| | | 1. Contracted
|
|---|
| | | 2. Current
|
|---|
| | | 3. To date
|
|---|
| Item Nbr Item Code | Unit Price | | 4. This Est
|
|---|
| Item Description | Units | Qty | Amount
|
|---|
| GROUP 9 BITUMINOUS | | |
|
| 0001 0001.00 | 50.00 | 118.000 | 5,900.00
|
| SURVEILLANCE OF TEMPORARY TRAFFIC CONTROL DEVICES | CDAY | 118.000 | 5,900.00
|
| | | 28.000 | 1,400.00
|
| | 5.000 | 250.00
|
| | |
|
| 0002 0001.08 | 0.50 | 11,860.000 | 5,930.00
|
| BARRICADE, TYPE II | BDAY | 11,860.000 | 5,930.00
|
| | | 11,571.000 | 5,785.50
|
| | 2,209.000 | 1,104.50
|
| | |
|
| 0003 0001.10 | 0.10 | 821.000 | 82.10
|
| BARRICADE, TYPE III | BDAY | 821.000 | 82.10
|
| | | 308.000 | 30.80
|
| | 98.000 | 9.80
|
| | |
|
| 0004 0001.75 | 0.50 | 1,316.000 | 658.00
|
| TEMPORARY SIGN DAY | EACH | 1,316.000 | 658.00
|
| | | 106.000 | 53.00
|
| | 16.000 | 8.00
|
| | |
|
| 0005 0001.90 | 0.05 | 3,304.000 | 165.20
|
| SIGN DAY | EACH | 3,304.000 | 165.20
|
| | | 4,010.000 | 200.50
|
| | 1,158.000 | 57.90
|
| | |
|
| 0006 0001.98 | 0.05 | 16.000 | 0.80
|
| CONTRACTOR FURNISHED SIGN | EACH | 16.000 | 0.80
|
| | | 9.000 | 0.45
|
| | 0.000 | 0.00
|
| | |
|
| 0007 0002.55 | 4.00 | 1,335.360 | 5,341.44
|
| OVERLAY BROKEN LINES | STA | 1,335.360 | 5,341.44
|
| | | 1,334.820 | 5,339.29
|
| | 0.000 | 0.00
|
| | |
|
| 0008 0002.60 | 4.00 | 2,670.720 | 10,682.88
|
| OVERLAY SOLID LINES | STA | 2,670.720 | 10,682.88
|
| | | 2,563.980 | 10,255.92
|
| | 0.000 | 0.00
|
| | |
|
| 0009 0002.61 | 18.05 | 640.000 | 11,552.00
|
| PLOWABLE PAVEMENT MARKER | EACH | 640.000 | 11,552.00
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 0010 0002.97 | 100.50 | 65.000 | 6,532.50
|
| FLASHING ARROW PANEL | DAY | 65.000 | 6,532.50
|
| | | 53.000 | 5,326.50
|
| | 10.000 | 1,005.00
|
| | |
|
| 0011 0003.10 | 185.00 | 33.000 | 6,105.00
|
| FLAGGING | DAY | 33.000 | 6,105.00
|
| | | 21.000 | 3,885.00
|
| | 2.000 | 370.00
|
| | |
|
| 0012 0003.35 | 10.00 | 5.000 | 50.00
|
| MOBILE TRAFFIC CONTROL OPERATION | DAY | 5.000 | 50.00
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 0013 0010.04 | 1,850.00 | 1.000 | 1,850.00
|
| FIELD OFFICE | EACH | 1.000 | 1,850.00
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 0014 0030.90 | 146,200.00 | 1.000 | 146,200.00
|
| MOBILIZATION | LS | 1.000 | 146,200.00
|
| | | 1.000 | 146,200.00
|
| | 1.000 | 146,200.00
|
| | |
|
| 0015 3040.11 | 132.25 | 19.900 | 2,631.77
|
| CONCRETE PAVEMENT REPAIR, TYPE A, FULL DEPTH | SY | 19.900 | 2,631.77
|
| | | 17.500 | 2,314.38
|
| | 0.000 | 0.00
|
| | |
|
| 0016 3040.12 | 115.85 | 121.900 | 14,122.12
|
| CONCRETE PAVEMENT REPAIR, TYPE B, FULL DEPTH | SY | 121.900 | 14,122.12
|
| | | 132.834 | 15,388.82
|
| | 0.000 | 0.00
|
| | |
|
| 0017 3040.13 | 108.50 | 37.300 | 4,047.05
|
| CONCRETE PAVEMENT REPAIR, TYPE C, FULL DEPTH | SY | 37.300 | 4,047.05
|
| | | 76.480 | 8,298.08
|
