Nebraska Department of Roads
Estimate Summary to Contractor
Vendor ID:0463 GRAVES CONSTRUCTION CO., INC.
Contract ID:3477
Estimate Number:0005
Pay Period End Date:08.02.2003
Contract Location:
BELDEN WESTEstimate Type:PROG
Contractor:
GRAVES CONSTRUCTION CO., INC.Date Let:03.13.2003
5TH AVE & MAIN STDate Awarded:04.09.2003
PO BOX 208Date Contract Executed:04.29.2003
Date Notice to Proceed:04.29.2003
MELVIN IA 51350-0208Date Work Began:
Phone:Date Physical Work Completed:
(712)736-2341Date Accepted:
Escrow Agent:
Surety Co:
UNITED FIRE & CASUALTY COMPANY
Counties
CEDAR
Project Number PCT Fed State Project Number Description
31477 000  0.000 BRO-7014(26)  BRIDGE
Total to DatePrev to DateThis Estimate
Current Contract AmtTotal Earnings$154,197.78$114,149.70$40,048.08
$220,357.91Stockpiled Materials$.00$.00$.00
Original Contract AmtGross Earnings$154,197.78$114,149.70$40,048.08
$218,677.91Retainage$-1,541.98$-1,141.50$-400.48
Escrow Amount$.00$.00$.00
Percent CompleteSecurities Encumbered$.00$.00$.00
69.98%Net Earnings$152,655.80$113,008.20$39,647.60
Liquidated Damages$.00$.00$.00
Incentives$.00$.00$.00
Disincentives$.00$.00$.00
Other Contract Adj$.00$.00$.00
Appl of Training Adj$.00$.00$.00
Training Rates Adj$.00$.00$.00
Fuel Adj$-84.85$-70.20$-14.65
Bituminous Adj$.00$.00$.00
Autopay Adj$.00$.00$.00
Gasoline Adj$.00$.00$.00
Other Adj$.00$.00$.00
Price Adj$.00$.00$.00
Substandard Item Adj$.00$.00$.00
Asphalt Adj$.00$.00$.00
Diesel Fuel Adj$.00$.00$.00
Petrol Adj$.00$.00$.00
Total for Adjustments-$84.85-$70.20-$14.65
Payment$152,570.95$112,938.00$39,632.95
Project ManagerDiv. Head/Dist. Eng.
Wiebelhaus, Bob08.04.2003Boyle, Pat08.06.2003
Constr. Estimate Eng.Materials Eng.
Bartos, Steve08.06.2003
Controller Div. Processed
Burling, Laurie08.07.2003
Detailed breakdown of stockpiled materials
Total remaining for contract:0.00
1. Contracted
2. Current
3. To date
Item Nbr        Item CodeUnit Price4. This Est
Item DescriptionUnitsQtyAmount
GROUP 6 BRIDGE AT STA. 17+41
0001                          0001.10 1.051,332.0001,398.60
BARRICADE, TYPE III BDAY1,332.0001,398.60
900.000945.00
140.000147.00

0002                          0001.90 0.531,776.000941.28
SIGN DAY EACH1,776.000941.28
540.000286.20
84.00044.52

0003                          0001.99 1.05666.000699.30
CONTRACTOR FURNISHED SIGN DAY EACH666.000699.30
360.000378.00
56.00058.80

0004                          0030.60 19,000.001.00019,000.00
MOBILIZATION LS 1.00019,000.00
1.00019,000.00
0.0000.00

0005                          1009.00 350.001.000350.00
GENERAL CLEARING AND GRUBBING LS 1.000350.00
1.000350.00
0.0000.00

0006                          1010.01 4.003,259.00013,036.00
EXCAVATION (ESTABLISHED QUANTITY) CY 3,259.00013,036.00
2,500.00010,000.00
500.0002,000.00

