Return to District Map


Nebraska Department of Roads
Estimate Summary to Contractor
Vendor ID:0810 ELK HORN CONSTRUCTION CO.
Contract ID:3625X
Estimate Number:0004
Pay Period End Date:02.04.2003
Contract Location:
G STREET OVERPASS, SOUTH SIOUX CITYEstimate Type:FINL
Contractor:
ELK HORN CONSTRUCTION CO.Date Let:06.27.2002
2243 ANDREW AVEDate Awarded:07.03.2002
PO BOX 580Date Contract Executed:07.16.2002
Date Notice to Proceed:07.16.2002
SERGEANT BLUFF IA 51054Date Work Began:10.15.2002
Phone:Date Physical Work Completed:
(712)943-4430Date Accepted:11.06.2002
Escrow Agent:
Surety Co:
MERCHANTS BONDING COMPANY (MUTUAL)
Counties
DAKOTA
Project Number PCT Fed State Project Number Description
31625 000  0.000 MISC-129-1(1009)  BRIDGE
Total to DatePrev to DateThis Estimate
Current Contract AmtTotal Earnings$18,476.00$18,476.00$.00
$16,620.00Stockpiled Materials$.00$.00$.00
Original Contract AmtGross Earnings$18,476.00$18,476.00$.00
$14,820.00Retainage$.00$-184.76$184.76
Escrow Amount$.00$.00$.00
Percent CompleteSecurities Encumbered$.00$.00$.00
111.17%Net Earnings$18,476.00$18,291.24$184.76
Liquidated Damages$.00$.00$.00
Incentives$.00$.00$.00
Disincentives$.00$.00$.00
Other Contract Adj$.00$.00$.00
Appl of Training Adj$.00$.00$.00
Training Rates Adj$.00$.00$.00
Fuel Adj$.00$.00$.00
Bituminous Adj$.00$.00$.00
Autopay Adj$.00$.00$.00
Gasoline Adj$.00$.00$.00
Other Adj$.00$.00$.00
Price Adj$.00$.00$.00
Substandard Item Adj$.00$.00$.00
Asphalt Adj$.00$.00$.00
Diesel Fuel Adj$.00$.00$.00
Petrol Adj$.00$.00$.00
Total for Adjustments$.00$.00$.00
Payment$18,476.00$18,291.24$184.76
Project ManagerDiv. Head/Dist. Eng.
Wiebelhaus, Bob02.04.2003Boyle, Pat06.06.2003
Constr. Estimate Eng.Materials Eng.
Davis, Carl06.10.2003Hall, David06.10.2003
Controller Div. Processed
Harring, Joyce06.23.2003
Detailed breakdown of stockpiled materials
Total remaining for contract:0.00
1. Contracted
2. Current
3. To date
Item Nbr        Item CodeUnit Price4. This Est
Item DescriptionUnitsQtyAmount
GROUP 6 BRIDGE AT STA. 355+00.85
0001                          0001.08 0.50350.000175.00
BARRICADE, TYPE II BDAY350.000175.00
0.0000.00
0.0000.00

0002                          0001.10 2.0038.00076.00
BARRICADE, TYPE III BDAY38.00076.00
95.000190.00
0.0000.00

0003                          0001.30 2.0038.00076.00
TYPE B HIGH INTENSITY WARNING LIGHT LDAY38.00076.00
0.0000.00
0.0000.00

0004                          0001.75 4.00120.000480.00
TEMPORARY SIGN DAY EACH120.000480.00
0.0000.00
0.0000.00

0005                          0001.90 1.00513.000513.00
SIGN DAY EACH513.000513.00
653.000653.00
0.0000.00

0006                          0003.10 150.0010.0001,500.00
FLAGGING DAY 10.0001,500.00
0.0000.00
0.0000.00

0007                          0030.60 2,000.001.0002,000.00
MOBILIZATION LS 1.0002,000.00
1.0002,000.00
0.0000.00

0008                          3089.80 150.0020.0003,000.00
FLOWABLE FILL CONCRETE CY 20.0003,000.00
15.5002,325.00
0.0000.00

0009                          6030.05 6,000.001.0006,000.00
PREPARATION OF BRIDGE EACH1.0006,000.00
AT STA. 355+00.85 1.0006,000.00
0.0000.00

0010                          6107.00 200.005.0001,000.00
CONCRETE SLOPE PROTECTION SY 5.0001,000.00
27.5405,508.00
0.0000.00

4001                          A900.10 450.000.0000.00
ADDITIONAL WORK EACH4.0001,800.00
Extension of bridge deck drains, down to slope protection Using 6" PVC pipe and connections. 4.0001,800.00
0.0000.00

GROUP 6 BRIDGE AT STA. 355+00.85Contracted14,820.00
Current16,620.00
In place18,476.00
This Estimate0.00

Totals for contractContracted14,820.00
Current16,620.00
In place18,476.00
This Estimate0.00