Estimate Summary to Contractor
Vendor ID:1742 HERBST CONSTRUCTION, INC.
Contract ID:3805
Estimate Number:0003
Pay Period End Date:08.30.2003
Contract Location:
VERDIGRE NORTHWESTEstimate Type:PROG
Contractor:
HERBST CONSTRUCTION, INC.Date Let:02.06.2003
16022 HWY 75Date Awarded:02.14.2003
PO BOX 728Date Contract Executed:03.17.2003
Date Notice to Proceed:03.17.2003
LE MARS IA 51031-0728Date Work Began:07.14.2003
Phone:Date Physical Work Completed:
(712)546-5653Date Accepted:
Escrow Agent:
Surety Co:
MERCHANTS BONDING COMPANY (MUTUAL)
Counties
KNOX
Project Number PCT Fed State Project Number Description
30805 000  0.000 BRO-7054(9)  GR BR GDRL
Total to DatePrev to DateThis Estimate
Current Contract AmtTotal Earnings$171,473.25$104,694.00$66,779.25
$382,945.95Stockpiled Materials$.00$.00$.00
Original Contract AmtGross Earnings$171,473.25$104,694.00$66,779.25
$382,367.55Retainage$-1,714.73$-1,046.94$-667.79
Escrow Amount$.00$.00$.00
Percent CompleteSecurities Encumbered$.00$.00$.00
44.78%Net Earnings$169,758.52$103,647.06$66,111.46
Liquidated Damages$.00$.00$.00
Incentives$.00$.00$.00
Disincentives$.00$.00$.00
Other Contract Adj$.00$.00$.00
Appl of Training Adj$.00$.00$.00
Training Rates Adj$.00$.00$.00
Fuel Adj$.00$.00$.00
Bituminous Adj$.00$.00$.00
Autopay Adj$.00$.00$.00
Gasoline Adj$.00$.00$.00
Other Adj$.00$.00$.00
Price Adj$.00$.00$.00
Substandard Item Adj$.00$.00$.00
Asphalt Adj$.00$.00$.00
Diesel Fuel Adj$.00$.00$.00
Petrol Adj$.00$.00$.00
Total for Adjustments$.00$.00$.00
Payment$169,758.52$103,647.06$66,111.46
Project ManagerProject Engineer
VanRoekel, Kirk09.02.2003Hausman, Larry09.04.2003
Div. Head/Dist. Eng.Constr. Estimate Eng.
Boyle, Pat09.05.2003Bartos, Steve09.05.2003
Controller Div. Processed
Burling, Laurie09.05.2003
Detailed breakdown of stockpiled materials
Total remaining for contract:0.00
1. Contracted
2. Current
3. To date
Item Nbr        Item CodeUnit Price4. This Est
Item DescriptionUnitsQtyAmount
GROUP 1 GRADING
0001                          0030.10 5,000.001.0005,000.00
MOBILIZATION LS 1.0005,000.00
0.0000.00
0.0000.00

0002                          1009.00 2,500.001.0002,500.00
GENERAL CLEARING AND GRUBBING LS 1.0002,500.00
0.250625.00
0.0000.00

0003                          1010.01 1.3517,914.00024,183.90
EXCAVATION (ESTABLISHED QUANTITY) CY 17,914.00024,183.90
0.0000.00
0.0000.00

0004                          1011.00 3.0018.00054.00
WATER MGAL18.00054.00
0.0000.00
0.0000.00

0005                          1305.24 17.00162.0002,754.00
24" ROUND EQUIVALENT DRIVEWAY CULVERT PIPE LF 162.0002,754.00
0.0000.00
0.0000.00

0006                          2009.51 120.0023.2002,784.00
CRUSHED ROCK EMBEDMENT STA 23.2002,784.00
0.0000.00
0.0000.00

0007                          2010.00 33.75537.00018,123.75
CRUSHED ROCK SURFACE COURSE CY 537.00018,123.75
0.0000.00
0.0000.00

0008                          4043.00 2.1074.000155.40
REMOVE CULVERT PIPE LF 74.000155.40
0.0000.00
0.0000.00

0009                          4050.01 2.00304.000608.00
EXCAVATION FOR PIPE, PIPE-ARCH CULVERTS, AND HEADWALLS CY 304.000608.00
0.0000.00
0.0000.00

0010                          4300.24 16.00280.0004,480.00
24" CULVERT PIPE LF 280.0004,480.00
0.0000.00
0.0000.00

0011                          4310.24 140.006.000840.00
24" FLARED-END SECTION EACH6.000840.00
0.0000.00
0.0000.00

0012                          L006.00 250.003.000750.00
COVER CROP SEEDING ACRE3.000750.00
0.0000.00
0.0000.00

GROUP 1 GRADINGContracted62,233.05
Current62,233.05
In place625.00
This Estimate0.00

