| | | 1. Contracted
|
|---|
| | | 2. Current
|
|---|
| | | 3. To date
|
|---|
| Item Nbr Item Code | Unit Price | | 4. This Est
|
|---|
| Item Description | Units | Qty | Amount
|
|---|
| GROUP 1 GRADING | | |
|
| 0001 L020.00 | 1.79 | 8,081.000 | 14,464.99
|
| EROSION CONTROL | m2 | 8,081.000 | 14,464.99
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 0002 L022.11 | 8.47 | 335.000 | 2,837.45
|
| FABRIC SILT FENCE-LOW POROSITY | m | 335.000 | 2,837.45
|
| | | 336.000 | 2,845.92
|
| | 0.000 | 0.00
|
| | |
|
| 0003 0030.10 | 9,500.00 | 1.000 | 9,500.00
|
| MOBILIZATION | LS | 1.000 | 9,500.00
|
| | | 1.000 | 9,500.00
|
| | 0.000 | 0.00
|
| | |
|
| 0004 1009.00 | 1,250.00 | 1.000 | 1,250.00
|
| GENERAL CLEARING AND GRUBBING | LS | 1.000 | 1,250.00
|
| | | 1.000 | 1,250.00
|
| | 0.000 | 0.00
|
| | |
|
| 0005 1011.00 | 5.00 | 243.000 | 1,215.00
|
| WATER | kL | 243.000 | 1,215.00
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 0006 1012.00 | 135.00 | 3.000 | 405.00
|
| RIGHT-OF-WAY MARKERS | EACH | 3.000 | 405.00
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 0007 1030.00 | 12.35 | 6,065.000 | 74,902.75
|
| EARTHWORK MEASURED IN EMBANKMENT | m3 | 6,065.000 | 74,902.75
|
| | | 6,065.000 | 74,902.77
|
| | 674.500 | 8,330.08
|
| | |
|
| 0008 1033.00 | 2,950.00 | 0.930 | 2,743.50
|
| ROADWAY GRADING | StaM | 0.930 | 2,743.50
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 0009 1101.00 | 6.90 | 758.800 | 5,235.72
|
| REMOVE PAVEMENT | m2 | 758.800 | 5,235.72
|
| | | 758.800 | 5,235.72
|
| | 0.000 | 0.00
|
| | |
|
| 0010 1120.00 | 820.00 | 1.000 | 820.00
|
| REMOVE DISCHARGE STRUCTURE | EACH | 1.000 | 820.00
|
| | | 1.000 | 820.00
|
| | 0.000 | 0.00
|
| | |
|
| 0011 1305.42 | 150.00 | 75.000 | 11,250.00
|
| 1050 mm ROUND EQUIVALENT DRIVEWAY CULVERT PIPE | m | 75.000 | 11,250.00
|
| | | 75.000 | 11,250.00
|
| | 0.000 | 0.00
|
| | |
|
| 0012 4100.06 | 725.00 | 9.800 | 7,105.00
|
| CLASS 47B-20 OR AX-20 CONCRETE FOR HEADWALL | m3 | 9.800 | 7,105.00
|
| | | 9.800 | 7,105.00
|
| | 0.000 | 0.00
|
| | |
|
| 0013 4150.00 | 2.00 | 774.000 | 1,548.00
|
| REINFORCING STEEL FOR HEADWALL | kg | 774.000 | 1,548.00
|
| | | 796.000 | 1,592.00
|
| | 0.000 | 0.00
|
| | |
|
| 0014 7017.00 | 5.00 | 299.100 | 1,495.50
|
| REMOVE GUARDRAIL | m | 299.100 | 1,495.50
|
| | | 299.100 | 1,495.51
|
| | 0.000 | 0.00
|
| | |
|
| GROUP 1 GRADING | | Contracted | 134,772.91
|
| | Current | 134,772.91
|
| | In place | 115,996.92
|
| | This Estimate | 8,330.08
|
| | |
|
| GROUP 6 BRIDGE AT STA. 103+17.3 | | |
|
| 0015 0030.60 | 75,000.00 | 1.000 | 75,000.00
|
| MOBILIZATION | LS | 1.000 | 75,000.00
|
| | | 1.000 | 75,000.00
|
| | 0.000 | 0.00
|
| | |
|
| 0016 1010.01 | 25.00 | 5.000 | 125.00
|
| EXCAVATION (ESTABLISHED QUANTITY) | m3 | 5.000 | 125.00
|
| | | 5.000 | 125.00
|
| | 0.000 | 0.00
|
| | |
|
| 0017 1043.50 | 2.50 | 321.500 | 803.75
|
| RIPRAP FILTER FABRIC | m2 | 321.500 | 803.75
|
| | | 497.150 | 1,242.88
|
| | 0.000 | 0.00
|
| | |
|
| 0018 3050.15 | 350.00 | 162.400 | 56,840.00
|
| CONCRETE FOR PAVEMENT APPROACHES CLASS 47BD-30 | m3 | 162.400 | 56,840.00
