| | Detailed breakdown of stockpiled materials | |
|
|---|
| Est Nbr: | 0010 | | |
|
| Item Nbr | Item Cd | Item Desc | Adj Amt | Invoice Nbr
|
| 0062 | 1020.06 | FLEXIBLE POST DELINEATOR | |
|
| | S.P. Initial Payment | 6,074.25 | Sale005389
|
| | Flexable deliniator Posts | |
|
| 0077 | 3075.55 | 255 mm DOWELED CONCRETE PAVEMENT, CLASS 47B-25 | |
|
| | S.P. Initial Payment | 5,657.06 | 21928
|
| | 47B ROCK | |
|
| | S.P. Initial Payment | 11,570.15 | 21975
|
| | 47B ROCK | |
|
| | S.P. Initial Payment | 22,254.59 | 21975
|
| | 47B ROCK | |
|
| 0251 | 6011.11 | PRECAST/PRESTRESSED CONCRETE SUPERSTRUCTURE | |
|
| | S.P. Initial Payment | 90,550.00 | 3636
|
| | Inverted T Griders for superstructure 6B | |
|
| 0271 | 6011.11 | PRECAST/PRESTRESSED CONCRETE SUPERSTRUCTURE | |
|
| | S.P. Initial Payment | 90,550.00 | 3636
|
| | Inverted T griders for superstucture 6C | |
|
| 0333 | 6011.11 | PRECAST/PRESTRESSED CONCRETE SUPERSTRUCTURE | |
|
| | S.P. Initial Payment | 86,650.00 | 3636
|
| | Inverted T girders for superstucture 6F | |
|
| 0353 | 6011.11 | PRECAST/PRESTRESSED CONCRETE SUPERSTRUCTURE | |
|
| | S.P. Initial Payment | 86,650.00 | 3636
|
| | Inerted T girders for superstructure 6G | |
|
| | Total for estimate 0010: | 399,956.05 |
|
| Est Nbr: | 0012 | | |
|
| Item Nbr | Item Cd | Item Desc | Adj Amt | Invoice Nbr
|
| 0077 | 3075.55 | 255 mm DOWELED CONCRETE PAVEMENT, CLASS 47B-25 | |
|
| | S.P. Initial Payment | 31,646.84 | 22165
|
| | 47B ROCK | |
|
| | Total for estimate 0012: | 31,646.84 |
|
| Est Nbr: | 0013 | | |
|
| Item Nbr | Item Cd | Item Desc | Adj Amt | Invoice Nbr
|
| 0077 | 3075.55 | 255 mm DOWELED CONCRETE PAVEMENT, CLASS 47B-25 | |
|
| | S.P. Initial Payment | 20,822.21 | 22193
|
| | 47B ROCK | |
|
| | S.P. Initial Payment | 43,993.95 | 22226
|
| | 47B ROCK | |
|
| | Total for estimate 0013: | 64,816.16 |
|
| Est Nbr: | 0014 | | |
|
| Item Nbr | Item Cd | Item Desc | Adj Amt | Invoice Nbr
|
| 0077 | 3075.55 | 255 mm DOWELED CONCRETE PAVEMENT, CLASS 47B-25 | |
|
| | S.P. Initial Payment | 47,289.89 | 22259
|
| | 47B ROCK | |
|
| | S.P. Initial Payment | 67,547.11 | 22334
|
| | 47B ROCK | |
|
| 0271 | 6011.11 | PRECAST/PRESTRESSED CONCRETE SUPERSTRUCTURE | |
|
| | S.P. Adjustment | -90,550.00 | 3636
|
| | Inverted T griders for superstucture 6C | |
|
| | Total for estimate 0014: | 24,287.00 |
|
| Est Nbr: | 0015 | | |
|
| Item Nbr | Item Cd | Item Desc | Adj Amt | Invoice Nbr
|
| 0077 | 3075.55 | 255 mm DOWELED CONCRETE PAVEMENT, CLASS 47B-25 | |
|
| | S.P. Initial Payment | 12,089.92 | 22367
|
| | 47B ROCK | |
|
| | Total for estimate 0015: | 12,089.92 |
|
| Est Nbr: | 0016 | | |
|
| Item Nbr | Item Cd | Item Desc | Adj Amt | Invoice Nbr
|
| 0077 | 3075.55 | 255 mm DOWELED CONCRETE PAVEMENT, CLASS 47B-25 | |
|
| | S.P. Initial Payment | 1,191.32 | 22403
|
| | 47B ROCK | |
|
| | Total for estimate 0016: | 1,191.32 |
|
| Est Nbr: | 0017 | | |
|
| Item Nbr | Item Cd | Item Desc | Adj Amt | Invoice Nbr
|
| 0353 | 6011.11 | PRECAST/PRESTRESSED CONCRETE SUPERSTRUCTURE | |
|
| | S.P. Adjustment | -86,650.00 | 3636
|
| | Inerted T girders for superstructure 6G | |
|
| | Total for estimate 0017: | -86,650.00 |
|
| Est Nbr: | 0018 | | |
|
| Item Nbr | Item Cd | Item Desc | Adj Amt | Invoice Nbr
|
| 0048 | 1701.24 | 600 mm DRIVEWAY CULVERT PIPE, TYPE 2,3,4,5,6,7 OR 8 | |
|
| | S.P. Initial Payment | 4,595.95 | 70631
|
| | 600 mm driveway pipe | |
|
| | S.P. Adjustment | -1,607.33 | 70631
|
| | 600 mm driveway pipe | |
|
| 0049 | 1701.36 | 900 mm DRIVEWAY CULVERT PIPE, TYPE 2,3,4,5,6,7 OR 8 | |
|
| | S.P. Initial Payment | 1,150.81 | 70631
|
| | 900 mm driveway culvert pipe 41576 | |
|
| 0077 | 3075.55 | 255 mm DOWELED CONCRETE PAVEMENT, CLASS 47B-25 | |
|
| | S.P. Adjustment | -5,657.06 | 21928
|
| | 47B ROCK | |
|
| | S.P. Adjustment | -11,570.15 | 21975
|
| | 47B ROCK | |
|
| | S.P. Adjustment | -22,254.59 | 21975
|
| | 47B ROCK | |
|
| | S.P. Adjustment | -6,814.99 | 22165
|
| | 47B ROCK | |
|
| | S.P. Initial Payment | 19,847.56 | 22604
|
| | 47B ROCK | |
|
| | Total for estimate 0018: | -22,309.80 |
|
| Est Nbr: | 0019 | | |
|
| Item Nbr | Item Cd | Item Desc | Adj Amt | Invoice Nbr
|
| 0048 | 1701.24 | 600 mm DRIVEWAY CULVERT PIPE, TYPE 2,3,4,5,6,7 OR 8 | |
|
| | S.P. Initial Payment | 1,607.32 | 70631
|
| | 600 mm driveway pipe | |
|
| 0077 | 3075.55 | 255 mm DOWELED CONCRETE PAVEMENT, CLASS 47B-25 | |
|
| | S.P. Adjustment | -24,831.85 | 22165
|
| | 47B ROCK | |
|
| | S.P. Adjustment | -13,677.69 | 22193
|
| | 47B ROCK | |
|
| | Total for estimate 0019: | -36,902.22 |
|
| Est Nbr: | 0020 | | |
|
| Item Nbr | Item Cd | Item Desc | Adj Amt | Invoice Nbr
|
| 0077 | 3075.55 | 255 mm DOWELED CONCRETE PAVEMENT, CLASS 47B-25 | |
|
| | S.P. Adjustment | -7,144.52 | 22193
|
| | 47B ROCK | |
|
| | S.P. Adjustment | -11,369.07 | 22226
|
| | 47B ROCK | |
|
| | Total for estimate 0020: | -18,513.59 |
|
| Est Nbr: | 0021 | | |
|
| Item Nbr | Item Cd | Item Desc | Adj Amt | Invoice Nbr
|
| 0048 | 1701.24 | 600 mm DRIVEWAY CULVERT PIPE, TYPE 2,3,4,5,6,7 OR 8 | |
|
| | S.P. Adjustment | -577.63 | 70631
|
| | 600 mm driveway pipe | |
|
| 0077 | 3075.55 | 255 mm DOWELED CONCRETE PAVEMENT, CLASS 47B-25 | |
|
| | S.P. Adjustment | -24,836.46 | 22226
|
| | 47B ROCK | |
|
| | S.P. Initial Payment | 7,437.75 | 22994
|
| | 47B ROCK | |
|
| | S.P. Initial Payment | 13,142.22 | 23037
|
| | 47B ROCK | |
|
| | Total for estimate 0021: | -4,834.12 |
|
| Est Nbr: | 0022 | | |
|
| Item Nbr | Item Cd | Item Desc | Adj Amt | Invoice Nbr
|
| 0077 | 3075.55 | 255 mm DOWELED CONCRETE PAVEMENT, CLASS 47B-25 | |
|
| | S.P. Initial Payment | 21,073.68 | 23080
|
| | 47B ROCK | |
|
| | S.P. Initial Payment | 23,377.66 | 23235
|
| | 47B ROCK | |
|
| | Total for estimate 0022: | 44,451.34 |
|
| Est Nbr: | 0025 | | |
|
| Item Nbr | Item Cd | Item Desc | Adj Amt | Invoice Nbr
|
| 0251 | 6011.11 | PRECAST/PRESTRESSED CONCRETE SUPERSTRUCTURE | |
|
| | S.P. Adjustment | -90,550.00 | 3636
|
| | Inverted T Griders for superstructure 6B | |
|
| 0333 | 6011.11 | PRECAST/PRESTRESSED CONCRETE SUPERSTRUCTURE | |
|
| | S.P. Adjustment | -86,650.00 | 3636
|
| | Inverted T girders for superstucture 6F | |
|
| | Total for estimate 0025: | -177,200.00 |
|
| Est Nbr: | 0030 | | |
|
| Item Nbr | Item Cd | Item Desc | Adj Amt | Invoice Nbr
|
| 0077 | 3075.55 | 255 mm DOWELED CONCRETE PAVEMENT, CLASS 47B-25 | |
|
| | S.P. Adjustment | -7,788.43 | 22226
|
| | 47B ROCK | |
|
| | S.P. Adjustment | -29,221.86 | 22259
|
| | 47B ROCK | |
|
| | Total for estimate 0030: | -37,010.29 |
|
| Est Nbr: | 0031 | | |
|
| Item Nbr | Item Cd | Item Desc | Adj Amt | Invoice Nbr
|
| 0077 | 3075.55 | 255 mm DOWELED CONCRETE PAVEMENT, CLASS 47B-25 | |
|
| | S.P. Adjustment | -18,068.03 | 22259
|
| | 47B ROCK | |
|
| | S.P. Adjustment | -9,147.36 | 22334
|
| | 47B ROCK | |
|
| | Total for estimate 0031: | -27,215.39 |
|
| Est Nbr: | 0032 | | |
|
| Item Nbr | Item Cd | Item Desc | Adj Amt | Invoice Nbr
|
| 0077 | 3075.55 | 255 mm DOWELED CONCRETE PAVEMENT, CLASS 47B-25 | |
|
| | S.P. Adjustment | -14,935.64 | 22334
|
| | 47B ROCK | |
|
| | Total for estimate 0032: | -14,935.64 |
|
| Est Nbr: | 0033 | | |
|
| Item Nbr | Item Cd | Item Desc | Adj Amt | Invoice Nbr
|
| 0077 | 3075.55 | 255 mm DOWELED CONCRETE PAVEMENT, CLASS 47B-25 | |
|
| | S.P. Adjustment | -43,464.12 | 22334
|
| | 47B ROCK | |
|
| | S.P. Adjustment | -12,089.92 | 22367
|
| | 47B ROCK | |
|
| | S.P. Adjustment | -1,191.32 | 22403
|
| | 47B ROCK | |
|
| | S.P. Adjustment | -410.06 | 22604
|
| | 47B ROCK | |
|
| | Total for estimate 0033: | -57,155.42 |
|
| Est Nbr: | 0034 | | |
|
| Item Nbr | Item Cd | Item Desc | Adj Amt | Invoice Nbr
|
| 0077 | 3075.55 | 255 mm DOWELED CONCRETE PAVEMENT, CLASS 47B-25 | |
|
| | S.P. Adjustment | -19,437.50 | 22604
|
| | 47B ROCK | |
|
| | S.P. Adjustment | -7,437.75 | 22994
|
| | 47B ROCK | |
|
| | S.P. Adjustment | -13,142.22 | 23037
|
| | 47B ROCK | |
|
| | S.P. Adjustment | -6,025.74 | 23080
|
| | 47B ROCK | |
|
| | Total for estimate 0034: | -46,043.21 |
|
| Est Nbr: | 0035 | | |
|
| Item Nbr | Item Cd | Item Desc | Adj Amt | Invoice Nbr
|
| 0077 | 3075.55 | 255 mm DOWELED CONCRETE PAVEMENT, CLASS 47B-25 | |
|
| | S.P. Adjustment | -15,047.94 | 23080
|
| | 47B ROCK | |
|
| | S.P. Adjustment | -4,511.50 | 23235
|
| | 47B ROCK | |
|
| | Total for estimate 0035: | -19,559.44 |
|
| Est Nbr: | 0037 | | |
|
| Item Nbr | Item Cd | Item Desc | Adj Amt | Invoice Nbr
|
| 0048 | 1701.24 | 600 mm DRIVEWAY CULVERT PIPE, TYPE 2,3,4,5,6,7 OR 8 | |
|
| | S.P. Adjustment | -715.76 | 70631
|
| | 600 mm driveway pipe | |
|
| 0049 | 1701.36 | 900 mm DRIVEWAY CULVERT PIPE, TYPE 2,3,4,5,6,7 OR 8 | |
|
| | S.P. Adjustment | -1,150.81 | 70631
|
| | 900 mm driveway culvert pipe 41576 | |
|
| | Total for estimate 0037: | -1,866.57 |
|
| Est Nbr: | 0040 | | |
|
| Item Nbr | Item Cd | Item Desc | Adj Amt | Invoice Nbr
|
| 0077 | 3075.55 | 255 mm DOWELED CONCRETE PAVEMENT, CLASS 47B-25 | |
|
| | S.P. Adjustment | -11,229.25 | 23235
|
| | 47B ROCK | |
|
| | Total for estimate 0040: | -11,229.25 |
|
| Est Nbr: | 0046 | | |
|
| Item Nbr | Item Cd | Item Desc | Adj Amt | Invoice Nbr
|
| 0077 | 3075.55 | 255 mm DOWELED CONCRETE PAVEMENT, CLASS 47B-25 | |
|
| | S.P. Adjustment | -7,636.92 | 23235
|
| | 47B ROCK | |
|
| | Total for estimate 0046: | -7,636.92 |
|
| Est Nbr: | 0047 | | |
|
| Item Nbr | Item Cd | Item Desc | Adj Amt | Invoice Nbr
|
| 0048 | 1701.24 | 600 mm DRIVEWAY CULVERT PIPE, TYPE 2,3,4,5,6,7 OR 8 | |
|
| | S.P. Adjustment | -1,695.23 | 70631
|
| | 600 mm driveway pipe | |
|
| | S.P. Adjustment | -1,557.09 | 70631
|
| | 600 mm driveway pipe | |
|
| | Total for estimate 0047: | -3,252.32 |
|
| Est Nbr: | 0010 | | |
|
| Item Nbr | Item Cd | Item Desc | Adj Amt | Invoice Nbr
|
| 0062 | 1020.06 | FLEXIBLE POST DELINEATOR | |
|
| | S.P. Initial Payment | 1,911.00 | Sale005389
|
| | Flexible Deliniator posts | |
|
| | Total for estimate 0010: | 1,911.00 |
|
| Est Nbr: | 0018 | | |
|
| Item Nbr | Item Cd | Item Desc | Adj Amt | Invoice Nbr
|
| 0048 | 1701.24 | 600 mm DRIVEWAY CULVERT PIPE, TYPE 2,3,4,5,6,7 OR 8 | |
|
| | S.P. Initial Payment | 276.25 | 70631
|
| | 600 mm driveway culvert pipe 41585 | |
|
| | S.P. Adjustment | -276.25 | 70631
|
| | 600 mm driveway culvert pipe 41585 | |
|
| | Total for estimate 0018: | 0.00 |
|
| Est Nbr: | 0019 | | |
|
| Item Nbr | Item Cd | Item Desc | Adj Amt | Invoice Nbr
|
| 0048 | 1701.24 | 600 mm DRIVEWAY CULVERT PIPE, TYPE 2,3,4,5,6,7 OR 8 | |
|
| | S.P. Initial Payment | 276.25 | 70631
|
| | 600 mm driveway culvert pipe 41585 | |
|
| | Total for estimate 0019: | 276.25 |
|
| Est Nbr: | 0022 | | |