| | 0.000 | 0.00
|
| | |
|
| 0018 3041.25 | 685.00 | 4.000 | 2,740.00
|
| BITUMINOUS PATCHING | TON | 4.000 | 2,740.00
|
| | | 2.500 | 1,712.50
|
| | 0.000 | 0.00
|
| | |
|
| 0019 3221.05 | 119.15 | 202.300 | 24,104.05
|
| CONCRETE PAVEMENT, CLASS PR-3625 | SY | 202.300 | 24,104.05
|
| JOINT REPAIR | | 346.423 | 41,276.30
|
| | 0.000 | 0.00
|
| | |
|
| 0020 7490.03 | 0.31 | 49,200.000 | 15,252.00
|
| 4" YELLOW THERMOPLASTIC | LF | 49,200.000 | 15,252.00
|
| | | 49,200.000 | 15,252.00
|
| | 49,200.000 | 15,252.00
|
| | |
|
| 0021 7490.04 | 0.31 | 63,300.000 | 19,623.00
|
| 4" WHITE THERMOPLASTIC | LF | 63,300.000 | 19,623.00
|
| | | 62,524.000 | 19,382.44
|
| | 62,524.000 | 19,382.44
|
| | |
|
| 0022 7490.12 | 1.00 | 2,000.000 | 2,000.00
|
| 12" WHITE THERMOPLASTIC | LF | 2,000.000 | 2,000.00
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 0023 9000.75 | 9.20 | 500.000 | 4,600.00
|
| ASPHALTIC CONCRETE FOR STATE MAINTENANCE PATCHING, TYPE | TON | 500.000 | 4,600.00
|
| SPS | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 0024 9005.00 | 44.70 | 800.000 | 35,760.00
|
| ASPHALTIC CONCRETE FOR PATCHING, TYPE | TON | 800.000 | 35,760.00
|
| SP5(0.5) | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 0025 9005.23 | 9.20 | 4,450.000 | 40,940.00
|
| ASPHALTIC CONCRETE, TYPE SPS | TON | 4,450.000 | 40,940.00
|
| | | 4,796.570 | 44,128.45
|
| | 2,944.790 | 27,092.07
|
| | |
|
| 0026 9005.55 | 15.20 | 16,640.000 | 252,928.00
|
| ASPHALTIC CONCRETE, TYPE SP5(0.5) | TON | 16,640.000 | 252,928.00
|
| | | 17,687.630 | 268,851.98
|
| | 0.000 | 0.00
|
| | |
|
| 0027 9005.57 | 14.00 | 12,760.000 | 178,640.00
|
| ASPHALTIC CONCRETE, TYPE SP5(.375) | TON | 12,760.000 | 178,640.00
|
| | | 12,388.760 | 173,442.64
|
| | 1,047.210 | 14,660.94
|
| | |
|
| 0028 9020.92 | 186.00 | 27.000 | 5,022.00
|
| PERFORMANCE GRADED BINDER (58-28) FOR STATE MAINTENANCEPATCHING | TON | 27.000 | 5,022.00
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 0029 9021.03 | 186.00 | 240.300 | 44,695.80
|
| PERFORMANCE GRADED BINDER (58-28) | TON | 240.300 | 44,695.80
|
| | | 205.541 | 38,230.62
|
| | 129.682 | 24,120.85
|
| | |
|
| 0030 9021.04 | 235.00 | 1,758.400 | 413,224.00
|
| PERFORMANCE GRADED BINDER (70-28) | TON | 0.000 | 0.00
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 0031 9053.00 | 0.75 | 36,510.000 | 27,382.50
|
| TACK COAT | GAL | 36,510.000 | 27,382.50
|
| | | 28,800.000 | 21,600.00
|
| | 2,900.000 | 2,175.00
|
| | |
|
| 0032 9110.01 | 57.00 | 40.000 | 2,280.00
|
| RENTAL OF LOADER, FULLY OPERATED | HOUR | 40.000 | 2,280.00
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 0033 9110.02 | 70.00 | 40.000 | 2,800.00
|
| RENTAL OF MOTOR GRADER, FULLY OPERATED | HOUR | 40.000 | 2,800.00
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 0034 9110.03 | 45.00 | 40.000 | 1,800.00
|