|
| | | 162.400 | 56,840.00
|
| | 0.000 | 0.00
|
| | |
|
| 0019 3051.10 | 1.25 | 10,069.000 | 12,586.25
|
| EPOXY COATED REINFORCING STEEL FOR PAVEMENT APPROACHES | kg | 10,069.000 | 12,586.25
|
| | | 10,069.000 | 12,586.26
|
| | 0.000 | 0.00
|
| | |
|
| 0020 6000.10 | 15,000.00 | 1.000 | 15,000.00
|
| ABUTMENT NO.1 EXCAVATION | LS | 1.000 | 15,000.00
|
| | | 1.000 | 15,000.00
|
| | 0.000 | 0.00
|
| | |
|
| 0021 6000.11 | 15,000.00 | 1.000 | 15,000.00
|
| ABUTMENT NO.2 EXCAVATION | LS | 1.000 | 15,000.00
|
| | | 1.000 | 15,000.00
|
| | 0.000 | 0.00
|
| | |
|
| 0022 6000.20 | 35,000.00 | 1.000 | 35,000.00
|
| PIER NO.1 EXCAVATION | LS | 1.000 | 35,000.00
|
| | | 1.000 | 35,000.00
|
| | 0.000 | 0.00
|
| | |
|
| 0023 6000.21 | 35,000.00 | 1.000 | 35,000.00
|
| PIER NO.2 EXCAVATION | LS | 1.000 | 35,000.00
|
| | | 1.000 | 35,000.00
|
| | 0.000 | 0.00
|
| | |
|
| 0024 6005.60 | 1,600.00 | 8.000 | 12,800.00
|
| ELASTOMERIC BEARING | EACH | 8.000 | 12,800.00
|
| | | 8.000 | 12,800.00
|
| | 0.000 | 0.00
|
| | |
|
| 0025 6010.22 | 425.00 | 136.200 | 57,885.00
|
| CLASS 47B-20 CONCRETE FOR BRIDGE | m3 | 136.200 | 57,885.00
|
| | | 136.200 | 57,885.03
|
| | 0.000 | 0.00
|
| | |
|
| 0026 6010.26 | 425.00 | 399.000 | 169,575.00
|
| CLASS 47BD-30 CONCRETE FOR BRIDGE | m3 | 399.000 | 169,575.00
|
| | | 399.000 | 169,575.00
|
| | 0.000 | 0.00
|
| | |
|
| 0027 6030.00 | 211,400.00 | 1.000 | 211,400.00
|
| PREPARATION OF BRIDGE | EACH | 1.000 | 211,400.00
|
| AT STA. 103+17.30 | | 1.000 | 211,400.00
|
| | 0.000 | 0.00
|
| | |
|
| 0028 6071.11 | 212,000.00 | 1.000 | 212,000.00
|
| STEEL SUPERSTRUCTURE | LS | 1.000 | 212,000.00
|
| AT STA. 103+17.30 | | 1.000 | 212,000.00
|
| | 0.000 | 0.00
|
| | |
|
| 0029 6080.00 | 6.00 | 430.000 | 2,580.00
|
| STRUCTURAL STEEL FOR SUBSTRUCTURE | kg | 430.000 | 2,580.00
|
| | | 430.000 | 2,580.00
|
| | 0.000 | 0.00
|
| | |
|
| 0030 6105.03 | 50.00 | 386.000 | 19,300.00
|
| ROCK RIPRAP, TYPE C | Mg | 386.000 | 19,300.00
|
| | | 394.181 | 19,709.05
|
| | 0.000 | 0.00
|
| | |
|
| 0031 6131.50 | 1.20 | 71,121.000 | 85,345.20
|
| EPOXY COATED REINFORCING STEEL | kg | 71,121.000 | 85,345.20
|
| | | 73,731.500 | 88,477.79
|
| | 0.000 | 0.00
|
| | |
|
| 0032 6200.00 | 75.00 | 308.200 | 23,115.00
|
| CONCRETE PILING | m | 290.200 | 21,765.00
|
| | | 296.600 | 22,245.00
|
| | 0.000 | 0.00
|
| | |
|
| 0142 6200.50 | 45.00 | 0.000 | 0.00
|
| PAY CUT-OFF FOR CONCRETE PILING | m | 18.000 | 810.00
|
| | | 11.600 | 522.00
|
| | 0.000 | 0.00
|
| | |
|
| 0145 6960.51 | 1,119.30 | 0.000 | 0.00
|
| COMPENSATION FOR ADDITIONAL COST | LS | 1.000 | 1,119.30
|
| Shop installed Shear Connectors | | 1.000 | 1,119.30
|
| | 0.000 | 0.00
|
| | |
|
| 0146 6951.12 | 3.3075 | 0.000 | 0.00
|
| SHEAR CONNECTORS | EACH | 1,200.000 | 3,969.00
|
| Field installed Shear Connectors | | 1,200.000 | 3,969.00
|
| | 0.000 | 0.00
|
| | |
|
| 0148 6960.51 | 972.30 | 0.000 | 0.00
|
| COMPENSATION FOR ADDITIONAL COST | LS | 1.000 | 972.30
|
| Welded separator connections | | 1.000 | 972.30
|
| | 0.000 | 0.00
|
| | |
|
| GROUP 6 BRIDGE AT STA. 103+17.3 | | Contracted | 1,039,355.20