|
| Item Nbr | Item Cd | Item Desc | Adj Amt | Invoice Nbr
|
| 0077 | 3075.55 | 255 mm DOWELED CONCRETE PAVEMENT, CLASS 47B-25 | |
|
| | S.P. Initial Payment | 29,927.85 | 23138
|
| | 47B ROCK | |
|
| | S.P. Initial Payment | 37,017.63 | 23190
|
| | 47B ROCK | |
|
| | S.P. Initial Payment | 30,258.00 | 23235
|
| | 47B ROCK | |
|
| | Total for estimate 0022: | 97,203.48 |
|
| Est Nbr: | 0031 | | |
|
| Item Nbr | Item Cd | Item Desc | Adj Amt | Invoice Nbr
|
| 0077 | 3075.55 | 255 mm DOWELED CONCRETE PAVEMENT, CLASS 47B-25 | |
|
| | S.P. Adjustment | -29,927.85 | 23138
|
| | 47B ROCK | |
|
| | S.P. Adjustment | -16,062.54 | 23190
|
| | 47B ROCK | |
|
| | Total for estimate 0031: | -45,990.39 |
|
| Est Nbr: | 0032 | | |
|
| Item Nbr | Item Cd | Item Desc | Adj Amt | Invoice Nbr
|
| 0077 | 3075.55 | 255 mm DOWELED CONCRETE PAVEMENT, CLASS 47B-25 | |
|
| | S.P. Adjustment | -20,955.09 | 23190
|
| | 47B ROCK | |
|
| | S.P. Adjustment | -30,258.00 | 23235
|
| | 47B ROCK | |
|
| | Total for estimate 0032: | -51,213.09 |
|
| Est Nbr: | 0038 | | |
|
| Item Nbr | Item Cd | Item Desc | Adj Amt | Invoice Nbr
|
| 0048 | 1701.24 | 600 mm DRIVEWAY CULVERT PIPE, TYPE 2,3,4,5,6,7 OR 8 | |
|
| | S.P. Adjustment | -276.25 | 70631
|
| | 600 mm driveway culvert pipe 41585 | |
|
| | Total for estimate 0038: | -276.25 |
|
| | Total remaining for contract: | 8,035.45 |
|
|---|
| | | 1. Contracted
|
|---|
| | | 2. Current
|
|---|
| | | 3. To date
|
|---|
| Item Nbr Item Code | Unit Price | | 4. This Est
|
|---|
| Item Description | Units | Qty | Amount
|
|---|
| GROUP 1 GRADING | | |
|
| 0001 L006.00 | 125.00 | 50.000 | 6,250.00
|
| COVER CROP SEEDING | ha | 50.000 | 6,250.00
|
| | | 48.000 | 6,000.00
|
| | 0.000 | 0.00
|
| | |
|
| 0002 L020.01 | 6.00 | 1,764.100 | 10,584.60
|
| EROSION CONTROL, TYPE A | m2 | 1,764.100 | 10,584.60
|
| | | 1,410.100 | 8,460.60
|
| | 0.000 | 0.00
|
| | |
|
| 0003 L020.09 | 12.00 | 33.000 | 396.00
|
| EROSION CONTROL, TYPE AAA | m2 | 33.000 | 396.00
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 0004 L020.10 | 1.80 | 2,092.500 | 3,766.50
|
| EROSION CONTROL, TYPE HV | m2 | 2,092.500 | 3,766.50
|
| | | 148.000 | 266.40
|
| | 0.000 | 0.00
|
| | |
|
| 0006 L021.01 | 16.00 | 24.000 | 384.00
|
| EROSION CHECKS, TYPE A | BALE | 24.000 | 384.00
|
| | | 24.000 | 384.00
|
| | 0.000 | 0.00
|
| | |
|
| 0007 L021.06 | 13.00 | 258.000 | 3,354.00
|
| EROSION CHECKS, TYPE HV | BALE | 258.000 | 3,354.00
|
| | | 342.000 | 4,446.00
|
| | 0.000 | 0.00
|
| | |
|
| 0010 L022.13 | 8.50 | 203.000 | 1,725.50
|
| FABRIC SILT FENCE-LOW PROFILE HIGH POROSITY | m | 203.000 | 1,725.50
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 0011 L022.14 | 8.50 | 297.600 | 2,529.60
|
| FABRIC SILT FENCE-LOW PROFILE LOW POROSITY | m | 297.600 | 2,529.60
|
| | | 585.600 | 4,977.60
|
| | 0.000 | 0.00
|
| | |
|
| 0012 L022.25 | 9.00 | 200.000 | 1,800.00
|
| FABRIC SILT FENCE, TYPE COIR FIBER | m | 200.000 | 1,800.00
|
| | | 251.700 | 2,265.30
|
| | 0.000 | 0.00
|
| | |
|
| 0013 P120.18 | 81.00 | 1.500 | 121.50
|
| 450 mm CULVERT PIPE, TYPE 2 | m | 1.500 | 121.50
|
| | | 1.500 | 121.50
|
| | 0.000 | 0.00
|
| | |
|
| 0014 P200.24 | 115.00 | 21.000 | 2,415.00
|
| 600mm CULVERT PIPE, TYPE 2 OR 5 | m | 21.000 | 2,415.00
|
| | | 21.000 | 2,415.00
|
| | 0.000 | 0.00
|
| | |
|
| 0015 P400.18 | 71.00 | 640.500 | 45,475.50
|
| 450 mm CULVERT PIPE, TYPE 2,5,7 OR 8 | m | 640.500 | 45,475.50
|
| | | 624.900 | 44,367.90
|
| | 0.000 | 0.00
|
| | |
|
| 0016 P700.12 | 83.00 | 1.000 | 83.00
|
| 300 mm STORM SEWER PIPE, TYPE 1,7 OR 8 | m | 1.000 | 83.00
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 0017 P775.36 | 306.00 | 5.500 | 1,683.00
|
| 900 mm ROUND EQUIVALENT STORM SEWER PIPE, TYPE 1 | m | 5.500 | 1,683.00
|
| | | 5.500 | 1,683.00
|
| | 0.000 | 0.00
|
| | |
|
| 0018 0030.10 | 11,396.30 | 1.000 | 11,396.30
|
| MOBILIZATION | LS | 1.000 | 11,396.30
|
| | | 1.000 | 11,396.30
|
| | 0.000 | 0.00
|
| | |
|
| 0019 1009.00 | 100,493.55 | 1.000 | 100,493.55
|
| GENERAL CLEARING AND GRUBBING | LS | 1.000 | 100,493.55
|
| | | 1.000 | 100,493.55
|
| | 0.000 | 0.00
|
| | |
|
| 0020 1010.00 | 1.10 | 171,469.000 | 188,615.90
|
| EXCAVATION | m3 | 171,469.000 | 188,615.90
|
| | | 172,367.000 | 189,603.70
|
| | 0.000 | 0.00
|
| | |
|
| 0021 1010.10 | 1.90 | 562,387.000 | 1,068,535.30
|
| EXCAVATION, BORROW | m3 | 562,387.000 | 1,068,535.30
|
| | | 600,988.000 | 1,141,877.20
|
| | 0.000 | 0.00
|
| | |
|
| 0022 1010.45 | 2.50 | 7,500.000 | 18,750.00
|
| REMOVAL OF LIVESTOCK WASTE | kL | 7,500.000 | 18,750.00
|
| | | 7,500.000 | 18,750.00
|
| | 0.000 | 0.00
|
| | |
|
| 0023 1010.50 | 3.50 | 3,100.000 | 10,850.00
|
| REMOVAL OF UNSUITABLE MATERIAL | m3 | 3,100.000 | 10,850.00
|
| | | 3,100.000 | 10,850.00
|
| | 0.000 | 0.00
|
| | |
|
| 0024 1011.00 | 1.00 | 14,731.000 | 14,731.00
|
| WATER | kL | 14,731.000 | 14,731.00
|
| | | 2,400.000 | 2,400.00
|
| | 0.000 | 0.00
|
| | |
|
| 0025 1012.00 | 50.00 | 110.000 | 5,500.00
|
| RIGHT-OF-WAY MARKERS | EACH | 110.000 | 5,500.00
|
| | | 140.000 | 7,000.00
|
| | 0.000 | 0.00
|
| | |
|
| 0026 1043.50 | 2.00 | 149.000 | 298.00
|
| RIPRAP FILTER FABRIC | m2 | 149.000 | 298.00
|
| | | 164.458 | 328.92
|
| | 0.000 | 0.00
|
| | |
|
| 0027 1090.00 | 750.00 | 1.000 | 750.00
|
| ABANDON WELLS | EACH | 1.000 | 750.00
|
| | | 2.000 | 1,500.00
|
| | 0.000 | 0.00
|
| | |
|
| 0028 1101.25 | 10.00 | 87.600 | 876.00
|
| SAWING PAVEMENT | m | 121.000 | 1,210.00
|
| | | 21.050 | 210.50
|
| | 0.000 | 0.00
|
| | |
|
| 0029 1102.00 | 2.50 | 5,278.000 | 13,195.00
|
| REMOVE ASPHALT SURFACE | m2 | 4,472.000 | 11,180.00
|
| | | 2,959.260 | 7,398.15
|
| | 0.000 | 0.00
|
| | |
|
| 0030 1106.00 | 4.00 | 31.000 | 124.00
|
| REMOVE DRIVEWAY | m2 | 31.000 | 124.00
|
| | | 31.000 | 124.00
|
| | 0.000 | 0.00
|
| | |
|
| 0031 1109.00 | 40.00 | 16.000 | 640.00
|
| REMOVE CURB | m | 16.000 | 640.00
|
| | | 32.000 | 1,280.00
|
| | 0.000 | 0.00
|
| | |
|
| 0037 1124.05 | 100.00 | 1.000 | 100.00
|
| REMOVE BUILDING | EACH | 1.000 | 100.00
|
| AT STA. 1015+85 RT. | | 1.000 | 100.00
|
| | 0.000 | 0.00
|
| | |
|
| 0038 1124.06 | 500.00 | 1.000 | 500.00
|
| REMOVE BUILDING | EACH | 1.000 | 500.00
|
| AT STA. 1016+16 RT. | | 1.000 | 500.00
|
| | 0.000 | 0.00
|
| | |
|
| 0039 1124.07 | 100.00 | 1.000 | 100.00
|
| REMOVE BUILDING | EACH | 1.000 | 100.00
|
| AT STA. 1016+52 RT. | | 1.000 | 100.00
|
| | 0.000 | 0.00
|
| | |
|
| 0040 1124.08 | 100.00 | 1.000 | 100.00
|
| REMOVE BUILDING | EACH | 1.000 | 100.00
|
| AT STA. 1016+79 RT. | | 1.000 | 100.00
|
| | 0.000 | 0.00
|
| | |
|
| 0041 1124.09 | 100.00 | 1.000 | 100.00
|
| REMOVE BUILDING | EACH | 1.000 | 100.00
|
| AT STA. 1016+85 RT. | | 1.000 | 100.00
|
| | 0.000 | 0.00
|
| | |
|
| 0042 1124.10 | 100.00 | 1.000 | 100.00
|
| REMOVE BUILDING | EACH | 1.000 | 100.00
|
| AT STA. 1016+97 RT. | | 1.000 | 100.00
|
| | 0.000 | 0.00
|
| | |
|
| 0045 1125.02 | 1,500.00 | 1.000 | 1,500.00
|
| CLEAR TRACT | EACH | 1.000 | 1,500.00
|
| STA. 1016+10 TO 1017+18 RT. | | 1.000 | 1,500.00
|
| | 0.000 | 0.00
|
| | |
|
| 0048 1701.24 | 40.00 | 418.000 | 16,720.00
|
| 600 mm DRIVEWAY CULVERT PIPE, TYPE 2,3,4,5,6,7 OR 8 | m | 405.000 | 16,200.00
|
| | | 530.000 | 21,200.00
|
| | 0.000 | 0.00
|
| | |
|
| 0049 1701.36 | 55.00 | 26.000 | 1,430.00
|
| 900 mm DRIVEWAY CULVERT PIPE, TYPE 2,3,4,5,6,7 OR 8 | m | 26.000 | 1,430.00
|
| | | 26.000 | 1,430.00
|
| | 0.000 | 0.00
|
| | |
|
| 0050 1703.42 | 75.00 | 16.000 | 1,200.00
|
| 1050 mm DRIVEWAY CULVERT PIPE, TYPE 2,3,4 OR 5 | m | 16.000 | 1,200.00
|
| | | 16.000 | 1,200.00
|
| | 0.000 | 0.00
|
| | |
|
| 0051 1703.48 | 90.00 | 78.500 | 7,065.00
|
| 1200 mm DRIVEWAY CULVERT PIPE, TYPE 2,3,4 OR 5 | m | 78.500 | 7,065.00
|
| | | 78.500 | 7,065.00
|
| | 0.000 | 0.00
|
| | |
|
| 0052 4004.50 | 2.80 | 1,831.000 | 5,126.80
|
| CAST IRON GRATE AND FRAME | kg | 1,831.000 | 5,126.80
|
| | | 1,831.000 | 5,126.80
|
| | 0.000 | 0.00
|
| | |
|
| 0053 4040.00 | 150.00 | 6.000 | 900.00
|
| REMOVE HEADWALLS FROM CULVERTS | EACH | 6.000 | 900.00
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 0054 4050.01 | 12.00 | 30.000 | 360.00
|
| EXCAVATION FOR PIPE, PIPE-ARCH CULVERTS, AND HEADWALLS | m3 | 30.000 | 360.00
|
| | | 30.000 | 360.00
|
| | 0.000 | 0.00
|
| | |
|
| 0055 4105.59 | 540.00 | 38.900 | 21,006.00
|
| CLASS 47B-20 CONCRETE FOR INLET AND JUNCTION BOX | m3 | 38.900 | 21,006.00
|
| | | 38.900 | 21,006.00
|
| | 0.000 | 0.00
|
| | |
|
| 0056 4155.50 | 2.00 | 1,497.000 | 2,994.00
|
| REINFORCING STEEL FOR INLET AND JUNCTION BOX | kg | 1,497.000 | 2,994.00
|
| | | 1,497.000 | 2,994.00
|
| | 0.000 | 0.00
|
| | |
|
| 0057 4310.18 | 300.00 | 26.000 | 7,800.00
|
| 450 mm FLARED-END SECTION | EACH | 26.000 | 7,800.00
|
| | | 26.000 | 7,800.00
|
| | 0.000 | 0.00
|
| | |
|
| 0058 4310.24 | 245.00 | 2.000 | 490.00
|
| 600 mm FLARED-END SECTION | EACH | 2.000 | 490.00
|
| | | 2.000 | 490.00
|
| | 0.000 | 0.00
|
| | |
|
| 0059 4320.36 | 640.00 | 1.000 | 640.00
|
| 900 mm ROUND EQUIVALENT FLARED-END SECTION | EACH | 1.000 | 640.00
|
| | | 1.000 | 640.00
|
| | 0.000 | 0.00
|
| | |
|
| 0060 6105.02 | 22.00 | 118.000 | 2,596.00
|
| ROCK RIPRAP, TYPE B | Mg | 118.000 | 2,596.00
|
| | | 130.790 | 2,877.38
|
| | 0.000 | 0.00
|
| | |
|
| 4001 0003.10 | 175.00 | 0.000 | 0.00
|
| FLAGGING | DAY | 40.000 | 7,000.00
|
| Flagging | | 12.000 | 2,100.00
|
| | 0.000 | 0.00
|
| | |
|
| 4002 1136.10 | 3,465.00 | 0.000 | 0.00
|
| REMOVE | LS | 1.000 | 3,465.00
|
| Remove Debris from Bridge Site. | | 1.000 | 3,465.00
|
| | 0.000 | 0.00
|
| | |
|
| 4003 L022.11 | 8.08 | 0.000 | 0.00
|
| FABRIC SILT FENCE-LOW POROSITY | m | 5,745.000 | 46,419.60
|
| Fabric Silt Fence-Low Porosity | | 5,176.500 | 41,826.12
|
| | 0.000 | 0.00
|
| | |
|
| 4030 1701.18 | 26.25 | 0.000 | 0.00
|
| 450 mm DRIVEWAY CULVERT PIPE, TYPE 2,3,4,5,6,7 OR 8 | m | 11.000 | 288.75
|
| 450MM Driveway Culvert Pipe Type 2,3,4,5,6,7 or 8 | | 11.000 | 288.75
|
| | 0.000 | 0.00
|
| | |
|
| 4048 1010.46 | 2.20 | 0.000 | 0.00
|
| REMOVAL OF UNSUITABLY WET SOIL | m3 | 1,238.000 | 2,723.60
|
| Removal of Unsuitably wet material from grading sectionStd. Specification, section 205.05, para 10a. | | 1,238.000 | 2,723.60
|
| | 0.000 | 0.00
|
| | |
|
| GROUP 1 GRADING | | Contracted | 1,586,151.05
|
| | Current | 1,643,847.00
|
| | In place | 1,693,692.27
|
| | This Estimate | 0.00
|
| | |
|
| GROUP 3 CONCRETE PAVEMENT | | |
|
| 0061 0030.30 | 156,064.00 | 1.000 | 156,064.00
|
| MOBILIZATION | LS | 1.000 | 156,064.00
|
| | | 0.975 | 152,296.13
|
| | 0.000 | 0.00
|
| | |
|
| 0062 1020.06 | 20.00 | 445.000 | 8,900.00
|
| FLEXIBLE POST DELINEATOR | EACH | 445.000 | 8,900.00
