Return to District Map


Nebraska Department of Roads
Estimate Summary to Contractor
Vendor ID:0049 HAWKINS CONSTRUCTION COMPANY
Contract ID:2926
Estimate Number:0029
Pay Period End Date:08.09.2003
Contract Location:
N-370 TO N-50Estimate Type:PROG
Contractor:
HAWKINS CONSTRUCTION COMPANYDate Let:03.14.2002
2512 DEER PARK BLVDDate Awarded:03.26.2002
PO BOX 9008 STA CDate Contract Executed:04.08.2002
Date Notice to Proceed:04.08.2002
OMAHA NE 68109Date Work Began:
Phone:Date Physical Work Completed:
(402)342-1607Date Accepted:
Escrow Agent:
Surety Co:
ST. PAUL FIRE & MARINE INSURANCE COMPANY
Counties
SARPY
Project Number PCT Fed State Project Number Description
21926 000  0.000 EACNH-80-9(808)  GR CP CULV SEED BR GDRL FENCE ELEC SIGN
21931 000  0.000 EACNH-80-9(813)  BRIDGE
Total to DatePrev to DateThis Estimate
Current Contract AmtTotal Earnings$11,564,574.17$11,236,458.58$328,115.59
$18,809,515.05Stockpiled Materials$284,819.24$291,849.83$-7,030.59
Original Contract AmtGross Earnings$11,849,393.41$11,528,308.41$321,085.00
$18,862,392.57Retainage$-25,000.00$-25,000.00$.00
Escrow Amount$.00$.00$.00
Percent CompleteSecurities Encumbered$.00$.00$.00
61.48%Net Earnings$11,824,393.41$11,503,308.41$321,085.00
Liquidated Damages$.00$.00$.00
Incentives$.00$.00$.00
Disincentives$.00$.00$.00
Other Contract Adj$.00$.00$.00
Appl of Training Adj$.00$.00$.00
Training Rates Adj$.00$.00$.00
Fuel Adj$4,973.68$4,973.68$.00
Bituminous Adj$.00$.00$.00
Autopay Adj$.00$.00$.00
Gasoline Adj$.00$.00$.00
Other Adj$.00$.00$.00
Price Adj$.00$.00$.00
Substandard Item Adj$.00$.00$.00
Asphalt Adj$.00$.00$.00
Diesel Fuel Adj$.00$.00$.00
Petrol Adj$.00$.00$.00
Total for Adjustments$4,973.68$4,973.68$.00
Payment$11,829,367.09$11,508,282.09$321,085.00
Project ManagerDiv. Head/Dist. Eng.
Fisher, Rick08.11.2003Lech, Marvin (Marv)08.11.2003
Constr. Estimate Eng.Materials Eng.
Hitzeman, Bill08.11.2003
Controller Div. Processed
Burling, Laurie08.12.2003
Detailed breakdown of stockpiled materials
Est Nbr:0006
Item NbrItem CdItem DescAdj AmtInvoice Nbr
00583075.56 10" DOWELED CONCRETE PAVEMENT, CLASS 47B-3500
S.P. Initial Payment54,647.52552996
Dowel Baskets 10"
Total for estimate 0006:54,647.52
Est Nbr:0007
Item NbrItem CdItem DescAdj AmtInvoice Nbr
00583075.56 10" DOWELED CONCRETE PAVEMENT, CLASS 47B-3500
S.P. Adjustment-9,942.13552996
Dowel Baskets 10"
Total for estimate 0007:-9,942.13
Est Nbr:0008
Item NbrItem CdItem DescAdj AmtInvoice Nbr
00583075.56 10" DOWELED CONCRETE PAVEMENT, CLASS 47B-3500
S.P. Adjustment-774.28552996
Dowel Baskets 10"
02007110.05 5 FOOT CHAIN-LINK FENCE
S.P. Initial Payment57,264.90811829
5' Chain-Link Fence
S.P. Adjustment-6,912.53811829
5' Chain-Link Fence
Total for estimate 0008:49,578.09
Est Nbr:0009
Item NbrItem CdItem DescAdj AmtInvoice Nbr
00583075.56 10" DOWELED CONCRETE PAVEMENT, CLASS 47B-3500
S.P. Adjustment-1,842.80552996
Dowel Baskets 10"
Total for estimate 0009:-1,842.80
Est Nbr:0010
Item NbrItem CdItem DescAdj AmtInvoice Nbr