|
| | Current | 1,044,875.80
|
| | In place | 1,049,048.61
|
| | This Estimate | 0.00
|
| | |
|
| GROUP 6A BRIDGE AT STA. 104+92.25 | | |
|
| 0033 0030.60 | 14,000.00 | 1.000 | 14,000.00
|
| MOBILIZATION | LS | 1.000 | 14,000.00
|
| | | 1.000 | 14,000.00
|
| | 0.000 | 0.00
|
| | |
|
| 0034 1010.01 | 100.00 | 5.000 | 500.00
|
| EXCAVATION (ESTABLISHED QUANTITY) | m3 | 5.000 | 500.00
|
| | | 5.000 | 500.00
|
| | 5.000 | 500.00
|
| | |
|
| 0035 3050.15 | 390.00 | 18.700 | 7,293.00
|
| CONCRETE FOR PAVEMENT APPROACHES CLASS 47BD-30 | m3 | 18.700 | 7,293.00
|
| | | 26.400 | 10,296.00
|
| | 0.000 | 0.00
|
| | |
|
| 0036 3051.10 | 1.32 | 762.000 | 1,005.84
|
| EPOXY COATED REINFORCING STEEL FOR PAVEMENT APPROACHES | kg | 762.000 | 1,005.84
|
| | | 2,122.000 | 2,801.04
|
| | 0.000 | 0.00
|
| | |
|
| 0037 6000.10 | 6,500.00 | 1.000 | 6,500.00
|
| ABUTMENT NO.1 EXCAVATION | LS | 1.000 | 6,500.00
|
| | | 1.000 | 6,500.00
|
| | 0.000 | 0.00
|
| | |
|
| 0038 6000.11 | 6,500.00 | 1.000 | 6,500.00
|
| ABUTMENT NO.2 EXCAVATION | LS | 1.000 | 6,500.00
|
| | | 1.000 | 6,500.00
|
| | 0.000 | 0.00
|
| | |
|
| 0039 6010.22 | 430.00 | 83.600 | 35,948.00
|
| CLASS 47B-20 CONCRETE FOR BRIDGE | m3 | 83.600 | 35,948.00
|
| | | 83.600 | 35,948.00
|
| | 0.000 | 0.00
|
| | |
|
| 0040 6010.26 | 430.00 | 99.300 | 42,699.00
|
| CLASS 47BD-30 CONCRETE FOR BRIDGE | m3 | 99.300 | 42,699.00
|
| | | 99.300 | 42,699.00
|
| | 0.000 | 0.00
|
| | |
|
| 0041 6030.00 | 18,000.00 | 1.000 | 18,000.00
|
| PREPARATION OF BRIDGE | EACH | 1.000 | 18,000.00
|
| AT STA. 104+92.25 | | 1.000 | 18,000.00
|
| | 0.000 | 0.00
|
| | |
|
| 0042 6131.50 | 1.32 | 11,295.000 | 14,909.40
|
| EPOXY COATED REINFORCING STEEL | kg | 11,295.000 | 14,909.40
|
| | | 11,295.000 | 14,909.40
|
| | 0.000 | 0.00
|
| | |
|
| 0043 6200.00 | 91.00 | 130.800 | 11,902.80
|
| CONCRETE PILING | m | 127.300 | 11,584.30
|
| | | 124.900 | 11,365.90
|
| | 0.000 | 0.00
|
| | |
|
| 0044 6310.00 | 142.00 | 187.000 | 26,554.00
|
| STEEL SHEET PILING | m2 | 187.000 | 26,554.00
|
| | | 231.474 | 32,869.31
|
| | 0.000 | 0.00
|
| | |
|
| 0045 6404.15 | 189.00 | 31.030 | 5,864.67
|
| 1.5 m PEDESTRIAN RAILING (CHAIN LINK TYPE) | m | 31.030 | 5,864.67
|
| | | 32.900 | 6,218.10
|
| | 0.000 | 0.00
|
| | |
|
| 0046 6601.15 | 77.00 | 9.915 | 763.46
|
| 38 mm CONDUIT IN BRIDGE | m | 9.915 | 763.46
|
| | | 9.915 | 763.46
|
| | 0.000 | 0.00
|
| | |
|
| 0147 6200.50 | 54.60 | 0.000 | 0.00
|
| PAY CUT-OFF FOR CONCRETE PILING | m | 3.500 | 191.10
|
| | | 5.900 | 322.14
|
| | 0.000 | 0.00
|
| | |
|
| GROUP 6A BRIDGE AT STA. 104+92.25 | | Contracted | 192,440.16
|
| | Current | 192,312.77
|
| | In place | 203,692.35
|
| | This Estimate | 500.00
|
| | |
|
| GROUP 6B BRIDGE AT STA. 106+70.95 | | |
|
| 0047 0030.60 | 16,000.00 | 1.000 | 16,000.00
|
| MOBILIZATION | LS | 1.000 | 16,000.00
|
| | | 1.000 | 16,000.00
|
| | 0.000 | 0.00
|
| | |
|
| 0048 1010.01 | 100.00 | 5.000 | 500.00
|
| EXCAVATION (ESTABLISHED QUANTITY) | m3 | 5.000 | 500.00
|
| | | 5.000 | 500.00
|
| | 0.000 | 0.00
|
| | |
|
| 0049 3050.15 | 390.00 | 144.000 | 56,160.00
|