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 0064 2001.00 | 15.00 | 985.000 | 14,775.00
|
| GRAVEL SURFACE COURSE | m3 | 1,014.000 | 15,210.00
|
| | | 874.070 | 13,111.05
|
| | 0.000 | 0.00
|
| | |
|
| 0065 2020.00 | 7.50 | 70.000 | 525.00
|
| SPECIAL SURFACE COURSE FOR MAILBOX TURNOUTS | m2 | 70.000 | 525.00
|
| | | 78.000 | 585.00
|
| | 0.000 | 0.00
|
| | |
|
| 0066 2021.00 | 50.00 | 3.000 | 150.00
|
| MAILBOX POST | EACH | 3.000 | 150.00
|
| | | 6.000 | 300.00
|
| | 0.000 | 0.00
|
| | |
|
| 0067 3016.21 | 26.00 | 890.000 | 23,140.00
|
| CONCRETE CLASS 47B-20 SIDEWALKS | m2 | 890.000 | 23,140.00
|
| | | 854.300 | 22,211.80
|
| | 0.000 | 0.00
|
| | |
|
| 0068 3017.40 | 26.00 | 504.000 | 13,104.00
|
| CONCRETE CLASS 47B-20 MEDIAN SURFACING | m2 | 504.000 | 13,104.00
|
| | | 499.364 | 12,983.46
|
| | 0.000 | 0.00
|
| | |
|
| 0069 3020.26 | 30.00 | 195.000 | 5,850.00
|
| CONCRETE CLASS 47B-25 DRIVEWAY | m2 | 195.000 | 5,850.00
|
| | | 241.800 | 7,254.00
|
| | 0.000 | 0.00
|
| | |
|
| 0070 3040.11 | 124.35 | 13.400 | 1,666.29
|
| CONCRETE PAVEMENT REPAIR, TYPE A, FULL DEPTH | m2 | 13.400 | 1,666.29
|
| | | 49.450 | 6,149.11
|
| | 0.000 | 0.00
|
| | |
|
| 0071 3040.12 | 98.00 | 424.600 | 41,610.80
|
| CONCRETE PAVEMENT REPAIR, TYPE B, FULL DEPTH | m2 | 424.600 | 41,610.80
|
| | | 250.110 | 24,510.78
|
| | 0.000 | 0.00
|
| | |
|
| 0072 3040.13 | 95.34 | 511.000 | 48,718.74
|
| CONCRETE PAVEMENT REPAIR, TYPE C, FULL DEPTH | m2 | 511.000 | 48,718.74
|
| | | 544.980 | 51,958.39
|
| | 0.000 | 0.00
|
| | |
|
| 0073 3040.18 | 109.85 | 30.300 | 3,328.46
|
| CONCRETE PAVEMENT REPAIR, TYPE A, PARTIAL DEPTH | m2 | 30.300 | 3,328.46
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 0074 3041.25 | 540.00 | 28.000 | 15,120.00
|
| BITUMINOUS PATCHING | Mg | 28.000 | 15,120.00
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 0075 3075.31 | 29.59 | 15,168.000 | 448,821.12
|
| 205 mm CONCRETE PAVEMENT, CLASS 47B-25 | m2 | 15,168.000 | 448,821.12
|
| | | 12,490.953 | 369,607.29
|
| | 0.000 | 0.00
|
| | |
|
| 0076 3075.51 | 34.90 | 10,157.000 | 354,479.30
|
| 255 mm CONCRETE PAVEMENT, CLASS 47B-25 | m2 | 10,157.000 | 354,479.30
|
| | | 9,548.935 | 333,257.82
|
| | 0.000 | 0.00
|
| | |
|
| 0077 3075.55 | 26.64 | 174,881.000 | 4,658,829.84
|
| 255 mm DOWELED CONCRETE PAVEMENT, CLASS 47B-25 | m2 | 174,881.000 | 4,658,829.84
|
| | | 175,733.727 | 4,681,546.49
|
| | 0.000 | 0.00
|
| | |
|
| 0078 3221.05 | 95.34 | 595.500 | 56,774.97
|
| CONCRETE PAVEMENT, CLASS PR-25 | m2 | 595.500 | 56,774.97
|
| JOINT REPAIR | | 754.400 | 71,924.50
|
| | 0.000 | 0.00
|
| | |
|
| 0079 3275.20 | 5.47 | 32,769.000 | 179,246.43
|
| CRUSH CONCRETE PAVEMENT | m2 | 27,427.000 | 150,025.69
|
| | | 27,945.860 | 152,863.86
|
| | 0.000 | 0.00
|
| | |
|
| 0080 3300.50 | 5,090.91 | 1.000 | 5,090.91
|
| PORTLAND CEMENT CONCRETE SMOOTHNESS TESTING | LS | 1.000 | 5,090.91
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 0081 7550.03 | 1.26 | 19,800.000 | 24,948.00
|
| 100 mm YELLOW EPOXY PAVEMENT MARKING | m | 19,800.000 | 24,948.00
|
| | | 822.000 | 1,035.72
|
| | 0.000 | 0.00
|
| | |
|
| 0082 7550.04 | 1.20 | 24,750.000 | 29,700.00
|
| 100 mm WHITE EPOXY PAVEMENT MARKING | m | 24,750.000 | 29,700.00
|
| | | 12,499.200 | 14,999.04
|
| | 0.000 | 0.00
|
| | |
|
| 0083 8022.00 | 99.50 | 2,440.000 | 242,780.00
|
| HYDRATED LIME | Mg | 3,828.000 | 380,886.00
|
| | | 3,914.030 | 389,446.01
|
| | 0.000 | 0.00
|
| | |
|
| 0085 8029.10 | 4.12 | 129,667.000 | 534,228.04
|
| AGGREGATE FOUNDATION COURSE-D 100 mm | m2 | 216,422.000 | 891,658.64
|
| | | 186,894.139 | 770,003.86
|
| | 0.000 | 0.00
|
| | |
|
| 0086 8029.12 | 6.53 | 16,743.000 | 109,331.79
|
| AGGREGATE FOUNDATION COURSE-D 150 mm | m2 | 16,743.000 | 109,331.79
|
| | | 16,373.273 | 106,917.47
|
| | 0.000 | 0.00
|
| | |
|
| 0087 8029.84 | 1.15 | 29,261.000 | 33,650.15
|
| BITUMINOUS FOUNDATION COURSE 100 mm | m2 | 0.000 | 0.00
|
| | | 6,685.000 | 7,687.76
|
| | 0.000 | 0.00
|
| | |
|
| 0088 8032.04 | 1.07 | 57,494.000 | 61,518.58
|
| CRUSHED CONCRETE FOUNDATION COURSE 100 mm | m2 | 0.000 | 0.00
|
| | | 10,523.963 | 11,260.63
|
| | 0.000 | 0.00
|
| | |
|
| 0089 8060.08 | 150.00 | 632.000 | 94,800.00
|
| N-DRAIN | EACH | 80.000 | 12,000.00
|
| | | 50.000 | 7,500.00
|
| | 0.000 | 0.00
|
| | |
|
| 0090 8101.50 | 1.38 | 216,422.000 | 298,662.36
|
| STABILIZED SUBGRADE | m2 | 216,422.000 | 298,662.36
|
| | | 200,910.822 | 277,256.94
|
| | 0.000 | 0.00
|
| | |
|
| 0091 9000.74 | 22.86 | 100.000 | 2,286.00
|
| ASPHALTIC CONCRETE FOR STATE MAINTENANCE PATCHING, TYPE | Mg | 100.000 | 2,286.00
|
| SP2(12.5) | | 165.953 | 3,793.68
|
| | 39.003 | 891.61
|
| | |
|
| 0093 9005.00 | 34.74 | 100.000 | 3,474.00
|
| ASPHALTIC CONCRETE FOR PATCHING, TYPE | Mg | 100.000 | 3,474.00
|
| SP4(12.5) | | 90.532 | 3,145.08
|
| | 0.000 | 0.00
|
| | |
|
| 0095 9005.30 | 22.86 | 10,295.000 | 235,343.70
|
| ASPHALTIC CONCRETE, TYPE SP2(12.5) | Mg | 0.000 | 0.00
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 0096 9005.45 | 24.74 | 10,390.000 | 257,048.60
|
| ASPHALTIC CONCRETE, TYPE SP4(12.5) | Mg | 7,748.000 | 191,685.52
|
| | | 5,197.740 | 128,592.09
|
| | 0.000 | 0.00
|
| | |
|
| 0097 9009.00 | 2.50 | 359.000 | 897.50
|
| PLACEMENT OF ASPHALTIC CONCRETE FOR DRIVEWAYS ANDINTERSECTIONS | m2 | 359.000 | 897.50
|
| | | 1,665.650 | 4,164.14
|
| | 187.930 | 469.83
|
| | |
|
| 0098 9009.86 | 12.30 | 31,384.000 | 386,023.20
|
| SURFACING 150mm | m2 | 31,384.000 | 386,023.20
|
| | | 32,719.640 | 402,451.57
|
| | 0.000 | 0.00
|
| | |
|
| 0099 9020.92 | 200.00 | 5.200 | 1,040.00
|
| PERFORMANCE GRADED BINDER (58-28) FOR STATE MAINTENANCEPATCHING | Mg | 5.200 | 1,040.00
|
| | | 6.830 | 1,366.00
|
| | 1.542 | 308.40
|
| | |
|
| 0100 9021.03 | 202.00 | 556.038 | 112,319.68
|
| PERFORMANCE GRADED BINDER (58-28) | Mg | 261.320 | 52,786.64
|
| | | 199.633 | 40,325.86
|
| | 8.315 | 1,679.63
|
| | |
|
| 0101 9021.04 | 252.00 | 561.060 | 141,387.12
|
| PERFORMANCE GRADED BINDER (70-28) | Mg | 419.060 | 105,603.12
|
| | | 402.114 | 101,332.73
|
| | 106.546 | 26,849.59
|
| | |
|
| 0102 9034.00 | 2.50 | 359.000 | 897.50
|
| PREPARATION OF INTERSECTIONS AND DRIVEWAYS | m2 | 359.000 | 897.50
|
| | | 1,618.820 | 4,047.06
|
| | 0.000 | 0.00
|
| | |
|
| 0103 9053.00 | 0.26 | 43,256.000 | 11,246.56
|
| TACK COAT | L | 43,256.000 | 11,246.56
|
| | | 60,182.541 | 15,647.46
|
| | 11,731.000 | 3,050.06
|
| | |
|
| 0104 9111.00 | 4.00 | 4,542.000 | 18,168.00
|
| WATER | kL | 4,542.000 | 18,168.00
|
| | | 10,853.700 | 43,414.80
|
| | 0.000 | 0.00
|
| | |
|
| 0105 9170.00 | 100.00 | 467.477 | 46,747.70
|
| EARTH SHOULDER CONSTRUCTION | StaM | 467.477 | 46,747.70
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 0106 9173.20 | 1.34 | 21,813.000 | 29,229.42
|
| SUBGRADE PREPARATION | m2 | 21,813.000 | 29,229.42
|
| | | 53,201.003 | 71,289.34
|
| | 0.000 | 0.00
|
| | |
|
| 0107 9179.34 | 2.25 | 25,107.000 | 56,490.75
|
| COLD MILLING, CLASS 4 | m2 | 19,766.000 | 44,473.50
|
| | | 20,373.113 | 45,839.50
|
| | 0.000 | 0.00
|
| | |
|
| 0108 9185.27 | 1.50 | 15,505.000 | 23,257.50
|
| MILLING CONCRETE PAVEMENT | m2 | 15,505.000 | 23,257.50
|
| | | 11,051.100 | 16,576.65
|
| | 0.000 | 0.00
|
| | |
|
| 0110 9185.77 | 79.00 | 395.000 | 31,205.00
|
| RUMBLE STRIPS, CONCRETE | StaM | 395.000 | 31,205.00
|
| | | 222.666 | 17,590.61
|
| | 0.000 | 0.00
|
| | |
|
| 0111 9188.50 | 20.00 | 1,111.000 | 22,220.00
|
| SURFACING UNDER GUARDRAIL | m2 | 1,111.000 | 22,220.00
|
| | | 433.750 | 8,675.00
|
| | 0.000 | 0.00
|
| | |
|
| 4010 9005.23 | 20.30 | 0.000 | 0.00
|
| ASPHALTIC CONCRETE, TYPE SPS | Mg | 1,044.920 | 21,211.88
|
| Asphaltic Concrete, Type SPS for shoe-fly. | | 1,044.920 | 21,211.88
|
| | 0.000 | 0.00
|
| | |
|
| 4022 9005.45 | 32.54 | 0.000 | 0.00
|
| ASPHALTIC CONCRETE, TYPE SP4(12.5) | Mg | 2,715.000 | 88,346.10
|
| SP-4 for R Street County Section | | 2,707.393 | 88,098.57
|
| | 0.000 | 0.00
|
| | |
|
| 4023 9005.45 | 32.54 | 0.000 | 0.00
|
| ASPHALTIC CONCRETE, TYPE SP4(12.5) | Mg | 4,155.000 | 135,203.70
|
| Type S-4 for F & R Street State Portion | | 5,657.419 | 184,092.42
|
| | 0.000 | 0.00
|
| | |
|
| 4024 9021.01 | 202.00 | 0.000 | 0.00
|
| PERFORMANCE GRADED BINDER (64-22) | Mg | 115.000 | 23,230.00
|
| Perf_Graded Binder 64-22 R Street county portion | | 130.384 | 26,337.57
|
| | 0.000 | 0.00
|
| | |
|
| 4025 9021.01 | 202.00 | 0.000 | 0.00
|
| PERFORMANCE GRADED BINDER (64-22) | Mg | 177.000 | 35,754.00
|
| Pref_graded Binder for F & R Street State Portion | | 261.815 | 52,886.63
|
| | 0.000 | 0.00
|
| | |
|
| 4027 9005.23 | 21.98 | 0.000 | 0.00
|
| ASPHALTIC CONCRETE, TYPE SPS | Mg | 4,840.000 | 106,383.20
|
| SPS for Median Crossings, Frontage Roads, Drives & Inter.Geneva North & South | | 5,098.380 | 112,062.39
|
| | 326.628 | 7,179.28
|
| | |
|
| 4032 L001.02 | 1,786.92 | 0.000 | 0.00
|
| SEEDING, TYPE B | ha | 1.515 | 2,707.18
|
| Seeding, Type B for F street | | 1.515 | 2,707.18
|
| | 0.000 | 0.00
|
| | |
|
| 4033 L032.75 | 89.25 | 0.000 | 0.00
|
| MULCH | Mg | 6.818 | 608.51
|
| Mulch for F Street | | 6.818 | 608.51
|
| | 0.000 | 0.00
|
| | |
|
| 4034 0030.50 | | 1.000 |
|
| MOBILIZATION | LS | 2.000 | 0.00
|
| Mobilization for seeding on F Street | | 1.000 | 1,050.00
|
| | 0.000 | 0.00
|
| | |
|
| 4036 8060.05 | 85.00 | 0.000 | 0.00
|
| GRANULAR SUBDRAIN | EACH | 552.000 | 46,920.00
|
| Granular Subdrains in Place of N Drains | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 4038 9179.77 | 2,000.00 | 0.000 | 0.00
|
| MILLING FOR ASPHALTIC CONCRETE INLAY | m | 1.000 | 2,000.00
|
| Milling for Asph Conc Inlay | | 1.000 | 2,000.00
|
| | 0.000 | 0.00
|
| | |
|
| 4039 0030.00 | | 1.000 |
|
| MOBILIZATION | LS | 2.000 | 0.00
|
| Addition Mobilization for Epoxy Painting | | 1.000 | 1,250.00
|
| | 0.000 | 0.00
|
| | |
|
| 4043 1102.05 | 3.00 | 0.000 | 0.00
|
| REMOVE ASPHALT SURFACING FROM PAVEMENT | m2 | 1,766.600 | 5,299.80
|
| Remove Asphalt Surface from pavement | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 4045 7508.04 | 23.10 | 0.000 | 0.00
|
| 300 mm WHITE PREFORMED PAVEMENT MARKING, TYPE 4 | m | 500.000 | 11,550.00
|
| 300 mm white Preformed Pavement Marking | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 4046 3300.03 | 2,948.40 | 0.000 | 0.00
|
| DEDUCTION | LS | 0.000 | 0.00
|
| Deduction for under strength PR Conc.Std. specification 603.05 para. 3 d, table 603.02 | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 4047 3300.03 | -2,948.40 | 0.000 | 0.00
|
| DEDUCTION | LS | 1.000 | -2,948.40
|
| Deduction of under strength PR ConcStd specification 603.05 para. 3 d table 603.02 | | 1.000 | -2,948.40
|
| | 0.000 | 0.00
|
| | |
|
| GROUP 3 CONCRETE PAVEMENT | | Contracted | 8,845,096.00
|
