Return to District Map


Nebraska Department of Roads
Estimate Summary to Contractor
Vendor ID:0083 WERNER CONSTRUCTION, INC.
Contract ID:4194X
Estimate Number:0009
Pay Period End Date:08.09.2003
Contract Location:
HENDERSON - WACOEstimate Type:PROG
Contractor:
WERNER CONSTRUCTION, INC.Date Let:09.05.2002
129 E 2ND STDate Awarded:09.12.2002
PO BOX 1087Date Contract Executed:09.17.2002
Date Notice to Proceed:09.17.2002
HASTINGS NE 68902-1087Date Work Began:03.31.2003
Phone:Date Physical Work Completed:
(402)463-4545Date Accepted:
Escrow Agent:
Surety Co:
UNIVERSAL SURETY COMPANY
Counties
YORK
Project Number PCT Fed State Project Number Description
42194 000  0.000 EACIM-80-7(116)  BITUMINOUS
Total to DatePrev to DateThis Estimate
Current Contract AmtTotal Earnings$6,542,353.95$6,105,800.90$436,553.05
$6,898,876.97Stockpiled Materials$4,249.82$8,567.35$-4,317.53
Original Contract AmtGross Earnings$6,546,603.77$6,114,368.25$432,235.52
$6,790,024.71Retainage$-25,000.00$-25,000.00$.00
Escrow Amount$.00$.00$.00
Percent CompleteSecurities Encumbered$.00$.00$.00
94.83%Net Earnings$6,521,603.77$6,089,368.25$432,235.52
Liquidated Damages$.00$.00$.00
Incentives$.00$.00$.00
Disincentives$.00$.00$.00
Other Contract Adj$.00$.00$.00
Appl of Training Adj$.00$.00$.00
Training Rates Adj$.00$.00$.00
Fuel Adj$26.60$26.60$.00
Bituminous Adj$.00$.00$.00
Autopay Adj$.00$.00$.00
Gasoline Adj$.00$.00$.00
Other Adj$.00$.00$.00
Price Adj$.00$.00$.00
Substandard Item Adj$.00$.00$.00
Asphalt Adj$.00$.00$.00
Diesel Fuel Adj$.00$.00$.00
Petrol Adj$.00$.00$.00
Total for Adjustments$26.60$26.60$.00
Payment$6,521,630.37$6,089,394.85$432,235.52
Project ManagerDiv. Head/Dist. Eng.
Anderson, Tom08.14.2003Meyer, Keith08.15.2003
Constr. Estimate Eng.Materials Eng.
Bartos, Steve08.15.2003
Controller Div. Processed
Burling, Laurie08.18.2003
Detailed breakdown of stockpiled materials
Est Nbr:0001
Item NbrItem CdItem DescAdj AmtInvoice Nbr
00449005.64 ASPHALTIC CONCRETE, TYPE SP6(0.375)
S.P. Initial Payment14,582.45824066
1/4" Limestone
S.P. Initial Payment6,055.68881139
1/4" Limestone
S.P. Initial Payment1,602.27881139
1/4" Limestone
S.P. Initial Payment8,347.65896704
1/4" Limestone
S.P. Initial Payment101,752.0771321
Qtz. Man Sand 10 % (0.375)
00459005.65 ASPHALTIC CONCRETE, TYPE SP6(0.5)
S.P. Initial Payment32,235.78733496
5/8" Limestone
S.P. Initial Payment163,314.1971321
Qtz Man Sand 15% ( 0.5)
Total for estimate 0001:327,890.09
Est Nbr:0002
Item NbrItem CdItem DescAdj AmtInvoice Nbr
