92
0.0000.00

0007                          1011.00 10.00290.0002,900.00
WATER MGAL290.0002,900.00
141.3001,413.00
0.0000.00

0013                          1300.24 14.00460.0006,440.00
24" DRIVEWAY CULVERT PIPE LF 460.0006,440.00
462.0006,468.00
0.0000.00

0016                          1305.24 15.00100.0001,500.00
24" ROUND EQUIVALENT DRIVEWAY CULVERT PIPE LF 100.0001,500.00
100.0001,500.00
0.0000.00

GROUP 1 GRADINGContracted49,234.90
Current56,234.90
In place54,775.90
This Estimate0.00

GROUP 4 CULVERT
0017                          0030.40 328.451.000328.45
MOBILIZATION LS 1.000328.45
1.000328.45
0.0000.00

0018                          4043.00 2.00232.000464.00
REMOVE CULVERT PIPE LF 232.000464.00
199.000398.00
0.0000.00

0020                          4050.01 11.10440.0004,884.00
EXCAVATION FOR PIPE, PIPE-ARCH CULVERTS, AND HEADWALLS CY 440.0004,884.00
465.0005,161.50
0.0000.00

0024                          4300.24 17.75310.0005,502.50
24" CULVERT PIPE LF 66.0001,171.50
66.0001,171.50
0.0000.00

0025                          4300.36 28.0554.0001,514.70
36" CULVERT PIPE LF 0.0000.00
0.0000.00
0.0000.00

0027                          4310.24 175.0010.0001,750.00
24" FLARED-END SECTION EACH4.000700.00
4.000700.00
0.0000.00

0028                          4310.36 350.002.000700.00
36" FLARED-END SECTION EACH0.0000.00
0.0000.00
0.0000.00

4000                          4450.24 32.550.0000.00
24" REINFORCED CONCRETE PIPE LF 244.0007,942.20
revise culvert pipe to reinforce concrete pipe 244.0007,942.20
0.0000.00

4001                          4460.24 393.750.0000.00
24" CONCRETE FLARED END SECTION EACH6.0002,362.50
revise culvert pipe to reinforce concrete pipe 6.0002,362.50
0.0000.00

4003                          4450.36 58.800.0000.00
36" REINFORCED CONCRETE PIPE LF 54.0003,175.20
revise culvert pipe to reinforce concrete pipe 54.0003,175.20
0.0000.00

4004                          4460.36 756.000.0000.00
36" CONCRETE FLARED END SECTION EACH2.0001,512.00
revise culvert pipe to reinforce concrete pipe 2.0001,512.00
0.0000.00

GROUP 4 CULVERTContracted15,143.65
Current22,539.85
In place22,751.35
This Estimate0.00

GROUP 9 BITUMINOUS
0044                          0002.55 9.75143.0001,394.25
OVERLAY BROKEN LINES STA 143.0001,394.25
143.0001,394.25
0.0000.00

0045                          0002.60 9.75286.0002,788.50
OVERLAY SOLID LINES STA 286.0002,788.50
286.0002,788.50
0.0000.00

0046                          0030.90 16,485.081.00016,485.08
MOBILIZATION LS 1.00016,485.08
1.00016,485.08
0.0000.00

0048                          2010.00 22.0017.000374.00
CRUSHED ROCK SURFACE COURSE CY 220.0004,840.00
220.0004,840.00
0.0000.00

0052                          9005.30 16.8717,350.000292,694.50
ASPHALTIC CONCRETE, TYPE SP2(0.5) TON 17,350.000292,694.50
17,258.430291,149.71
0.0000.00

0053                          9009.00 3.351,173.0003,929.55
PLACEMENT OF ASPHALTIC CONCRETE FOR DRIVEWAYS ANDINTERSECTIONS SY 1,173.0003,929.55
1,120.0003,752.00
0.0000.00

0054                          9021.01 181.00936.900169,578.90
PERFORMANCE GRADED BINDER (64-22) TON 936.900169,578.90
858.147155,324.61
0.0000.00

0055                          9034.00 2.501,173.0002,932.50
PREPARATION OF INTERSECTIONS AND DRIVEWAYS SY 1,173.0002,932.50
1,173.0002,932.50
0.0000.00

0056                          9053.00 1.005,730.0005,730.00
TACK COAT GAL 5,730.0005,730.00
7,382.0007,382.00
0.0000.00

0057                          9111.00 8.00215.0001,720.00
WATER MGAL215.0001,720.00
0.0000.00
0.0000.00

0058                          9170.00 28.00286.2898,016.09
EARTH SHOULDER CONSTRUCTION STA 286.2898,016.09
286.2898,016.09
0.0000.00

0059                          9173.00 175.00143.14525,050.38
SUBGRADE PREPARATION STA 143.14525,050.38
143.14525,050.38
0.0000.00

GROUP 9 BITUMINOUSContracted530,693.75
Current535,159.75
In place519,115.12
This Estimate0.00

GROUP 10 GENERAL ITEMS
0060                          0001.10 2.501,168.0002,920.00
BARRICADE, TYPE III BDAY1,168.0002,920.00
4,571.00011,427.50
0.0000.00

0061                          0001.30 2.50146.000365.00
TYPE B HIGH INTENSITY WARNING LIGHT LDAY146.000365.00
0.0000.00
0.0000.00

0062                          0001.90 0.852,336.0001,985.60
SIGN DAY EACH1,460.0001,241.00
2,790.0002,371.50
0.0000.00

0063                          0010.04 1,000.000.410410.00
FIELD OFFICE EACH0.410410.00
0.0000.00
0.0000.00

0064                          0030.10 2,175.931.0002,175.93
MOBILIZATION LS 1.0002,175.93
1.0002,175.93
0.0000.00

4006                          0001.99 0.790.0000.00
CONTRACTOR FURNISHED SIGN DAY EACH876.000692.04
Plastic signs furnished on barricades. 921.000727.59
0.0000.00

GROUP 10 GENERAL ITEMSContracted7,856.53
Current7,803.97
In place16,702.52
This Estimate0.00

Totals for contractContracted1,451,353.52
Current1,475,834.58
In place1,479,520.10
This Estimate0.00