Nebraska Department of Roads
Estimate Summary to Contractor
Vendor ID:0875 BROWER CONSTRUCTION CO.
Contract ID:3901
Estimate Number:0005
Pay Period End Date:07.19.2003
Contract Location:
WAYNE EASTEstimate Type:PROG
Contractor:
BROWER CONSTRUCTION CO.Date Let:02.06.2003
2220 HAWKEYE DRIVEDate Awarded:02.13.2003
PO BOX 1137Date Contract Executed:02.24.2003
Date Notice to Proceed:02.24.2003
SIOUX CITY IA 51102Date Work Began:05.05.2003
Phone:Date Physical Work Completed:
(712)252-2766Date Accepted:
Escrow Agent:
Surety Co:
FEDERAL INSURANCE COMPANY
Counties
WAYNE
Project Number PCT Fed State Project Number Description
30901 000  0.000 EACSTPD-35-4(112)  GRAD CULV BR GDRL ELEC BIT
Total to DatePrev to DateThis Estimate
Current Contract AmtTotal Earnings$593,977.94$300,484.89$293,493.05
$4,423,176.44Stockpiled Materials$107,260.25$116,908.91$-9,648.66
Original Contract AmtGross Earnings$701,238.19$417,393.80$283,844.39
$4,418,941.08Retainage$-5,939.78$-3,004.85$-2,934.93
Escrow Amount$.00$.00$.00
Percent CompleteSecurities Encumbered$.00$.00$.00
13.43%Net Earnings$695,298.41$414,388.95$280,909.46
Liquidated Damages$.00$.00$.00
Incentives$.00$.00$.00
Disincentives$.00$.00$.00
Other Contract Adj$.00$.00$.00
Appl of Training Adj$.00$.00$.00
Training Rates Adj$.00$.00$.00
Fuel Adj$-525.84$-525.84$.00
Bituminous Adj$.00$.00$.00
Autopay Adj$.00$.00$.00
Gasoline Adj$.00$.00$.00
Other Adj$.00$.00$.00
Price Adj$.00$.00$.00
Substandard Item Adj$.00$.00$.00
Asphalt Adj$.00$.00$.00
Diesel Fuel Adj$.00$.00$.00
Petrol Adj$.00$.00$.00
Total for Adjustments-$525.84-$525.84$.00
Payment$694,772.57$413,863.11$280,909.46
Project ManagerDiv. Head/Dist. Eng.
Francis, Jeff07.22.2003Boyle, Pat07.24.2003
Constr. Estimate Eng.Materials Eng.
Hitzeman, Bill07.25.2003
Controller Div. Processed
Burling, Laurie07.25.2003
Detailed breakdown of stockpiled materials
Est Nbr:0003
Item NbrItem CdItem DescAdj AmtInvoice Nbr
01116131.50 EPOXY COATED REINFORCING STEEL
S.P. Initial Payment12,039.863587
Phase 1
Total for estimate 0003:12,039.86
Est Nbr:0004
Item NbrItem CdItem DescAdj AmtInvoice Nbr
01096080.00 STRUCTURAL STEEL FOR SUBSTRUCTURE
S.P. Initial Payment1,837.0023177
S.P. Adjustment-918.5023177
01116131.50 EPOXY COATED REINFORCING STEEL
S.P. Adjustment-1,305.153587
Phase 1
01136210.50 PIPE PILING
S.P. Initial Payment34,145.11053317
01146310.00 STEEL SHEET PILING
S.P. Initial Payment34,033.543100c
01316080.00 STRUCTURAL STEEL FOR SUBSTRUCTURE
S.P. Initial Payment330.0023177
01356210.50 PIPE PILING
S.P. Initial Payment22,131.84053317
01366310.00 STEEL SHEET PILING
S.P. Initial Payment14,615.213100c
Total for estimate 0004:104,869.05
Est Nbr:0005
Item NbrItem CdItem DescAdj AmtInvoice Nbr
01096080.00 STRUCTURAL STEEL FOR SUBSTRUCTURE
S.P. Adjustment-918.5023177
01116131.50 EPOXY COATED REINFORCING STEEL
S.P. Adjustment-1,061.823587
Phase 1
01136210.50 PIPE PILING
S.P. Adjustment-7,668.34053317
Total for estimate 0005:-9,648.66
Total remaining for contract:107,260.25
1. Contracted
2. Current
3. To date
Item Nbr        Item CodeUnit Price4. This Est
Item DescriptionUnitsQtyAmount
GROUP 1 GRADING
0001                          0030.10 28,324.581.00028,324.58
MOBILIZATION LS 1.00028,324.58
1.00028,324.58
0.0000.00