00459005.65 ASPHALTIC CONCRETE, TYPE SP6(0.5)
S.P. Adjustment-14,543.52733496
5/8" Limestone
S.P. Adjustment-27,321.0471321
Qtz Man Sand 15% ( 0.5)
Total for estimate 0002:-41,864.56
Est Nbr:0003
Item NbrItem CdItem DescAdj AmtInvoice Nbr
00449005.64 ASPHALTIC CONCRETE, TYPE SP6(0.375)
S.P. Adjustment-454.00824066
1/4" Limestone
S.P. Adjustment-586.5471321
Qtz. Man Sand 10 % (0.375)
00459005.65 ASPHALTIC CONCRETE, TYPE SP6(0.5)
S.P. Adjustment-17,692.26733496
5/8" Limestone
S.P. Adjustment-76,692.3071321
Qtz Man Sand 15% ( 0.5)
Total for estimate 0003:-95,425.10
Est Nbr:0004
Item NbrItem CdItem DescAdj AmtInvoice Nbr
00449005.64 ASPHALTIC CONCRETE, TYPE SP6(0.375)
S.P. Adjustment-725.91824066
1/4" Limestone
S.P. Adjustment-937.8271321
Qtz. Man Sand 10 % (0.375)
00459005.65 ASPHALTIC CONCRETE, TYPE SP6(0.5)
S.P. Adjustment-32,586.2571321
Qtz Man Sand 15% ( 0.5)
Total for estimate 0004:-34,249.98
Est Nbr:0005
Item NbrItem CdItem DescAdj AmtInvoice Nbr
00449005.64 ASPHALTIC CONCRETE, TYPE SP6(0.375)
S.P. Adjustment-835.14824066
1/4" Limestone
S.P. Adjustment-1,078.9471321
Qtz. Man Sand 10 % (0.375)
00459005.65 ASPHALTIC CONCRETE, TYPE SP6(0.5)
S.P. Adjustment-26,714.6871321
Qtz Man Sand 15% ( 0.5)
Total for estimate 0005:-28,628.76
Est Nbr:0006
Item NbrItem CdItem DescAdj AmtInvoice Nbr
00449005.64 ASPHALTIC CONCRETE, TYPE SP6(0.375)
S.P. Adjustment-12,567.40824066
1/4" Limestone
S.P. Adjustment-6,055.68881139
1/4" Limestone
S.P. Adjustment-1,602.27881139
1/4" Limestone
S.P. Adjustment-8,347.65896704
1/4" Limestone
S.P. Adjustment-42,364.2571321
Qtz. Man Sand 10 % (0.375)
Total for estimate 0006:-70,937.25
Est Nbr:0007
Item NbrItem CdItem DescAdj AmtInvoice Nbr
00449005.64 ASPHALTIC CONCRETE, TYPE SP6(0.375)
S.P. Adjustment-42,590.5071321
Qtz. Man Sand 10 % (0.375)
Total for estimate 0007:-42,590.50
Est Nbr:0008
Item NbrItem CdItem DescAdj AmtInvoice Nbr
00449005.64 ASPHALTIC CONCRETE, TYPE SP6(0.375)
S.P. Adjustment-5,626.5971321
Qtz. Man Sand 10 % (0.375)
Total for estimate 0008:-5,626.59
Est Nbr:0009
Item NbrItem CdItem DescAdj AmtInvoice Nbr
00449005.64 ASPHALTIC CONCRETE, TYPE SP6(0.375)
S.P. Adjustment-4,317.5371321
Qtz. Man Sand 10 % (0.375)
Total for estimate 0009:-4,317.53
Total remaining for contract:4,249.82
1. Contracted
2. Current
3. To date
Item Nbr        Item CodeUnit Price4. This Est
Item DescriptionUnitsQtyAmount
GROUP 9 BITUMINOUS
0001                          L020.02 1.2511,215.00014,018.75
EROSION CONTROL, TYPE B SY 8,600.00010,750.00
0.0000.00
0.0000.00

