Return to District Map


Nebraska Department of Roads
Estimate Summary to Contractor
Vendor ID:2775 GILL CONSTRUCTION, INC.
Contract ID:3305
Estimate Number:0012
Pay Period End Date:02.18.2003
Contract Location:
HUBBARD NORTHEASTEstimate Type:PROG
Contractor:
GILL CONSTRUCTION, INC.Date Let:04.18.2002
116 MONONA BLVDDate Awarded:05.06.2002
PO BOX 86Date Contract Executed:05.20.2002
Date Notice to Proceed:05.20.2002
JACKSON NE 68743Date Work Began:06.03.2002
Phone:Date Physical Work Completed:
(402)632-4335Date Accepted:
Escrow Agent:
Surety Co:
MERCHANTS BONDING COMPANY (MUTUAL)
Counties
DAKOTA
Project Number PCT Fed State Project Number Description
31305 000  0.000 EACSTPE-3925(1)  GRAD CONC PAVE CULV
31306 000  0.000 EACSTPE-3925(2)  GRAD CONC PAVE CULV
Total to DatePrev to DateThis Estimate
Current Contract AmtTotal Earnings$1,391,195.99$1,364,368.83$26,827.16
$1,356,983.91Stockpiled Materials$.00$.00$.00
Original Contract AmtGross Earnings$1,391,195.99$1,364,368.83$26,827.16
$1,296,647.08Retainage$-13,986.10$-13,643.69$-342.41
Escrow Amount$.00$.00$.00
Percent CompleteSecurities Encumbered$.00$.00$.00
102.52%Net Earnings$1,377,209.89$1,350,725.14$26,484.75
Liquidated Damages-$4,788.00-$4,788.00$.00
Incentives$.00$.00$.00
Disincentives$.00$.00$.00
Other Contract Adj$.00$.00$.00
Appl of Training Adj$.00$.00$.00
Training Rates Adj$.00$.00$.00
Fuel Adj$693.98$243.92$450.06
Bituminous Adj$.00$.00$.00
Autopay Adj$.00$.00$.00
Gasoline Adj$.00$.00$.00
Other Adj$.00$.00$.00
Price Adj$.00$.00$.00
Substandard Item Adj$.00$.00$.00
Asphalt Adj$.00$.00$.00
Diesel Fuel Adj$.00$.00$.00
Petrol Adj$.00$.00$.00
Total for Adjustments-$4,094.02-$4,544.08$450.06
Payment$1,373,115.87$1,346,181.06$26,934.81
Project ManagerDiv. Head/Dist. Eng.
Mead, Terry02.19.2003Hausman, Larry02.19.2003
Constr. Estimate Eng.Materials Eng.
Boyle, Pat02.19.2003
Controller Div. Processed
Burling, Laurie02.20.2003
Detailed breakdown of stockpiled materials
Total remaining for contract:0.00
1. Contracted
2. Current
3. To date
Item Nbr        Item CodeUnit Price4. This Est
Item DescriptionUnitsQtyAmount
GROUP 1 GRADING
0001                          L006.00 255.008.2002,091.00
COVER CROP SEEDING ha 8.2002,091.00
8.2002,091.00
0.0000.00

0002                          0030.10 3,789.251.0003,789.25
MOBILIZATION LS 1.0003,789.25
1.0003,789.25
0.0000.00

0003                          1009.00 2,613.751.0002,613.75
GENERAL CLEARING AND GRUBBING LS 1.0002,613.75
1.0002,613.75
0.0000.00

0004                          1010.01 2.4014,424.00034,617.60
EXCAVATION (ESTABLISHED QUANTITY) m3 14,424.00034,617.60
14,424.00034,617.60
0.0000.00

0005                          1011.00 1.022,213.0002,257.26
WATER kL 2,213.0002,257.26
189.000192.78
0.0000.00

0006                          1030.00 1.1334,040.00038,465.20
EARTHWORK MEASURED IN EMBANKMENT m3 34,040.00038,465.20
34,040.00038,465.20
0.0000.00

0008                          1090.00 357.001.000357.00
ABANDON WELLS EACH1.000357.00
0.0000.00
0.0000.00

0009                          1102.00 3.67200.000734.00
REMOVE ASPHALT SURFACE m2 200.000734.00
466.6301,712.53
0.0000.00

0010                          1320.18 28.5674.5002,127.72
450 mm CORRUGATED METAL PIPE FOR DRIVEWAY CULVERT PIPE m 74.5002,127.72
86.7002,476.15
0.0000.00