| CONCRETE FOR PAVEMENT APPROACHES CLASS 47BD-30 | m3 | 144.000 | 56,160.00
|
| | | 144.000 | 56,160.00
|
| | 0.000 | 0.00
|
| | |
|
| 0050 3051.10 | 1.32 | 8,983.000 | 11,857.56
|
| EPOXY COATED REINFORCING STEEL FOR PAVEMENT APPROACHES | kg | 8,983.000 | 11,857.56
|
| | | 8,983.000 | 11,857.56
|
| | 0.000 | 0.00
|
| | |
|
| 0051 6000.10 | 9,000.00 | 1.000 | 9,000.00
|
| ABUTMENT NO.1 EXCAVATION | LS | 1.000 | 9,000.00
|
| | | 1.000 | 9,000.00
|
| | 0.000 | 0.00
|
| | |
|
| 0052 6000.11 | 9,000.00 | 1.000 | 9,000.00
|
| ABUTMENT NO.2 EXCAVATION | LS | 1.000 | 9,000.00
|
| | | 1.000 | 9,000.00
|
| | 0.000 | 0.00
|
| | |
|
| 0053 6000.20 | 14,000.00 | 1.000 | 14,000.00
|
| PIER NO.1 EXCAVATION | LS | 1.000 | 14,000.00
|
| | | 1.000 | 14,000.00
|
| | 0.000 | 0.00
|
| | |
|
| 0054 6000.21 | 14,000.00 | 1.000 | 14,000.00
|
| PIER NO.2 EXCAVATION | LS | 1.000 | 14,000.00
|
| | | 1.000 | 14,000.00
|
| | 0.000 | 0.00
|
| | |
|
| 0055 6007.01 | 42.00 | 297.700 | 12,503.40
|
| CLASS I REPAIR | m2 | 297.700 | 12,503.40
|
| | | 185.628 | 7,796.38
|
| | 0.000 | 0.00
|
| | |
|
| 0056 6007.02 | 133.00 | 59.500 | 7,913.50
|
| CLASS II REPAIR | m2 | 59.500 | 7,913.50
|
| | | 29.555 | 3,930.82
|
| | 0.000 | 0.00
|
| | |
|
| 0057 6007.03 | 185.00 | 5.000 | 925.00
|
| CLASS III REPAIR | m2 | 5.000 | 925.00
|
| | | 2.372 | 438.82
|
| | 0.000 | 0.00
|
| | |
|
| 0058 6008.40 | 40.00 | 297.700 | 11,908.00
|
| PLACING, FINISHING, AND CURING CONCRETE OVERLAY-SF | m2 | 297.700 | 11,908.00
|
| | | 297.726 | 11,909.04
|
| | 0.000 | 0.00
|
| | |
|
| 0059 6010.22 | 460.00 | 48.800 | 22,448.00
|
| CLASS 47B-20 CONCRETE FOR BRIDGE | m3 | 48.800 | 22,448.00
|
| | | 48.800 | 22,448.00
|
| | 0.000 | 0.00
|
| | |
|
| 0060 6010.26 | 460.00 | 51.700 | 23,782.00
|
| CLASS 47BD-30 CONCRETE FOR BRIDGE | m3 | 51.700 | 23,782.00
|
| | | 52.464 | 24,133.44
|
| | 0.000 | 0.00
|
| | |
|
| 0061 6016.02 | 510.00 | 17.400 | 8,874.00
|
| CONCRETE FOR OVERLAYS-SF | m3 | 17.400 | 8,874.00
|
| | | 26.409 | 13,468.59
|
| | 0.000 | 0.00
|
| | |
|
| 0062 6030.00 | 21,000.00 | 1.000 | 21,000.00
|
| PREPARATION OF BRIDGE | EACH | 1.000 | 21,000.00
|
| AT STA. 106+70.95 | | 1.000 | 21,000.00
|
| | 0.000 | 0.00
|
| | |
|
| 0063 6080.00 | 6.20 | 359.700 | 2,230.14
|
| STRUCTURAL STEEL FOR SUBSTRUCTURE | kg | 359.700 | 2,230.14
|
| | | 359.700 | 2,230.14
|
| | 0.000 | 0.00
|
| | |
|
| 0064 6131.50 | 1.33 | 10,358.000 | 13,776.14
|
| EPOXY COATED REINFORCING STEEL | kg | 10,358.000 | 13,776.14
|
| | | 10,557.562 | 14,041.58
|
| | 0.000 | 0.00
|
| | |
|
| 0065 6200.00 | 99.00 | 344.000 | 34,056.00
|
| CONCRETE PILING | m | 332.000 | 32,868.00
|
| | | 272.900 | 27,017.10
|
| | 0.000 | 0.00
|
| | |
|
| 0140 6200.50 | 59.40 | 0.000 | 0.00
|
| PAY CUT-OFF FOR CONCRETE PILING | m | 12.000 | 712.80
|
| | | 10.300 | 611.82
|
| | 0.000 | 0.00
|
| | |
|
| 0144 0096.00 | 245.70 | 0.000 | 0.00
|
| DEDUCTION | LS | 1.000 | 245.70
|
| Substandard concrete strength for #2 Pavement Approach, Group 6B Bridge, Phase I | | 1.000 | 245.70
|
| | 0.000 | 0.00
|
| | |
|
| GROUP 6B BRIDGE AT STA. 106+70.95 | | Contracted | 289,933.74
|