0002                          0001.08 0.5055,980.00027,990.00
BARRICADE, TYPE II BDAY55,980.00027,990.00
46,371.00023,185.50
5,127.0002,563.50

0003                          0001.10 3.171,800.0005,706.00
BARRICADE, TYPE III BDAY1,800.0005,706.00
1,744.0005,528.48
187.000592.79

0004                          0001.75 0.264,380.0001,138.80
TEMPORARY SIGN DAY EACH4,380.0001,138.80
5,564.0001,446.64
590.000153.40

0005                          0001.90 3.175,508.00017,460.36
SIGN DAY EACH5,508.00017,460.36
5,075.00016,087.75
546.0001,730.82

0006                          0002.55 8.005,719.00045,752.00
OVERLAY BROKEN LINES STA 5,719.00045,752.00
5,729.00045,832.00
0.0000.00

0007                          0002.60 8.0012,102.00096,816.00
OVERLAY SOLID LINES STA 12,102.00096,816.00
12,112.00096,896.00
0.0000.00

0008                          0002.61 17.001,350.00022,950.00
PLOWABLE PAVEMENT MARKER EACH1,350.00022,950.00
1,919.00032,623.00
1,919.00032,623.00

0009                          0002.97 58.03180.00010,445.40
FLASHING ARROW PANEL DAY 180.00010,445.40
169.0009,807.07
20.0001,160.60

0010                          0003.10 175.0050.0008,750.00
FLAGGING DAY 50.0008,750.00
109.00019,075.00
27.0004,725.00

0011                          0003.35 500.008.0004,000.00
MOBILE TRAFFIC CONTROL OPERATION DAY 8.0004,000.00
0.0000.00
0.0000.00

0012                          0005.10 100.0090.0009,000.00
TRAFFIC CONTROL MANAGEMENT DAY 0.0000.00
0.0000.00
0.0000.00

0013                          0010.04 1,000.001.0001,000.00
FIELD OFFICE EACH1.0001,000.00
1.0001,000.00
0.0000.00

0014                          0030.90 285,000.001.000285,000.00
MOBILIZATION LS 1.000285,000.00
1.000285,000.00
0.0000.00

0015                          1009.00 1,800.001.0001,800.00
GENERAL CLEARING AND GRUBBING LS 1.0001,800.00
1.0001,800.00
1.0001,800.00

0016                          1011.00 10.00114.0001,140.00
WATER MGAL114.0001,140.00
0.0000.00
0.0000.00

0017                          1021.00 15.0028.000420.00
REMOVE AND RESET DELINEATORS EACH28.000420.00
14.000210.00
0.0000.00

0018                          1030.00 6.678,450.00056,361.50
EARTHWORK MEASURED IN EMBANKMENT CY 3,500.00023,345.00
3,500.00023,345.00
0.0000.00

0019                          1102.00 2.652,684.0007,112.60
REMOVE ASPHALT SURFACE SY 2,684.0007,112.60
2,684.0007,112.60
0.0000.00

0020                          3008.05 5.95724.0004,307.80
TIE BARS EACH724.0004,307.80
631.0003,754.45
9.00053.55

0021                          3031.09 28.536,929.000197,684.37
9" CONCRETE BASE COURSE SY 5,460.000155,773.80
5,462.320155,839.99
18.720534.08

0022                          3040.11 124.40134.90016,781.56
CONCRETE PAVEMENT REPAIR, TYPE A, FULL DEPTH SY 134.90016,781.56
195.28024,292.83
6.440801.14

0023                          3040.12 94.88212.60020,171.49
CONCRETE PAVEMENT REPAIR, TYPE B, FULL DEPTH SY 212.60020,171.49
371.91035,286.81
4.370414.63

0024                          3040.13 90.331,632.500147,463.73
CONCRETE PAVEMENT REPAIR, TYPE C, FULL DEPTH SY 1,632.500147,463.73
2,659.154240,201.38
3.514317.42

0025                          3040.16 189.9011.8002,240.82
CONCRETE PAVEMENT REPAIR, TYPE B, PARTIAL DEPTH SY 11.8002,240.82
0.0000.00
0.0000.00

0026                          3040.18 194.6028.3005,507.18
CONCRETE PAVEMENT REPAIR, TYPE A, PARTIAL DEPTH SY 28.3005,507.18
0.0000.00
0.0000.00

0027                          3221.05 96.801,317.400127,524.32
CONCRETE PAVEMENT, CLASS PR-3625 SY 1,317.400127,524.32
JOINT REPAIR 1,607.074155,564.76
57.5645,572.20

0028                          3300.65 100.004.000400.00
CONCRETE PAVEMENT THICKNESS CORE EACH4.000400.00
4.000400.00
4.000400.00