0011                          1320.24 40.808.900363.12
600 mm CORRUGATED METAL PIPE FOR DRIVEWAY CULVERT PIPE m 8.900363.12
8.000326.40
0.0000.00

0012                          1320.36 65.2819.0001,240.32
900 mm CORRUGATED METAL PIPE FOR DRIVEWAY CULVERT PIPE m 19.0001,240.32
19.0001,240.32
0.0000.00

0013                          1405.00 12.245.48667.15
RELAYING DRIVEWAY CULVERT PIPE m 5.48667.15
5.48667.15
0.0000.00

0014                          4360.36 306.004.0001,224.00
900 mm METAL FLARED-END SECTION EACH4.0001,224.00
4.0001,224.00
0.0000.00

4020                          L022.11 6.900.0000.00
FABRIC SILT FENCE-LOW POROSITY m 690.0004,761.00
618.6004,268.34
0.0000.00

4021                          L020.00 1.440.0000.00
EROSION CONTROL m2 3,275.0004,716.00
3,275.0004,716.00
0.0000.00

4022                          L020.09 12.940.0000.00
EROSION CONTROL, TYPE AAA m2 381.5004,936.61
381.5004,936.61
0.0000.00

4023                          L021.06 20.700.0000.00
EROSION CHECKS, TYPE HV BALE215.0004,450.50
215.0004,450.50
0.0000.00

4024                          1030.00 2.260.0000.00
EARTHWORK MEASURED IN EMBANKMENT m3 762.0001,722.12
762.0001,722.12
0.0000.00

GROUP 1 GRADINGContracted89,947.37
Current110,533.60
In place108,909.70
This Estimate0.00

GROUP 3 CONCRETE PAVEMENT
0015                          L001.01 933.305.7005,319.81
SEEDING, TYPE A ha 5.7005,319.81
5.7005,319.81
0.0000.00

0016                          L001.02 872.102.5002,180.25
SEEDING, TYPE B ha 2.5002,180.25
2.5002,180.25
0.0000.00

0018                          L032.75 91.8041.0003,763.80
MULCH Mg 41.0003,763.80
41.0003,763.80
0.0000.00

0019                          0002.76 0.198,235.0001,564.65
PERMANENT PAVEMENT MARKING PAINT m 8,235.0001,564.65
9,853.9501,872.25
0.0000.00

0020                          0030.30 1,029.821.0001,029.82
MOBILIZATION LS 1.0001,029.82
1.0001,029.82
0.0000.00

0021                          2001.00 15.75406.0006,394.50
GRAVEL SURFACE COURSE m3 406.0006,394.50
406.0006,394.50
0.0000.00

0022                          2020.00 30.06144.0004,328.64
SPECIAL SURFACE COURSE FOR MAILBOX TURNOUTS m2 144.0004,328.64
288.0008,657.28
0.0000.00

0023                          2021.00 50.004.000200.00
MAILBOX POST EACH4.000200.00
8.000400.00
0.0000.00

0024                          3008.05 10.0012.000120.00
TIE BARS EACH12.000120.00
63.000630.00
0.0000.00

0025                          3020.24 34.21540.86018,502.82
CONCRETE CLASS 47B-25 DRIVEWAY m2 540.86018,502.82
1,234.09942,218.53
115.3203,945.10

0026                          3020.32 35.87234.4308,409.00
CONCRETE CLASS 47B-HE-25 DRIVEWAY m2 234.4308,409.00
0.0000.00
0.0000.00

0027                          3050.15 241.8792.08622,272.84
CONCRETE FOR PAVEMENT APPROACHES CLASS 47BD-30 m3 92.08622,272.84
92.08622,272.85
0.0000.00

0028                          3051.10 1.405,418.9107,586.47
EPOXY COATED REINFORCING STEEL FOR PAVEMENT APPROACHES kg 5,418.9107,586.47
5,994.5908,392.43
0.0000.00

0029                          3070.12 131.891.251164.99
CONCRETE FOR HEADERS, CLASS 47B-25 m3 1.251164.99
1.251165.00
0.41755.00

0030                          3075.32 21.1821,143.116447,811.20
205 mm CONCRETE PAVEMENT, CLASS 47B-25 m2 21,143.116447,811.20
22,095.036467,972.86
-638.143-13,515.87

0031                          3091.18 30.32439.56013,327.46
205 mm CONCRETE PAVEMENT CLASS 47B-HE-25 m2 439.56013,327.46
72.6002,201.23
0.0000.00