00583075.56 10" DOWELED CONCRETE PAVEMENT, CLASS 47B-3500
S.P. Adjustment-2,535.97552996
Dowel Baskets 10"
Total for estimate 0010:-2,535.97
Est Nbr:0011
Item NbrItem CdItem DescAdj AmtInvoice Nbr
00583075.56 10" DOWELED CONCRETE PAVEMENT, CLASS 47B-3500
S.P. Adjustment-1,565.20552996
Dowel Baskets 10"
01094004.50 CAST IRON GRATE AND FRAME
S.P. Initial Payment98,458.30115125
Cast Iron Grate & Frame
S.P. Adjustment-3,752.62115125
Cast Iron Grate & Frame
01104005.00 CAST IRON RING AND COVER
S.P. Initial Payment234.59115125
Cast Iron Ring & Cover
Total for estimate 0011:93,375.07
Est Nbr:0012
Item NbrItem CdItem DescAdj AmtInvoice Nbr
00533025.00 CONCRETE CLASS 47BD-4000 MEDIAN BARRIER
S.P. Initial Payment11,592.00118764
Conc 47BD-4000 Median Barrier
00583075.56 10" DOWELED CONCRETE PAVEMENT, CLASS 47B-3500
S.P. Adjustment-7,974.06552996
Dowel Baskets 10"
01094004.50 CAST IRON GRATE AND FRAME
S.P. Adjustment-1,876.31115125
Cast Iron Grate & Frame
Total for estimate 0012:1,741.63
Est Nbr:0013
Item NbrItem CdItem DescAdj AmtInvoice Nbr
00533025.00 CONCRETE CLASS 47BD-4000 MEDIAN BARRIER
S.P. Adjustment-4,047.12118764
Conc 47BD-4000 Median Barrier
00583075.56 10" DOWELED CONCRETE PAVEMENT, CLASS 47B-3500
S.P. Adjustment-6,663.70552996
Dowel Baskets 10"
01094004.50 CAST IRON GRATE AND FRAME
S.P. Adjustment-617.46115125
Cast Iron Grate & Frame
Total for estimate 0013:-11,328.28
Est Nbr:0014
Item NbrItem CdItem DescAdj AmtInvoice Nbr
00583075.56 10" DOWELED CONCRETE PAVEMENT, CLASS 47B-3500
S.P. Adjustment-1,590.09552996
Dowel Baskets 10"
Total for estimate 0014:-1,590.09
Est Nbr:0015
Item NbrItem CdItem DescAdj AmtInvoice Nbr
00583075.56 10" DOWELED CONCRETE PAVEMENT, CLASS 47B-3500
S.P. Adjustment-953.32552996
Dowel Baskets 10"
02007110.05 5 FOOT CHAIN-LINK FENCE
S.P. Adjustment-999.00811829
5' Chain-Link Fence
Total for estimate 0015:-1,952.32
Est Nbr:0017
Item NbrItem CdItem DescAdj AmtInvoice Nbr
0209A001.12 PULL BOX, TYPE PB-5
S.P. Initial Payment742.28S2062568
Pull Box, Type PB-5
0210A001.16 PULL BOX, TYPE PB-6
S.P. Initial Payment6,092.24S2062568
Pull Box, Type PB-6
0223A009.73 STREET LIGHTING UNIT, TYPE SL-S-45-6 & 6-0.20
S.P. Initial Payment24,970.00S1933159
St Light Unit SL-S-45-6 & 6-0.20
0224A010.20 LUMINAIRE, TYPE HML-A-1KW
S.P. Initial Payment24,552.00S1937342
Luminaire, Type HML-A-1KW
0225A010.26 LUMINAIRE, TYPE HML-V-1KW
S.P. Initial Payment18,414.00S1937342
Luminaire, Type HML-V-1KW
0227A012.05 COMBINATION MAST ARM SIGNAL AND LIGHTING POLE,
S.P. Initial Payment3,815.00S1933159
C.M.A. Sig & Light Pole, CMP-45-12
0228A012.60 COMBINATION MAST ARM SIGNAL AND LIGHTING POLE
S.P. Initial Payment3,960.00S1933159
C.M.A. Sig & Light Pole, CMP-50-12
0229A012.90 COMBINATION MAST ARM SIGNAL AND LIGHTING POLE,
S.P. Initial Payment16,326.00S1933159
C.M.A. Sig & Light Pole, CMP-60-12
0230A012.95 COMBINATION MAST ARM SIGNAL AND LIGHTING POLE,
S.P. Initial Payment16,581.00S1933159
C.M.A. Sig & Light Pole, CMP-65-12
0231A016.74 MAST ARM SIGNAL POLE, TYPE MP-50-45
