Return to District Map


Nebraska Department of Roads
Estimate Summary to Contractor
Vendor ID:1730 WILKE CONTRACTING CORPORATION
Contract ID:4603X
Estimate Number:0005
Pay Period End Date:05.28.2003
Contract Location:
ODESSA INTERCHANGE BRIDGEEstimate Type:PROG
Contractor:
WILKE CONTRACTING CORPORATIONDate Let:04.18.2002
27705 115TH RDDate Awarded:04.29.2002
PO BOX 1205Date Contract Executed:05.07.2002
Date Notice to Proceed:05.07.2002
KEARNEY NE 68848Date Work Began:09.09.2002
Phone:Date Physical Work Completed:
(308)236-9014Date Accepted:
Escrow Agent:
Surety Co:
AMERICAN CASUALTY COMPANY OF READING, PENNSYLVANIA
Counties
BUFFALO
Project Number PCT Fed State Project Number Description
41603 000  0.000 EACSTPD-L10B(102)  BRIDGE
Total to DatePrev to DateThis Estimate
Current Contract AmtTotal Earnings$152,835.75$145,929.98$6,905.77
$167,305.60Stockpiled Materials$.00$.00$.00
Original Contract AmtGross Earnings$152,835.75$145,929.98$6,905.77
$164,571.60Retainage$-1,528.36$-1,459.30$-69.06
Escrow Amount$.00$.00$.00
Percent CompleteSecurities Encumbered$.00$.00$.00
91.35%Net Earnings$151,307.39$144,470.68$6,836.71
Liquidated Damages$.00-$247.00$247.00
Incentives$.00$.00$.00
Disincentives$.00$.00$.00
Other Contract Adj$.00$.00$.00
Appl of Training Adj$.00$.00$.00
Training Rates Adj$.00$.00$.00
Fuel Adj$.00$.00$.00
Bituminous Adj$.00$.00$.00
Autopay Adj$.00$.00$.00
Gasoline Adj$.00$.00$.00
Other Adj$.00$.00$.00
Price Adj$.00$.00$.00
Substandard Item Adj$.00$.00$.00
Asphalt Adj$.00$.00$.00
Diesel Fuel Adj$.00$.00$.00
Petrol Adj$.00$.00$.00
Total for Adjustments$.00-$247.00$247.00
Payment$151,307.39$144,223.68$7,083.71
Project ManagerDiv. Head/Dist. Eng.
Farber, Tom05.29.2003Meyer, Keith05.29.2003
Constr. Estimate Eng.Materials Eng.
Bartos, Steve05.30.2003
Controller Div. Processed
Burling, Laurie06.02.2003
Detailed breakdown of stockpiled materials
Total remaining for contract:0.00
1. Contracted
2. Current
3. To date
Item Nbr        Item CodeUnit Price4. This Est
Item DescriptionUnitsQtyAmount
GROUP 6 BRIDGE AT STA. 1421+40.34
0001                          L020.00 1.806,700.00012,060.00
EROSION CONTROL SY 6,700.00012,060.00
2,871.8505,169.33
2,871.8505,169.33

0002                          0001.08 0.50964.000482.00
BARRICADE, TYPE II BDAY964.000482.00
1,180.000590.00
284.000142.00

0003                          0001.10 2.00840.0001,680.00
BARRICADE, TYPE III BDAY840.0001,680.00
777.0001,554.00
68.000136.00

0004                          0001.30 2.20498.0001,095.60
TYPE B HIGH INTENSITY WARNING LIGHT LDAY498.0001,095.60
0.0000.00
0.0000.00

0005                          0001.75 4.50120.000540.00
TEMPORARY SIGN DAY EACH120.000540.00
0.0000.00
0.0000.00

0006                          0001.90 0.504,814.0002,407.00
SIGN DAY EACH4,814.0002,407.00
2,727.0001,363.50
407.000203.50