0002                          1009.00 25,000.001.00025,000.00
GENERAL CLEARING AND GRUBBING LS 1.00025,000.00
0.75018,750.00
0.0000.00

0003                          1010.01 3.448,451.00029,071.44
EXCAVATION (ESTABLISHED QUANTITY) m3 8,451.00029,071.44
0.0000.00
0.0000.00

0004                          1011.00 1.311,084.0001,420.04
WATER kL 1,084.0001,420.04
0.0000.00
0.0000.00

0005                          1012.00 68.3286.0005,875.52
RIGHT-OF-WAY MARKERS EACH86.0005,875.52
61.0004,167.52
0.0000.00

0006                          1030.00 5.0638,717.000195,908.02
EARTHWORK MEASURED IN EMBANKMENT m3 38,717.000195,908.02
20,051.000101,458.06
0.0000.00

0007                          1101.00 5.35371.0001,984.85
REMOVE PAVEMENT m2 371.0001,984.85
0.0000.00
0.0000.00

0008                          1106.00 4.99199.000993.01
REMOVE DRIVEWAY m2 199.000993.01
614.1473,064.59
0.0000.00

0009                          1128.50 6.6038.000250.80
REMOVE SLAB m2 38.000250.80
40.920270.07
0.0000.00

0010                          1701.24 52.6812.000632.16
600 mm DRIVEWAY CULVERT PIPE, TYPE 2,3,4,5,6,7 OR 8 m 12.000632.16
13.500711.18
0.0000.00

0011                          4050.01 3.69154.000568.26
EXCAVATION FOR PIPE, PIPE-ARCH CULVERTS, AND HEADWALLS m3 154.000568.26
154.000568.26
0.0000.00

0012                          7017.00 4.301,546.0006,647.80
REMOVE GUARDRAIL m 1,546.0006,647.80
0.0000.00
0.0000.00

0013                          L006.00 185.0014.0002,590.00
COVER CROP SEEDING ha 14.0002,590.00
1.886348.91
1.886348.91

0014                          L006.50 7,410.001.0007,410.00
TEMPORARY SEEDING ha 1.0007,410.00
0.0000.00
0.0000.00

0015                          L020.00 1.4828,894.00042,763.12
EROSION CONTROL m2 28,894.00042,763.12
0.0000.00
0.0000.00

0016                          L020.08 5.091,962.0009,986.58
EROSION CONTROL, TYPE AA m2 1,962.0009,986.58
0.0000.00
0.0000.00

0017                          L020.09 11.501,062.00012,213.00
EROSION CONTROL, TYPE AAA m2 1,062.00012,213.00
0.0000.00
0.0000.00

0018                          L020.10 1.67750.0001,252.50
EROSION CONTROL, TYPE HV m2 750.0001,252.50
0.0000.00
0.0000.00

0019                          L021.06 13.50150.0002,025.00
EROSION CHECKS, TYPE HV BALE150.0002,025.00
0.0000.00
0.0000.00

0020                          L021.21 24.0040.000960.00
EROSION CHECKS, TYPE AA BALE40.000960.00
0.0000.00
0.0000.00

0021                          L021.22 48.0010.000480.00
EROSION CHECKS, TYPE AAA BALE10.000480.00
0.0000.00
0.0000.00

0022                          L022.11 6.903,983.00027,482.70
FABRIC SILT FENCE-LOW POROSITY m 3,983.00027,482.70
694.1804,789.84
276.7801,909.78

0023                          P300.60 221.9379.00017,532.47
1500 mm CULVERT PIPE, TYPE 3,4 OR 5 m 79.00017,532.47
81.00017,976.33
0.0000.00

4001                          7390.10 908.120.0000.00
REMOVE SIGN, POST, AND FOOTING EACH1.000908.12
Billboard removal Sta. 22+00 Rt. 1.000908.12
0.0000.00

GROUP 1 GRADINGContracted421,371.85
Current422,279.97
In place181,337.46
This Estimate2,258.69

GROUP 4 CULVERTS
0024                          0030.40 9,000.001.0009,000.00
MOBILIZATION LS 1.0009,000.00
1.0009,000.00
0.0000.00

0025                          1043.50 2.0017.00034.00
RIPRAP FILTER FABRIC m2 17.00034.00
0.0000.00
0.0000.00

0026                          4030.00 80.0021.0001,680.00
RELAYING CORRUGATED METAL PIPE m 21.0001,680.00
26.0002,080.00
0.0000.00

0027                          4035.25 75.004.000300.00
REMOVE AND SALVAGE FLARED-END SECTION EACH4.000300.00
3.000225.00
1.00075.00