| | Current | 9,204,403.03
|
| | In place | 8,884,275.43
|
| | This Estimate | 40,428.40
|
| | |
|
| GROUP 4 CULVERTS | | |
|
| 0114 P120.18 | 360.00 | 1.200 | 432.00
|
| 450 mm CULVERT PIPE, TYPE 2 | m | 1.200 | 432.00
|
| | | 1.200 | 432.00
|
| | 0.000 | 0.00
|
| | |
|
| 0116 P120.48 | 231.00 | 91.000 | 21,021.00
|
| 1200 mm CULVERT PIPE, TYPE 2 | m | 91.000 | 21,021.00
|
| | | 91.000 | 21,021.00
|
| | 0.000 | 0.00
|
| | |
|
| 0117 P120.60 | 346.00 | 66.000 | 22,836.00
|
| 1500 mm CULVERT PIPE, TYPE 2 | m | 66.000 | 22,836.00
|
| | | 66.000 | 22,836.00
|
| | 0.000 | 0.00
|
| | |
|
| 0122 P127.30 | 154.00 | 81.000 | 12,474.00
|
| 750 mm ROUND EQUIVALENT CULVERT PIPE, TYPE 2 | m | 81.000 | 12,474.00
|
| | | 81.000 | 12,474.00
|
| | 0.000 | 0.00
|
| | |
|
| 0125 P127.54 | 405.00 | 43.000 | 17,415.00
|
| 1350 mm ROUND EQUIVALENT CULVERT PIPE, TYPE 2 | m | 43.000 | 17,415.00
|
| | | 43.000 | 17,415.00
|
| | 0.000 | 0.00
|
| | |
|
| 0128 P128.60 | 338.00 | 24.000 | 8,112.00
|
| 1500 mm CULVERT PIPE, TYPE 2 CLASS IV | m | 24.000 | 8,112.00
|
| | | 24.000 | 8,112.00
|
| | 0.000 | 0.00
|
| | |
|
| 0130 P155.24 | 88.00 | 8.500 | 748.00
|
| 600 mm ROUND EQUIVALENT CULVERT PIPE, TYPE 5 | m | 0.000 | 0.00
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 0131 P200.18 | 360.00 | 7.200 | 2,592.00
|
| 450 mm CULVERT PIPE, TYPE 2 OR 5 | m | 7.200 | 2,592.00
|
| | | 7.200 | 2,592.00
|
| | 0.000 | 0.00
|
| | |
|
| 0132 P200.24 | 82.00 | 149.500 | 12,259.00
|
| 600mm CULVERT PIPE, TYPE 2 OR 5 | m | 149.500 | 12,259.00
|
| | | 149.500 | 12,259.00
|
| | 0.000 | 0.00
|
| | |
|
| 0133 P200.30 | 114.00 | 48.500 | 5,529.00
|
| 750 mm CULVERT PIPE, TYPE 2 OR 5 | m | 48.500 | 5,529.00
|
| | | 48.500 | 5,529.00
|
| | 0.000 | 0.00
|
| | |
|
| 0134 P200.36 | 152.00 | 105.000 | 15,960.00
|
| 900 mm CULVERT PIPE, TYPE 2 OR 5 | m | 105.000 | 15,960.00
|
| | | 105.000 | 15,960.00
|
| | 0.000 | 0.00
|
| | |
|
| 0135 P200.42 | 188.50 | 48.000 | 9,048.00
|
| 1050 mm CULVERT PIPE, TYPE 2 OR 5 | m | 48.000 | 9,048.00
|
| | | 48.000 | 9,048.00
|
| | 0.000 | 0.00
|
| | |
|
| 0136 P200.48 | 231.50 | 143.500 | 33,220.25
|
| 1200 mm CULVERT PIPE, TYPE 2 OR 5 | m | 143.500 | 33,220.25
|
| | | 143.500 | 33,220.25
|
| | 0.000 | 0.00
|
| | |
|
| 0137 P200.54 | 287.00 | 43.000 | 12,341.00
|
| 1350 mm CULVERT PIPE, TYPE 2 OR 5 | m | 43.000 | 12,341.00
|
| | | 43.000 | 12,341.00
|
| | 0.000 | 0.00
|
| | |
|
| 0138 P200.78 | 579.00 | 70.500 | 40,819.50
|
| 1950 mm CULVERT PIPE, TYPE 2 OR 5 | m | 70.500 | 40,819.50
|
| | | 70.500 | 40,819.50
|
| | 0.000 | 0.00
|
| | |
|
| 0141 P406.66 | 218.00 | 33.000 | 7,194.00
|
| 1650 mm CULVERT PIPE, TYPE 2, 3, 4 OR 5 | m | 33.000 | 7,194.00
|
| | | 33.000 | 7,194.00
|
| | 0.000 | 0.00
|
| | |
|
| 0143 P700.12 | 86.88 | 6.000 | 521.28
|
| 300 mm STORM SEWER PIPE, TYPE 1,7 OR 8 | m | 6.000 | 521.28
|
| | | 6.000 | 521.28
|
| | 0.000 | 0.00
|
| | |
|
| 0144 P700.15 | 92.50 | 18.500 | 1,711.25
|
| 375 mm STORM SEWER PIPE, TYPE 1,7 OR 8 | m | 18.500 | 1,711.25
|
| | | 18.500 | 1,711.25
|
| | 0.000 | 0.00
|
| | |
|
| 0145 P700.18 | 118.00 | 10.000 | 1,180.00
|
| 450 mm STORM SEWER PIPE, TYPE 1,7 OR 8 | m | 10.000 | 1,180.00
|
| | | 10.000 | 1,180.00
|
| | 0.000 | 0.00
|
| | |
|
| 0146 P700.24 | 138.00 | 14.000 | 1,932.00
|
| 600 mm STORM SEWER PIPE, TYPE 1,7 OR 8 | m | 14.000 | 1,932.00
|
| | | 27.200 | 3,753.60
|
| | 0.000 | 0.00
|
| | |
|
| 0147 P775.18 | 162.00 | 12.500 | 2,025.00
|
| 450 mm ROUND EQUIVALENT STORM SEWER PIPE, TYPE 1 | m | 12.500 | 2,025.00
|
| | | 12.500 | 2,025.00
|
| | 0.000 | 0.00
|
| | |
|
| 0148 P775.24 | 180.55 | 22.500 | 4,062.38
|
| 600 mm ROUND EQUIVALENT STORM SEWER PIPE, TYPE 1 | m | 22.500 | 4,062.38
|
| | | 22.500 | 4,062.38
|
| | 0.000 | 0.00
|
| | |
|
| 0149 P775.30 | 235.00 | 102.000 | 23,970.00
|
| 750 mm ROUND EQUIVALENT STORM SEWER PIPE, TYPE 1 | m | 102.000 | 23,970.00
|
| | | 97.600 | 22,936.00
|
| | 0.000 | 0.00
|
| | |
|
| 0150 P775.36 | 295.00 | 10.500 | 3,097.50
|
| 900 mm ROUND EQUIVALENT STORM SEWER PIPE, TYPE 1 | m | 10.500 | 3,097.50
|
| | | 10.500 | 3,097.50
|
| | 0.000 | 0.00
|
| | |
|
| 0151 0030.40 | 1,931.04 | 1.000 | 1,931.04
|
| MOBILIZATION | LS | 1.000 | 1,931.04
|
| | | 1.000 | 1,931.04
|
| | 0.000 | 0.00
|
| | |
|
| 0152 1117.00 | 500.00 | 1.000 | 500.00
|
| REMOVE MANHOLE | EACH | 1.000 | 500.00
|
| | | 1.000 | 500.00
|
| | 0.000 | 0.00
|
| | |
|
| 0153 1119.00 | 250.00 | 2.000 | 500.00
|
| REMOVE INLET | EACH | 2.000 | 500.00
|
| | | 2.000 | 500.00
|
| | 0.000 | 0.00
|
| | |
|
| 0154 4002.00 | 3.10 | 399.000 | 1,236.90
|
| CAST IRON COVER AND FRAME | kg | 399.000 | 1,236.90
|
| | | 399.000 | 1,236.90
|
| | 0.000 | 0.00
|
| | |
|
| 0155 4005.00 | 2.58 | 156.000 | 402.48
|
| CAST IRON RING AND COVER | kg | 156.000 | 402.48
|
| | | 383.000 | 988.14
|
| | 0.000 | 0.00
|
| | |
|
| 0156 4016.00 | 2,515.00 | 1.000 | 2,515.00
|
| MANHOLE | EACH | 1.000 | 2,515.00
|
| AT STA. 406+21.5 | | 1.000 | 2,515.00
|
| | 0.000 | 0.00
|
| | |
|
| 0157 4035.00 | 75.00 | 14.000 | 1,050.00
|
| REMOVE FLARED-END SECTION | EACH | 14.000 | 1,050.00
|
| | | 10.000 | 750.00
|
| | 0.000 | 0.00
|
| | |
|
| 0158 4040.00 | 100.00 | 6.000 | 600.00
|
| REMOVE HEADWALLS FROM CULVERTS | EACH | 6.000 | 600.00
|
| | | 6.000 | 600.00
|
| | 0.000 | 0.00
|
| | |
|
| 0159 4041.00 | 500.00 | 1.000 | 500.00
|
| CULVERT CLEANOUT | EACH | 1.000 | 500.00
|
| | | 1.000 | 500.00
|
| | 0.000 | 0.00
|
| | |
|
| 0160 4043.00 | 6.56 | 19.600 | 128.58
|
| REMOVE CULVERT PIPE | m | 19.600 | 128.58
|
| | | 19.600 | 128.58
|
| | 0.000 | 0.00
|
| | |
|
| 0161 4043.50 | 15.00 | 28.800 | 432.00
|
| REMOVE SEWER PIPE | m | 28.800 | 432.00
|
| | | 41.100 | 616.50
|
| | 0.000 | 0.00
|
| | |
|
| 0162 4044.00 | 1,250.00 | 1.000 | 1,250.00
|
| PREPARATION OF STRUCTURE | EACH | 1.000 | 1,250.00
|
| AT STA. 707+72 | | 1.000 | 1,250.00
|
| | 0.000 | 0.00
|
| | |
|
| 0164 4045.01 | 1,500.00 | 1.000 | 1,500.00
|
| REMOVE STRUCTURE | EACH | 1.000 | 1,500.00
|
| AT STA. 206+10 RT. | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 0165 4050.01 | 10.00 | 2,103.000 | 21,030.00
|
| EXCAVATION FOR PIPE, PIPE-ARCH CULVERTS, AND HEADWALLS | m3 | 2,103.000 | 21,030.00
|
| | | 2,492.000 | 24,920.00
|
| | 0.000 | 0.00
|
| | |
|
| 0166 4051.01 | 13.00 | 26.000 | 338.00
|
| EXCAVATION FOR BOX CULVERTS | m3 | 26.000 | 338.00
|
| | | 26.000 | 338.00
|
| | 0.000 | 0.00
|
| | |
|
| 0167 4101.06 | 325.00 | 28.940 | 9,405.50
|
| CLASS 47B-20 OR AX-20 CONCRETE FOR BOX CULVERT | m3 | 28.940 | 9,405.50
|
| | | 29.630 | 9,629.75
|
| | 0.000 | 0.00
|
| | |
|
| 0168 4105.59 | 653.00 | 24.770 | 16,174.81
|
| CLASS 47B-20 CONCRETE FOR INLET AND JUNCTION BOX | m3 | 24.770 | 16,174.81
|
| | | 26.160 | 17,082.48
|
| | 0.000 | 0.00
|
| | |
|
| 0170 4151.00 | 1.10 | 1,272.000 | 1,399.20
|
| REINFORCING STEEL FOR BOX CULVERT | kg | 1,272.000 | 1,399.20
|
| | | 1,585.441 | 1,743.99
|
| | 0.000 | 0.00
|
| | |
|
| 0171 4155.50 | 1.25 | 1,006.000 | 1,257.50
|
| REINFORCING STEEL FOR INLET AND JUNCTION BOX | kg | 1,006.000 | 1,257.50
|
| | | 1,045.000 | 1,306.25
|
| | 0.000 | 0.00
|
| | |
|
| 0173 4310.24 | 330.00 | 7.000 | 2,310.00
|
| 600 mm FLARED-END SECTION | EACH | 7.000 | 2,310.00
|
| | | 7.000 | 2,310.00
|
| | 0.000 | 0.00
|
| | |
|
| 0174 4310.30 | 375.00 | 2.000 | 750.00
|
| 750 mm FLARED-END SECTION | EACH | 2.000 | 750.00
|
| | | 2.000 | 750.00
|
| | 0.000 | 0.00
|
| | |
|
| 0175 4310.36 | 580.00 | 6.000 | 3,480.00
|
| 900 mm FLARED-END SECTION | EACH | 6.000 | 3,480.00
|
| | | 6.000 | 3,480.00
|
| | 0.000 | 0.00
|
| | |
|
| 0176 4310.42 | 725.00 | 2.000 | 1,450.00
|
| 1050 mm FLARED-END SECTION | EACH | 2.000 | 1,450.00
|
| | | 2.000 | 1,450.00
|
| | 0.000 | 0.00
|
| | |
|
| 0177 4310.48 | 800.00 | 10.000 | 8,000.00
|
| 1200 mm FLARED-END SECTION | EACH | 10.000 | 8,000.00
|
| | | 10.000 | 8,000.00
|
| | 0.000 | 0.00
|
| | |
|
| 0178 4310.54 | 1,000.00 | 2.000 | 2,000.00
|
| 1350 mm FLARED-END SECTION | EACH | 2.000 | 2,000.00
|
| | | 2.000 | 2,000.00
|
| | 0.000 | 0.00
|
| | |
|
| 0179 4310.60 | 1,200.00 | 4.000 | 4,800.00
|
| 1500 mm FLARED-END SECTION | EACH | 4.000 | 4,800.00
|
| | | 4.000 | 4,800.00
|
| | 0.000 | 0.00
|
| | |
|
| 0180 4310.66 | 900.00 | 4.000 | 3,600.00
|
| 1650 mm FLARED-END SECTION | EACH | 4.000 | 3,600.00
|
| | | 4.000 | 3,600.00
|
| | 0.000 | 0.00
|
| | |
|
| 0182 4310.78 | 3,000.00 | 2.000 | 6,000.00
|
| 1950 mm FLARED-END SECTION | EACH | 2.000 | 6,000.00
|
| | | 2.000 | 6,000.00
|
| | 0.000 | 0.00
|
| | |
|
| 0183 4320.24 | 190.00 | 2.000 | 380.00
|
| 600 mm ROUND EQUIVALENT FLARED-END SECTION | EACH | 0.000 | 0.00
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 0184 4320.30 | 500.00 | 4.000 | 2,000.00
|
| 750 mm ROUND EQUIVALENT FLARED-END SECTION | EACH | 4.000 | 2,000.00
|
| | | 4.000 | 2,000.00
|
| | 0.000 | 0.00
|
| | |
|
| 0185 4320.54 | 1,250.00 | 2.000 | 2,500.00
|
| 1350 mm ROUND EQUIVALENT FLARED-END SECTION | EACH | 2.000 | 2,500.00
|
| | | 2.000 | 2,500.00
|
| | 0.000 | 0.00
|
| | |
|
| 0192 4880.60 | 725.00 | 24.000 | 17,400.00
|
| JACKING 1500 mm CULVERT PIPE, TYPE 2 CLASS IV | m | 24.000 | 17,400.00
|
| | | 24.000 | 17,400.00
|
| | 0.000 | 0.00
|
| | |
|
| 4006 P375.30 | 112.35 | 0.000 | 0.00
|
| 750 mm ROUND EQUIVALENT CULVERT PIPE, TYPE 3,4 OR 5 | m | 8.500 | 954.97
|
| 750 mm RND EQ CULV PIPE Type 3 | | 8.500 | 954.98
|
| | 0.000 | 0.00
|
| | |
|
| 4007 4320.30 | 262.00 | 0.000 | 0.00
|
| 750 mm ROUND EQUIVALENT FLARED-END SECTION | EACH | 2.000 | 524.00
|
| | | 2.000 | 524.00
|
| | 0.000 | 0.00
|
| | |
|
| 4008 1905.00 | 499.46 | 0.000 | 0.00
|
| MATERIAL DELIVERED NOT INCORPORATED | LS | 1.000 | 499.46
|
| 7.5m 600 mm RND EQ & @ FES's | | 1.000 | 499.46
|
| | 0.000 | 0.00
|
| | |
|
| 4011 4976.05 | 1,470.00 | 0.000 | 0.00
|
| ADDITIONAL WORK | LS | 1.000 | 1,470.00
|
| Lay & Remove drainage pipe on Shoe-fly at 1107+25 | | 1.000 | 1,470.00
|
| | 0.000 | 0.00
|
| | |
|
| 4014 6960.02 | 5,189.61 | 0.000 | 0.00
|
| ADDITIONAL WORK | LS | 1.000 | 5,189.61
|
| Specialty Items Change Order. | | 1.000 | 5,189.61
|
| | 0.000 | 0.00
|
| | |
|
| GROUP 4 CULVERTS | | Contracted | 377,321.16
|
| | Current | 384,831.21
|
| | In place | 390,004.44
|
| | This Estimate | 0.00
|
| | |
|
| GROUP 6B BRIDGE AT STA. 1040+89.542 LT. | | |
|
| 0239 0030.60 | 10,000.00 | 1.000 | 10,000.00
|
| MOBILIZATION | LS | 1.000 | 10,000.00
|
| | | 1.000 | 10,000.00
|
| | 0.000 | 0.00
|
| | |
|
| 0240 1043.50 | 2.40 | 497.000 | 1,192.80
|
| RIPRAP FILTER FABRIC | m2 | 497.000 | 1,192.80
|
| | | 493.600 | 1,184.64
|
| | 0.000 | 0.00
|
| | |
|
| 0241 3050.15 | 210.00 | 121.300 | 25,473.00
|
| CONCRETE FOR PAVEMENT APPROACHES CLASS 47BD-30 | m3 | 121.300 | 25,473.00
|