| | Current | 289,704.24
|
| | In place | 279,788.99
|
| | This Estimate | 0.00
|
| | |
|
| GROUP 6C BRIDGE AT STA. 107+98.90 | | |
|
| 0066 0030.60 | 16,000.00 | 1.000 | 16,000.00
|
| MOBILIZATION | LS | 1.000 | 16,000.00
|
| | | 1.000 | 16,000.00
|
| | 0.000 | 0.00
|
| | |
|
| 0067 1010.01 | 100.00 | 5.000 | 500.00
|
| EXCAVATION (ESTABLISHED QUANTITY) | m3 | 5.000 | 500.00
|
| | | 5.000 | 500.00
|
| | 0.000 | 0.00
|
| | |
|
| 0068 3050.15 | 390.00 | 140.100 | 54,639.00
|
| CONCRETE FOR PAVEMENT APPROACHES CLASS 47BD-30 | m3 | 140.100 | 54,639.00
|
| | | 140.100 | 54,639.00
|
| | 0.000 | 0.00
|
| | |
|
| 0069 3051.10 | 1.32 | 8,983.000 | 11,857.56
|
| EPOXY COATED REINFORCING STEEL FOR PAVEMENT APPROACHES | kg | 8,983.000 | 11,857.56
|
| | | 8,983.000 | 11,857.56
|
| | 0.000 | 0.00
|
| | |
|
| 0070 6000.10 | 9,000.00 | 1.000 | 9,000.00
|
| ABUTMENT NO.1 EXCAVATION | LS | 1.000 | 9,000.00
|
| | | 1.000 | 9,000.00
|
| | 0.000 | 0.00
|
| | |
|
| 0071 6000.11 | 9,000.00 | 1.000 | 9,000.00
|
| ABUTMENT NO.2 EXCAVATION | LS | 1.000 | 9,000.00
|
| | | 1.000 | 9,000.00
|
| | 0.000 | 0.00
|
| | |
|
| 0072 6000.20 | 14,000.00 | 1.000 | 14,000.00
|
| PIER NO.1 EXCAVATION | LS | 1.000 | 14,000.00
|
| | | 1.000 | 14,000.00
|
| | 0.000 | 0.00
|
| | |
|
| 0073 6000.21 | 14,000.00 | 1.000 | 14,000.00
|
| PIER NO.2 EXCAVATION | LS | 1.000 | 14,000.00
|
| | | 1.000 | 14,000.00
|
| | 0.000 | 0.00
|
| | |
|
| 0074 6007.01 | 42.00 | 330.000 | 13,860.00
|
| CLASS I REPAIR | m2 | 330.000 | 13,860.00
|
| | | 205.701 | 8,639.44
|
| | 0.000 | 0.00
|
| | |
|
| 0075 6007.02 | 130.00 | 66.000 | 8,580.00
|
| CLASS II REPAIR | m2 | 66.000 | 8,580.00
|
| | | 72.646 | 9,443.98
|
| | 0.000 | 0.00
|
| | |
|
| 0076 6007.03 | 190.00 | 5.000 | 950.00
|
| CLASS III REPAIR | m2 | 5.000 | 950.00
|
| | | 0.750 | 142.50
|
| | 0.000 | 0.00
|
| | |
|
| 0077 6008.40 | 42.00 | 330.000 | 13,860.00
|
| PLACING, FINISHING, AND CURING CONCRETE OVERLAY-SF | m2 | 330.000 | 13,860.00
|
| | | 329.921 | 13,856.68
|
| | 0.000 | 0.00
|
| | |
|
| 0078 6010.22 | 466.00 | 52.100 | 24,278.60
|
| CLASS 47B-20 CONCRETE FOR BRIDGE | m3 | 52.100 | 24,278.60
|
| | | 52.100 | 24,278.60
|
| | 0.000 | 0.00
|
| | |
|
| 0079 6010.26 | 428.00 | 81.200 | 34,753.60
|
| CLASS 47BD-30 CONCRETE FOR BRIDGE | m3 | 81.200 | 34,753.60
|
| | | 66.550 | 28,483.40
|
| | 0.000 | 0.00
|
| | |
|
| 0080 6016.02 | 510.00 | 19.100 | 9,741.00
|
| CONCRETE FOR OVERLAYS-SF | m3 | 19.100 | 9,741.00
|
| | | 34.290 | 17,487.90
|
| | 0.000 | 0.00
|
| | |
|
| 0081 6030.00 | 20,000.00 | 1.000 | 20,000.00
|
| PREPARATION OF BRIDGE | EACH | 1.000 | 20,000.00
|
| AT STA. 107+98.90 | | 1.000 | 20,000.00
|
| | 0.000 | 0.00
|
| | |
|
| 0082 6080.00 | 6.20 | 297.900 | 1,846.98
|
| STRUCTURAL STEEL FOR SUBSTRUCTURE | kg | 297.900 | 1,846.98
|
| | | 297.900 | 1,846.98
|
| | 0.000 | 0.00
|
| | |
|
| 0083 6131.50 | 1.33 | 12,108.000 | 16,103.64
|
| EPOXY COATED REINFORCING STEEL | kg | 12,108.000 | 16,103.64
|
| | | 12,487.562 | 16,608.46
|
| | 0.000 | 0.00
|
| | |
|
| 0084 6200.00 | 91.00 | 246.600 | 22,440.60
|
| CONCRETE PILING | m | 243.900 | 22,194.90
|