0028                          4040.00 150.0028.0004,200.00
REMOVE HEADWALLS FROM CULVERTS EACH28.0004,200.00
7.0001,050.00
4.000600.00

0029                          4043.00 71.5021.0001,501.50
REMOVE CULVERT PIPE m 21.0001,501.50
29.5602,113.54
0.0000.00

0030                          4044.00 2,325.001.0002,325.00
PREPARATION OF STRUCTURE EACH1.0002,325.00
AT STA. 81+89 0.0000.00
0.0000.00

0031                          4044.01 2,325.001.0002,325.00
PREPARATION OF STRUCTURE EACH1.0002,325.00
AT STA. 89+14 0.0000.00
0.0000.00

0032                          4044.02 2,325.001.0002,325.00
PREPARATION OF STRUCTURE EACH1.0002,325.00
AT STA. 106+96.8 0.0000.00
0.0000.00

0033                          4050.01 25.70627.00016,113.90
EXCAVATION FOR PIPE, PIPE-ARCH CULVERTS, AND HEADWALLS m3 627.00016,113.90
262.0006,733.40
1.00025.70

0034                          4051.01 25.70203.0005,217.10
EXCAVATION FOR BOX CULVERTS m3 203.0005,217.10
0.0000.00
0.0000.00

0035                          4101.06 485.0062.72030,419.20
CLASS 47B-20 OR AX-20 CONCRETE FOR BOX CULVERT m3 62.72030,419.20
0.0000.00
0.0000.00

0036                          4107.07 600.006.6704,002.00
CLASS 47B-20 OR AX-20 CONCRETE FOR CONCRETE COLLARS m3 6.6704,002.00
0.0000.00
0.0000.00

0037                          4151.00 1.004,144.0004,144.00
REINFORCING STEEL FOR BOX CULVERT kg 4,144.0004,144.00
0.0000.00
0.0000.00

0038                          4157.00 2.50240.000600.00
REINFORCING STEEL FOR COLLARS kg 240.000600.00
0.0000.00
0.0000.00

0039                          4310.24 225.008.0001,800.00
600 mm FLARED-END SECTION EACH8.0001,800.00
2.000450.00
2.000450.00

0040                          4310.30 290.002.000580.00
750 mm FLARED-END SECTION EACH2.000580.00
0.0000.00
0.0000.00

0041                          4310.36 240.007.0001,680.00
900 mm FLARED-END SECTION EACH7.0001,680.00
1.000240.00
1.000240.00

0042                          4310.42 510.003.0001,530.00
1050 mm FLARED-END SECTION EACH3.0001,530.00
0.0000.00
0.0000.00

0043                          4310.48 560.002.0001,120.00
1200 mm FLARED-END SECTION EACH2.0001,120.00
0.0000.00
0.0000.00

0044                          4310.54 660.003.0001,980.00
1350 mm FLARED-END SECTION EACH3.0001,980.00
0.0000.00
0.0000.00

0045                          4310.60 690.002.0001,380.00
1500 mm FLARED-END SECTION EACH2.0001,380.00
2.0001,380.00
2.0001,380.00

0046                          4320.42 690.001.000690.00
1050 mm ROUND EQUIVALENT FLARED-END SECTION EACH1.000690.00
0.0000.00
0.0000.00

0047                          4320.60 800.002.0001,600.00
1500 mm ROUND EQUIVALENT FLARED-END SECTION EACH2.0001,600.00
0.0000.00
0.0000.00

0048                          4362.24 75.001.00075.00
INSTALL 600 mm METAL FLARED-END SECTION EACH1.00075.00
0.0000.00
0.0000.00

0049                          4362.36 75.001.00075.00
INSTALL 900 mm METAL FLARED-END SECTION EACH1.00075.00
0.0000.00
0.0000.00

0050                          4362.48 75.002.000150.00
INSTALL 1200 mm METAL FLARED-END SECTION EACH2.000150.00
2.000150.00
2.000150.00

0051                          6105.02 40.0013.000520.00
ROCK RIPRAP, TYPE B Mg 13.000520.00
0.0000.00
0.0000.00

0052                          P300.24 90.0013.2001,188.00
600 mm CULVERT PIPE, TYPE 3,4 OR 5 m 13.2001,188.00
2.000180.00
2.000180.00

0053                          P300.30 110.007.400814.00
750 mm CULVERT PIPE, TYPE 3,4 OR 5 m 7.400814.00
0.0000.00
0.0000.00

0054                          P300.36 129.0015.1001,947.90
900 mm CULVERT PIPE, TYPE 3,4 OR 5 m 15.1001,947.90
0.0000.00
0.0000.00

