Nebraska Department of Roads
Estimate Summary to Contractor
Vendor ID:3606 DOBSON BROTHERS CONSTRUCTION CO. & AFFIL
Contract ID:4117X1
Estimate Number:0009
Pay Period End Date:05.13.2003
Contract Location:
GIBBON - SHELTONEstimate Type:PROG
Contractor:
DOBSON BROTHERS CONSTRUCTION CO. & AFFILDate Let:02.07.2002
410 S 7THDate Awarded:02.14.2002
PO BOX 81409Date Contract Executed:02.19.2002
Date Notice to Proceed:02.19.2002
LINCOLN NE 68501Date Work Began:08.21.2002
Phone:Date Physical Work Completed:
(402)474-5115Date Accepted:10.16.2002
Escrow Agent:
Surety Co:
NATIONAL FIRE INSURANCE COMPANY OF HARTFORD
Counties
BUFFALO
Project Number PCT Fed State Project Number Description
42117 1001  0.000 EACIM-80-6(72)  BITUMINOUS
Total to DatePrev to DateThis Estimate
Current Contract AmtTotal Earnings$2,357,489.78$2,369,704.70$-12,214.92
$2,425,360.56Stockpiled Materials$.00$.00$.00
Original Contract AmtGross Earnings$2,357,489.78$2,369,704.70$-12,214.92
$2,367,303.91Retainage$-23,574.90$-23,697.05$122.15
Escrow Amount$.00$.00$.00
Percent CompleteSecurities Encumbered$.00$.00$.00
97.20%Net Earnings$2,333,914.88$2,346,007.65-$12,092.77
Liquidated Damages$.00$.00$.00
Incentives$.00$.00$.00
Disincentives$.00$.00$.00
Other Contract Adj$.00$.00$.00
Appl of Training Adj$.00$.00$.00
Training Rates Adj$.00$.00$.00
Fuel Adj$.00$.00$.00
Bituminous Adj$.00$.00$.00
Autopay Adj$.00$.00$.00
Gasoline Adj$.00$.00$.00
Other Adj$.00$.00$.00
Price Adj$.00$.00$.00
Substandard Item Adj$.00$.00$.00
Asphalt Adj$.00$.00$.00
Diesel Fuel Adj$.00$.00$.00
Petrol Adj$.00$.00$.00
Total for Adjustments$.00$.00$.00
Payment$2,333,914.88$2,346,007.65-$12,092.77
Project ManagerDiv. Head/Dist. Eng.
Woodgate, Gerald05.13.2003Meyer, Keith05.13.2003
Constr. Estimate Eng.Materials Eng.
Bartos, Steve05.14.2003
Controller Div. Processed
Burling, Laurie05.14.2003
Detailed breakdown of stockpiled materials
Total remaining for contract:0.00
1. Contracted
2. Current
3. To date
Item Nbr        Item CodeUnit Price4. This Est
Item DescriptionUnitsQtyAmount
GROUP 9 BITUMINOUS
0001                          L001.02 500.001.630815.00
SEEDING, TYPE B ACRE1.630815.00
0.0000.00
0.0000.00

0002                          L032.75 100.003.700370.00
MULCH TON 3.700370.00
0.0000.00
0.0000.00

0003                          0001.00 200.0065.00013,000.00
SURVEILLANCE OF TEMPORARY TRAFFIC CONTROL DEVICES CDAY65.00013,000.00
52.00010,400.00
0.0000.00

0004                          0001.08 0.5039,000.00019,500.00
BARRICADE, TYPE II BDAY39,000.00019,500.00
41,392.00020,696.00
0.0000.00

0005                          0001.10 0.531,270.000673.10
BARRICADE, TYPE III BDAY1,270.000673.10
442.000234.26
0.0000.00

0006                          0001.30 0.53666.000352.98
TYPE B HIGH INTENSITY WARNING LIGHT LDAY666.000352.98
0.0000.00
0.0000.00

0007                          0001.75 0.263,640.000946.40
TEMPORARY SIGN DAY EACH3,640.000946.40
4,038.0001,049.88
0.0000.00

0008                          0001.90 0.263,128.000813.28
SIGN DAY EACH3,128.000813.28
2,249.000584.74
0.0000.00

0009                          0002.55 5.002,300.00011,500.00
OVERLAY BROKEN LINES STA 2,300.00011,500.00
1,323.0616,615.31
0.0000.00