| | | 243.900 | 22,194.90
|
| | 0.000 | 0.00
|
| | |
|
| 0143 6200.50 | 54.60 | 0.000 | 0.00
|
| PAY CUT-OFF FOR CONCRETE PILING | m | 2.700 | 147.42
|
| | | 2.700 | 147.42
|
| | 0.000 | 0.00
|
| | |
|
| GROUP 6C BRIDGE AT STA. 107+98.90 | | Contracted | 295,410.98
|
| | Current | 295,312.70
|
| | In place | 292,126.82
|
| | This Estimate | 0.00
|
| | |
|
| GROUP 7 GUARDRAIL | | |
|
| 0085 0030.70 | 1,000.00 | 1.000 | 1,000.00
|
| MOBILIZATION | LS | 1.000 | 1,000.00
|
| | | 1.000 | 1,000.00
|
| | 1.000 | 1,000.00
|
| | |
|
| 0086 7011.20 | 41.68 | 345.640 | 14,406.28
|
| W-BEAM GUARDRAIL | m | 345.640 | 14,406.28
|
| | | 345.640 | 14,406.28
|
| | 345.640 | 14,406.28
|
| | |
|
| 0087 7020.00 | 1,007.00 | 14.000 | 14,098.00
|
| BRIDGE APPROACH SECTIONS | EACH | 14.000 | 14,098.00
|
| | | 14.000 | 14,098.00
|
| | 14.000 | 14,098.00
|
| | |
|
| 0088 7024.27 | 1,475.00 | 8.000 | 11,800.00
|
| GUARDRAIL END TREATMENT, TYPE II | EACH | 8.000 | 11,800.00
|
| | | 8.000 | 11,800.00
|
| | 8.000 | 11,800.00
|
| | |
|
| GROUP 7 GUARDRAIL | | Contracted | 41,304.28
|
| | Current | 41,304.28
|
| | In place | 41,304.28
|
| | This Estimate | 41,304.28
|
| | |
|
| GROUP 8B ELECTRICAL | | |
|
| 0089 A001.12 | 350.00 | 1.000 | 350.00
|
| PULL BOX, TYPE PB-5 | EACH | 1.000 | 350.00
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 0090 A009.14 | 2,100.00 | 3.000 | 6,300.00
|
| STREET LIGHTING UNIT, TYPE SL-BT-12.2-3.7-0.25 | EACH | 3.000 | 6,300.00
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 0091 A020.10 | 1,500.00 | 1.000 | 1,500.00
|
| LIGHTING CONTROL CENTER, TYPE D | EACH | 1.000 | 1,500.00
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 0092 A070.10 | 7.50 | 67.000 | 502.50
|
| 38 mm CONDUIT IN TRENCH | m | 67.000 | 502.50
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 0093 A072.10 | 7.50 | 26.000 | 195.00
|
| 38 mm CONDUIT UNDER ROADWAY | m | 26.000 | 195.00
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 0094 A074.12 | 45.00 | 25.000 | 1,125.00
|
| 38 mm CONDUIT, JACKED | m | 25.000 | 1,125.00
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 0095 A080.22 | 1.60 | 127.000 | 203.20
|
| STREET LIGHTING CABLE, NO. 6 BARE | m | 127.000 | 203.20
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 0096 A080.24 | 2.25 | 254.000 | 571.50
|
| STREET LIGHTING CABLE, NO. 6 USE | m | 254.000 | 571.50
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 0097 0030.81 | 2,500.00 | 1.000 | 2,500.00
|
| MOBILIZATION | LS | 1.000 | 2,500.00
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| GROUP 8B ELECTRICAL | | Contracted | 13,247.20
|
| | Current | 13,247.20
|
| | In place | 0.00
|
| | This Estimate | 0.00
|
| | |
|
| GROUP 9 BITUMINOUS | | |
|
| 0098 0002.55 | 72.00 | 12.000 | 864.00
|
| OVERLAY BROKEN LINES | StaM | 12.000 | 864.00
|
| | | 13.405 | 965.16
|
| | 0.000 | 0.00
|
| | |
|
| 0099 0002.60 | 72.00 | 24.000 | 1,728.00
|
| OVERLAY SOLID LINES | StaM | 24.000 | 1,728.00
|
| | | 16.000 | 1,152.00
|
| | 0.000 | 0.00
|
| | |
|
| 0100 0030.90 | 30,000.00 | 1.000 | 30,000.00
|
| MOBILIZATION | LS | 1.000 | 30,000.00
|
| | | 0.944 | 28,320.00