0055                          P300.42 165.0018.4003,036.00
1050 mm CULVERT PIPE, TYPE 3,4 OR 5 m 18.4003,036.00
21.4603,540.90
0.0000.00

0056                          P300.48 180.0012.1002,178.00
1200 mm CULVERT PIPE, TYPE 3,4 OR 5 m 12.1002,178.00
0.0000.00
0.0000.00

0057                          P300.54 210.0023.3004,893.00
1350 mm CULVERT PIPE, TYPE 3,4 OR 5 m 23.3004,893.00
0.0000.00
0.0000.00

0058                          P300.60 226.006.9001,559.40
1500 mm CULVERT PIPE, TYPE 3,4 OR 5 m 6.9001,559.40
5.5001,243.00
3.000678.00

0059                          P375.42 250.001.000250.00
1050 mm ROUND EQUIVALENT CULVERT PIPE, TYPE 3,4 OR 5 m 1.000250.00
0.0000.00
0.0000.00

0060                          P375.60 275.002.500687.50
1500 mm ROUND EQUIVALENT CULVERT PIPE, TYPE 3,4 OR 5 m 2.500687.50
0.0000.00
0.0000.00

0061                          P400.24 120.0016.0001,920.00
600 mm CULVERT PIPE, TYPE 2,5,7 OR 8 m 16.0001,920.00
0.0000.00
0.0000.00

GROUP 4 CULVERTSContracted115,840.50
Current115,840.50
In place28,385.84
This Estimate3,778.70

GROUP 4A CONCRETE BOX CULVERT AT STA. 96+03.3
0062                          0030.40 9,000.001.0009,000.00
MOBILIZATION LS 1.0009,000.00
0.0000.00
0.0000.00

0063                          1043.50 2.0083.000166.00
RIPRAP FILTER FABRIC m2 83.000166.00
0.0000.00
0.0000.00

0064                          4051.01 20.00624.00012,480.00
EXCAVATION FOR BOX CULVERTS m3 624.00012,480.00
0.0000.00
0.0000.00

0065                          4101.06 330.00242.01079,863.30
CLASS 47B-20 OR AX-20 CONCRETE FOR BOX CULVERT m3 242.01079,863.30
0.0000.00
0.0000.00

0066                          4151.00 1.0016,852.00016,852.00
REINFORCING STEEL FOR BOX CULVERT kg 16,852.00016,852.00
0.0000.00
0.0000.00

0067                          6040.00 6,000.001.0006,000.00
REMOVE STRUCTURE EACH1.0006,000.00
AT STA. 96+07.1 0.0000.00
0.0000.00

0068                          6105.02 40.0079.0003,160.00
ROCK RIPRAP, TYPE B Mg 79.0003,160.00
0.0000.00
0.0000.00

GROUP 4A CONCRETE BOX CULVERT AT STA. 96+03.3Contracted127,521.30
Current127,521.30
In place0.00
This Estimate0.00

GROUP 6A BRIDGE AT STA. 23+12.025
0093                          0030.60 84,841.001.00084,841.00
MOBILIZATION LS 1.00084,841.00
1.00084,841.00
0.50042,420.50

0094                          1010.01 3.50240.000840.00
EXCAVATION (ESTABLISHED QUANTITY) m3 240.000840.00
0.0000.00
0.0000.00

0095                          1043.50 2.6743.000114.81
RIPRAP FILTER FABRIC m2 43.000114.81
0.0000.00
0.0000.00

0096                          3050.15 190.04180.30034,264.21
CONCRETE FOR PAVEMENT APPROACHES CLASS 47BD-30 m3 180.30034,264.21
0.0000.00
0.0000.00

0097                          3051.10 1.4011,245.00015,743.00
EPOXY COATED REINFORCING STEEL FOR PAVEMENT APPROACHES kg 11,245.00015,743.00
0.0000.00
0.0000.00

0098                          6000.10 3,148.001.0003,148.00
ABUTMENT NO.1 EXCAVATION LS 1.0003,148.00
0.0000.00
0.0000.00

0099                          6000.11 3,148.001.0003,148.00
ABUTMENT NO.2 EXCAVATION LS 1.0003,148.00
0.0000.00
0.0000.00

0100                          6001.50 8,457.001.0008,457.00
BENT NO.1 EXCAVATION LS 1.0008,457.00
0.5004,228.50
0.0000.00

0101                          6001.51 11,491.001.00011,491.00
BENT NO.2 EXCAVATION LS 1.00011,491.00
0.5005,745.50
0.5005,745.50

0102                          6005.35 123.0135.8004,403.76
PRECOMPRESSED POLYURETHANE FOAM JOINT m 35.8004,403.76
0.0000.00
0.0000.00