0007                          0002.30 0.80800.000640.00
PAVEMENT MARKING REMOVAL LF 800.000640.00
2,255.0001,804.00
0.0000.00

0008                          0002.38 0.60400.000240.00
TEMPORARY PAVEMENT MARKING, TYPE I LF 400.000240.00
2,181.0001,308.60
0.0000.00

0009                          0002.39 1.20500.000600.00
TEMPORARY PAVEMENT MARKING, TYPE II LF 500.000600.00
0.0000.00
0.0000.00

0010                          0002.97 35.0010.000350.00
FLASHING ARROW PANEL DAY 10.000350.00
0.0000.00
0.0000.00

0011                          0003.51 18.00550.0009,900.00
INSTALL CONCRETE PROTECTION BARRIER LF 550.0009,900.00
530.0009,540.00
0.0000.00

0012                          0003.56 4.50550.0002,475.00
RELOCATE CONCRETE PROTECTION BARRIER LF 550.0002,475.00
530.0002,385.00
0.0000.00

0013                          0003.75 7,500.001.0007,500.00
TEMPORARY TRAFFIC SIGNAL EACH1.0007,500.00
1.0007,500.00
0.0000.00

0014                          0030.60 4,500.001.0004,500.00
MOBILIZATION LS 1.0004,500.00
1.0004,500.00
0.0000.00

0015                          1033.00 3,555.004.20014,931.00
ROADWAY GRADING STA 4.20014,931.00
4.20014,931.00
0.0000.00

0016                          6004.50 105.0060.5006,352.50
EXPANSION JOINT LF 60.5006,352.50
60.5006,352.50
0.0000.00

0017                          6010.26 450.0084.40037,980.00
CLASS 47BD-4000 CONCRETE FOR BRIDGE CY 84.40037,980.00
80.05036,022.50
0.0000.00

0018                          6020.00 2.009,765.00019,530.00
REINFORCING STEEL FOR BRIDGE LB 9,765.00019,530.00
8,849.00017,698.00
0.0000.00

0019                          6030.00 11,500.001.00011,500.00
PREPARATION OF BRIDGE EACH1.00011,500.00
AT STA. 1421+40.34 1.00011,500.00
0.0000.00

0020                          7011.20 11.78325.0003,828.50
W-BEAM GUARDRAIL LF 325.0003,828.50
425.0005,006.50
50.000589.00

0021                          7017.00 2.00700.0001,400.00
REMOVE GUARDRAIL LF 700.0001,400.00
700.0001,400.00
0.0000.00

0022                          7020.00 983.004.0003,932.00
BRIDGE APPROACH SECTIONS EACH0.0000.00
0.0000.00
0.0000.00

0023                          7024.27 1,426.004.0005,704.00
GUARDRAIL END TREATMENT, TYPE II EACH4.0005,704.00
4.0005,704.00
0.0000.00

0024                          9188.50 32.00467.00014,944.00
SURFACING UNDER GUARDRAIL SY 467.00014,944.00
349.34011,178.88
0.0000.00

4001                          0003.70 350.000.0000.00
TEMPORARY RUMBLE STRIPS EACH4.0001,400.00
6.0002,100.00
0.0000.00

4002                          7020.30 1,140.500.0000.00
BRIDGE APPROACH SECTION (MODIFIED) EACH4.0004,562.00
Installation of twin spacer blocks. 4.0004,562.00
0.0000.00

4003                          0002.76 0.220.0000.00
PERMANENT PAVEMENT MARKING PAINT LF 3,200.000704.00
Permanent Pavement Marking across the top of the Interchange 3,027.000665.94
3,027.000665.94

GROUP 6 BRIDGE AT STA. 1421+40.34Contracted164,571.60
Current167,305.60
In place152,835.75
This Estimate6,905.77

Totals for contractContracted164,571.60
Current167,305.60
In place152,835.75
This Estimate6,905.77