|
| | 0.000 | 0.00
|
| | |
|
| 0101 2001.00 | 14.00 | 25.000 | 350.00
|
| GRAVEL SURFACE COURSE | m3 | 25.000 | 350.00
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 0102 7502.04 | 6.38 | 35.000 | 223.30
|
| 100 mm WHITE PREFORMED PAVEMENT MARKING, TYPE 4 | m | 35.000 | 223.30
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 0103 7503.04 | 6.72 | 4,100.000 | 27,552.00
|
| 100 mm YELLOW PREFORMED PAVEMENT MARKING, TYPE 4 | m | 4,100.000 | 27,552.00
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 0104 7509.04 | 20.20 | 275.000 | 5,555.00
|
| 300 mm YELLOW PREFORMED PAVEMENT MARKING, TYPE 4 | m | 275.000 | 5,555.00
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 0105 9005.00 | 58.00 | 50.000 | 2,900.00
|
| ASPHALTIC CONCRETE FOR PATCHING, TYPE | Mg | 50.000 | 2,900.00
|
| SP3(12.5) | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 0106 9005.35 | 41.00 | 1,800.000 | 73,800.00
|
| ASPHALTIC CONCRETE, TYPE SP3(12.5) | Mg | 1,450.000 | 59,450.00
|
| | | 1,789.130 | 73,354.33
|
| | 0.000 | 0.00
|
| | |
|
| 0107 9021.01 | 64.22 | 99.900 | 6,415.58
|
| PERFORMANCE GRADED BINDER (64-22) | Mg | 78.300 | 5,028.43
|
| | | 81.774 | 5,251.53
|
| | 0.000 | 0.00
|
| | |
|
| 0108 9053.00 | 1.95 | 5,280.000 | 10,296.00
|
| TACK COAT | L | 5,280.000 | 10,296.00
|
| | | 7,003.013 | 13,655.88
|
| | 0.000 | 0.00
|
| | |
|
| 0109 9111.00 | 0.35 | 56.000 | 19.60
|
| WATER | kL | 56.000 | 19.60
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 0110 9170.00 | 2,950.00 | 9.285 | 27,390.75
|
| EARTH SHOULDER CONSTRUCTION | StaM | 9.285 | 27,390.75
|
| | | 11.192 | 33,016.40
|
| | 11.192 | 33,016.40
|
| | |
|
| 0111 9173.20 | 3.75 | 2,080.000 | 7,800.00
|
| SUBGRADE PREPARATION | m2 | 2,080.000 | 7,800.00
|
| | | 3,440.504 | 12,901.89
|
| | 0.000 | 0.00
|
| | |
|
| 0112 9179.23 | 1,400.00 | 4.252 | 5,952.80
|
| COLD MILLING, CLASS 3 | StaM | 4.252 | 5,952.80
|
| | | 5.596 | 7,834.40
|
| | 0.000 | 0.00
|
| | |
|
| 0113 9188.50 | 33.00 | 1,230.000 | 40,590.00
|
| SURFACING UNDER GUARDRAIL | m2 | 1,230.000 | 40,590.00
|
| | | 1,231.011 | 40,623.36
|
| | 0.000 | 0.00
|
| | |
|
| 0114 9300.50 | 2,000.00 | 1.000 | 2,000.00
|
| ASPHALT PAVEMENT SMOOTHNESS TESTING | LS | 1.000 | 2,000.00
|
| | | 1.000 | 2,000.00
|
| | 1.000 | 2,000.00
|
| | |
|
| 0141 9009.87 | 39.00 | 0.000 | 0.00
|
| SURFACING 200mm | m2 | 1,427.000 | 55,653.00
|
| Surfacing for Phase II | | 1,747.478 | 68,151.64
|
| | 0.000 | 0.00
|
| | |
|
| GROUP 9 BITUMINOUS | | Contracted | 243,437.03
|
| | Current | 283,352.88
|
| | In place | 287,226.59
|
| | This Estimate | 35,016.40
|
| | |
|
| GROUP 10 GENERAL ITEMS | | |
|
| 0115 0001.08 | 0.50 | 5,792.000 | 2,896.00
|
| BARRICADE, TYPE II | BDAY | 5,792.000 | 2,896.00
|
| | | 9,774.000 | 4,887.00
|
| | 16.000 | 8.00
|
| | |
|
| 0116 0001.10 | 2.00 | 2,632.000 | 5,264.00
|
| BARRICADE, TYPE III | BDAY | 2,632.000 | 5,264.00
|
| | | 5,492.000 | 10,984.00
|
| | 179.000 | 358.00
|
| | |
|
| 0117 0001.30 | 0.60 | 880.000 | 528.00
|
| TYPE B HIGH INTENSITY WARNING LIGHT | LDAY | 880.000 | 528.00
|
| | | 141.000 | 84.60
|
| | 0.000 | 0.00
|