S.P. Initial Payment8,870.00S1933159
Mast Arm Signal Pole, MP-50-45
0233A016.90 MAST ARM SIGNAL POLE, TYPE MP-70
S.P. Initial Payment4,909.00S1933159
Mast Arm Signal Pole, MP-70
0234A016.95 MAST ARM SIGNAL POLE, TYPE MP-75
S.P. Initial Payment5,535.00S1933159
Mast Arm Signal Pole, MP-75
0238A018.84 ANCHOR BOLTS
S.P. Initial Payment2,976.00S1933159
Anchor Bolts
0258A500.20 INSTALL TRAFFIC SIGNAL CONTROLLER, TYPE TC-170
S.P. Initial Payment825.00S2062687
Inst Traf Sig Controller, TC-170
S.P. Adjustment-165.00S2062687
Inst Traf Sig Controller, TC-170
0269A750.10 MODIFY HIGH MAST TOWER
S.P. Initial Payment52,727.50S1933159
Modify High Mast Tower
0270A750.11 MODIFY HIGH MAST TOWER
S.P. Initial Payment31,636.50S1933159
Modify High Mast Tower
0271A750.12 MODIFY HIGH MAST TOWER
S.P. Initial Payment31,636.50S1933159
Modify High Mast Tower
0272A750.13 MODIFY HIGH MAST TOWER
S.P. Initial Payment10,545.50S1933159
Modify High Mast Tower
0273A750.14 MODIFY HIGH MAST TOWER
S.P. Initial Payment21,091.00S1933159
Modify High Mast Tower
0290A010.08 LUMINAIRE, TYPE HPS-150
S.P. Initial Payment7,105.35S1937342
Luminaire, Type HPS-150
Total for estimate 0017:293,144.87
Est Nbr:0018
Item NbrItem CdItem DescAdj AmtInvoice Nbr
0210A001.16 PULL BOX, TYPE PB-6
S.P. Adjustment-1,523.06S2062568
Pull Box, Type PB-6
Total for estimate 0018:-1,523.06
Est Nbr:0019
Item NbrItem CdItem DescAdj AmtInvoice Nbr
0096P300.48 48" CULVERT PIPE, TYPE 3,4 OR 5
S.P. Initial Payment1,819.6278111
48" Culvert Pipe, Type 3,4,5
01484310.48 48" FLARED-END SECTION
S.P. Initial Payment1,127.3078111
48" Flared-End Section
0269A750.10 MODIFY HIGH MAST TOWER
S.P. Adjustment-21,091.00S1933159
Modify High Mast Tower
0271A750.12 MODIFY HIGH MAST TOWER
S.P. Adjustment-10,545.50S1933159
Modify High Mast Tower
Total for estimate 0019:-28,689.58
Est Nbr:0020
Item NbrItem CdItem DescAdj AmtInvoice Nbr
0210A001.16 PULL BOX, TYPE PB-6
S.P. Adjustment-217.58S2062568
Pull Box, Type PB-6
0224A010.20 LUMINAIRE, TYPE HML-A-1KW
S.P. Adjustment-9,207.00S1937342
Luminaire, Type HML-A-1KW
0225A010.26 LUMINAIRE, TYPE HML-V-1KW
S.P. Adjustment-6,138.00S1937342
Luminaire, Type HML-V-1KW
0269A750.10 MODIFY HIGH MAST TOWER
S.P. Adjustment-10,545.50S1933159
Modify High Mast Tower
0270A750.11 MODIFY HIGH MAST TOWER
S.P. Adjustment-10,545.50S1933159
Modify High Mast Tower
Total for estimate 0020:-36,653.58
Est Nbr:0021
Item NbrItem CdItem DescAdj AmtInvoice Nbr
00603075.96 14" DOWELED CONCRETE PAVEMENT, CLASS 47B-3500
S.P. Initial Payment118,608.661003890
14" Doweled Conc Pvmt, 47B-3500
S.P. Adjustment-1,509.491003890
14" Doweled Conc Pvmt, 47B-3500
0238A018.84 ANCHOR BOLTS
S.P. Adjustment-1,488.00S1933159
Anchor Bolts
Total for estimate 0021:115,611.17
Est Nbr:0022
Item NbrItem CdItem DescAdj AmtInvoice Nbr
00583075.56 10" DOWELED CONCRETE PAVEMENT, CLASS 47B-3500
S.P. Adjustment-4,990.19552996
Dowel Baskets 10"
00603075.96 14" DOWELED CONCRETE PAVEMENT, CLASS 47B-3500
S.P. Adjustment-3,641.781003890
14" Doweled Conc Pvmt, 47B-3500