0029                          4035.25 200.002.000400.00
REMOVE AND SALVAGE FLARED-END SECTION EACH2.000400.00
2.000400.00
0.0000.00

0030                          4050.01 12.0016.000192.00
EXCAVATION FOR PIPE, PIPE-ARCH CULVERTS, AND HEADWALLS CY 23.000276.00
23.000276.00
0.0000.00

0031                          4107.07 900.001.4001,260.00
CLASS 47B-3000 OR AX-3000 CONCRETE FOR CONCRETE COLLARS CY 1.4001,260.00
0.0000.00
0.0000.00

0032                          4157.00 2.00102.000204.00
REINFORCING STEEL FOR COLLARS LB 102.000204.00
0.0000.00
0.0000.00

0033                          4450.30 68.0012.000816.00
30" REINFORCED CONCRETE PIPE LF 12.000816.00
12.000816.00
0.0000.00

0034                          4450.36 79.0022.0001,738.00
36" REINFORCED CONCRETE PIPE LF 14.0001,106.00
14.0001,106.00
0.0000.00

0035                          4461.30 150.001.000150.00
INSTALL 30" CONCRETE FLARED-END SECTION EACH1.000150.00
1.000150.00
0.0000.00

0036                          4461.36 150.001.000150.00
INSTALL 36" CONCRETE FLARED-END SECTION EACH1.000150.00
1.000150.00
0.0000.00

0037                          7490.03 0.31209,600.00064,976.00
4" YELLOW THERMOPLASTIC LF 209,600.00064,976.00
36,123.00011,198.13
36,123.00011,198.13

0038                          7490.04 0.31240,500.00074,555.00
4" WHITE THERMOPLASTIC LF 240,500.00074,555.00
9,030.7502,799.53
9,030.7502,799.53

0039                          7490.12 1.006,000.0006,000.00
12" WHITE THERMOPLASTIC LF 6,000.0006,000.00
0.0000.00
0.0000.00

0040                          8028.00 18.451,841.00033,966.45
FOUNDATION COURSE REPLACEMENT SY 1,841.00033,966.45
0.0000.00
0.0000.00

0041                          9000.75 10.93500.0005,465.00
ASPHALTIC CONCRETE FOR STATE MAINTENANCE PATCHING, TYPE TON 500.0005,465.00
SPS 0.0000.00
0.0000.00

0042                          9005.00 34.44100.0003,444.00
ASPHALTIC CONCRETE FOR PATCHING, TYPE TON 100.0003,444.00
SP6(0.5) 365.56012,589.90
78.1502,691.49

0043                          9005.23 10.9319,060.000208,325.80
ASPHALTIC CONCRETE, TYPE SPS TON 19,060.000208,325.80
20,641.770225,614.55
16,143.230176,445.50

0044                          9005.64 19.9555,270.0001,102,636.50
ASPHALTIC CONCRETE, TYPE SP6(0.375) TON 55,270.0001,102,636.50
52,961.5301,056,582.53
2,345.21046,786.94

0045                          9005.65 19.8369,620.0001,380,564.60
ASPHALTIC CONCRETE, TYPE SP6(0.5) TON 69,620.0001,380,564.60
74,759.5701,482,482.29
0.0000.00

0046                          9020.92 155.0027.0004,185.00
PERFORMANCE GRADED BINDER (58-28) FOR STATE MAINTENANCEPATCHING TON 27.0004,185.00
0.0000.00
0.0000.00

0047                          9021.03 155.001,029.240159,532.20
PERFORMANCE GRADED BINDER (58-28) TON 1,029.240159,532.20
479.31474,293.68
427.22366,219.57

0048                          9021.04 200.007,302.1601,460,432.00
PERFORMANCE GRADED BINDER (70-28) TON 0.0000.00
0.0000.00
0.0000.00

0049                          9053.00 0.60156,830.00094,098.00
TACK COAT GAL 156,830.00094,098.00
150,235.00090,141.00
22,300.00013,380.00