0032                          3300.65 55.0012.000660.00
CONCRETE PAVEMENT THICKNESS CORE EACH12.000660.00
14.000770.00
0.0000.00

0036                          9034.00 1.681,325.0002,226.00
PREPARATION OF INTERSECTIONS AND DRIVEWAYS m2 1,325.0002,226.00
1,820.4173,058.30
33.21555.80

0037                          9111.00 1.10514.000565.40
WATER kL 514.000565.40
600.662660.73
0.0000.00

0038                          9170.00 200.0065.88313,176.60
EARTH SHOULDER CONSTRUCTION StaM65.88313,176.60
65.88313,176.60
0.0000.00

0039                          9173.20 1.1021,871.00024,058.10
SUBGRADE PREPARATION m2 21,871.00024,058.10
21,393.39823,532.73
-741.023-815.13

GROUP 3 CONCRETE PAVEMENTContracted583,662.36
Current583,662.36
In place614,668.97
This Estimate-10,275.10

GROUP 4 CULVERTS
0040                          0030.40 1,956.521.0001,956.52
MOBILIZATION LS 1.0001,956.52
1.0001,956.52
0.0000.00

0041                          4040.00 500.001.000500.00
REMOVE HEADWALLS FROM CULVERTS EACH1.000500.00
1.000500.00
0.0000.00

0042                          4050.01 13.00842.00010,946.00
EXCAVATION FOR PIPE, PIPE-ARCH CULVERTS, AND HEADWALLS m3 842.00010,946.00
892.10011,597.30
0.0000.00

0043                          4450.24 89.7518.5001,660.38
600 mm REINFORCED CONCRETE PIPE m 18.5001,660.38
17.6901,587.68
0.0000.00

0044                          4450.30 157.5033.7005,307.75
750 mm REINFORCED CONCRETE PIPE m 33.7005,307.75
33.8205,326.65
0.0000.00

0045                          4450.36 176.3016.0002,820.80
900 mm REINFORCED CONCRETE PIPE m 16.0002,820.80
15.8602,796.12
0.0000.00

0046                          4450.48 313.2018.3005,731.56
1200 mm REINFORCED CONCRETE PIPE m 18.3005,731.56
18.2705,722.16
0.0000.00

0047                          4450.72 526.8030.00015,804.00
1800 mm REINFORCED CONCRETE PIPE m 30.00015,804.00
30.50016,067.40
0.0000.00

0048                          4460.24 442.202.000884.40
600 mm CONCRETE FLARED-END SECTION EACH2.000884.40
2.000884.40
0.0000.00

0049                          4460.30 581.254.0002,325.00
750 mm CONCRETE FLARED END SECTION EACH4.0002,325.00
4.0002,325.00
0.0000.00

0050                          4460.36 775.602.0001,551.20
900 mm CONCRETE FLARED-END SECTION EACH2.0001,551.20
2.0001,551.20
0.0000.00

0051                          4460.48 1,008.851.0001,008.85
1200 mm CONCRETE FLARED-END SECTION EACH1.0001,008.85
1.0001,008.85
0.0000.00

0052                          4460.72 1,656.004.0006,624.00
1800 mm CONCRETE FLARED-END SECTION EACH4.0006,624.00
4.0006,624.00
0.0000.00

GROUP 4 CULVERTSContracted57,120.45
Current57,120.45
In place57,947.28
This Estimate0.00

GROUP 10 GENERAL ITEMS
0055                          0001.10 1.00985.000985.00
BARRICADE, TYPE III BDAY985.000985.00
1,018.0001,018.00
402.000402.00

0056                          0001.30 1.00250.000250.00
TYPE B HIGH INTENSITY WARNING LIGHT LDAY250.000250.00
71.00071.00
0.0000.00

0057                          0001.90 0.45745.000335.25
SIGN DAY EACH745.000335.25
693.000311.85
233.000104.85

0058                          0010.04 1.000.5000.50
FIELD OFFICE EACH0.5000.50
0.5000.50
0.0000.00

0059                          0030.00 0.501.0000.50
MOBILIZATION LS 1.0000.50
1.0000.50
0.0000.00

4001                          0001.08 0.500.0000.00
BARRICADE, TYPE II BDAY1,000.000500.00
8,636.0004,318.00
3,908.0001,954.00

4002                          0001.75 2.000.0000.00
TEMPORARY SIGN DAY EACH1,000.0002,000.00
116.000232.00
0.0000.00

4003                          0003.10 200.000.0000.00
FLAGGING DAY 20.0004,000.00
6.0001,200.00
2.000400.00

GROUP 10 GENERAL ITEMSContracted1,571.25
Current8,071.25
In place7,151.85
This Estimate2,860.85