0010                          0002.60 5.003,116.00015,580.00
OVERLAY SOLID LINES STA 3,116.00015,580.00
3,709.02418,545.12
0.0000.00

0011                          0002.61 22.50960.00021,600.00
PLOWABLE PAVEMENT MARKER EACH960.00021,600.00
1,000.00022,500.00
0.0000.00

0012                          0002.97 5.25130.000682.50
FLASHING ARROW PANEL DAY 130.000682.50
83.000435.75
0.0000.00

0013                          0003.10 158.0265.00010,271.30
FLAGGING DAY 65.00010,271.30
14.5002,291.29
0.0000.00

0014                          0003.35 945.005.0004,725.00
MOBILE TRAFFIC CONTROL OPERATION DAY 5.0004,725.00
0.0000.00
0.0000.00

0015                          0010.04 1,000.001.0001,000.00
FIELD OFFICE EACH1.0001,000.00
0.0000.00
0.0000.00

0016                          0030.90 150,000.001.000150,000.00
MOBILIZATION LS 1.000150,000.00
1.000150,000.00
0.0000.00

0017                          3040.11 164.4014.3002,350.92
CONCRETE PAVEMENT REPAIR, TYPE A, FULL DEPTH SY 14.3002,350.92
7.7251,269.99
0.0000.00

0018                          3040.12 154.3042.7006,588.61
CONCRETE PAVEMENT REPAIR, TYPE B, FULL DEPTH SY 42.7006,588.61
83.68012,911.82
0.0000.00

0019                          3040.13 149.30221.90033,129.67
CONCRETE PAVEMENT REPAIR, TYPE C, FULL DEPTH SY 221.90033,129.67
365.55054,576.62
0.0000.00

0020                          3041.25 555.605.0002,778.00
BITUMINOUS PATCHING TON 5.0002,778.00
0.0000.00
0.0000.00

0021                          3221.05 156.00223.50034,866.00
CONCRETE PAVEMENT, CLASS PR-3625 SY 223.50034,866.00
JOINT REPAIR 359.15656,028.33
0.0000.00

0022                          7490.03 0.3376,700.00025,311.00
4" YELLOW THERMOPLASTIC LF 76,700.00025,311.00
82,061.40027,080.26
0.0000.00

0023                          7490.04 0.3396,000.00031,680.00
4" WHITE THERMOPLASTIC LF 96,000.00031,680.00
94,742.17531,264.92
0.0000.00

0024                          7490.12 1.251,000.0001,250.00
12" WHITE THERMOPLASTIC LF 1,000.0001,250.00
1,245.6001,557.00
0.0000.00

0025                          9000.75 10.001,000.00010,000.00
ASPHALTIC CONCRETE FOR STATE MAINTENANCE PATCHING, TYPE TON 1,000.00010,000.00
SPS 0.0000.00
0.0000.00

0026                          9003.45 26.6520,570.000548,190.50
ASPHALTIC CONCRETE, TYPE GGCRM TON 20,570.000548,190.50
20,619.930549,521.14
0.0000.00

0027                          9005.00 33.73100.0003,373.00
ASPHALTIC CONCRETE FOR PATCHING, TYPE TON 100.0003,373.00
SP5 21.500725.20
0.0000.00

0028                          9005.23 12.507,670.00095,875.00
ASPHALTIC CONCRETE, TYPE SPS TON 7,670.00095,875.00
7,346.79091,834.88
0.0000.00

0029                          9005.55 22.0013,800.000303,600.00
ASPHALTIC CONCRETE, TYPE SP5(0.5) TON 13,800.000303,600.00
14,584.210320,852.62
0.0000.00

0030                          9009.00 2.86420.0001,201.20
PLACEMENT OF ASPHALTIC CONCRETE FOR DRIVEWAYS ANDINTERSECTIONS SY 420.0001,201.20
1,260.0003,603.60
0.0000.00

0031                          9020.70 280.001,645.670460,787.60
ASPHALT-RUBBER BINDER TON 1,645.670460,787.60
1,515.699424,395.72
0.0000.00

0032                          9020.92 146.0054.0007,884.00
PERFORMANCE GRADED BINDER (58-28) FOR STATE MAINTENANCEPATCHING TON 54.0007,884.00
0.0000.00
0.0000.00

0033                          9021.03 146.00415.60060,677.60
PERFORMANCE GRADED BINDER (58-28) TON 415.60060,677.60
247.33536,110.91
0.0000.00