0103                          6005.78 587.2012.0007,046.40
EXPANSION BEARING, TFE TYPE EACH12.0007,046.40
0.0000.00
0.0000.00

0104                          6005.83 127.4824.0003,059.52
FIXED BEARING EACH24.0003,059.52
0.0000.00
0.0000.00

0105                          6010.22 295.34377.000111,343.18
CLASS 47B-20 CONCRETE FOR BRIDGE m3 377.000111,343.18
143.90042,499.43
68.90020,348.93

0106                          6010.26 292.32346.700101,347.34
CLASS 47BD-30 CONCRETE FOR BRIDGE m3 346.700101,347.34
0.0000.00
0.0000.00

0107                          6011.11 171,819.001.000171,819.00
PRECAST/PRESTRESSED CONCRETE SUPERSTRUCTURE LS 1.000171,819.00
AT STA. 23+12.025 0.0000.00
0.0000.00

0108                          6040.00 73,532.001.00073,532.00
REMOVE STRUCTURE EACH1.00073,532.00
AT STA. 23+10.5 0.0000.00
0.0000.00

0109                          6080.00 5.75835.0004,801.25
STRUCTURAL STEEL FOR SUBSTRUCTURE kg 835.0004,801.25
835.0004,801.26
417.5002,400.63

0110                          6104.00 5.37120.000644.40
BROKEN CONCRETE RIPRAP Mg 120.000644.40
0.0000.00
0.0000.00

0111                          6131.50 1.4051,000.00071,400.00
EPOXY COATED REINFORCING STEEL kg 51,000.00071,400.00
4,012.5005,617.50
1,800.0002,520.00

0112                          6139.50 49.2051.0002,509.20
SUBSURFACE DRAINAGE MATTING m2 51.0002,509.20
0.0000.00
0.0000.00

0113                          6210.50 66.96979.20065,567.23
PIPE PILING m 979.20065,567.23
314.22221,040.30
190.22012,737.13

0114                          6310.00 118.38496.00058,716.48
STEEL SHEET PILING m2 496.00058,716.48
0.0000.00
0.0000.00

0115                          6510.55 8,158.001.0008,158.00
TEMPORARY BRIDGE SHORING LS 1.0008,158.00
0.0000.00
0.0000.00

0116                          8091.00 16.03154.0002,468.62
GRANULAR BACKFILL m3 154.0002,468.62
0.0000.00
0.0000.00

4002                          6210.62 133.920.0000.00
PILE SPLICE FOR PIPE PILING EACH20.0002,678.40
20.0002,678.40
10.0001,339.20

4003                          6210.60 40.1760.0000.00
PAY CUT-OFF FOR PIPE PILE m 16.150648.84
Grp 6A pipe pile cut-off 16.150648.84
16.150648.84

GROUP 6A BRIDGE AT STA. 23+12.025Contracted848,863.41
Current852,190.65
In place172,100.73
This Estimate88,160.73

GROUP 6B BRIDGE AT STA. 28+85.160
0117                          0030.60 44,580.001.00044,580.00
MOBILIZATION LS 1.00044,580.00
0.0000.00
0.0000.00

0118                          1010.01 3.44975.0003,354.00
EXCAVATION (ESTABLISHED QUANTITY) m3 975.0003,354.00
0.0000.00
0.0000.00

0119                          1043.50 2.5261.000153.72
RIPRAP FILTER FABRIC m2 61.000153.72
0.0000.00
0.0000.00

0120                          3050.15 201.99141.60028,601.78
CONCRETE FOR PAVEMENT APPROACHES CLASS 47BD-30 m3 141.60028,601.78
0.0000.00
0.0000.00

0121                          3051.10 1.349,445.00012,656.30
EPOXY COATED REINFORCING STEEL FOR PAVEMENT APPROACHES kg 9,445.00012,656.30
0.0000.00
0.0000.00

0122                          6000.10 12,205.001.00012,205.00
ABUTMENT NO.1 EXCAVATION LS 1.00012,205.00
0.0000.00
0.0000.00

0123                          6000.11 12,205.001.00012,205.00
ABUTMENT NO.2 EXCAVATION LS 1.00012,205.00
0.0000.00
0.0000.00

0124                          6001.50 10,726.001.00010,726.00
BENT NO.1 EXCAVATION LS 1.00010,726.00
0.0000.00
0.0000.00

0125                          6001.51 10,753.001.00010,753.00
BENT NO.2 EXCAVATION LS 1.00010,753.00
0.0000.00
0.0000.00

0126                          6005.60 44.89114.0005,117.46
ELASTOMERIC BEARING EACH114.0005,117.46
0.0000.00
0.0000.00

0127                          6010.22 300.96111.20033,466.75
CLASS 47B-20 CONCRETE FOR BRIDGE m3 111.20033,466.75
0.0000.00
0.0000.00

