Nebraska Department of Roads
Estimate Summary to Contractor
Vendor ID:2364 TAB CONST. (DBA)/TAB HOLDING CO. INC.
Contract ID:2963
Estimate Number:0006
Pay Period End Date:02.19.2003
Contract Location:
US-75/NEBRASKA STREET, BLAIREstimate Type:PROG
Contractor:
TAB CONST. (DBA)/TAB HOLDING CO. INC.Date Let:03.14.2002
4153 S 67TH STDate Awarded:03.21.2002
Date Contract Executed:04.01.2002
Date Notice to Proceed:04.01.2002
OMAHA NE 68117Date Work Began:07.08.2002
Phone:Date Physical Work Completed:
(402)331-1244Date Accepted:
Escrow Agent:
Surety Co:
UNITED STATES FIDELITY AND GUARANTY COMPANY
Counties
WASHINGTON
Project Number PCT Fed State Project Number Description
21963 000  0.000 MISC-75-3(1014)  GR CP CULV ELEC
Total to DatePrev to DateThis Estimate
Current Contract AmtTotal Earnings$334,853.36$271,762.28$63,091.08
$326,150.91Stockpiled Materials$.00$.00$.00
Original Contract AmtGross Earnings$334,853.36$271,762.28$63,091.08
$315,899.99Retainage$-3,348.53$-2,717.62$-630.91
Escrow Amount$.00$.00$.00
Percent CompleteSecurities Encumbered$.00$.00$.00
102.67%Net Earnings$331,504.83$269,044.66$62,460.17
Liquidated Damages-$2,370.00$.00-$2,370.00
Incentives$.00$.00$.00
Disincentives$.00$.00$.00
Other Contract Adj$.00$.00$.00
Appl of Training Adj$.00$.00$.00
Training Rates Adj$.00$.00$.00
Fuel Adj$23.37$23.37$.00
Bituminous Adj$.00$.00$.00
Autopay Adj$.00$.00$.00
Gasoline Adj$.00$.00$.00
Other Adj$.00$.00$.00
Price Adj$.00$.00$.00
Substandard Item Adj$.00$.00$.00
Asphalt Adj$.00$.00$.00
Diesel Fuel Adj$.00$.00$.00
Petrol Adj$.00$.00$.00
Total for Adjustments-$2,346.63$23.37-$2,370.00
Payment$329,158.20$269,068.03$60,090.17
Project ManagerDiv. Head/Dist. Eng.
Brown, Darin G02.19.2003Lech, Marvin (Marv)02.19.2003
Constr. Estimate Eng.Materials Eng.
Bartos, Steve02.19.2003
Controller Div. Processed
Burling, Laurie02.20.2003
Detailed breakdown of stockpiled materials
Total remaining for contract:0.00
1. Contracted
2. Current
3. To date
Item Nbr        Item CodeUnit Price4. This Est
Item DescriptionUnitsQtyAmount
GROUP 1 GRADING
0001                          0030.10 3,895.001.0003,895.00
MOBILIZATION LS 1.0003,895.00
1.0003,895.00
0.0000.00

0002                          1009.00 6,910.001.0006,910.00
GENERAL CLEARING AND GRUBBING LS 1.0006,910.00
1.0006,910.00
1.0006,910.00

0003                          1010.01 10.001,699.00016,990.00
EXCAVATION (ESTABLISHED QUANTITY) CY 1,699.00016,990.00
1,699.00016,990.00
0.0000.00

0004                          1101.00 7.55772.0005,828.60
REMOVE PAVEMENT SY 772.0005,828.60
1,090.4508,232.90
0.0000.00

0005                          1101.25 2.501,675.0004,187.50
SAWING PAVEMENT LF 1,675.0004,187.50
1,623.8104,059.53
0.0000.00

0006                          1103.00 10.85313.0003,396.05
REMOVE BRICK SURFACE SY 313.0003,396.05
315.0003,417.75
0.0000.00

0007                          1106.00 7.55911.0006,878.05
REMOVE DRIVEWAY SY 911.0006,878.05
878.4406,632.22
0.0000.00

0008                          1107.00 0.65590.000383.50
REMOVE WALK SY 590.000383.50
622.790404.81
0.0000.00

0009                          1109.00 4.0066.000264.00
REMOVE CURB LF 66.000264.00
66.000264.00
0.0000.00

0010                          1113.00 165.002.000330.00
REMOVE STEP EACH2.000330.00
2.000330.00
0.0000.00

GROUP 1 GRADINGContracted49,062.70
Current49,062.70
In place51,136.21
This Estimate6,910.00