| | | 121.300 | 25,473.00
|
| | 0.000 | 0.00
|
| | |
|
| 0242 3051.10 | 1.26 | 8,175.000 | 10,300.50
|
| EPOXY COATED REINFORCING STEEL FOR PAVEMENT APPROACHES | kg | 8,175.000 | 10,300.50
|
| | | 8,175.000 | 10,300.50
|
| | 0.000 | 0.00
|
| | |
|
| 0243 6000.10 | 2,000.00 | 1.000 | 2,000.00
|
| ABUTMENT NO.1 EXCAVATION | LS | 1.000 | 2,000.00
|
| | | 1.000 | 2,000.00
|
| | 0.000 | 0.00
|
| | |
|
| 0244 6000.11 | 2,000.00 | 1.000 | 2,000.00
|
| ABUTMENT NO.2 EXCAVATION | LS | 1.000 | 2,000.00
|
| | | 1.000 | 2,000.00
|
| | 0.000 | 0.00
|
| | |
|
| 0245 6001.50 | 3,500.00 | 1.000 | 3,500.00
|
| BENT NO.1 EXCAVATION | LS | 1.000 | 3,500.00
|
| | | 1.000 | 3,500.00
|
| | 0.000 | 0.00
|
| | |
|
| 0246 6001.51 | 3,500.00 | 1.000 | 3,500.00
|
| BENT NO.2 EXCAVATION | LS | 1.000 | 3,500.00
|
| | | 1.000 | 3,500.00
|
| | 0.000 | 0.00
|
| | |
|
| 0247 6005.35 | 164.00 | 32.600 | 5,346.40
|
| PRECOMPRESSED POLYURETHANE FOAM JOINT | m | 32.600 | 5,346.40
|
| | | 32.600 | 5,346.40
|
| | 0.000 | 0.00
|
| | |
|
| 0248 6005.60 | 40.00 | 108.000 | 4,320.00
|
| ELASTOMERIC BEARING | EACH | 108.000 | 4,320.00
|
| | | 108.000 | 4,320.00
|
| | 0.000 | 0.00
|
| | |
|
| 0249 6010.22 | 360.00 | 200.700 | 72,252.00
|
| CLASS 47B-20 CONCRETE FOR BRIDGE | m3 | 200.700 | 72,252.00
|
| | | 203.080 | 73,108.80
|
| | 0.000 | 0.00
|
| | |
|
| 0250 6010.28 | 360.00 | 149.900 | 53,964.00
|
| CLASS 47BD-35 CONCRETE FOR BRIDGE | m3 | 149.900 | 53,964.00
|
| | | 156.900 | 56,484.00
|
| | 0.000 | 0.00
|
| | |
|
| 0251 6011.11 | 114,000.00 | 1.000 | 114,000.00
|
| PRECAST/PRESTRESSED CONCRETE SUPERSTRUCTURE | LS | 1.000 | 114,000.00
|
| AT STA. 1040+89.542 | | 1.000 | 114,000.00
|
| | 0.000 | 0.00
|
| | |
|
| 0252 6080.00 | 6.60 | 250.000 | 1,650.00
|
| STRUCTURAL STEEL FOR SUBSTRUCTURE | kg | 250.000 | 1,650.00
|
| | | 250.000 | 1,650.00
|
| | 0.000 | 0.00
|
| | |
|
| 0253 6105.02 | 30.00 | 485.000 | 14,550.00
|
| ROCK RIPRAP, TYPE B | Mg | 485.000 | 14,550.00
|
| | | 497.910 | 14,937.30
|
| | 0.000 | 0.00
|
| | |
|
| 0254 6131.50 | 1.26 | 28,665.000 | 36,117.90
|
| EPOXY COATED REINFORCING STEEL | kg | 28,676.000 | 36,131.76
|
| | | 28,676.000 | 36,131.76
|
| | 0.000 | 0.00
|
| | |
|
| 0255 6139.50 | 36.00 | 44.000 | 1,584.00
|
| SUBSURFACE DRAINAGE MATTING | m2 | 44.000 | 1,584.00
|
| | | 29.040 | 1,045.44
|
| | 0.000 | 0.00
|
| | |
|
| 0256 6200.00 | 85.30 | 643.000 | 54,847.90
|
| CONCRETE PILING | m | 610.000 | 52,033.00
|
| | | 512.250 | 43,694.93
|
| | 0.000 | 0.00
|
| | |
|
| 0257 6310.00 | 120.00 | 223.200 | 26,784.00
|
| STEEL SHEET PILING | m2 | 223.200 | 26,784.00
|
| | | 223.200 | 26,784.00
|
| | 0.000 | 0.00
|
| | |
|
| 0258 8091.00 | 26.00 | 85.000 | 2,210.00
|
| GRANULAR BACKFILL | m3 | 85.000 | 2,210.00
|
| | | 85.000 | 2,210.00
|
| | 0.000 | 0.00
|
| | |
|
| 4009 7390.20 | 2,785.00 | 0.000 | 0.00
|
| REVISION | LS | 1.000 | 2,785.00
|
| For additional cost to change girder lengths and eng. | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 4026 6210.59 | 51.18 | 0.000 | 0.00
|
| PAY CUT-OFF | m | 19.750 | 1,010.81
|
| 1997 Metric Spec 703.05, para 2. | | 19.750 | 1,010.81
|
| | 0.000 | 0.00
|
| | |
|
| GROUP 6B BRIDGE AT STA. 1040+89.542 LT. | | Contracted | 445,592.50
|
| | Current | 446,587.27
|
| | In place | 438,681.58
|
| | This Estimate | 0.00
|
| | |
|
| GROUP 6C BRIDGE AT STA. 1040+89.542 RT. | | |
|
| 0259 0030.60 | 10,000.00 | 1.000 | 10,000.00
|
| MOBILIZATION | LS | 1.000 | 10,000.00
|
| | | 1.000 | 10,000.00
|
| | 0.000 | 0.00
|
| | |
|
| 0260 1043.50 | 2.40 | 497.000 | 1,192.80
|
| RIPRAP FILTER FABRIC | m2 | 497.000 | 1,192.80
|
| | | 498.400 | 1,196.16
|
| | 0.000 | 0.00
|
| | |
|
| 0261 3050.15 | 210.00 | 118.300 | 24,843.00
|
| CONCRETE FOR PAVEMENT APPROACHES CLASS 47BD-30 | m3 | 118.300 | 24,843.00
|
| | | 118.300 | 24,843.00
|
| | 0.000 | 0.00
|
| | |
|
| 0262 3051.10 | 1.26 | 8,000.000 | 10,080.00
|
| EPOXY COATED REINFORCING STEEL FOR PAVEMENT APPROACHES | kg | 8,000.000 | 10,080.00
|
| | | 8,000.000 | 10,080.00
|
| | 0.000 | 0.00
|
| | |
|
| 0263 6000.10 | 2,000.00 | 1.000 | 2,000.00
|
| ABUTMENT NO.1 EXCAVATION | LS | 1.000 | 2,000.00
|
| | | 1.000 | 2,000.00
|
| | 0.000 | 0.00
|
| | |
|
| 0264 6000.11 | 2,000.00 | 1.000 | 2,000.00
|
| ABUTMENT NO.2 EXCAVATION | LS | 1.000 | 2,000.00
|
| | | 1.000 | 2,000.00
|
| | 0.000 | 0.00
|
| | |
|
| 0265 6001.50 | 3,000.00 | 1.000 | 3,000.00
|
| BENT NO.1 EXCAVATION | LS | 1.000 | 3,000.00
|
| | | 1.000 | 3,000.00
|
| | 0.000 | 0.00
|
| | |
|
| 0266 6001.51 | 3,000.00 | 1.000 | 3,000.00
|
| BENT NO.2 EXCAVATION | LS | 1.000 | 3,000.00
|
| | | 1.000 | 3,000.00
|
| | 0.000 | 0.00
|
| | |
|
| 0267 6005.35 | 164.00 | 32.200 | 5,280.80
|
| PRECOMPRESSED POLYURETHANE FOAM JOINT | m | 32.200 | 5,280.80
|
| | | 32.200 | 5,280.80
|
| | 0.000 | 0.00
|
| | |
|
| 0268 6005.60 | 40.00 | 108.000 | 4,320.00
|
| ELASTOMERIC BEARING | EACH | 108.000 | 4,320.00
|
| | | 108.000 | 4,320.00
|
| | 0.000 | 0.00
|
| | |
|
| 0269 6010.22 | 355.00 | 211.700 | 75,153.50
|
| CLASS 47B-20 CONCRETE FOR BRIDGE | m3 | 211.700 | 75,153.50
|
| | | 209.969 | 74,539.00
|
| | 0.000 | 0.00
|
| | |
|
| 0270 6010.28 | 360.00 | 146.600 | 52,776.00
|
| CLASS 47BD-35 CONCRETE FOR BRIDGE | m3 | 146.600 | 52,776.00
|
| | | 146.600 | 52,776.00
|
| | 0.000 | 0.00
|
| | |
|
| 0271 6011.11 | 114,000.00 | 1.000 | 114,000.00
|
| PRECAST/PRESTRESSED CONCRETE SUPERSTRUCTURE | LS | 1.000 | 114,000.00
|
| AT STA. 1040+89.542 | | 1.000 | 114,000.00
|
| | 0.000 | 0.00
|
| | |
|
| 0272 6080.00 | 6.60 | 295.000 | 1,947.00
|
| STRUCTURAL STEEL FOR SUBSTRUCTURE | kg | 295.000 | 1,947.00
|
| | | 295.000 | 1,947.00
|
| | 0.000 | 0.00
|
| | |
|
| 0273 6105.02 | 30.00 | 485.000 | 14,550.00
|
| ROCK RIPRAP, TYPE B | Mg | 485.000 | 14,550.00
|
| | | 474.720 | 14,241.60
|
| | 0.000 | 0.00
|
| | |
|
| 0274 6131.50 | 1.26 | 28,445.000 | 35,840.70
|
| EPOXY COATED REINFORCING STEEL | kg | 28,456.000 | 35,854.56
|
| | | 28,501.000 | 35,911.26
|
| | 0.000 | 0.00
|
| | |
|
| 0275 6139.50 | 36.00 | 43.000 | 1,548.00
|
| SUBSURFACE DRAINAGE MATTING | m2 | 43.000 | 1,548.00
|
| | | 29.370 | 1,057.32
|
| | 0.000 | 0.00
|
| | |
|
| 0276 6200.00 | 85.30 | 643.000 | 54,847.90
|
| CONCRETE PILING | m | 626.500 | 53,440.45
|
| | | 534.420 | 45,586.03
|
| | 0.000 | 0.00
|
| | |
|
| 0277 6310.00 | 120.00 | 219.500 | 26,340.00
|
| STEEL SHEET PILING | m2 | 219.500 | 26,340.00
|
| | | 219.480 | 26,337.60
|
| | 0.000 | 0.00
|
| | |
|
| 0278 8091.00 | 26.00 | 85.000 | 2,210.00
|
| GRANULAR BACKFILL | m3 | 85.000 | 2,210.00
|
| | | 85.000 | 2,210.00
|
| | 0.000 | 0.00
|
| | |
|
| 4012 6960.02 | 1,482.87 | 0.000 | 0.00
|
| ADDITIONAL WORK | LS | 1.000 | 1,482.87
|
| Extra work to remove Steel from Bent Caps, Cut, paint and retie and replace because of plan error. | | 1.000 | 1,482.87
|
| | 0.000 | 0.00
|
| | |
|
| 4013 6210.59 | 51.18 | 0.000 | 0.00
|
| PAY CUT-OFF | m | 51.380 | 2,629.63
|
| 1197 Metric Spec, 703.05, para 2 | | 51.580 | 2,639.86
|
| | 0.000 | 0.00
|
| | |
|
| 4021 W900.02 | 986.45 | 0.000 | 0.00
|
| RESTOCKING | LS | 1.000 | 986.45
|
| Restocking of Type I Concrete Pile | | 1.000 | 986.45
|
| | 0.000 | 0.00
|
| | |
|
| GROUP 6C BRIDGE AT STA. 1040+89.542 RT. | | Contracted | 444,929.70
|
| | Current | 448,635.06
|
| | In place | 439,434.95
|
| | This Estimate | 0.00
|
| | |
|
| GROUP 6F BRIDGE AT STA. 1070+23.000 LT. | | |
|
| 0321 0030.60 | 10,000.00 | 1.000 | 10,000.00
|
| MOBILIZATION | LS | 1.000 | 10,000.00
|
| | | 1.000 | 10,000.00
|
| | 0.000 | 0.00
|
| | |
|
| 0322 1043.50 | 2.40 | 800.000 | 1,920.00
|
| RIPRAP FILTER FABRIC | m2 | 800.000 | 1,920.00
|
| | | 800.000 | 1,920.00
|
| | 0.000 | 0.00
|
| | |
|
| 0323 3050.15 | 210.00 | 117.200 | 24,612.00
|
| CONCRETE FOR PAVEMENT APPROACHES CLASS 47BD-30 | m3 | 117.200 | 24,612.00
|
| | | 125.800 | 26,418.00
|
| | 0.000 | 0.00
|
| | |
|
| 0324 3051.10 | 1.26 | 8,135.000 | 10,250.10
|
| EPOXY COATED REINFORCING STEEL FOR PAVEMENT APPROACHES | kg | 8,135.000 | 10,250.10
|
| | | 8,135.000 | 10,250.10
|
| | 0.000 | 0.00
|
| | |
|
| 0325 6000.10 | 2,000.00 | 1.000 | 2,000.00
|
| ABUTMENT NO.1 EXCAVATION | LS | 1.000 | 2,000.00
|
| | | 1.000 | 2,000.00
|
| | 0.000 | 0.00
|
| | |
|
| 0326 6000.11 | 2,000.00 | 1.000 | 2,000.00
|
| ABUTMENT NO.2 EXCAVATION | LS | 1.000 | 2,000.00
|
| | | 1.000 | 2,000.00
|
| | 0.000 | 0.00
|
| | |
|
| 0327 6001.50 | 3,000.00 | 1.000 | 3,000.00
|
| BENT NO.1 EXCAVATION | LS | 1.000 | 3,000.00
|
| | | 1.000 | 3,000.00
|
| | 0.000 | 0.00
|
| | |
|
| 0328 6001.51 | 3,000.00 | 1.000 | 3,000.00
|
| BENT NO.2 EXCAVATION | LS | 1.000 | 3,000.00
|
| | | 1.000 | 3,000.00
|
| | 0.000 | 0.00
|
| | |
|
| 0329 6005.35 | 164.00 | 25.700 | 4,214.80
|
| PRECOMPRESSED POLYURETHANE FOAM JOINT | m | 25.700 | 4,214.80
|
| | | 25.700 | 4,214.80
|
| | 0.000 | 0.00
|
| | |
|
| 0330 6005.60 | 40.00 | 102.000 | 4,080.00
|
| ELASTOMERIC BEARING | EACH | 102.000 | 4,080.00
|
| | | 102.000 | 4,080.00
|
| | 0.000 | 0.00
|
| | |
|
| 0331 6010.22 | 360.00 | 183.300 | 65,988.00
|
| CLASS 47B-20 CONCRETE FOR BRIDGE | m3 | 183.300 | 65,988.00
|
| | | 186.420 | 67,111.20
|
| | 0.000 | 0.00
|
| | |
|
| 0332 6010.28 | 360.00 | 128.600 | 46,296.00
|
| CLASS 47BD-35 CONCRETE FOR BRIDGE | m3 | 128.600 | 46,296.00
|
| | | 135.900 | 48,924.00
|
| | 0.000 | 0.00
|
| | |
|
| 0333 6011.11 | 111,000.00 | 1.000 | 111,000.00
|
| PRECAST/PRESTRESSED CONCRETE SUPERSTRUCTURE | LS | 1.000 | 111,000.00
|
| AT STA. 1070+23.00 | | 1.000 | 111,000.00
|
| | 0.000 | 0.00
|
| | |
|
| 0334 6080.00 | 6.60 | 556.000 | 3,669.60
|
| STRUCTURAL STEEL FOR SUBSTRUCTURE | kg | 556.000 | 3,669.60
|
| | | 556.000 | 3,669.60
|
| | 0.000 | 0.00
|
| | |
|
| 0335 6105.02 | 30.00 | 765.000 | 22,950.00
|
| ROCK RIPRAP, TYPE B | Mg | 765.000 | 22,950.00
|
| | | 759.390 | 22,781.70
|
| | 0.000 | 0.00
|
| | |
|
| 0336 6131.50 | 1.26 | 27,470.000 | 34,612.20
|
| EPOXY COATED REINFORCING STEEL | kg | 27,470.000 | 34,612.20
|
| | | 27,470.000 | 34,612.20
|
| | 0.000 | 0.00
|
| | |
|
| 0337 6139.50 | 36.00 | 20.200 | 727.20
|
| SUBSURFACE DRAINAGE MATTING | m2 | 20.200 | 727.20
|
| | | 22.220 | 799.92
|
| | 0.000 | 0.00
|
| | |
|
| 0338 6200.00 | 85.30 | 767.800 | 65,493.34
|
| CONCRETE PILING | m | 767.800 | 65,493.34
|
| | | 701.100 | 59,803.84
|
| | 0.000 | 0.00
|
| | |
|
| 0339 6310.00 | 120.00 | 315.000 | 37,800.00
|
| STEEL SHEET PILING | m2 | 315.000 | 37,800.00
|
| | | 315.000 | 37,800.00
|
| | 0.000 | 0.00
|
| | |
|
| 0340 8091.00 | 26.00 | 91.600 | 2,381.60
|
| GRANULAR BACKFILL | m3 | 91.600 | 2,381.60
|
| | | 91.600 | 2,381.60
|
| | 0.000 | 0.00
|
| | |
|
| 4031 6210.59 | 51.18 | 0.000 | 0.00
|
| PAY CUT-OFF | m | 30.650 | 1,568.67
|
| 1997 Metric Spec 703.05, para 2. | | 30.650 | 1,568.67