0128                          6010.26 478.1071.60034,231.96
CLASS 47BD-30 CONCRETE FOR BRIDGE m3 71.60034,231.96
0.0000.00
0.0000.00

0129                          6011.11 61,686.001.00061,686.00
PRECAST/PRESTRESSED CONCRETE SUPERSTRUCTURE LS 1.00061,686.00
AT STA. 28+85.16 0.0000.00
0.0000.00

0130                          6040.00 64,954.001.00064,954.00
REMOVE STRUCTURE EACH1.00064,954.00
AT STA. 28+87.1 0.0000.00
0.0000.00

0131                          6080.00 5.59150.000838.50
STRUCTURAL STEEL FOR SUBSTRUCTURE kg 150.000838.50
0.0000.00
0.0000.00

0132                          6104.00 10.3425.000258.50
BROKEN CONCRETE RIPRAP Mg 25.000258.50
0.0000.00
0.0000.00

0133                          6131.50 1.3416,745.00022,438.30
EPOXY COATED REINFORCING STEEL kg 16,745.00022,438.30
0.0000.00
0.0000.00

0134                          6139.50 73.0925.0001,827.25
SUBSURFACE DRAINAGE MATTING m2 25.0001,827.25
0.0000.00
0.0000.00

0135                          6210.50 66.70549.00036,618.30
PIPE PILING m 549.00036,618.30
0.0000.00
0.0000.00

0136                          6310.00 118.79213.00025,302.27
STEEL SHEET PILING m2 213.00025,302.27
0.0000.00
0.0000.00

0137                          8091.00 20.71125.0002,588.75
GRANULAR BACKFILL m3 125.0002,588.75
0.0000.00
0.0000.00

GROUP 6B BRIDGE AT STA. 28+85.160Contracted424,562.85
Current424,562.85
In place0.00
This Estimate0.00

GROUP 7 GUARDRAIL
0138                          0030.70 3,408.001.0003,408.00
MOBILIZATION LS 1.0003,408.00
0.0000.00
0.0000.00

0139                          7011.20 35.4095.2503,371.85
W-BEAM GUARDRAIL m 95.2503,371.85
0.0000.00
0.0000.00

0140                          7015.00 17.622,850.00050,217.00
CABLE GUARDRAIL m 2,850.00050,217.00
0.0000.00
0.0000.00

0141                          7020.00 1,925.008.00015,400.00
BRIDGE APPROACH SECTIONS EACH8.00015,400.00
0.0000.00
0.0000.00

0142                          7023.00 1,110.0030.00033,300.00
TERMINAL ANCHORAGE SECTIONS EACH30.00033,300.00
0.0000.00
0.0000.00

0143                          7024.27 1,398.008.00011,184.00
GUARDRAIL END TREATMENT, TYPE II EACH8.00011,184.00
0.0000.00
0.0000.00

GROUP 7 GUARDRAILContracted116,880.85
Current116,880.85
In place0.00
This Estimate0.00

GROUP 8B ELECTRICAL
0144                          0030.81 1,435.001.0001,435.00
MOBILIZATION LS 1.0001,435.00
1.0001,435.00
0.0000.00

0145                          A001.12 250.002.000500.00
PULL BOX, TYPE PB-5 EACH2.000500.00
2.000500.00
0.0000.00

0146                          A001.16 300.001.000300.00
PULL BOX, TYPE PB-6 EACH1.000300.00
1.000300.00
0.0000.00

0147                          A009.11 1,350.001.0001,350.00
STREET LIGHTING UNIT, TYPE SL-A-12.2-3.7-0.25 EACH1.0001,350.00
0.0000.00
0.0000.00

0148                          A009.14 1,450.004.0005,800.00
STREET LIGHTING UNIT, TYPE SL-BT-12.2-3.7-0.25 EACH4.0005,800.00
0.0000.00
0.0000.00

0149                          A020.30 1,200.001.0001,200.00
LIGHTING CONTROL CENTER, TYPE R EACH1.0001,200.00
0.0000.00
0.0000.00

0150                          A070.10 6.00212.0001,272.00
38 mm CONDUIT IN TRENCH m 212.0001,272.00
228.8001,372.80
0.0000.00

0151                          A072.10 6.0035.000210.00
38 mm CONDUIT UNDER ROADWAY m 35.000210.00
10.70064.20
0.0000.00

0152                          A074.12 45.0014.000630.00
38 mm CONDUIT, JACKED m 14.000630.00
37.2001,674.00
0.0000.00

0153                          A080.22 2.00261.000522.00
STREET LIGHTING CABLE, NO. 6 BARE m 261.000522.00
276.700553.40
0.0000.00