GROUP 3 CONCRETE PAVEMENT
0011                          L010.00 4.301,436.0006,174.80
SODDING SY 1,436.0006,174.80
3,007.00012,930.10
0.0000.00

0012                          W600.03 75.006.000450.00
ADJUST VALVE BOX TO GRADE EACH6.000450.00
5.000375.00
0.0000.00

0013                          0030.30 14,680.001.00014,680.00
MOBILIZATION LS 1.00014,680.00
1.00014,680.00
0.0000.00

0014                          2010.03 47.001.00047.00
CRUSHED ROCK SURFACE COURSE TON 1.00047.00
1.00047.00
0.0000.00

0015                          3008.05 6.05426.0002,577.30
TIE BARS EACH426.0002,577.30
369.0002,232.45
0.0000.00

0016                          3013.07 13.7065.000890.50
CONCRETE CLASS 47B-3625 BARRIER CURB, TYPE I LF 65.000890.50
97.7001,338.49
29.700406.89

0017                          3016.21 23.85789.00018,817.65
CONCRETE CLASS 47B-3000 SIDEWALKS SY 789.00018,817.65
771.36718,397.11
0.0000.00

0018                          3020.26 26.55777.00020,629.35
CONCRETE CLASS 47B-3625 DRIVEWAY SY 777.00020,629.35
791.57221,016.23
15.622414.76

0019                          3075.42 32.511,989.00064,662.39
9" CONCRETE PAVEMENT, CLASS 47B-3500 SY 1,989.00064,662.39
1,952.44263,473.88
8.810286.41

0020                          4093.80 16.85130.0002,190.50
WALL MATERIALS SF 130.0002,190.50
377.0006,352.45
0.0000.00

0021                          4095.15 5.5059.000324.50
COMPACTED EARTH LEVELING PAD LF 59.000324.50
159.000874.50
0.0000.00

0022                          4103.06 1,259.001.8002,266.20
CLASS 47B-3000 CONCRETE FOR STEP CY 1.8002,266.20
0.560705.04
0.0000.00

0023                          8024.50 16.502.00033.00
SELECT GRANULAR BACKFILL FOR RETAINED EARTH STRUCTURE CY 2.00033.00
3.50057.75
0.0000.00

0024                          8029.10 7.251,989.00014,420.25
AGGREGATE FOUNDATION COURSE-D 4" SY 1,989.00014,420.25
2,105.64415,265.92
24.432177.13

0025                          9111.00 5.0011.00055.00
WATER MGAL11.00055.00
0.0000.00
0.0000.00

0026                          9170.00 145.0017.4762,534.02
EARTH SHOULDER CONSTRUCTION STA 17.4762,534.02
16.7642,430.78
0.0000.00

0027                          9173.20 2.302,766.0006,361.80
SUBGRADE PREPARATION SY 2,766.0006,361.80
2,744.0146,311.23
24.43256.19

GROUP 3 CONCRETE PAVEMENTContracted157,114.26
Current157,114.26
In place166,487.93
This Estimate1,341.38

GROUP 4 CULVERTS
0028                          0030.40 1,104.861.0001,104.86
MOBILIZATION LS 1.0001,104.86
1.0001,104.86
0.0000.00

0029                          1119.00 608.002.0001,216.00
REMOVE INLET EACH2.0001,216.00
2.0001,216.00
0.0000.00

0030                          4002.00 1.23250.000307.50
CAST IRON COVER AND FRAME LB 250.000307.50
250.000307.50
0.0000.00

0031                          4043.50 12.1528.000340.20
REMOVE SEWER PIPE LF 28.000340.20
7.50091.13
0.0000.00

0032                          4044.00 1,455.001.0001,455.00
PREPARATION OF STRUCTURE EACH1.0001,455.00
AT STA. 620+92.51 1.0001,455.00
0.0000.00

0033                          4051.01 28.9511.000318.45
EXCAVATION FOR BOX CULVERTS CY 11.000318.45
11.000318.45
0.0000.00

0034                          4101.06 715.257.3105,228.48
CLASS 47B-3000 OR AX-3000 CONCRETE FOR BOX CULVERT CY 7.3105,228.48
7.3105,228.48
0.0000.00

0035                          4105.59 363.159.9103,598.82
CLASS 47B-3000 CONCRETE FOR INLET AND JUNCTION BOX CY 9.9103,598.82
3.5101,274.66
0.0000.00