| RENTAL OF DUMP TRUCK, FULLY OPERATED | HOUR | 40.000 | 1,800.00
|
| | | 1.000 | 45.00
|
| | 0.000 | 0.00
|
| | |
|
| 0035 9110.07 | 35.00 | 40.000 | 1,400.00
|
| RENTAL OF SKID LOADER, FULLY OPERATED | HOUR | 40.000 | 1,400.00
|
| | | 1.000 | 35.00
|
| | 0.000 | 0.00
|
| | |
|
| 0036 9111.00 | 10.00 | 9.000 | 90.00
|
| WATER | MGAL | 9.000 | 90.00
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 0037 9170.00 | 270.00 | 34.122 | 9,212.94
|
| EARTH SHOULDER CONSTRUCTION | STA | 34.122 | 9,212.94
|
| | | 34.122 | 9,212.94
|
| | 34.122 | 9,212.94
|
| | |
|
| 0038 9179.23 | 38.30 | 445.126 | 17,048.33
|
| COLD MILLING, CLASS 3 | STA | 445.126 | 17,048.33
|
| | | 445.126 | 17,048.32
|
| | 0.000 | 0.00
|
| | |
|
| 0039 9179.24 | 243.70 | 445.126 | 108,477.21
|
| COLD MILLING, CLASS 4 | STA | 445.126 | 108,477.21
|
| | | 445.126 | 108,477.21
|
| | 0.000 | 0.00
|
| | |
|
| 0040 9179.43 | 11.60 | 445.126 | 5,163.46
|
| COLD MILLING, CLASS 3 | STA | 445.126 | 5,163.46
|
| TYPE 'A' | | 445.126 | 5,163.46
|
| | 0.000 | 0.00
|
| | |
|
| 0041 9179.63 | 161.50 | 55.621 | 8,982.79
|
| COLD MILLING, CLASS 3 | STA | 55.621 | 8,982.79
|
| TYPE 'B' | | 55.380 | 8,943.87
|
| | 0.000 | 0.00
|
| | |
|
| 0042 9179.65 | 78.90 | 67.070 | 5,291.82
|
| COLD MILLING, CLASS 3 | STA | 67.070 | 5,291.82
|
| TYPE 'C' | | 67.070 | 5,291.82
|
| | 0.000 | 0.00
|
| | |
|
| 0043 9179.80 | 760.00 | 2.000 | 1,520.00
|
| MILLING CONCRETE FOR INLAYS | EACH | 2.000 | 1,520.00
|
| | | 2.000 | 1,520.00
|
| | 0.000 | 0.00
|
| | |
|
| 0044 9185.76 | 14.05 | 890.240 | 12,507.87
|
| RUMBLE STRIPS, ASPHALT | STA | 890.240 | 12,507.87
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 0045 9300.52 | 7,500.00 | 1.000 | 7,500.00
|
| ASPHALT PAVEMENT SMOOTHNESS TESTING I/D | LS | 1.000 | 7,500.00
|
| | | 1.000 | 7,500.00
|
| | 1.000 | 7,500.00
|
| | |
|
| 0046 L001.02 | 1,004.00 | 0.900 | 903.60
|
| SEEDING, TYPE B | ACRE | 0.900 | 903.60
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 0047 L032.75 | 100.50 | 2.000 | 201.00
|
| MULCH | TON | 2.000 | 201.00
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 4001 9021.04 | 275.00 | 0.000 | 0.00
|
| PERFORMANCE GRADED BINDER (70-28) | TON | 816.640 | 224,576.00
|
| PG binder 78-28 MP-1 w polymer, top lift for SP-5(0.375) | | 554.942 | 152,609.05
|
| | 57.402 | 15,785.55
|
| | |
|
| 4002 9021.01 | 228.00 | 0.000 | 0.00
|
| PERFORMANCE GRADED BINDER (64-22) | TON | 941.760 | 214,721.28
|
| PG binder 64-22 w/o acid, Bottom Lift for SP-5(0.5) | | 824.177 | 187,912.36
|
| | 0.000 | 0.00
|
| | |
|
| GROUP 9 BITUMINOUS | | Contracted | 1,473,941.23
|
| | Current | 1,500,014.51
|
| | In place | 1,332,114.20
|
| | This Estimate | 284,186.99
|
| | |
|
| Totals for contract | | Contracted | 1,473,941.23
|
|---|
| | Current | 1,500,014.51
|
|---|
| | In place | 1,332,114.20
|
|---|
| | This Estimate | 284,186.99
|
|---|