|
| | 0.000 | 0.00
|
| | |
|
| GROUP 6F BRIDGE AT STA. 1070+23.000 LT. | | Contracted | 455,994.84
|
| | Current | 457,563.51
|
| | In place | 457,335.63
|
| | This Estimate | 0.00
|
| | |
|
| GROUP 6G BRIDGE AT STA. 1070+23.000 RT. | | |
|
| 0341 0030.60 | 10,000.00 | 1.000 | 10,000.00
|
| MOBILIZATION | LS | 1.000 | 10,000.00
|
| | | 1.000 | 10,000.00
|
| | 0.000 | 0.00
|
| | |
|
| 0342 1043.50 | 2.40 | 800.000 | 1,920.00
|
| RIPRAP FILTER FABRIC | m2 | 800.000 | 1,920.00
|
| | | 800.000 | 1,920.00
|
| | 0.000 | 0.00
|
| | |
|
| 0343 3050.15 | 210.00 | 117.200 | 24,612.00
|
| CONCRETE FOR PAVEMENT APPROACHES CLASS 47BD-30 | m3 | 117.200 | 24,612.00
|
| | | 125.800 | 26,418.00
|
| | 0.000 | 0.00
|
| | |
|
| 0344 3051.10 | 1.26 | 8,135.000 | 10,250.10
|
| EPOXY COATED REINFORCING STEEL FOR PAVEMENT APPROACHES | kg | 8,135.000 | 10,250.10
|
| | | 8,135.000 | 10,250.10
|
| | 0.000 | 0.00
|
| | |
|
| 0345 6000.10 | 2,000.00 | 1.000 | 2,000.00
|
| ABUTMENT NO.1 EXCAVATION | LS | 1.000 | 2,000.00
|
| | | 1.000 | 2,000.00
|
| | 0.000 | 0.00
|
| | |
|
| 0346 6000.11 | 2,000.00 | 1.000 | 2,000.00
|
| ABUTMENT NO.2 EXCAVATION | LS | 1.000 | 2,000.00
|
| | | 1.000 | 2,000.00
|
| | 0.000 | 0.00
|
| | |
|
| 0347 6001.50 | 3,000.00 | 1.000 | 3,000.00
|
| BENT NO.1 EXCAVATION | LS | 1.000 | 3,000.00
|
| | | 1.000 | 3,000.00
|
| | 0.000 | 0.00
|
| | |
|
| 0348 6001.51 | 3,000.00 | 1.000 | 3,000.00
|
| BENT NO.2 EXCAVATION | LS | 1.000 | 3,000.00
|
| | | 1.000 | 3,000.00
|
| | 0.000 | 0.00
|
| | |
|
| 0349 6005.35 | 164.00 | 25.700 | 4,214.80
|
| PRECOMPRESSED POLYURETHANE FOAM JOINT | m | 25.700 | 4,214.80
|
| | | 25.700 | 4,214.80
|
| | 0.000 | 0.00
|
| | |
|
| 0350 6005.60 | 40.00 | 102.000 | 4,080.00
|
| ELASTOMERIC BEARING | EACH | 102.000 | 4,080.00
|
| | | 102.000 | 4,080.00
|
| | 0.000 | 0.00
|
| | |
|
| 0351 6010.22 | 360.00 | 183.300 | 65,988.00
|
| CLASS 47B-20 CONCRETE FOR BRIDGE | m3 | 183.300 | 65,988.00
|
| | | 184.350 | 66,366.00
|
| | 0.000 | 0.00
|
| | |
|
| 0352 6010.28 | 360.00 | 128.600 | 46,296.00
|
| CLASS 47BD-35 CONCRETE FOR BRIDGE | m3 | 128.600 | 46,296.00
|
| | | 133.400 | 48,024.00
|
| | 0.000 | 0.00
|
| | |
|
| 0353 6011.11 | 111,000.00 | 1.000 | 111,000.00
|
| PRECAST/PRESTRESSED CONCRETE SUPERSTRUCTURE | LS | 1.000 | 111,000.00
|
| AT STA. 1070+23 | | 1.000 | 111,000.00
|
| | 0.000 | 0.00
|
| | |
|
| 0354 6080.00 | 6.60 | 556.000 | 3,669.60
|
| STRUCTURAL STEEL FOR SUBSTRUCTURE | kg | 556.000 | 3,669.60
|
| | | 556.000 | 3,669.60
|
| | 0.000 | 0.00
|
| | |
|
| 0355 6105.02 | 30.00 | 765.000 | 22,950.00
|
| ROCK RIPRAP, TYPE B | Mg | 765.000 | 22,950.00
|
| | | 759.740 | 22,792.20
|
| | 0.000 | 0.00
|
| | |
|
| 0356 6131.50 | 1.26 | 27,470.000 | 34,612.20
|
| EPOXY COATED REINFORCING STEEL | kg | 27,470.000 | 34,612.20
|
| | | 27,517.000 | 34,671.42
|
| | 0.000 | 0.00
|
| | |
|
| 0357 6139.50 | 36.00 | 20.200 | 727.20
|
| SUBSURFACE DRAINAGE MATTING | m2 | 20.200 | 727.20
|
| | | 23.100 | 831.60
|
| | 0.000 | 0.00
|
| | |
|
| 0358 6200.00 | 85.30 | 767.800 | 65,493.34
|
| CONCRETE PILING | m | 767.800 | 65,493.34
|
| | | 698.820 | 59,609.35
|
| | 0.000 | 0.00
|
| | |
|
| 0359 6310.00 | 120.00 | 315.000 | 37,800.00
|
| STEEL SHEET PILING | m2 | 315.000 | 37,800.00
|
| | | 303.570 | 36,428.40
|
| | 0.000 | 0.00
|
| | |
|
| 0360 8091.00 | 26.00 | 91.600 | 2,381.60
|
| GRANULAR BACKFILL | m3 | 91.600 | 2,381.60
|
| | | 91.600 | 2,381.60
|
| | 0.000 | 0.00
|
| | |
|
| 4015 6210.59 | 51.18 | 0.000 | 0.00
|
| PAY CUT-OFF | m | 32.980 | 1,687.92
|
| 1997 Metric Spec 703.05, para 2 | | 32.980 | 1,687.92
|
| | 0.000 | 0.00
|
| | |
|
| 4028 3300.03 | -1,829.98 | 0.000 | 0.00
|
| DEDUCTION | LS | 1.000 | -1,829.98
|
| Deduction for 47BD35 Concrete for Bridge Deck, for strength | | 1.000 | -1,829.98
|
| | 0.000 | 0.00
|
| | |
|
| 4029 3300.03 | -203.54 | 0.000 | 0.00
|
| DEDUCTION | LS | 1.000 | -203.54
|
| Deduction for strength for 47BD35, used in diapharms | | 1.000 | -203.54
|
| | 0.000 | 0.00
|
| | |
|
| GROUP 6G BRIDGE AT STA. 1070+23.000 RT. | | Contracted | 455,994.84
|
| | Current | 455,649.24
|
| | In place | 452,311.47
|
| | This Estimate | 0.00
|
| | |
|
| GROUP 7 GUARDRAIL | | |
|
| 0361 0030.70 | 1,500.00 | 1.000 | 1,500.00
|
| MOBILIZATION | LS | 1.000 | 1,500.00
|
| | | 1.000 | 1,500.00
|
| | 0.000 | 0.00
|
| | |
|
| 0362 7011.20 | 49.00 | 407.147 | 19,950.20
|
| W-BEAM GUARDRAIL | m | 407.147 | 19,950.20
|
| | | 413.390 | 20,256.11
|
| | 0.000 | 0.00
|
| | |
|
| 0363 7020.00 | 1,250.00 | 12.000 | 15,000.00
|
| BRIDGE APPROACH SECTIONS | EACH | 12.000 | 15,000.00
|
| | | 12.000 | 15,000.00
|
| | 0.000 | 0.00
|
| | |
|
| 0364 7021.70 | 1,650.00 | 4.000 | 6,600.00
|
| GUARDRAIL END TREATMENT, SRT-350 | EACH | 4.000 | 6,600.00
|
| | | 4.000 | 6,600.00
|
| | 0.000 | 0.00
|
| | |
|
| GROUP 7 GUARDRAIL | | Contracted | 43,050.20
|
| | Current | 43,050.20
|
| | In place | 43,356.11
|
| | This Estimate | 0.00
|
| | |
|
| GROUP 8B ELECTRICAL | | |
|
| 0365 A001.12 | 300.00 | 3.000 | 900.00
|
| PULL BOX, TYPE PB-5 | EACH | 3.000 | 900.00
|
| | | 2.000 | 600.00
|
| | 0.000 | 0.00
|
| | |
|
| 0366 A009.14 | 1,550.00 | 25.000 | 38,750.00
|
| STREET LIGHTING UNIT, TYPE SL-BT-12.2-3.7-0.25 | EACH | 25.000 | 38,750.00
|
| | | 20.000 | 31,000.00
|
| | 0.000 | 0.00
|
| | |
|
| 0367 A009.29 | 1,500.00 | 5.000 | 7,500.00
|
| STREET LIGHTING UNIT, TYPE SL-BT-12.2-1.8-0.25 | EACH | 5.000 | 7,500.00
|
| | | 5.000 | 7,500.00
|
| | 0.000 | 0.00
|
| | |
|
| 0368 A020.30 | 1,200.00 | 5.000 | 6,000.00
|
| LIGHTING CONTROL CENTER, TYPE R | EACH | 5.000 | 6,000.00
|
| | | 5.000 | 6,000.00
|
| | 0.000 | 0.00
|
| | |
|
| 0369 A070.10 | 7.00 | 871.000 | 6,097.00
|
| 38 mm CONDUIT IN TRENCH | m | 871.000 | 6,097.00
|
| | | 857.000 | 5,999.00
|
| | 0.000 | 0.00
|
| | |
|
| 0370 A072.10 | 7.00 | 316.000 | 2,212.00
|
| 38 mm CONDUIT UNDER ROADWAY | m | 316.000 | 2,212.00
|
| | | 263.000 | 1,841.00
|
| | 0.000 | 0.00
|
| | |
|
| 0371 A080.23 | 1.40 | 1,179.000 | 1,650.60
|
| STREET LIGHTING CABLE, NO. 6 BARE | m | 1,179.000 | 1,650.60
|
| | | 989.000 | 1,384.60
|
| | 0.000 | 0.00
|
| | |
|
| 0372 A080.24 | 1.50 | 2,358.000 | 3,537.00
|
| STREET LIGHTING CABLE, NO. 6 USE | m | 2,358.000 | 3,537.00
|
| | | 1,978.000 | 2,967.00
|
| | 0.000 | 0.00
|
| | |
|
| 0373 0030.81 | 1,702.00 | 1.000 | 1,702.00
|
| MOBILIZATION | LS | 1.000 | 1,702.00
|
| | | 1.000 | 1,702.00
|
| | 0.000 | 0.00
|
| | |
|
| GROUP 8B ELECTRICAL | | Contracted | 68,348.60
|
| | Current | 68,348.60
|
| | In place | 58,993.60
|
| | This Estimate | 0.00
|
| | |
|
| GROUP 10 GENERAL ITEMS | | |
|
| 0374 0001.08 | 0.50 | 11,230.000 | 5,615.00
|
| BARRICADE, TYPE II | BDAY | 11,230.000 | 5,615.00
|
| | | 27,203.000 | 13,601.50
|
| | 994.000 | 497.00
|
| | |
|
| 0375 0001.10 | 1.20 | 12,388.000 | 14,865.60
|
| BARRICADE, TYPE III | BDAY | 12,388.000 | 14,865.60
|
| | | 25,722.000 | 30,866.40
|
| | 966.000 | 1,159.20
|
| | |
|
| 0376 0001.30 | 1.00 | 2,908.000 | 2,908.00
|
| TYPE B HIGH INTENSITY WARNING LIGHT | LDAY | 2,908.000 | 2,908.00
|
| | | 489.000 | 489.00
|
| | 0.000 | 0.00
|
| | |
|
| 0377 0001.90 | 0.35 | 23,203.000 | 8,121.05
|
| SIGN DAY | EACH | 23,203.000 | 8,121.05
|
| | | 53,143.000 | 18,600.05
|
| | 784.000 | 274.40
|
| | |
|
| 0379 0002.31 | 0.96 | 23,900.000 | 22,944.00
|
| TEMPORARY PAVEMENT MARKING | m | 15,400.000 | 14,784.00
|
| | | 29,439.000 | 28,261.44
|
| | 0.000 | 0.00
|
| | |
|
| 0381 0002.97 | 12.00 | 155.000 | 1,860.00
|
| FLASHING ARROW PANEL | DAY | 155.000 | 1,860.00
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 0382 0003.10 | 175.00 | 70.000 | 12,250.00
|
| FLAGGING | DAY | 70.000 | 12,250.00
|
| | | 26.500 | 4,637.50
|
| | 0.000 | 0.00
|
| | |
|
| 0383 0003.51 | 60.00 | 72.000 | 4,320.00
|
| INSTALL CONCRETE PROTECTION BARRIER | m | 72.000 | 4,320.00
|
| | | 73.160 | 4,389.60
|
| | 0.000 | 0.00
|
| | |
|
| 0384 0003.58 | 3,000.00 | 2.000 | 6,000.00
|
| INERTIAL BARRIER SYSTEM | EACH | 2.000 | 6,000.00
|
| | | 2.000 | 6,000.00
|
| | 0.000 | 0.00
|
| | |
|
| 0385 0003.64 | 270.00 | 1.000 | 270.00
|
| REPLACEMENT MODULE | EACH | 1.000 | 270.00
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 0386 0010.04 | 1,500.00 | 0.500 | 750.00
|
| FIELD OFFICE | EACH | 0.500 | 750.00
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 0387 0030.00 | 12,602.84 | 1.000 | 12,602.84
|
| MOBILIZATION | LS | 1.000 | 12,602.84
|
| | | 0.998 | 12,582.12
|
| | 0.000 | 0.00
|
| | |
|
| 0388 1017.00 | 88,418.12 | 1.000 | 88,418.12
|
| CONSTRUCTION STAKING AND SURVEYING | LS | 1.000 | 88,418.12
|
| | | 0.767 | 67,877.61
|
| | 0.000 | 0.00
|
| | |
|
| 0389 9110.01 | 65.00 | 30.000 | 1,950.00
|
| RENTAL OF LOADER, FULLY OPERATED | HOUR | 30.000 | 1,950.00
|
| | | 18.750 | 1,218.75
|
| | 0.000 | 0.00
|
| | |
|
| 0390 9110.02 | 65.00 | 10.000 | 650.00
|
| RENTAL OF MOTOR GRADER, FULLY OPERATED | HOUR | 10.000 | 650.00
|
| | | 16.000 | 1,040.00
|
| | 0.000 | 0.00
|
| | |
|
| 0391 9110.03 | 55.00 | 30.000 | 1,650.00
|
| RENTAL OF DUMP TRUCK, FULLY OPERATED | HOUR | 30.000 | 1,650.00
|
| | | 11.500 | 632.50
|
| | 0.000 | 0.00
|
| | |
|
| 0392 9110.07 | 50.00 | 30.000 | 1,500.00
|
| RENTAL OF SKID LOADER, FULLY OPERATED | HOUR | 30.000 | 1,500.00
|
| | | 40.000 | 2,000.00
|
| | 0.000 | 0.00
|
| | |
|
| 4004 9110.06 | 127.00 | 0.000 | 0.00
|
| RENTAL OF BACKHOE, FULLY OPERATED | HOUR | 40.000 | 5,080.00
|
| Rental of Backhoe, Fully Operated | | 38.250 | 4,857.75
|
| | 0.000 | 0.00
|
| | |
|
| 4042 0002.30 | 1.95 | 0.000 | 0.00
|
| PAVEMENT MARKING REMOVAL | m | 500.000 | 975.00
|
| Pavement Marking Removal | | 395.000 | 770.25
|
| | 0.000 | 0.00
|
| | |
|
| GROUP 10 GENERAL ITEMS | | Contracted | 186,674.61
|
| | Current | 184,569.61
|
| | In place | 197,824.47
|
| | This Estimate | 1,930.60
|
| | |
|
| GROUP 1 GRADING | | |
|
| 0001 L006.00 | 125.00 | 20.500 | 2,562.50
|
| COVER CROP SEEDING | ha | 20.500 | 2,562.50
|
| | | 4.400 | 550.00
|
| | 0.000 | 0.00
|
| | |
|
| 0003 L020.09 | 12.00 | 310.750 | 3,729.00
|
| EROSION CONTROL, TYPE AAA | m2 | 310.750 | 3,729.00
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 0005 L021.00 | 12.00 | 24.000 | 288.00
|
| EROSION CHECKS | BALE | 24.000 | 288.00
|
| | | 24.000 | 288.00
|
| | 0.000 | 0.00
|
| | |
|
| 0008 L022.11 | 8.00 | 525.200 | 4,201.60
|
| FABRIC SILT FENCE-LOW POROSITY | m | 525.200 | 4,201.60
|
| | | 396.400 | 3,171.20
|
| | 0.000 | 0.00
|
| | |
|
| 0009 L022.12 | 8.20 | 201.600 | 1,653.12
|
| FABRIC SILT FENCE-HIGH POROSITY | m | 201.600 | 1,653.12
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 0018 0030.10 | 5,103.70 | 1.000 | 5,103.70
|
| MOBILIZATION | LS | 1.000 | 5,103.70
|
| | | 1.000 | 5,103.70