0154                          A080.24 3.00522.0001,566.00
STREET LIGHTING CABLE, NO. 6 USE m 522.0001,566.00
553.4001,660.20
0.0000.00

GROUP 8B ELECTRICALContracted14,785.00
Current14,785.00
In place7,559.60
This Estimate0.00

GROUP 9 BITUMINOUS
0155                          0002.55 22.73333.0607,570.45
OVERLAY BROKEN LINES StaM333.0607,570.45
0.0000.00
0.0000.00

0156                          0002.60 22.73666.12015,140.91
OVERLAY SOLID LINES StaM666.12015,140.91
62.1301,412.21
62.1301,412.21

0157                          0030.90 39,983.321.00039,983.32
MOBILIZATION LS 1.00039,983.32
0.50019,991.66
0.50019,991.66

0158                          2001.00 17.05130.0002,216.50
GRAVEL SURFACE COURSE m3 130.0002,216.50
18.000306.90
0.0000.00

0159                          2020.00 11.05640.0007,072.00
SPECIAL SURFACE COURSE FOR MAILBOX TURNOUTS m2 640.0007,072.00
0.0000.00
0.0000.00

0160                          2021.00 50.5014.000707.00
MAILBOX POST EACH14.000707.00
0.0000.00
0.0000.00

0161                          3008.05 7.76171.0001,326.96
TIE BARS EACH171.0001,326.96
0.0000.00
0.0000.00

0162                          3031.08 54.37244.00013,266.28
205 mm CONCRETE BASE COURSE m2 244.00013,266.28
0.0000.00
0.0000.00

0163                          7503.04 9.09340.0003,090.60
100 mm YELLOW PREFORMED PAVEMENT MARKING, TYPE 4 m 340.0003,090.60
0.0000.00
0.0000.00

0164                          7509.04 25.2550.0001,262.50
300 mm YELLOW PREFORMED PAVEMENT MARKING, TYPE 4 m 50.0001,262.50
0.0000.00
0.0000.00

0165                          9000.75 20.21500.00010,105.00
ASPHALTIC CONCRETE FOR STATE MAINTENANCE PATCHING, TYPE Mg 500.00010,105.00
SP4(12.5) 0.0000.00
0.0000.00

0166                          9005.00 50.93575.00029,284.75
ASPHALTIC CONCRETE FOR PATCHING, TYPE Mg 575.00029,284.75
SP4(12.5) 24.8921,267.75
24.8921,267.75

0167                          9005.45 19.9844,720.000893,505.60
ASPHALTIC CONCRETE, TYPE SP4(12.5) Mg 44,720.000893,505.60
0.0000.00
0.0000.00

0168                          9009.00 3.155,041.00015,879.15
PLACEMENT OF ASPHALTIC CONCRETE FOR DRIVEWAYS ANDINTERSECTIONS m2 5,041.00015,879.15
0.0000.00
0.0000.00

0169                          9009.75 22.899,350.000214,021.50
TEMPORARY SURFACING m2 9,350.000214,021.50
200 mm 6,996.683160,154.07
6,996.683160,154.07

0170                          9020.91 233.2027.0006,296.40
PERFORMANCE GRADED BINDER (64-22) FOR STATE MAINTENANCEPATCHING Mg 27.0006,296.40
0.0000.00
0.0000.00

0171                          9021.01 233.202,445.930570,390.88
PERFORMANCE GRADED BINDER (64-22) Mg 2,445.930570,390.88
1.319307.59
1.319307.59

0172                          9034.00 1.751,907.0003,337.25
PREPARATION OF INTERSECTIONS AND DRIVEWAYS m2 1,907.0003,337.25
0.0000.00
0.0000.00

0173                          9053.00 0.2622,380.0005,818.80
TACK COAT L 22,380.0005,818.80
320.00083.20
320.00083.20

0174                          9111.00 3.001,010.0003,030.00
WATER kL 1,010.0003,030.00
0.0000.00
0.0000.00

0175                          9170.00 245.99221.73754,545.08
EARTH SHOULDER CONSTRUCTION StaM221.73754,545.08
0.0000.00
0.0000.00

0176                          9173.20 0.9024,596.00022,136.40
SUBGRADE PREPARATION m2 24,596.00022,136.40
0.0000.00
0.0000.00

0177                          9179.23 322.97102.37633,064.38
COLD MILLING, CLASS 3 StaM102.37633,064.38
0.0000.00
0.0000.00

0178                          9179.34 3.805,747.00021,838.60
COLD MILLING, CLASS 4 m2 5,747.00021,838.60
0.0000.00
0.0000.00