GROUP 6 BRIDGE AT STA. 17+67
0013                          0030.60 25,000.001.00025,000.00
MOBILIZATION LS 1.00025,000.00
1.00025,000.00
0.0000.00

0014                          1043.50 2.50605.0001,512.50
RIPRAP FILTER FABRIC SY 605.0001,512.50
140.900352.25
140.900352.25

0015                          6000.10 5,000.001.0005,000.00
ABUTMENT NO.1 EXCAVATION LS 1.0005,000.00
0.5002,500.00
0.5002,500.00

0016                          6000.11 5,000.001.0005,000.00
ABUTMENT NO.2 EXCAVATION LS 1.0005,000.00
1.0005,000.00
0.0000.00

0017                          6001.50 3,000.001.0003,000.00
BENT NO.1 EXCAVATION LS 1.0003,000.00
0.5001,500.00
0.5001,500.00

0018                          6001.51 5,000.001.0005,000.00
BENT NO.2 EXCAVATION LS 1.0005,000.00
0.5002,500.00
0.0000.00

0019                          6010.22 320.00247.90079,328.00
CLASS 47B-3000 CONCRETE FOR BRIDGE CY 247.90079,328.00
247.90079,328.00
123.95039,664.00

0020                          6010.26 320.00101.10032,352.00
CLASS 47BD-4000 CONCRETE FOR BRIDGE CY 101.10032,352.00
0.0000.00
0.0000.00

0021                          6011.11 77,000.001.00077,000.00
PRECAST/PRESTRESSED CONCRETE SUPERSTRUCTURE LS 1.00077,000.00
AT STA. 17+67 0.0000.00
0.0000.00

0022                          6020.00 0.5027,085.00013,542.50
REINFORCING STEEL FOR BRIDGE LB 27,085.00013,542.50
9,660.0004,830.00
4,830.0002,415.00

0023                          6040.00 12,500.001.00012,500.00
REMOVE STRUCTURE EACH1.00012,500.00
AT STA. 17+73 1.00012,500.00
0.0000.00

0024                          6080.00 4.002,020.0008,080.00
STRUCTURAL STEEL FOR SUBSTRUCTURE LB 2,020.0008,080.00
1,595.0006,380.00
968.5003,874.00

0025                          6105.01 30.00380.00011,400.00
ROCK RIPRAP, TYPE A TON 380.00011,400.00
87.4002,622.00
87.4002,622.00

0026                          6210.14 25.001,090.00027,250.00
HP 12"X53# STEEL PILING LF 1,090.00027,250.00
1,051.44026,286.00
534.76013,369.00

4000                          6210.59 15.000.0000.00
PILE CUT-OFF LF 38.560578.40
Authorized cut-off of bearing piling 0.0000.00
0.0000.00

GROUP 6 BRIDGE AT STA. 17+67Contracted305,965.00
Current306,543.40
In place168,798.25
This Estimate66,296.25

GROUP 7 GUARDRAIL
0027                          0030.70 450.001.000450.00
MOBILIZATION LS 1.000450.00
0.0000.00
0.0000.00

0028                          7011.20 13.5050.000675.00
W-BEAM GUARDRAIL LF 50.000675.00
0.0000.00
0.0000.00

0029                          7020.00 1,150.004.0004,600.00
BRIDGE APPROACH SECTIONS EACH4.0004,600.00
0.0000.00
0.0000.00

0030                          7021.47 1,200.003.0003,600.00
MELT EACH3.0003,600.00
0.0000.00
0.0000.00

0031                          7022.00 900.001.000900.00
END ANCHORAGE ASSEMBLY EACH1.000900.00
0.0000.00
0.0000.00

GROUP 7 GUARDRAILContracted10,225.00
Current10,225.00
In place0.00
This Estimate0.00

GROUP 10 GENERAL ITEMS
0032                          0001.10 2.001,390.0002,780.00
BARRICADE, TYPE III BDAY1,390.0002,780.00
717.0001,434.00
210.000420.00

0033                          0001.90 0.501,112.000556.00
SIGN DAY EACH1,112.000556.00
432.000216.00
126.00063.00

0034                          0001.98 0.25834.000208.50
CONTRACTOR FURNISHED SIGN EACH834.000208.50
0.0000.00
0.0000.00

0035                          0030.00 400.001.000400.00
MOBILIZATION LS 1.000400.00
1.000400.00
0.0000.00

GROUP 10 GENERAL ITEMSContracted3,944.50
Current3,944.50
In place2,050.00
This Estimate483.00

Totals for contractContracted382,367.55
Current382,945.95
In place171,473.25
This Estimate66,779.25