Return to District Map


Nebraska Department of Roads
Estimate Summary to Contractor
Vendor ID:0083 WERNER CONSTRUCTION, INC.
Contract ID:4328X
Estimate Number:0002
Pay Period End Date:09.13.2003
Contract Location:
US-30 WESTEstimate Type:PROG
Contractor:
WERNER CONSTRUCTION, INC.Date Let:06.26.2003
129 E 2ND STDate Awarded:07.03.2003
PO BOX 1087Date Contract Executed:07.09.2003
Date Notice to Proceed:07.09.2003
HASTINGS NE 68902-1087Date Work Began:08.14.2003
Phone:Date Physical Work Completed:
(402)463-4545Date Accepted:
Escrow Agent:
Surety Co:
UNIVERSAL SURETY COMPANY
Counties
MERRICK
Project Number PCT Fed State Project Number Description
42328 000  0.000 RD-92-5(1005)  BITUMINOUS
Total to DatePrev to DateThis Estimate
Current Contract AmtTotal Earnings$662,297.97$256,931.79$405,366.18
$1,396,719.42Stockpiled Materials$.00$.00$.00
Original Contract AmtGross Earnings$662,297.97$256,931.79$405,366.18
$1,396,719.42Retainage$-6,622.98$-2,569.32$-4,053.66
Escrow Amount$.00$.00$.00
Percent CompleteSecurities Encumbered$.00$.00$.00
47.42%Net Earnings$655,674.99$254,362.47$401,312.52
Liquidated Damages$.00$.00$.00
Incentives$.00$.00$.00
Disincentives$.00$.00$.00
Other Contract Adj$.00$.00$.00
Appl of Training Adj$.00$.00$.00
Training Rates Adj$.00$.00$.00
Fuel Adj$.00$.00$.00
Bituminous Adj$.00$.00$.00
Autopay Adj$.00$.00$.00
Gasoline Adj$.00$.00$.00
Other Adj$.00$.00$.00
Price Adj$.00$.00$.00
Substandard Item Adj$.00$.00$.00
Asphalt Adj$.00$.00$.00
Diesel Fuel Adj$.00$.00$.00
Petrol Adj$.00$.00$.00
Total for Adjustments$.00$.00$.00
Payment$655,674.99$254,362.47$401,312.52
Project ManagerDiv. Head/Dist. Eng.
Kwiatkowski, Rick09.19.2003Meyer, Keith09.19.2003
Constr. Estimate Eng.Materials Eng.
Bartos, Steve09.19.2003
Controller Div. Processed
Burling, Laurie09.19.2003
Detailed breakdown of stockpiled materials
Total remaining for contract:0.00
1. Contracted
2. Current
3. To date
Item Nbr        Item CodeUnit Price4. This Est
Item DescriptionUnitsQtyAmount
GROUP 9 BITUMINOUS
0001                          0001.08 0.505,280.0002,640.00
BARRICADE, TYPE II BDAY5,280.0002,640.00
6,477.0003,238.50
5,698.0002,849.00

0002                          0001.10 3.00276.000828.00
BARRICADE, TYPE III BDAY276.000828.00
287.000861.00
66.000198.00

0003                          0001.75 6.00560.0003,360.00
TEMPORARY SIGN DAY EACH560.0003,360.00
188.0001,128.00
134.000804.00

0004                          0001.90 0.505,244.0002,622.00
SIGN DAY EACH5,244.0002,622.00
2,201.0001,100.50
1,573.000786.50

0005                          0002.55 7.001,160.7508,125.25
OVERLAY BROKEN LINES STA 1,160.7508,125.25
1,285.1308,995.91
1,032.5807,228.06

0006                          0002.60 8.002,321.50018,572.00
OVERLAY SOLID LINES STA 2,321.50018,572.00
1,629.59013,036.72
1,629.59013,036.72