0034                          9021.04 231.00750.600173,388.60
PERFORMANCE GRADED BINDER (70-28) TON 750.600173,388.60
695.095160,566.95
0.0000.00

0035                          9053.00 0.8055,410.00044,328.00
TACK COAT GAL 55,410.00044,328.00
37,500.00030,000.00
0.0000.00

0036                          9110.01 50.0070.0003,500.00
RENTAL OF LOADER, FULLY OPERATED HOUR70.0003,500.00
10.000500.00
0.0000.00

0037                          9110.02 50.0070.0003,500.00
RENTAL OF MOTOR GRADER, FULLY OPERATED HOUR70.0003,500.00
79.5003,975.00
0.0000.00

0038                          9110.03 45.0070.0003,150.00
RENTAL OF DUMP TRUCK, FULLY OPERATED HOUR70.0003,150.00
0.0000.00
0.0000.00

0039                          9110.07 30.0070.0002,100.00
RENTAL OF SKID LOADER, FULLY OPERATED HOUR70.0002,100.00
0.50015.00
0.0000.00

0040                          9111.00 10.0036.000360.00
WATER MGAL36.000360.00
0.0000.00
0.0000.00

0041                          9170.00 78.70143.74011,312.34
EARTH SHOULDER CONSTRUCTION STA 143.74011,312.34
143.74011,312.34
0.0000.00

0042                          9179.24 150.00766.873115,030.95
COLD MILLING, CLASS 4 STA 766.873115,030.95
767.372115,105.80
0.0000.00

0043                          9179.33 0.49213,020.000104,379.80
COLD MILLING, CLASS 3 SY 213,020.000104,379.80
221,067.224108,322.94
0.0000.00

0044                          9179.80 900.004.0003,600.00
MILLING CONCRETE FOR INLAYS EACH4.0003,600.00
4.0003,600.00
0.0000.00

0045                          9185.76 11.171,533.76017,132.10
RUMBLE STRIPS, ASPHALT STA 1,533.76017,132.10
1,504.04816,800.22
0.0000.00

0046                          9300.50 4,149.461.0004,149.46
ASPHALT PAVEMENT SMOOTHNESS TESTING LS 1.0004,149.46
1.0004,149.46
0.0000.00

4000                          9300.56 0.4840.0000.00
SUPERPAVE QUALITY INCENTIVE TON 20,619.9309,980.05
Incentive pay for GGCRM Asphalt 20,619.9309,980.05
0.0000.00

4001                          9300.58 -0.2370.0000.00
SUPERPAVE QUALITY DISINCENTIVE TON 14,603.710-3,461.08
Disincentive for type SP5 Asphalt 14,603.710-3,461.08
0.0000.00

4002                          9300.60 1.3130.0000.00
SMOOTHNESS INCENTIVE-ASPHALTIC CONCRETE TON 19,164.31625,162.75
Incentive pay factor of 104.93 % 19,164.31625,162.75
0.0000.00

4003                          9300.77 12.0260.0000.00
SMOOTHNESS INCENTIVE-PERFORMANCE GRADED BINDER TON 0.0000.00
Incentive pay factor of 104.93% 0.0000.00
-1,015.709-12,214.92

4004                          9300.77 12.0260.0000.00
SMOOTHNESS INCENTIVE-PERFORMANCE GRADED BINDER TON 1,437.32417,285.26
1,437.32417,285.26
0.0000.00

4005                          9300.77 12.0260.0000.00
SMOOTHNESS INCENTIVE-PERFORMANCE GRADED BINDER TON 0.0000.00
0.0000.00
0.0000.00

4006                          L999.00 9,184.110.0000.00
COMPENSATION FOR ADDITIONAL COST LS 1.0009,184.11
1.0009,184.11
0.0000.00

4007                          0096.10 146.000.0000.00
DEDUCTION TON 0.0000.00
Deduction for PG binder test failure 0.0000.00
0.0000.00

4008                          0096.10 146.000.0000.00
DEDUCTION TON 0.0000.00
To Zero out item # 4007 0.0000.00
0.0000.00

4009                          0096.10 -3.740.0000.00
DEDUCTION TON 25.250-94.44
Deduction for failing PG binder test 25.250-94.44
0.0000.00

GROUP 9 BITUMINOUSContracted2,367,303.91
Current2,425,360.55
In place2,357,489.72
This Estimate-12,214.92

Totals for contractContracted2,367,303.91
Current2,425,360.55
In place2,357,489.72
This Estimate-12,214.92