0007                          1011.00 50.008.000400.00
WATER MGAL8.000400.00
0.0000.00
0.0000.00

0008                          1043.50 2.00834.0001,668.00
RIPRAP FILTER FABRIC SY 834.0001,668.00
500.0001,000.00
0.0000.00

0009                          4050.01 10.0069.000690.00
EXCAVATION FOR PIPE, PIPE-ARCH CULVERTS, AND HEADWALLS CY 69.000690.00
0.0000.00
0.0000.00

0010                          4300.24 15.0050.000750.00
24" CULVERT PIPE LF 50.000750.00
0.0000.00
0.0000.00

0011                          4300.36 26.0052.0001,352.00
36" CULVERT PIPE LF 52.0001,352.00
0.0000.00
0.0000.00

0012                          4310.24 125.001.000125.00
24" FLARED-END SECTION EACH1.000125.00
0.0000.00
0.0000.00

0013                          4310.36 250.001.000250.00
36" FLARED-END SECTION EACH1.000250.00
0.0000.00
0.0000.00

0014                          6000.10 2,500.001.0002,500.00
ABUTMENT NO.1 EXCAVATION LS 1.0002,500.00
1.0002,500.00
1.0002,500.00

0015                          6000.11 2,500.001.0002,500.00
ABUTMENT NO.2 EXCAVATION LS 1.0002,500.00
1.0002,500.00
0.0000.00

0016                          6001.00 3,200.001.0003,200.00
BENT NO.1 EXCAVATION LS 1.0003,200.00
1.0003,200.00
0.0000.00

0017                          6001.01 3,200.001.0003,200.00
BENT NO.2 EXCAVATION LS 1.0003,200.00
1.0003,200.00
0.0000.00

0018                          6010.22 270.00164.90044,523.00
CLASS 47B-3000 CONCRETE FOR BRIDGE CY 164.90044,523.00
164.89944,522.73
82.43022,256.10

0019                          6010.26 280.00110.10030,828.00
CLASS 47BD-4000 CONCRETE FOR BRIDGE CY 110.10030,828.00
0.0000.00
0.0000.00

0020                          6020.00 0.5631,225.00017,486.00
REINFORCING STEEL FOR BRIDGE LB 31,225.00017,486.00
7,739.0004,333.84
3,869.0002,166.64

0021                          6040.00 10,750.001.00010,750.00
REMOVE STRUCTURE EACH1.00010,750.00
AT STA. 17+16.3 1.00010,750.00
0.0000.00

0022                          6080.00 2.001,665.0003,330.00
STRUCTURAL STEEL FOR SUBSTRUCTURE LB 1,665.0003,330.00
1,215.0002,430.00
607.5001,215.00

0023                          6105.02 25.69617.00015,850.73
ROCK RIPRAP, TYPE B TON 617.00015,850.73
457.99011,765.77
0.0000.00

0024                          6200.00 28.001,350.00037,800.00
CONCRETE PILING LF 1,350.00037,800.00
1,281.80035,890.40
345.0009,660.00

0025                          7020.00 1,122.002.0002,244.00
BRIDGE APPROACH SECTIONS EACH2.0002,244.00
0.0000.00
0.0000.00

0026                          7021.47 1,403.002.0002,806.00
MELT EACH2.0002,806.00
0.0000.00
0.0000.00

0027                          L006.00 1,000.001.0001,000.00
COVER CROP SEEDING ACRE1.0001,000.00
0.0000.00
0.0000.00

4001                          6200.50 16.800.0000.00
PAY CUT-OFF FOR CONCRETE PILING LF 100.0001,680.00
Pay, for cutting off excess piling down to cutoff elevation. 68.2001,145.76
0.0000.00

GROUP 6 BRIDGE AT STA. 17+41Contracted218,677.91
Current220,357.91
In place154,197.70
This Estimate40,048.06

Totals for contractContracted218,677.91
Current220,357.91
In place154,197.70
This Estimate40,048.06