| | |
|
| 0118 0001.75 | 8.00 | 168.000 | 1,344.00
|
| TEMPORARY SIGN DAY | EACH | 168.000 | 1,344.00
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 0119 0001.90 | 0.40 | 10,920.000 | 4,368.00
|
| SIGN DAY | EACH | 10,920.000 | 4,368.00
|
| | | 12,849.000 | 5,139.60
|
| | 84.000 | 33.60
|
| | |
|
| 0120 0002.30 | 1.50 | 825.000 | 1,237.50
|
| PAVEMENT MARKING REMOVAL | m | 825.000 | 1,237.50
|
| | | 1,308.000 | 1,962.00
|
| | 0.000 | 0.00
|
| | |
|
| 0121 0002.31 | 1.50 | 665.000 | 997.50
|
| TEMPORARY PAVEMENT MARKING | m | 665.000 | 997.50
|
| | | 4,872.871 | 7,309.30
|
| | 0.000 | 0.00
|
| | |
|
| 0122 0002.47 | 3.00 | 300.000 | 900.00
|
| TEMPORARY PAVEMENT MARKING SURFACE PREPARATION | m | 300.000 | 900.00
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 0123 0003.10 | 175.00 | 86.000 | 15,050.00
|
| FLAGGING | DAY | 86.000 | 15,050.00
|
| | | 23.500 | 4,112.50
|
| | 0.000 | 0.00
|
| | |
|
| 0124 0003.51 | 52.00 | 350.000 | 18,200.00
|
| INSTALL CONCRETE PROTECTION BARRIER | m | 350.000 | 18,200.00
|
| | | 708.000 | 36,816.00
|
| | 0.000 | 0.00
|
| | |
|
| 0125 0003.56 | 14.00 | 950.000 | 13,300.00
|
| RELOCATE CONCRETE PROTECTION BARRIER | m | 950.000 | 13,300.00
|
| | | 612.000 | 8,568.00
|
| | 0.000 | 0.00
|
| | |
|
| 0126 0003.70 | 400.00 | 8.000 | 3,200.00
|
| TEMPORARY RUMBLE STRIP | EACH | 8.000 | 3,200.00
|
| | | 8.000 | 3,200.00
|
| | 0.000 | 0.00
|
| | |
|
| 0127 0003.75 | 8,400.00 | 2.000 | 16,800.00
|
| TEMPORARY TRAFFIC SIGNAL | EACH | 2.000 | 16,800.00
|
| | | 2.000 | 16,800.00
|
| | 0.000 | 0.00
|
| | |
|
| 0128 0005.10 | 2.75 | 320.000 | 880.00
|
| TRAFFIC CONTROL MANAGEMENT | DAY | 320.000 | 880.00
|
| | | 286.000 | 786.50
|
| | 0.000 | 0.00
|
| | |
|
| 0129 0010.04 | 3,500.00 | 1.000 | 3,500.00
|
| FIELD OFFICE | EACH | 1.000 | 3,500.00
|
| | | 1.000 | 3,500.00
|
| | 0.000 | 0.00
|
| | |
|
| 0130 0020.00 | 0.80 | 1,000.000 | 800.00
|
| TRAINING | HOUR | 1,000.000 | 800.00
|
| | | 1,000.000 | 800.00
|
| | 0.000 | 0.00
|
| | |
|
| 0131 0030.00 | 7,000.00 | 1.000 | 7,000.00
|
| MOBILIZATION | LS | 1.000 | 7,000.00
|
| | | 1.000 | 7,000.00
|
| | 0.000 | 0.00
|
| | |
|
| 0132 9110.01 | 70.00 | 20.000 | 1,400.00
|
| RENTAL OF LOADER, FULLY OPERATED | HOUR | 20.000 | 1,400.00
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 0133 9110.02 | 65.00 | 20.000 | 1,300.00
|
| RENTAL OF MOTOR GRADER, FULLY OPERATED | HOUR | 20.000 | 1,300.00
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 0134 9110.03 | 55.00 | 20.000 | 1,100.00
|
| RENTAL OF DUMP TRUCK, FULLY OPERATED | HOUR | 20.000 | 1,100.00
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 0135 9110.07 | 50.00 | 20.000 | 1,000.00
|
| RENTAL OF SKID LOADER, FULLY OPERATED | HOUR | 20.000 | 1,000.00
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| GROUP 10 GENERAL ITEMS | | Contracted | 101,065.00
|
| | Current | 101,065.00
|
| | In place | 111,949.50
|
| | This Estimate | 399.60
|
| | |
|
| Totals for contract | | Contracted | 2,350,966.50
|
|---|
| | Current | 2,395,947.77
|
|---|
| | In place | 2,381,134.06
|
|---|
| | This Estimate | 85,550.36
|
|---|