0007                          0003.10 185.0080.00014,800.00
FLAGGING DAY 80.00014,800.00
62.00011,470.00
42.0007,770.00

0008                          0003.20 285.0040.00011,400.00
FURNISHING AND OPERATING PILOT VEHICLE DAY 40.00011,400.00
28.0007,980.00
19.0005,415.00

0009                          0010.04 1,000.001.0001,000.00
FIELD OFFICE EACH1.0001,000.00
0.0000.00
0.0000.00

0010                          0030.90 88,000.001.00088,000.00
MOBILIZATION LS 1.00088,000.00
1.00088,000.00
0.0000.00

0011                          9005.00 28.33100.0002,833.00
ASPHALTIC CONCRETE FOR PATCHING, TYPE TON 100.0002,833.00
SP4(0.375) 5.000141.65
5.000141.65

0012                          9005.44 18.3321,990.000403,076.70
ASPHALTIC CONCRETE, TYPE SP4(0.375) TON 21,990.000403,076.70
4,613.05084,557.21
4,613.05084,557.21

0013                          9021.08 200.001,192.860238,572.00
PERFORMANCE GRADED BINDER (64-28) TON 1,192.860238,572.00
216.44943,289.80
216.44943,289.80

0014                          9053.00 1.0016,650.00016,650.00
TACK COAT GAL 16,650.00016,650.00
5,150.0005,150.00
5,150.0005,150.00

0015                          9053.21 1.5026,740.00040,110.00
FOG SEAL GAL 26,740.00040,110.00
13,019.00019,528.50
8,350.00012,525.00

0016                          9110.01 75.0010.000750.00
RENTAL OF LOADER, FULLY OPERATED HOUR10.000750.00
0.0000.00
0.0000.00

0017                          9110.02 70.0010.000700.00
RENTAL OF MOTOR GRADER, FULLY OPERATED HOUR10.000700.00
1.500105.00
0.0000.00

0018                          9110.03 60.0010.000600.00
RENTAL OF DUMP TRUCK, FULLY OPERATED HOUR10.000600.00
0.0000.00
0.0000.00

0019                          9110.07 55.0010.000550.00
RENTAL OF SKID LOADER, FULLY OPERATED HOUR10.000550.00
2.000110.00
2.000110.00

0020                          9111.00 9.00219.0001,971.00
WATER MGAL219.0001,971.00
0.0000.00
0.0000.00

0021                          9111.10 4.00677.0002,708.00
WATER FOR FLY ASH STABILIZATION MGAL677.0002,708.00
238.900955.60
135.400541.60

0022                          9170.00 34.90875.50430,555.09
EARTH SHOULDER CONSTRUCTION STA 875.50430,555.09
0.0000.00
0.0000.00

0023                          9173.15 5.00721.1043,605.52
TRENCHED WIDENING STA 721.1043,605.52
528.7002,643.50
315.4001,577.00

0024                          9179.23 910.008.2507,507.50
COLD MILLING, CLASS 3 STA 8.2507,507.50
8.2507,507.50
6.2505,687.50

0025                          9190.00 930.00356.552331,593.36
FLY ASH STABILIZED BITUMINOUS STA 356.552331,593.36
264.350245,845.50
157.700146,661.00

0026                          9190.50 29.005,134.000148,886.00
FLY ASH TON 5,134.000148,886.00
4,022.520116,653.08
2,311.66067,038.14

0027                          9300.52 4,000.001.0004,000.00
ASPHALT PAVEMENT SMOOTHNESS TESTING I/D LS 1.0004,000.00
0.0000.00
0.0000.00

0028                          L001.02 534.0016.0008,544.00
SEEDING, TYPE B ACRE16.0008,544.00
0.0000.00
0.0000.00

0029                          L032.75 60.0036.0002,160.00
MULCH TON 36.0002,160.00
0.0000.00
0.0000.00

GROUP 9 BITUMINOUSContracted1,396,719.42
Current1,396,719.42
In place662,297.97
This Estimate405,366.18

Totals for contractContracted1,396,719.42
Current1,396,719.42
In place662,297.97
This Estimate405,366.18