|
| | 0.000 | 0.00
|
| | |
|
| 0019 1009.00 | 45,506.45 | 1.000 | 45,506.45
|
| GENERAL CLEARING AND GRUBBING | LS | 1.000 | 45,506.45
|
| | | 1.000 | 45,506.45
|
| | 0.000 | 0.00
|
| | |
|
| 0020 1010.00 | 1.10 | 34,159.000 | 37,574.90
|
| EXCAVATION | m3 | 34,159.000 | 37,574.90
|
| | | 34,159.000 | 37,574.90
|
| | 0.000 | 0.00
|
| | |
|
| 0021 1010.10 | 1.90 | 154,902.000 | 294,313.80
|
| EXCAVATION, BORROW | m3 | 154,902.000 | 294,313.80
|
| | | 147,713.000 | 280,654.70
|
| | 0.000 | 0.00
|
| | |
|
| 0024 1011.00 | 1.00 | 9,453.000 | 9,453.00
|
| WATER | kL | 9,453.000 | 9,453.00
|
| | | 540.000 | 540.00
|
| | 0.000 | 0.00
|
| | |
|
| 0025 1012.00 | 50.00 | 29.000 | 1,450.00
|
| RIGHT-OF-WAY MARKERS | EACH | 29.000 | 1,450.00
|
| | | 18.000 | 900.00
|
| | 0.000 | 0.00
|
| | |
|
| 0027 1090.00 | 750.00 | 3.000 | 2,250.00
|
| ABANDON WELLS | EACH | 3.000 | 2,250.00
|
| | | 4.000 | 3,000.00
|
| | 0.000 | 0.00
|
| | |
|
| 0029 1102.00 | 2.50 | 1,669.000 | 4,172.50
|
| REMOVE ASPHALT SURFACE | m2 | 1,669.000 | 4,172.50
|
| | | 587.516 | 1,468.79
|
| | 0.000 | 0.00
|
| | |
|
| 0032 1124.00 | 1.00 | 1.000 | 1.00
|
| REMOVE BUILDING | EACH | 1.000 | 1.00
|
| AT STA. 1475+35 TO 1475+50 RT. | | 1.000 | 1.00
|
| | 0.000 | 0.00
|
| | |
|
| 0033 1124.01 | 1.00 | 1.000 | 1.00
|
| REMOVE BUILDING | EACH | 1.000 | 1.00
|
| AT STA. 1475+90 TO 1476+00 RT. | | 1.000 | 1.00
|
| | 0.000 | 0.00
|
| | |
|
| 0034 1124.02 | 1.00 | 1.000 | 1.00
|
| REMOVE BUILDING | EACH | 1.000 | 1.00
|
| AT STA. 1526+80 TO 1526+90 RT. | | 1.000 | 1.00
|
| | 0.000 | 0.00
|
| | |
|
| 0035 1124.03 | 1.00 | 1.000 | 1.00
|
| REMOVE BUILDING | EACH | 1.000 | 1.00
|
| AT STA. 1527+10 TO 1527+25 | | 1.000 | 1.00
|
| | 0.000 | 0.00
|
| | |
|
| 0036 1124.04 | 1.00 | 1.000 | 1.00
|
| REMOVE BUILDING | EACH | 1.000 | 1.00
|
| AT STA. 1527+10 TO 1527+30 | | 1.000 | 1.00
|
| | 0.000 | 0.00
|
| | |
|
| 0043 1125.00 | 1,500.00 | 1.000 | 1,500.00
|
| CLEAR TRACT | EACH | 1.000 | 1,500.00
|
| AT STA. 1475+25 TO 1476+50 RT. | | 1.000 | 1,500.00
|
| | 0.000 | 0.00
|
| | |
|
| 0044 1125.01 | 1,500.00 | 1.000 | 1,500.00
|
| CLEAR TRACT | EACH | 1.000 | 1,500.00
|
| AT STA. 1526+75 TO 1527+40 RT. | | 1.000 | 1,500.00
|
| | 0.000 | 0.00
|
| | |
|
| 0046 1137.00 | 1,000.00 | 1.000 | 1,000.00
|
| REMOVE AND RESET HISTORICAL MARKER | EACH | 1.000 | 1,000.00
|
| | | 1.000 | 1,000.00
|
| | 0.000 | 0.00
|
| | |
|
| 0047 1701.18 | 25.00 | 12.000 | 300.00
|
| 450 mm DRIVEWAY CULVERT PIPE, TYPE 2,3,4,5,6,7 OR 8 | m | 12.000 | 300.00
|
| | | 13.500 | 337.50
|
| | 0.000 | 0.00
|
| | |
|
| 0048 1701.24 | 40.00 | 132.500 | 5,300.00
|
| 600 mm DRIVEWAY CULVERT PIPE, TYPE 2,3,4,5,6,7 OR 8 | m | 132.500 | 5,300.00
|
| | | 198.500 | 7,940.00
|
| | 0.000 | 0.00
|
| | |
|
| GROUP 1 GRADING | | Contracted | 421,863.57
|
| | Current | 421,863.57
|
| | In place | 391,040.24
|
| | This Estimate | 0.00
|
| | |
|
| GROUP 3 CONCRETE PAVEMENT | | |
|
| 0061 0030.30 | 93,936.00 | 1.000 | 93,936.00
|
| MOBILIZATION | LS | 1.000 | 93,936.00
|
| | | 1.000 | 93,936.00
|
| | 0.000 | 0.00
|
| | |
|
| 0062 1020.06 | 20.00 | 140.000 | 2,800.00
|
| FLEXIBLE POST DELINEATOR | EACH | 140.000 | 2,800.00
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 0063 1102.05 | 3.00 | 2,499.000 | 7,497.00
|
| REMOVE ASPHALT SURFACING FROM PAVEMENT | m2 | 2,499.000 | 7,497.00
|
| | | 2,366.660 | 7,099.98
|
| | 0.000 | 0.00
|
| | |
|
| 0064 2001.00 | 15.00 | 235.000 | 3,525.00
|
| GRAVEL SURFACE COURSE | m3 | 235.000 | 3,525.00
|
| | | 159.720 | 2,395.80
|
| | 0.000 | 0.00
|
| | |
|
| 0066 2021.00 | 50.00 | 3.000 | 150.00
|
| MAILBOX POST | EACH | 3.000 | 150.00
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 0070 3040.11 | 124.35 | 6.200 | 770.97
|
| CONCRETE PAVEMENT REPAIR, TYPE A, FULL DEPTH | m2 | 6.200 | 770.97
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 0071 3040.12 | 98.00 | 115.700 | 11,338.60
|
| CONCRETE PAVEMENT REPAIR, TYPE B, FULL DEPTH | m2 | 115.700 | 11,338.60
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 0072 3040.13 | 95.34 | 275.200 | 26,237.57
|
| CONCRETE PAVEMENT REPAIR, TYPE C, FULL DEPTH | m2 | 275.200 | 26,237.57
|
| | | 525.068 | 50,059.98
|
| | 0.000 | 0.00
|
| | |
|
| 0074 3041.25 | 540.00 | 4.000 | 2,160.00
|
| BITUMINOUS PATCHING | Mg | 0.000 | 0.00
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 0077 3075.55 | 26.64 | 50,762.000 | 1,352,299.68
|
| 255 mm DOWELED CONCRETE PAVEMENT, CLASS 47B-25 | m2 | 50,762.000 | 1,352,299.68
|
| | | 50,761.530 | 1,352,287.16
|
| | 0.000 | 0.00
|
| | |
|
| 0080 3300.50 | 2,909.09 | 1.000 | 2,909.09
|
| PORTLAND CEMENT CONCRETE SMOOTHNESS TESTING | LS | 1.000 | 2,909.09
|
| | | 1.000 | 2,909.09
|
| | 0.000 | 0.00
|
| | |
|
| 0081 7550.03 | 1.26 | 11,300.000 | 14,238.00
|
| 100 mm YELLOW EPOXY PAVEMENT MARKING | m | 11,300.000 | 14,238.00
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 0082 7550.04 | 1.20 | 14,100.000 | 16,920.00
|
| 100 mm WHITE EPOXY PAVEMENT MARKING | m | 14,100.000 | 16,920.00
|
| | | 5,640.000 | 6,768.00
|
| | 0.000 | 0.00
|
| | |
|
| 0083 8022.00 | 99.50 | 360.000 | 35,820.00
|
| HYDRATED LIME | Mg | 1,090.000 | 108,455.00
|
| | | 1,090.600 | 108,514.71
|
| | 0.000 | 0.00
|
| | |
|
| 0084 8027.01 | 275.00 | 112.803 | 31,020.83
|
| FULL DEPTH RECLAIMATION | StaM | 112.803 | 31,020.83
|
| | | 114.380 | 31,454.50
|
| | 0.000 | 0.00
|
| | |
|
| 0085 8029.10 | 4.12 | 59,223.000 | 243,998.76
|
| AGGREGATE FOUNDATION COURSE-D 100 mm | m2 | 59,223.000 | 243,998.76
|
| | | 59,077.285 | 243,398.41
|
| | 0.000 | 0.00
|
| | |
|
| 0089 8060.08 | 150.00 | 189.000 | 28,350.00
|
| N-DRAIN | EACH | 0.000 | 0.00
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 0090 8101.50 | 1.38 | 64,765.000 | 89,375.70
|
| STABILIZED SUBGRADE | m2 | 64,765.000 | 89,375.70
|
| | | 59,077.285 | 81,526.65
|
| | 0.000 | 0.00
|
| | |
|
| 0092 9000.75 | 20.30 | 100.000 | 2,030.00
|
| ASPHALTIC CONCRETE FOR STATE MAINTENANCE PATCHING, TYPE | Mg | 100.000 | 2,030.00
|
| SPS | | 16.180 | 328.45
|
| | 0.000 | 0.00
|
| | |
|
| 0093 9005.00 | 34.74 | 100.000 | 3,474.00
|
| ASPHALTIC CONCRETE FOR PATCHING, TYPE | Mg | 100.000 | 3,474.00
|
| SP4(12.5) | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 0094 9005.23 | 20.30 | 9,390.000 | 190,617.00
|
| ASPHALTIC CONCRETE, TYPE SPS | Mg | 0.000 | 0.00
|
| | | 1,794.490 | 36,428.15
|
| | 0.000 | 0.00
|
| | |
|
| 0096 9005.45 | 24.74 | 15,060.000 | 372,584.40
|
| ASPHALTIC CONCRETE, TYPE SP4(12.5) | Mg | 15,060.000 | 372,584.40
|
| | | 15,185.340 | 375,685.31
|
| | 0.000 | 0.00
|
| | |
|
| 0097 9009.00 | 2.50 | 1,465.000 | 3,662.50
|
| PLACEMENT OF ASPHALTIC CONCRETE FOR DRIVEWAYS ANDINTERSECTIONS | m2 | 1,465.000 | 3,662.50
|
| | | 1,465.000 | 3,662.50
|
| | 0.000 | 0.00
|
| | |
|
| 0098 9009.86 | 12.30 | 8,461.000 | 104,070.30
|
| SURFACING 150mm | m2 | 8,461.000 | 104,070.30
|
| | | 8,460.255 | 104,061.14
|
| | 0.000 | 0.00
|
| | |
|
| 0099 9020.92 | 200.00 | 5.200 | 1,040.00
|
| PERFORMANCE GRADED BINDER (58-28) FOR STATE MAINTENANCEPATCHING | Mg | 5.200 | 1,040.00
|
| | | 0.359 | 71.80
|
| | 0.000 | 0.00
|
| | |
|
| 0100 9021.03 | 202.00 | 507.060 | 102,426.12
|
| PERFORMANCE GRADED BINDER (58-28) | Mg | 507.060 | 102,426.12
|
| | | 403.710 | 81,549.42
|
| | 3.845 | 776.69
|
| | |
|
| 0101 9021.04 | 252.00 | 813.240 | 204,936.48
|
| PERFORMANCE GRADED BINDER (70-28) | Mg | 813.240 | 204,936.48
|
| | | 749.254 | 188,812.01
|
| | 0.000 | 0.00
|
| | |
|
| 0102 9034.00 | 2.50 | 988.000 | 2,470.00
|
| PREPARATION OF INTERSECTIONS AND DRIVEWAYS | m2 | 988.000 | 2,470.00
|
| | | 988.000 | 2,470.00
|
| | 0.000 | 0.00
|
| | |
|
| 0103 9053.00 | 0.26 | 58,320.000 | 15,163.20
|
| TACK COAT | L | 58,320.000 | 15,163.20
|
| | | 46,875.581 | 12,187.65
|
| | 0.000 | 0.00
|
| | |
|
| 0104 9111.00 | 4.00 | 1,488.000 | 5,952.00
|
| WATER | kL | 1,488.000 | 5,952.00
|
| | | 1,970.000 | 7,880.00
|
| | 0.000 | 0.00
|
| | |
|
| 0105 9170.00 | 100.00 | 173.785 | 17,378.50
|
| EARTH SHOULDER CONSTRUCTION | StaM | 173.785 | 17,378.50
|
| | | 225.600 | 22,560.00
|
| | 225.600 | 22,560.00
|
| | |
|
| 0106 9173.20 | 1.34 | 6,229.000 | 8,346.86
|
| SUBGRADE PREPARATION | m2 | 6,229.000 | 8,346.86
|
| | | 7,457.590 | 9,993.17
|
| | 0.000 | 0.00
|
| | |
|
| 0109 9185.76 | 33.00 | 112.800 | 3,722.40
|
| RUMBLE STRIPS, ASPHALT | StaM | 112.800 | 3,722.40
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 0110 9185.77 | 79.00 | 112.800 | 8,911.20
|
| RUMBLE STRIPS, CONCRETE | StaM | 112.800 | 8,911.20
|
| | | 106.850 | 8,441.15
|
| | 0.000 | 0.00
|
| | |
|
| 0112 9206.00 | 9.35 | 610.000 | 5,703.50
|
| FABRIC REINFORCEMENT CRACK REPAIR | m | 0.000 | 0.00
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 0113 9300.50 | 2,000.00 | 1.000 | 2,000.00
|
| ASPHALT PAVEMENT SMOOTHNESS TESTING | LS | 1.000 | 2,000.00
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 4028 9005.23 | 21.98 | 0.000 | 0.00
|
| ASPHALTIC CONCRETE, TYPE SPS | Mg | 9,390.000 | 206,392.20
|
| Revised SPS for Geneva to Fairmont. | | 10,485.538 | 230,472.13
|
| | 153.210 | 3,367.56
|
| | |
|
| 4035 9150.00 | 0.30 | 0.000 | 0.00
|
| CRACKING AND SEATING CONCRETE PAVEMENT | m2 | 41,173.000 | 12,351.90
|
| Cracking & Seating Conc Pvmt on Geneva to Fairmont | | 41,500.500 | 12,450.15
|
| | 0.000 | 0.00
|
| | |
|
| 4037 8060.05 | 85.00 | 0.000 | 0.00
|
| GRANULAR SUBDRAIN | EACH | 189.000 | 16,065.00
|
| Granular Subdrain in Place of N Drains | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 4041 0030.00 | | 1.000 |
|
| MOBILIZATION | LS | 2.000 | 0.00
|
| additional mobilization for epoxy painting | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 4049 3300.60 | 1.30 | 0.000 | 0.00
|
| SMOOTHNESS INCENTIVE - CONCRETE PAVEMENT | m2 | 40,392.000 | 52,509.60
|
| Conc. Smoothness Incetive Fairmont to Geneva | | 40,392.000 | 52,509.60
|
| | 0.000 | 0.00
|
| | |
|
| GROUP 3 CONCRETE PAVEMENT | | Contracted | 3,017,835.65
|
| | Current | 3,152,208.85
|
| | In place | 3,129,912.91
|
| | This Estimate | 26,704.25
|
| | |
|
| GROUP 4 CULVERTS | | |
|
| 0115 P120.36 | 154.00 | 76.500 | 11,781.00
|
| 900 mm CULVERT PIPE, TYPE 2 | m | 76.500 | 11,781.00
|
| | | 76.500 | 11,781.00
|
| | 0.000 | 0.00
|
| | |
|
| 0116 P120.48 | 231.00 | 61.000 | 14,091.00
|
| 1200 mm CULVERT PIPE, TYPE 2 | m | 61.000 | 14,091.00
|
| | | 61.000 | 14,091.00
|
| | 0.000 | 0.00
|
| | |
|
| 0118 P120.72 | 481.00 | 31.000 | 14,911.00
|
| 1800 mm CULVERT PIPE, TYPE 2 | m | 31.000 | 14,911.00
|
| | | 31.000 | 14,911.00
|
| | 0.000 | 0.00
|
| | |
|
| 0119 P126.30 | 133.00 | 32.500 | 4,322.50
|
| 750 mm ROUND EQUIVALENT CULVERT PIPE, TYPE 2 CLASS IV | m | 32.500 | 4,322.50
|
| | | 32.500 | 4,322.50
|
| | 0.000 | 0.00