0179                          9179.80 1,000.001.0001,000.00
MILLING CONCRETE FOR INLAYS EACH1.0001,000.00
0.0000.00
0.0000.00

0180                          9188.50 13.989,138.000127,749.24
SURFACING UNDER GUARDRAIL m2 9,138.000127,749.24
0.0000.00
0.0000.00

0181                          9300.52 3,500.001.0003,500.00
ASPHALT PAVEMENT SMOOTHNESS TESTING I/D LS 1.0003,500.00
0.0000.00
0.0000.00

0182                          L001.01 1,294.006.0007,764.00
SEEDING, TYPE A ha 6.0007,764.00
0.0000.00
0.0000.00

0183                          L001.02 1,120.008.0008,960.00
SEEDING, TYPE B ha 8.0008,960.00
0.0000.00
0.0000.00

0184                          L032.75 64.0070.0004,480.00
MULCH Mg 70.0004,480.00
0.0000.00
0.0000.00

GROUP 9 BITUMINOUSContracted2,128,343.55
Current2,128,343.55
In place183,523.38
This Estimate183,216.48

GROUP 10 GENERAL ITEMS
0185                          0001.08 0.5018,192.0009,096.00
BARRICADE, TYPE II BDAY18,192.0009,096.00
2,081.0001,040.50
908.000454.00

0186                          0001.10 2.025,886.00011,889.72
BARRICADE, TYPE III BDAY5,886.00011,889.72
859.0001,735.18
237.000478.74

0187                          0001.75 3.03980.0002,969.40
TEMPORARY SIGN DAY EACH980.0002,969.40
160.000484.80
80.000242.40

0188                          0001.90 0.2630,384.0007,899.84
SIGN DAY EACH30,384.0007,899.84
1,623.000421.98
390.000101.40

0189                          0001.98 1.012,148.0002,169.48
CONTRACTOR FURNISHED SIGN EACH2,148.0002,169.48
78.00078.78
22.00022.22

0190                          0002.30 1.012,280.0002,302.80
PAVEMENT MARKING REMOVAL m 2,280.0002,302.80
0.0000.00
0.0000.00

0191                          0002.39 2.2812,100.00027,588.00
TEMPORARY PAVEMENT MARKING, TYPE II m 12,100.00027,588.00
0.0000.00
0.0000.00

0192                          0002.47 0.764,000.0003,040.00
TEMPORARY PAVEMENT MARKING SURFACE PREPARATION m 4,000.0003,040.00
1,794.0001,363.44
1,794.0001,363.44

0193                          0002.61 35.3534.0001,201.90
PLOWABLE PAVEMENT MARKER EACH34.0001,201.90
0.0000.00
0.0000.00

0194                          0003.10 200.00250.00050,000.00
FLAGGING DAY 250.00050,000.00
24.0004,800.00
12.0002,400.00

0195                          0003.20 280.0035.0009,800.00
FURNISHING AND OPERATING PILOT VEHICLE DAY 35.0009,800.00
0.0000.00
0.0000.00

0196                          0003.50 202.07152.00030,714.64
CONCRETE PROTECTION BARRIER m 152.00030,714.64
0.0000.00
0.0000.00

0197                          0010.04 4,500.001.0004,500.00
FIELD OFFICE EACH1.0004,500.00
0.0000.00
0.0000.00

0198                          0030.00 20,000.001.00020,000.00
MOBILIZATION LS 1.00020,000.00
0.50010,000.00
0.50010,000.00

0199                          9110.01 65.00160.00010,400.00
RENTAL OF LOADER, FULLY OPERATED HOUR160.00010,400.00
0.0000.00
0.0000.00

0200                          9110.02 65.0040.0002,600.00
RENTAL OF MOTOR GRADER, FULLY OPERATED HOUR40.0002,600.00
0.0000.00
0.0000.00

0201                          9110.03 55.00160.0008,800.00
RENTAL OF DUMP TRUCK, FULLY OPERATED HOUR160.0008,800.00
12.750701.25
12.750701.25

0202                          9110.06 65.00120.0007,800.00
RENTAL OF BACKHOE, FULLY OPERATED HOUR120.0007,800.00
3.000195.00
1.00065.00

0203                          9110.07 50.00160.0008,000.00
RENTAL OF SKID LOADER, FULLY OPERATED HOUR160.0008,000.00
5.000250.00
5.000250.00

GROUP 10 GENERAL ITEMSContracted220,771.78
Current220,771.78
In place21,070.93
This Estimate16,078.45

Totals for contractContracted4,418,941.08
Current4,423,176.44
In place593,977.94
This Estimate293,493.05