0224A010.20 LUMINAIRE, TYPE HML-A-1KW
S.P. Adjustment-3,069.00S1937342
Luminaire, Type HML-A-1KW
0225A010.26 LUMINAIRE, TYPE HML-V-1KW
S.P. Adjustment-3,069.00S1937342
Luminaire, Type HML-V-1KW
0269A750.10 MODIFY HIGH MAST TOWER
S.P. Adjustment-10,545.50S1933159
Modify High Mast Tower
0270A750.11 MODIFY HIGH MAST TOWER
S.P. Adjustment-10,545.50S1933159
Modify High Mast Tower
02937312.00 OVERHEAD SIGN SUPPORT, LOCATION
S.P. Initial Payment710.93R1522
Overhead Sign Support, Location 16
02947312.01 OVERHEAD SIGN SUPPORT, LOCATION
S.P. Initial Payment710.93R1522
Overhead Sign Support, Location 17
02957312.02 OVERHEAD SIGN SUPPORT, LOCATION
S.P. Initial Payment710.93R1522
Overhead Sign Support, Location 18
02967312.03 OVERHEAD SIGN SUPPORT, LOCATION
S.P. Initial Payment710.93R1522
Overhead Sign Support, Location 19
03027312.09 OVERHEAD SIGN SUPPORT, LOCATION
S.P. Initial Payment710.93R1522
Overhead Sign Support, Location 31
03037312.10 OVERHEAD SIGN SUPPORT, LOCATION
S.P. Initial Payment710.93R1522
Overhead Sign Support, Location 32
03047312.11 OVERHEAD SIGN SUPPORT, LOCATION
S.P. Initial Payment710.93R1522
Overhead Sign Support, Location 33
03057312.12 OVERHEAD SIGN SUPPORT, LOCATION
S.P. Initial Payment710.93R1522
Overhead Sign Support, Loaction 34
Total for estimate 0022:-30,173.53
Est Nbr:0023
Item NbrItem CdItem DescAdj AmtInvoice Nbr
00354095.00 CONCRETE FACE PANELS
S.P. Initial Payment30,263.40201040
Concrete Face Panels
Total for estimate 0023:30,263.40
Est Nbr:0024
Item NbrItem CdItem DescAdj AmtInvoice Nbr
00583075.56 10" DOWELED CONCRETE PAVEMENT, CLASS 47B-3500
S.P. Adjustment-917.07552996
Dowel Baskets 10"
00603075.96 14" DOWELED CONCRETE PAVEMENT, CLASS 47B-3500
S.P. Adjustment-23,307.961003890
14" Doweled Conc Pvmt, 47B-3500
Total for estimate 0024:-24,225.03
Est Nbr:0025
Item NbrItem CdItem DescAdj AmtInvoice Nbr
00533025.00 CONCRETE CLASS 47BD-4000 MEDIAN BARRIER
S.P. Initial Payment10,503.36129936
Conc 47BD-4000 Median Barrier
00603075.96 14" DOWELED CONCRETE PAVEMENT, CLASS 47B-3500
S.P. Adjustment-17,262.851003890
14" Doweled Conc Pvmt, 47B-3500
00757508.14 12" WHITE PREFORMED PAVEMENT MARKING, TYPE 4, GROOVED
S.P. Initial Payment12,934.00TP47546
12" WHT PREF PVMT MRKING T-4 GROOVED
0096P300.48 48" CULVERT PIPE, TYPE 3,4 OR 5
S.P. Adjustment-1,819.6278111
48" Culvert Pipe, Type 3,4,5
01484310.48 48" FLARED-END SECTION
S.P. Adjustment-1,127.3078111
48" Flared-End Section
Total for estimate 0025:3,227.59
Est Nbr:0026
Item NbrItem CdItem DescAdj AmtInvoice Nbr
00603075.96 14" DOWELED CONCRETE PAVEMENT, CLASS 47B-3500
S.P. Adjustment-39,428.171003890
14" Doweled Conc Pvmt, 47B-3500
01094004.50 CAST IRON GRATE AND FRAME
S.P. Adjustment-46,907.70115125
Cast Iron Grate & Frame
0210A001.16 PULL BOX, TYPE PB-6
S.P. Adjustment-870.32S2062568
Pull Box, Type PB-6
Total for estimate 0026:-87,206.19
Est Nbr:0027
Item NbrItem CdItem DescAdj AmtInvoice Nbr
00533025.00 CONCRETE CLASS 47BD-4000 MEDIAN BARRIER
S.P. Adjustment-7,544.88118764
Conc 47BD-4000 Median Barrier