0036                          4107.07 200.001.730346.00
CLASS 47B-3000 OR AX-3000 CONCRETE FOR CONCRETE COLLARS CY 1.730346.00
0.0000.00
0.0000.00

0037                          4151.00 1.05606.000636.30
REINFORCING STEEL FOR BOX CULVERT LB 606.000636.30
606.000636.30
0.0000.00

0038                          4155.50 1.32580.000765.60
REINFORCING STEEL FOR INLET AND JUNCTION BOX LB 580.000765.60
259.000341.88
0.0000.00

0039                          4157.00 1.45128.000185.60
REINFORCING STEEL FOR COLLARS LB 128.000185.60
0.0000.00
0.0000.00

0040                          4600.15 40.1525.0001,003.75
15" REINFORCED CONCRETE SEWER PIPE LF 25.0001,003.75
8.000321.20
0.0000.00

0041                          4600.36 83.5514.0001,169.70
36" REINFORCED CONCRETE SEWER PIPE LF 14.0001,169.70
0.0000.00
0.0000.00

GROUP 4 CULVERTSContracted17,676.25
Current17,676.25
In place12,295.46
This Estimate0.00

GROUP 8B ELECTRICAL
0042                          A001.01 635.0015.0009,525.00
PULL BOX, TYPE PB-1 EACH15.0009,525.00
15.0009,525.00
0.0000.00

0043                          A004.00 785.007.0005,495.00
TRAFFIC SIGNAL, TYPE TS-1 EACH7.0005,495.00
7.0005,495.00
7.0005,495.00

0044                          A004.04 1,292.001.0001,292.00
TRAFFIC SIGNAL, TYPE TS-1LL EACH1.0001,292.00
1.0001,292.00
1.0001,292.00

0045                          A006.15 480.008.0003,840.00
PEDESTRIAN SIGNAL, TYPE PS-1 EACH8.0003,840.00
8.0003,840.00
8.0003,840.00

0046                          A006.70 93.004.000372.00
PEDESTRIAN PUSHBUTTON, TYPE PPB EACH4.000372.00
4.000372.00
4.000372.00

0047                          A007.00 260.004.0001,040.00
VEHICLE DETECTOR, TYPE B PREFORMED EACH4.0001,040.00
4.0001,040.00
0.0000.00

0048                          A007.15 485.004.0001,940.00
VEHICLE DETECTOR, TYPE TD-5 EACH4.0001,940.00
4.0001,940.00
4.0001,940.00

0049                          A011.40 5,355.002.00010,710.00
COMBINATION MAST ARM SIGNAL AND LIGHTING POLE,TYPE CMP-35-12 EACH2.00010,710.00
2.00010,710.00
2.00010,710.00

0050                          A011.65 5,400.002.00010,800.00
COMBINATION MAST ARM SIGNAL AND LIGHTING POLE,TYPE CMP-40-12 EACH2.00010,800.00
2.00010,800.00
2.00010,800.00

0051                          A070.10 4.00597.0002,388.00
1 1/2-INCH CONDUIT IN TRENCH LF 597.0002,388.00
597.0002,388.00
297.0001,188.00

0052                          A070.14 4.781,713.0008,188.14
2-INCH CONDUIT IN TRENCH LF 1,713.0008,188.14
1,713.0008,188.14
288.0001,376.64

0053                          A070.18 5.9529.000172.55
3-INCH CONDUIT IN TRENCH LF 29.000172.55
30.000178.50
0.0000.00

0054                          A072.10 6.65163.0001,083.95
1 1/2-INCH CONDUIT UNDER ROADWAY LF 163.0001,083.95
163.0001,083.95
101.000671.65

0055                          A072.14 7.25166.0001,203.50
2-INCH CONDUIT UNDER ROADWAY LF 166.0001,203.50
166.0001,203.50
104.000754.00

0056                          A073.12 7.05110.000775.50
2-INCH CONDUIT UNDER SIDEWALK LF 110.000775.50
110.000775.50
22.000155.10

0057                          A074.14 8.60411.0003,534.60
2-INCH CONDUIT, JACKED LF 411.0003,534.60
411.0003,534.60
146.0001,255.60

0058                          A074.18 11.7078.000912.60
3-INCH CONDUIT, JACKED LF 78.000912.60
78.000912.60
0.0000.00

0059                          A077.12 0.85437.000371.45
2/C #14 AWG TRAFFIC SIGNAL CABLE LF 437.000371.45
437.000371.45
437.000371.45

