Nebraska Department of Roads
Estimate Summary to Contractor
Vendor ID:0880 CHRISTENSEN BROS., INC.
Contract ID:3508
Estimate Number:0003
Pay Period End Date:05.18.2002
Contract Location:
FORDYCE SPUREstimate Type:PROG
Contractor:
CHRISTENSEN BROS., INC.Date Let:12.06.2001
644 RIVER ROADDate Awarded:12.18.2001
PO BOX 478Date Contract Executed:01.11.2002
Date Notice to Proceed:01.11.2002
CHEROKEE IA 51012Date Work Began:04.15.2002
Phone:Date Physical Work Completed:
(712)225-6146Date Accepted:
Escrow Agent:
Surety Co:
NATIONAL FIRE INSURANCE COMPANY OF HARTFORD
Counties
CEDAR
Project Number PCT Fed State Project Number Description
31508 000  0.000 STR-S14A(1002)  BRIDGE
Total to DatePrev to DateThis Estimate
Current Contract AmtTotal Earnings$140,767.67$81,839.47$58,928.20
$144,994.20Stockpiled Materials$.00$.00$.00
Original Contract AmtGross Earnings$140,767.67$81,839.47$58,928.20
$144,994.20Retainage$-1,407.68$-818.39$-589.29
Escrow Amount$.00$.00$.00
Percent CompleteSecurities Encumbered$.00$.00$.00
97.09%Net Earnings$139,359.99$81,021.08$58,338.91
Liquidated Damages$.00$.00$.00
Incentives$.00$.00$.00
Disincentives$.00$.00$.00
Other Contract Adj$.00$.00$.00
Appl of Training Adj$.00$.00$.00
Training Rates Adj$.00$.00$.00
Fuel Adj$.00$.00$.00
Bituminous Adj$.00$.00$.00
Autopay Adj$.00$.00$.00
Gasoline Adj$.00$.00$.00
Other Adj$.00$.00$.00
Price Adj$.00$.00$.00
Substandard Item Adj$.00$.00$.00
Asphalt Adj$.00$.00$.00
Diesel Fuel Adj$.00$.00$.00
Petrol Adj$.00$.00$.00
Total for Adjustments$.00$.00$.00
Payment$139,359.99$81,021.08$58,338.91
Project ManagerDiv. Head/Dist. Eng.
Becker, Roger05.21.2002Boyle, Pat05.21.2002
Constr. Estimate Eng.Materials Eng.
Bartos, Steve05.22.2002
Controller Div. Processed
Burling, Laurie05.22.2002
Detailed breakdown of stockpiled materials
Total remaining for contract:0.00
1. Contracted
2. Current
3. To date
Item Nbr        Item CodeUnit Price4. This Est
Item DescriptionUnitsQtyAmount
GROUP 6 BRIDGE AT STA. 93+60.00
0001                          L020.00 2.501,028.0002,570.00
EROSION CONTROL SY 1,028.0002,570.00
0.0000.00
0.0000.00

0002                          0001.08 0.50250.000125.00
BARRICADE, TYPE II BDAY250.000125.00
884.000442.00
416.000208.00

0003                          0001.10 3.00118.000354.00
BARRICADE, TYPE III BDAY118.000354.00
102.000306.00
48.000144.00

0004                          0001.30 3.0068.000204.00
TYPE B HIGH INTENSITY WARNING LIGHT LDAY68.000204.00
68.000204.00
32.00096.00

0005                          0001.90 1.20958.0001,149.60
SIGN DAY EACH958.0001,149.60
665.000798.00
304.000364.80

0006                          0003.10 160.0020.0003,200.00
FLAGGING DAY 20.0003,200.00
1.000160.00
1.000160.00

0007                          0030.60 14,000.001.00014,000.00
MOBILIZATION LS 1.00014,000.00
1.00014,000.00
0.0000.00

0008                          1009.00 3,000.001.0003,000.00
GENERAL CLEARING AND GRUBBING LS 1.0003,000.00
1.0003,000.00
1.0003,000.00

0009                          1033.00 940.004.9404,643.60
ROADWAY GRADING STA 4.9404,643.60
2.8402,669.60
2.8402,669.60

0010                          6007.01 20.001,124.00022,480.00
CLASS I REPAIR SY 1,124.00022,480.00
1,021.13220,422.64
450.0009,000.00

0011                          6007.02 90.00299.00026,910.00
CLASS II REPAIR SY 299.00026,910.00
270.60324,354.27
123.34011,100.60

0012                          6007.03 200.005.0001,000.00
CLASS III REPAIR SY 5.0001,000.00
0.827165.40
0.0000.00

0013                          6008.40 27.001,124.00030,348.00
PLACING, FINISHING, AND CURING CONCRETE OVERLAY-SF SY 1,124.00030,348.00
1,021.13227,570.56
450.00012,150.00

0014                          6016.02 360.0061.00021,960.00
CONCRETE FOR OVERLAYS-SF CY 61.00021,960.00
128.69046,328.40
54.69019,688.40

0015                          7017.00 5.00150.000750.00
REMOVE GUARDRAIL LF 150.000750.00
0.0000.00
0.0000.00

0016                          7024.27 1,800.004.0007,200.00
GUARDRAIL END TREATMENT, TYPE II EACH4.0007,200.00
0.0000.00
0.0000.00

0017                          9000.01 170.0030.0005,100.00
ASPHALTIC CONCRETE TON 30.0005,100.00
2.040346.80
2.040346.80

GROUP 6 BRIDGE AT STA. 93+60.00Contracted144,994.20
Current144,994.20
In place140,767.67
This Estimate58,928.20

Totals for contractContracted144,994.20
Current144,994.20
In place140,767.67
This Estimate58,928.20