GROUP 1 GRADING
0001                          L006.00 255.006.0001,530.00
COVER CROP SEEDING ha 6.0001,530.00
6.0001,530.00
0.0000.00

0002                          0030.10 1,310.751.0001,310.75
MOBILIZATION LS 1.0001,310.75
1.0001,310.75
0.0000.00

0003                          1009.00 1,568.251.0001,568.25
GENERAL CLEARING AND GRUBBING LS 1.0001,568.25
1.0001,568.25
0.0000.00

0004                          1010.01 2.402,981.0007,154.40
EXCAVATION (ESTABLISHED QUANTITY) m3 2,981.0007,154.40
2,981.0007,154.40
0.0000.00

0005                          1011.00 1.02817.000833.34
WATER kL 817.000833.34
114.000116.28
0.0000.00

0006                          1030.00 1.1311,660.00013,175.80
EARTHWORK MEASURED IN EMBANKMENT m3 11,660.00013,175.80
11,660.00013,175.80
0.0000.00

0007                          1042.00 1.131,700.0001,921.00
SALVAGING AND PLACING HYDRIC SOIL m2 1,700.0001,921.00
1,700.0001,921.00
0.0000.00

0010                          1320.18 28.5646.0001,313.76
450 mm CORRUGATED METAL PIPE FOR DRIVEWAY CULVERT PIPE m 46.0001,313.76
46.0001,313.76
0.0000.00

4025                          1030.00 2.260.0000.00
EARTHWORK MEASURED IN EMBANKMENT m3 762.0001,722.12
762.0001,722.12
0.0000.00

4026                          1030.00 3.860.0000.00
EARTHWORK MEASURED IN EMBANKMENT m3 8,168.00031,528.48
Additional borrow for North end 8,168.00031,528.48
8,168.00031,528.48

GROUP 1 GRADINGContracted28,807.30
Current62,057.90
In place61,340.84
This Estimate31,528.48

GROUP 3 CONCRETE PAVEMENT
0015                          L001.01 933.304.0003,733.20
SEEDING, TYPE A ha 4.0003,733.20
4.0003,733.20
0.0000.00

0016                          L001.02 872.102.0001,744.20
SEEDING, TYPE B ha 2.0001,744.20
2.0001,744.20
0.0000.00

0017                          L001.17 3,225.000.251809.48
SEEDING, TYPE WETLAND ha 0.251809.48
0.251809.48
0.0000.00

0018                          L032.75 91.8030.0002,754.00
MULCH Mg 30.0002,754.00
30.0002,754.00
0.0000.00

0019                          0002.76 0.196,908.0001,312.52
PERMANENT PAVEMENT MARKING PAINT m 6,908.0001,312.52
8,436.9501,603.02
0.0000.00

0020                          0030.30 965.181.000965.18
MOBILIZATION LS 1.000965.18
1.000965.18
0.0000.00

0021                          2001.00 15.75117.0001,842.75
GRAVEL SURFACE COURSE m3 117.0001,842.75
123.0001,937.25
0.0000.00

0022                          2020.00 30.0663.0001,893.78
SPECIAL SURFACE COURSE FOR MAILBOX TURNOUTS m2 63.0001,893.78
42.0001,262.52
0.0000.00

0023                          2021.00 50.003.000150.00
MAILBOX POST EACH3.000150.00
2.000100.00
0.0000.00

0025                          3020.24 34.21385.00013,170.85
CONCRETE CLASS 47B-25 DRIVEWAY m2 385.00013,170.85
387.45213,254.73
74.8802,561.64

0027                          3050.15 241.8792.00822,253.97
CONCRETE FOR PAVEMENT APPROACHES CLASS 47BD-30 m3 92.00822,253.97
92.00822,253.97
0.0000.00

0028                          3051.10 1.406,178.1628,649.43
EPOXY COATED REINFORCING STEEL FOR PAVEMENT APPROACHES kg 6,178.1628,649.43
6,475.2839,065.40
0.0000.00

0029                          3070.12 131.891.251164.99
CONCRETE FOR HEADERS, CLASS 47B-25 m3 1.251164.99
0.834110.00
0.0000.00

0030                          3075.32 21.1818,722.000396,531.96
205 mm CONCRETE PAVEMENT, CLASS 47B-25 m2 18,722.000396,531.96
18,993.318402,278.47
-12.692-268.82

0032                          3300.65 55.0010.000550.00
CONCRETE PAVEMENT THICKNESS CORE EACH10.000550.00
13.000715.00
0.0000.00