|
| | |
|
| 0120 P126.36 | 192.00 | 36.500 | 7,008.00
|
| 900 mm ROUND EQUIVALENT CULVERT PIPE, TYPE 2 CLASS IV | m | 36.500 | 7,008.00
|
| | | 36.500 | 7,008.00
|
| | 0.000 | 0.00
|
| | |
|
| 0121 P126.42 | 245.00 | 17.500 | 4,287.50
|
| 1050 mm ROUND EQUIVALENT CULVERT PIPE, TYPE 2, CLASS IV | m | 17.500 | 4,287.50
|
| | | 17.500 | 4,287.50
|
| | 0.000 | 0.00
|
| | |
|
| 0122 P127.30 | 154.00 | 47.000 | 7,238.00
|
| 750 mm ROUND EQUIVALENT CULVERT PIPE, TYPE 2 | m | 47.000 | 7,238.00
|
| | | 47.000 | 7,238.00
|
| | 0.000 | 0.00
|
| | |
|
| 0123 P127.36 | 200.00 | 61.000 | 12,200.00
|
| 900 mm ROUND EQUIVALENT CULVERT PIPE, TYPE 2 | m | 61.000 | 12,200.00
|
| | | 61.000 | 12,200.00
|
| | 0.000 | 0.00
|
| | |
|
| 0124 P127.42 | 249.00 | 27.500 | 6,847.50
|
| 1050 mm ROUND EQUIVALENT CULVERT PIPE, TYPE 2 | m | 27.500 | 6,847.50
|
| | | 27.500 | 6,847.50
|
| | 0.000 | 0.00
|
| | |
|
| 0126 P128.36 | 139.00 | 48.500 | 6,741.50
|
| 900 mm CULVERT PIPE, TYPE 2 CLASS IV | m | 48.500 | 6,741.50
|
| | | 48.500 | 6,741.50
|
| | 0.000 | 0.00
|
| | |
|
| 0127 P128.48 | 220.00 | 40.000 | 8,800.00
|
| 1200 mm CULVERT PIPE, TYPE 2 CLASS IV | m | 40.000 | 8,800.00
|
| | | 40.000 | 8,800.00
|
| | 0.000 | 0.00
|
| | |
|
| 0129 P128.72 | 483.00 | 20.000 | 9,660.00
|
| 1800 mm CULVERT PIPE, TYPE 2 CLASS IV | m | 20.000 | 9,660.00
|
| | | 20.000 | 9,660.00
|
| | 0.000 | 0.00
|
| | |
|
| 0139 P255.24 | 110.00 | 3.000 | 330.00
|
| 600 mm CULVERT PIPE, TYPE 4 OR 5 | m | 3.000 | 330.00
|
| | | 3.000 | 330.00
|
| | 0.000 | 0.00
|
| | |
|
| 0140 P400.18 | 105.00 | 308.500 | 32,392.50
|
| 450 mm CULVERT PIPE, TYPE 2,5,7 OR 8 | m | 308.500 | 32,392.50
|
| | | 310.800 | 32,634.00
|
| | 0.000 | 0.00
|
| | |
|
| 0142 P500.24 | 82.00 | 11.500 | 943.00
|
| 600 mm CULVERT PIPE, TYPE 2,4,5,7 OR 8 | m | 11.500 | 943.00
|
| | | 11.500 | 943.00
|
| | 0.000 | 0.00
|
| | |
|
| 0151 0030.40 | 2,068.96 | 1.000 | 2,068.96
|
| MOBILIZATION | LS | 1.000 | 2,068.96
|
| | | 1.000 | 2,068.96
|
| | 0.000 | 0.00
|
| | |
|
| 0157 4035.00 | 75.00 | 10.000 | 750.00
|
| REMOVE FLARED-END SECTION | EACH | 10.000 | 750.00
|
| | | 10.000 | 750.00
|
| | 0.000 | 0.00
|
| | |
|
| 0158 4040.00 | 100.00 | 4.000 | 400.00
|
| REMOVE HEADWALLS FROM CULVERTS | EACH | 4.000 | 400.00
|
| | | 4.000 | 400.00
|
| | 0.000 | 0.00
|
| | |
|
| 0163 4045.00 | 2,500.00 | 1.000 | 2,500.00
|
| REMOVE STRUCTURE | EACH | 1.000 | 2,500.00
|
| AT STA 1510+84 | | 1.000 | 2,500.00
|
| | 0.000 | 0.00
|
| | |
|
| 0165 4050.01 | 10.00 | 478.000 | 4,780.00
|
| EXCAVATION FOR PIPE, PIPE-ARCH CULVERTS, AND HEADWALLS | m3 | 478.000 | 4,780.00
|
| | | 567.000 | 5,670.00
|
| | 0.000 | 0.00
|
| | |
|
| 0166 4051.01 | 13.00 | 795.000 | 10,335.00
|
| EXCAVATION FOR BOX CULVERTS | m3 | 795.000 | 10,335.00
|
| | | 795.000 | 10,335.00
|
| | 0.000 | 0.00
|
| | |
|
| 0167 4101.06 | 325.00 | 212.720 | 69,134.00
|
| CLASS 47B-20 OR AX-20 CONCRETE FOR BOX CULVERT | m3 | 212.720 | 69,134.00
|
| | | 212.720 | 69,134.00
|
| | 0.000 | 0.00
|
| | |
|
| 0168 4105.59 | 653.00 | 10.200 | 6,660.60
|
| CLASS 47B-20 CONCRETE FOR INLET AND JUNCTION BOX | m3 | 10.200 | 6,660.60
|
| | | 10.200 | 6,660.60
|
| | 0.000 | 0.00
|
| | |
|
| 0169 4130.06 | 400.00 | 4.760 | 1,904.00
|
| CLASS 47B-20 OR AX-20 CONCRETE FOR PIPE CULVERT PLUG | m3 | 4.760 | 1,904.00
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 0170 4151.00 | 1.10 | 13,931.000 | 15,324.10
|
| REINFORCING STEEL FOR BOX CULVERT | kg | 13,931.000 | 15,324.10
|
| | | 13,931.000 | 15,324.10
|
| | 0.000 | 0.00
|
| | |
|
| 0171 4155.50 | 1.25 | 459.000 | 573.75
|
| REINFORCING STEEL FOR INLET AND JUNCTION BOX | kg | 459.000 | 573.75
|
| | | 459.000 | 573.75
|
| | 0.000 | 0.00
|
| | |
|
| 0172 4310.18 | 320.00 | 13.000 | 4,160.00
|
| 450 mm FLARED-END SECTION | EACH | 13.000 | 4,160.00
|
| | | 13.000 | 4,160.00
|
| | 0.000 | 0.00
|
| | |
|
| 0173 4310.24 | 330.00 | 4.000 | 1,320.00
|
| 600 mm FLARED-END SECTION | EACH | 4.000 | 1,320.00
|
| | | 4.000 | 1,320.00
|
| | 0.000 | 0.00
|
| | |
|
| 0175 4310.36 | 580.00 | 6.000 | 3,480.00
|
| 900 mm FLARED-END SECTION | EACH | 6.000 | 3,480.00
|
| | | 6.000 | 3,480.00
|
| | 0.000 | 0.00
|
| | |
|
| 0177 4310.48 | 800.00 | 4.000 | 3,200.00
|
| 1200 mm FLARED-END SECTION | EACH | 4.000 | 3,200.00
|
| | | 4.000 | 3,200.00
|
| | 0.000 | 0.00
|
| | |
|
| 0181 4310.72 | 1,600.00 | 2.000 | 3,200.00
|
| 1800 mm FLARED-END SECTION | EACH | 2.000 | 3,200.00
|
| | | 2.000 | 3,200.00
|
| | 0.000 | 0.00
|
| | |
|
| 0186 4510.30 | 500.00 | 4.000 | 2,000.00
|
| 750 mm ROUND EQUIVALENT CONCRETE FLARED-END SECTION | EACH | 4.000 | 2,000.00
|
| | | 4.000 | 2,000.00
|
| | 0.000 | 0.00
|
| | |
|
| 0187 4510.36 | 750.00 | 4.000 | 3,000.00
|
| 900 mm ROUND EQUIVALENT CONCRETE FLARED-END SECTION | EACH | 4.000 | 3,000.00
|
| | | 4.000 | 3,000.00
|
| | 0.000 | 0.00
|
| | |
|
| 0188 4510.42 | 875.00 | 2.000 | 1,750.00
|
| 1050 mm ROUND EQUIVALENT CONCRETE FLARED-END SECTION | EACH | 2.000 | 1,750.00
|
| | | 2.000 | 1,750.00
|
| | 0.000 | 0.00
|
| | |
|
| 0189 4670.05 | 100.00 | 139.400 | 13,940.00
|
| CULVERT SANDFILL | m3 | 139.400 | 13,940.00
|
| | | 177.400 | 17,740.00
|
| | 0.000 | 0.00
|
| | |
|
| 0190 4880.36 | 395.00 | 48.500 | 19,157.50
|
| JACKING 900 mm CULVERT PIPE, TYPE 2 CLASS IV | m | 48.500 | 19,157.50
|
| | | 48.500 | 19,157.50
|
| | 0.000 | 0.00
|
| | |
|
| 0191 4880.48 | 449.00 | 40.000 | 17,960.00
|
| JACKING 1200 mm CULVERT PIPE, TYPE 2 CLASS IV | m | 40.000 | 17,960.00
|
| | | 40.000 | 17,960.00
|
| | 0.000 | 0.00
|
| | |
|
| 0193 4880.72 | 890.00 | 20.000 | 17,800.00
|
| JACKING 1800 mm CULVERT PIPE, TYPE 2 CLASS IV | m | 20.000 | 17,800.00
|
| | | 20.000 | 17,800.00
|
| | 0.000 | 0.00
|
| | |
|
| 0194 4890.30 | 449.00 | 32.500 | 14,592.50
|
| JACKING 750 mm ROUND EQUIVALENT CULVERT PIPE, TYPE 2 CLASSIV | m | 32.500 | 14,592.50
|
| | | 32.500 | 14,592.50
|
| | 0.000 | 0.00
|
| | |
|
| 0195 4890.36 | 494.00 | 36.500 | 18,031.00
|
| JACKING 900 mm ROUND EQUIVALENT CULVERT PIPE, TYPE 2 CLASSIV | m | 36.500 | 18,031.00
|
| | | 36.500 | 18,031.00
|
| | 0.000 | 0.00
|
| | |
|
| 0196 4890.42 | 505.00 | 17.500 | 8,837.50
|
| JACKING 1050 mm ROUND EQUIVALENT CULVERT PIPE, TYPE 2 CLASSIV | m | 17.500 | 8,837.50
|
| | | 17.500 | 8,837.50
|
| | 0.000 | 0.00
|
| | |
|
| GROUP 4 CULVERTS | | Contracted | 388,412.41
|
| | Current | 388,412.41
|
| | In place | 391,439.91
|
| | This Estimate | 0.00
|
| | |
|
| GROUP 10 GENERAL ITEMS | | |
|
| 0374 0001.08 | 0.50 | 48,900.000 | 24,450.00
|
| BARRICADE, TYPE II | BDAY | 48,900.000 | 24,450.00
|
| | | 42,150.000 | 21,075.00
|
| | 868.000 | 434.00
|
| | |
|
| 0375 0001.10 | 1.20 | 4,521.000 | 5,425.20
|
| BARRICADE, TYPE III | BDAY | 4,521.000 | 5,425.20
|
| | | 8,917.000 | 10,700.40
|
| | 154.000 | 184.80
|
| | |
|
| 0376 0001.30 | 1.00 | 1,514.000 | 1,514.00
|
| TYPE B HIGH INTENSITY WARNING LIGHT | LDAY | 1,514.000 | 1,514.00
|
| | | 1,047.000 | 1,047.00
|
| | 0.000 | 0.00
|
| | |
|
| 0377 0001.90 | 0.35 | 33,151.000 | 11,602.85
|
| SIGN DAY | EACH | 33,151.000 | 11,602.85
|
| | | 33,243.000 | 11,635.05
|
| | 644.000 | 225.40
|
| | |
|
| 0378 0002.30 | 1.95 | 400.000 | 780.00
|
| PAVEMENT MARKING REMOVAL | m | 400.000 | 780.00
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 0380 0002.39 | 2.62 | 7,050.000 | 18,471.00
|
| TEMPORARY PAVEMENT MARKING, TYPE II | m | 0.000 | 0.00
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 0381 0002.97 | 12.00 | 757.000 | 9,084.00
|
| FLASHING ARROW PANEL | DAY | 757.000 | 9,084.00
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 0386 0010.04 | 1,500.00 | 0.500 | 750.00
|
| FIELD OFFICE | EACH | 0.500 | 750.00
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 0387 0030.00 | 7,397.16 | 1.000 | 7,397.16
|
| MOBILIZATION | LS | 1.000 | 7,397.16
|
| | | 1.000 | 7,397.16
|
| | 0.000 | 0.00
|
| | |
|
| 0388 1017.00 | 36,581.88 | 1.000 | 36,581.88
|
| CONSTRUCTION STAKING AND SURVEYING | LS | 1.000 | 36,581.88
|
| | | 0.420 | 15,364.39
|
| | 0.000 | 0.00
|
| | |
|
| 0389 9110.01 | 65.00 | 30.000 | 1,950.00
|
| RENTAL OF LOADER, FULLY OPERATED | HOUR | 30.000 | 1,950.00
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 0390 9110.02 | 65.00 | 10.000 | 650.00
|
| RENTAL OF MOTOR GRADER, FULLY OPERATED | HOUR | 10.000 | 650.00
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 0391 9110.03 | 55.00 | 30.000 | 1,650.00
|
| RENTAL OF DUMP TRUCK, FULLY OPERATED | HOUR | 30.000 | 1,650.00
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 0392 9110.07 | 50.00 | 30.000 | 1,500.00
|
| RENTAL OF SKID LOADER, FULLY OPERATED | HOUR | 30.000 | 1,500.00
|
| | | 10.000 | 500.00
|
| | 0.000 | 0.00
|
| | |
|
| 4005 9110.06 | 127.00 | 0.000 | 0.00
|
| RENTAL OF BACKHOE, FULLY OPERATED | HOUR | 20.000 | 2,540.00
|
| Rental of Backhoe, Fully Operated (track type) | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 4016 A800.52 | 18.11 | 0.000 | 0.00
|
| OPERATION AND MAINTENANCE OF TEMPORARY LIGHTING SYSTEM, TYPE | DAY | 700.000 | 12,677.00
|
| Operation and Maintenance of Temporary Lighting SystemType II | | 630.000 | 11,409.30
|
| | 14.000 | 253.54
|
| | |
|
| 4017 7322.01 | 262.00 | 0.000 | 0.00
|
| TYPE B SIGN | m2 | 12.080 | 3,164.96
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 4018 7360.30 | 666.75 | 0.000 | 0.00
|
| 750 mm SIGN SUPPORT FOOTING | EACH | 2.000 | 1,333.50
|
| 700 mm Sign Support Footings | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 4019 7340.00 | 6.04 | 0.000 | 0.00
|
| STRUCTURAL STEEL FOR SIGN SUPPORTS | kg | 446.600 | 2,697.46
|
| Structural Steel for Sign Supports | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 4020 0030.82 | | 1.000 |
|
| MOBILIZATION | LS | 2.000 | 0.00
|
| Mobilization for Signs | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 4040 0002.31 | 0.96 | 0.000 | 0.00
|
| TEMPORARY PAVEMENT MARKING | m | 8,500.000 | 8,160.00
|
| Tenporary Pavement Marking | | 12,528.750 | 12,027.60
|
| | 0.000 | 0.00
|
| | |
|
| 4044 0003.51 | 60.00 | 0.000 | 0.00
|
| INSTALL CONCRETE PROTECTION BARRIER | m | 79.250 | 4,755.00
|
| Install Concrete Protection Barriers | | 79.250 | 4,755.00
|
| | 0.000 | 0.00
|
| | |
|
| 4050 A780.02 | 1,986.60 | 0.000 | 0.00
|
| TEMPORARY LIGHTING SYSTEM, TYPE | EACH | 1.000 | 1,986.60
|
| Item 0298 on Contract 4586X transfered to Contract 4576 | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| GROUP 10 GENERAL ITEMS | | Contracted | 121,806.09
|
| | Current | 142,250.86
|
| | In place | 95,910.90
|
| | This Estimate | 1,097.74
|
| | |
|
| Totals for contract | | Contracted | 16,859,071.23
|
|---|
| | Current | 17,437,069.16
|
|---|
| | In place | 17,064,213.91
|
|---|
| | This Estimate | 70,160.99
|
|---|