0050                          9110.01 60.0090.0005,400.00
RENTAL OF LOADER, FULLY OPERATED HOUR90.0005,400.00
4.000240.00
0.0000.00

0051                          9110.02 65.0090.0005,850.00
RENTAL OF MOTOR GRADER, FULLY OPERATED HOUR90.0005,850.00
15.000975.00
0.0000.00

0052                          9110.03 45.0090.0004,050.00
RENTAL OF DUMP TRUCK, FULLY OPERATED HOUR90.0004,050.00
23.5001,057.50
0.0000.00

0053                          9110.07 45.0090.0004,050.00
RENTAL OF SKID LOADER, FULLY OPERATED HOUR90.0004,050.00
22.000990.00
0.0000.00

0054                          9170.00 110.0027.1202,983.20
EARTH SHOULDER CONSTRUCTION STA 27.1202,983.20
27.1202,983.20
27.1202,983.20

0055                          9173.20 2.236,929.00015,451.67
SUBGRADE PREPARATION SY 5,460.00012,175.80
5,462.32012,180.98
18.72041.75

0056                          9179.24 372.001,906.338709,157.74
COLD MILLING, CLASS 4 STA 1,906.338709,157.74
1,906.338709,157.74
0.0000.00

0057                          9179.33 0.72360,229.000259,364.88
COLD MILLING, CLASS 3 SY 360,229.000259,364.88
369,690.730266,177.33
0.0000.00

0058                          9185.76 7.003,812.00026,684.00
RUMBLE STRIPS, ASPHALT STA 3,812.00026,684.00
0.0000.00
0.0000.00

0059                          9300.52 15,000.001.00015,000.00
ASPHALT PAVEMENT SMOOTHNESS TESTING I/D LS 1.00015,000.00
0.0000.00
0.0000.00

4000                          0001.00 577.500.0000.00
SURVEILLANCE OF TEMPORARY TRAFFIC CONTROL DEVICES CDAY90.00051,975.00
Surveillance Traffic Control Devices 69.50040,136.25
7.5004,331.25

4001                          9021.01 210.000.0000.00
PERFORMANCE GRADED BINDER (64-22) TON 3,764.880790,624.80
Changing SP6 ( 0.5 ) to 64-22 w/o acid from 70-28 3,499.956734,990.76
0.0000.00

4002                          9021.04 227.130.0000.00
PERFORMANCE GRADED BINDER (70-28) TON 3,537.280803,422.41
Modifying original AC 70-28 for SP-6 ( 0.375 ) to 70-28 MP-1for SP-6 Asphaltic Concrete. 2,721.992618,246.05
247.58356,233.53

4004                          3900.20 3,000.000.0000.00
ADDITIONAL COST LS 1.0003,000.00
Additional costs for mix verification in resubmitting samplewith asphaltic cement change ( 2- samples ) - ( 2 Mixes ) 0.5001,500.00
0.0000.00

4005                          A001.16 614.250.0000.00
PULL BOX, TYPE PB-6 EACH4.0002,457.00
installation of new pull boxes 4.0002,457.00
0.0000.00

4006                          A070.13 3.6750.0000.00
2" CONDUIT IN TRENCH LF 1,410.0005,181.75
installation of 2" conduit in trench 1,321.4004,856.15
0.0000.00

4007                          A080.23 0.4730.0000.00
STREET LIGHTING CABLE, NO. 6 BARE LF 1,410.000666.93
installation of street lighting cable -- No. 6 bare 1,341.500634.53
0.0000.00

4008                          A080.24 0.6830.0000.00
STREET LIGHTING CABLE, NO. 6 USE LF 2,820.0001,926.06
installation of street lighting cable -- No.6 USE 2,683.0001,832.49
0.0000.00

4009                          0030.00 1,050.001.0001,050.00
MOBILIZATION LS 2.0002,100.00
mobilization for additional electrical work 1.0001,050.00
0.0000.00

GROUP 9 BITUMINOUSContracted6,790,024.71
Current6,898,876.97
In place6,542,353.85
This Estimate436,553.02

Totals for contractContracted6,791,074.71
Current6,899,926.97
In place6,542,353.85
This Estimate436,553.02