0060                          A077.17 1.202,662.0003,194.40
7/C #14 AWG TRAFFIC SIGNAL CABLE LF 2,662.0003,194.40
2,753.0003,303.60
2,753.0003,303.60

0061                          A077.22 2.65437.0001,158.05
12/C #14 AWG TRAFFIC SIGNAL CABLE LF 437.0001,158.05
437.0001,158.05
437.0001,158.05

0062                          A079.01 0.85428.000363.80
2/C #14 AWG DETECTOR LEAD-IN CABLE LF 428.000363.80
428.000363.80
428.000363.80

0063                          A079.50 0.582,928.0001,698.24
GROUNDING CONDUCTOR LF 2,928.0001,698.24
2,928.0001,698.24
2,928.0001,698.24

0064                          A079.55 0.75692.000519.00
SERVICE CABLE LF 692.000519.00
692.000519.00
692.000519.00

0065                          A080.22 0.70760.000532.00
STREET LIGHTING CABLE, NO. 6 BARE LF 760.000532.00
760.000532.00
760.000532.00

0066                          A080.24 0.701,520.0001,064.00
STREET LIGHTING CABLE, NO. 6 USE LF 1,520.0001,064.00
1,520.0001,064.00
1,520.0001,064.00

0067                          A500.20 689.001.000689.00
INSTALL TRAFFIC SIGNAL CONTROLLER, TYPE TC-170 EACH1.000689.00
1.000689.00
1.000689.00

0068                          A600.00 320.002.000640.00
REMOVE LIGHTING UNIT EACH2.000640.00
2.000640.00
0.0000.00

0069                          A700.20 985.003.0002,955.00
RELOCATE STREET LIGHTING UNIT EACH3.0002,955.00
3.0002,955.00
3.0002,955.00

0070                          0030.81 1,135.001.0001,135.00
MOBILIZATION LS 1.0001,135.00
1.0001,135.00
1.0001,135.00

GROUP 8B ELECTRICALContracted77,592.78
Current77,592.78
In place77,707.93
This Estimate53,639.13

GROUP 10 GENERAL ITEMS
0071                          0001.08 0.502,000.0001,000.00
BARRICADE, TYPE II BDAY2,000.0001,000.00
3,472.0001,736.00
36.00018.00

0072                          0001.10 3.00664.0001,992.00
BARRICADE, TYPE III BDAY664.0001,992.00
1,744.0005,232.00
270.000810.00

0073                          0001.75 2.20240.000528.00
TEMPORARY SIGN DAY EACH240.000528.00
0.0000.00
0.0000.00

0074                          0001.90 0.502,158.0001,079.00
SIGN DAY EACH2,158.0001,079.00
3,269.0001,634.50
655.000327.50

0075                          0002.97 45.0080.0003,600.00
FLASHING ARROW PANEL DAY 80.0003,600.00
84.0003,780.00
1.00045.00

0076                          0003.10 235.0020.0004,700.00
FLAGGING DAY 20.0004,700.00
0.0000.00
0.0000.00

0077                          0010.04 1,000.001.0001,000.00
FIELD OFFICE EACH1.0001,000.00
0.0000.00
0.0000.00

0078                          0030.00 555.001.000555.00
MOBILIZATION LS 1.000555.00
1.000555.00
0.0000.00

0079                          0001.30 2.310.0000.00
TYPE "B" HIGH INTENSITY WARNING LIGHTS LDAY32.00073.92
394.000910.14
0.0000.00

0080                          7500.04 1.900.0000.00
4" WHITE LINE LF 385.000731.50
689.0001,309.10
0.0000.00

0081                          7500.03 1.900.0000.00
4" YELLOW LINE LF 3,045.0005,785.50
3,196.0006,072.40
0.0000.00

0082                          7500.12 5.500.0000.00
12" WHITE LINE LF 400.0002,200.00
499.0002,744.50
0.0000.00

0083                          7500.13 5.500.0000.00
12" YELLOW LINE LF 120.000660.00
202.0001,111.00
0.0000.00

0084                          0002.30 0.800.0000.00
PAVEMENT MARKING REMOVAL LF 1,000.000800.00
2,676.0002,140.80
0.0000.00

GROUP 10 GENERAL ITEMSContracted14,454.00
Current24,704.92
In place27,225.44
This Estimate1,200.50

Totals for contractContracted315,899.99
Current326,150.91
In place334,852.97
This Estimate63,091.01