0033                          4763.26 160.008.0001,280.00
UNDERDRAIN HEADWALL EACH8.0001,280.00
8.0001,280.00
0.0000.00

0034                          4764.36 27.0024.000648.00
150mm NONPERFORATED PIPE UNDERDRAIN m 24.000648.00
24.000648.00
0.0000.00

0035                          4764.37 27.00350.0009,450.00
150mm PERFORATED PIPE UNDERDRAIN m 350.0009,450.00
350.0009,450.00
0.0000.00

0036                          9034.00 1.68996.0001,673.28
PREPARATION OF INTERSECTIONS AND DRIVEWAYS m2 996.0001,673.28
1,351.5802,270.65
203.768342.33

0037                          9111.00 1.10416.000457.60
WATER kL 416.000457.60
486.138534.75
0.0000.00

0038                          9170.00 200.0055.28911,057.80
EARTH SHOULDER CONSTRUCTION StaM55.28911,057.80
55.43911,087.80
0.0000.00

0039                          9173.20 1.1018,318.00020,149.80
SUBGRADE PREPARATION m2 18,318.00020,149.80
18,027.33219,830.06
-262.789-289.07

GROUP 3 CONCRETE PAVEMENTContracted501,242.79
Current501,242.79
In place507,687.68
This Estimate2,346.08

GROUP 4 CULVERTS
0040                          0030.40 1,043.481.0001,043.48
MOBILIZATION LS 1.0001,043.48
1.0001,043.48
0.0000.00

0042                          4050.01 13.00312.0004,056.00
EXCAVATION FOR PIPE, PIPE-ARCH CULVERTS, AND HEADWALLS m3 312.0004,056.00
312.0004,056.00
0.0000.00

0043                          4450.24 89.7549.5004,442.63
600 mm REINFORCED CONCRETE PIPE m 49.5004,442.63
50.0204,489.30
0.0000.00

0045                          4450.36 176.3015.5002,732.65
900 mm REINFORCED CONCRETE PIPE m 15.5002,732.65
15.8602,796.12
0.0000.00

0046                          4450.48 313.2012.0003,758.40
1200 mm REINFORCED CONCRETE PIPE m 12.0003,758.40
12.2003,821.04
0.0000.00

0048                          4460.24 442.208.0003,537.60
600 mm CONCRETE FLARED-END SECTION EACH8.0003,537.60
8.0003,537.60
0.0000.00

0050                          4460.36 775.602.0001,551.20
900 mm CONCRETE FLARED-END SECTION EACH2.0001,551.20
2.0001,551.20
0.0000.00

0051                          4460.48 1,008.852.0002,017.70
1200 mm CONCRETE FLARED-END SECTION EACH2.0002,017.70
2.0002,017.70
0.0000.00

0053                          4500.36 237.2524.0005,694.00
900 mm ROUND EQUIVALENT REINFORCED CONCRETE PIPE m 24.0005,694.00
22.9005,433.03
0.0000.00

0054                          4510.36 750.404.0003,001.60
900 mm ROUND EQUIVALENT CONCRETE FLARED-END SECTION EACH4.0003,001.60
4.0003,001.60
0.0000.00

GROUP 4 CULVERTSContracted31,835.25
Current31,835.25
In place31,747.07
This Estimate0.00

GROUP 10 GENERAL ITEMS
0055                          0001.10 1.001,057.0001,057.00
BARRICADE, TYPE III BDAY1,057.0001,057.00
1,295.0001,295.00
401.000401.00

0056                          0001.30 1.00250.000250.00
TYPE B HIGH INTENSITY WARNING LIGHT LDAY250.000250.00
65.00065.00
-139.000-139.00

0057                          0001.90 0.45894.000402.30
SIGN DAY EACH894.000402.30
848.000381.60
233.000104.85

0058                          0010.04 1.000.5000.50
FIELD OFFICE EACH0.5000.50
0.5000.50
0.0000.00

0059                          0030.00 0.501.0000.50
MOBILIZATION LS 1.0000.50
1.0000.50
0.0000.00

0060                          9110.09 150.005.000750.00
RENTAL OF TRACTOR AND SCRAPER, FULLY OPERATED HOUR5.000750.00
0.0000.00
0.0000.00

GROUP 10 GENERAL ITEMSContracted2,460.30
Current2,460.30
In place1,742.60
This Estimate366.85

Totals for contractContracted1,296,647.08
Current1,356,983.91
In place1,391,195.99
This Estimate26,827.16