S.P. Adjustment-7,877.52129936
Conc 47BD-4000 Median Barrier
00603075.96 14" DOWELED CONCRETE PAVEMENT, CLASS 47B-3500
S.P. Adjustment-10,847.551003890
14" Doweled Conc Pvmt, 47B-3500
0210A001.16 PULL BOX, TYPE PB-6
S.P. Adjustment-1,087.90S2062568
Pull Box, Type PB-6
0223A009.73 STREET LIGHTING UNIT, TYPE SL-S-45-6 & 6-0.20
S.P. Adjustment-18,160.00S1933159
St Light Unit SL-S-45-6 & 6-0.20
0269A750.10 MODIFY HIGH MAST TOWER
S.P. Adjustment-10,545.50S1933159
Modify High Mast Tower
0271A750.12 MODIFY HIGH MAST TOWER
S.P. Adjustment-10,545.50S1933159
Modify High Mast Tower
Total for estimate 0027:-66,608.85
Est Nbr:0028
Item NbrItem CdItem DescAdj AmtInvoice Nbr
00533025.00 CONCRETE CLASS 47BD-4000 MEDIAN BARRIER
S.P. Adjustment-2,625.84129936
Conc 47BD-4000 Median Barrier
00583075.56 10" DOWELED CONCRETE PAVEMENT, CLASS 47B-3500
S.P. Adjustment-2,786.60552996
Dowel Baskets 10"
00603075.96 14" DOWELED CONCRETE PAVEMENT, CLASS 47B-3500
S.P. Adjustment-2,568.201003890
14" Doweled Conc Pvmt, 47B-3500
01094004.50 CAST IRON GRATE AND FRAME
S.P. Adjustment-42,489.76115125
Cast Iron Grate & Frame
0210A001.16 PULL BOX, TYPE PB-6
S.P. Adjustment-435.16S2062568
Pull Box, Type PB-6
0223A009.73 STREET LIGHTING UNIT, TYPE SL-S-45-6 & 6-0.20
S.P. Adjustment-4,540.00S1933159
St Light Unit SL-S-45-6 & 6-0.20
Total for estimate 0028:-55,445.56
Est Nbr:0029
Item NbrItem CdItem DescAdj AmtInvoice Nbr
00603075.96 14" DOWELED CONCRETE PAVEMENT, CLASS 47B-3500
S.P. Adjustment-1,623.111003890
14" Doweled Conc Pvmt, 47B-3500
0224A010.20 LUMINAIRE, TYPE HML-A-1KW
S.P. Adjustment-9,207.00S1937342
Luminaire, Type HML-A-1KW
0225A010.26 LUMINAIRE, TYPE HML-V-1KW
S.P. Adjustment-6,138.00S1937342
Luminaire, Type HML-V-1KW
0271A750.12 MODIFY HIGH MAST TOWER
S.P. Adjustment-10,545.50S1933159
Modify High Mast Tower
0273A750.14 MODIFY HIGH MAST TOWER
S.P. Adjustment-10,545.50S1933159
Modify High Mast Tower
03067322.01 TYPE B SIGN
S.P. Initial Payment31,028.52143931
Type B Sign
Total for estimate 0029:-7,030.59
Est Nbr:0007
Item NbrItem CdItem DescAdj AmtInvoice Nbr
01816131.50 EPOXY COATED REINFORCING STEEL
S.P. Initial Payment24,812.952695
Epoxy Coated Re-Steel
S.P. Adjustment-1,267.112695
Epoxy Coated Re-Steel
Total for estimate 0007:23,545.84
Est Nbr:0008
Item NbrItem CdItem DescAdj AmtInvoice Nbr
01746005.85 GUIDED BEARING DEVICE, TYPE II
S.P. Initial Payment22,900.00108576
Guided Bearing DVC, Type II
01796081.00 STRUCTURAL STEEL FOR SUPERSTRUCTURE
S.P. Initial Payment4,910.00SI-16433
Struc Steel for Superstructure
01816131.50 EPOXY COATED REINFORCING STEEL
S.P. Adjustment-607.362695
Epoxy Coated Re-Steel
Total for estimate 0008:27,202.64
Est Nbr:0009
Item NbrItem CdItem DescAdj AmtInvoice Nbr
01816131.50 EPOXY COATED REINFORCING STEEL
S.P. Adjustment-3,264.672695
Epoxy Coated Re-Steel
Total for estimate 0009:-3,264.67
Est Nbr:0010
Item NbrItem CdItem DescAdj AmtInvoice Nbr
01796081.00 STRUCTURAL STEEL FOR SUPERSTRUCTURE
S.P. Adjustment-4,910.00SI-16433
Struc Steel for Superstructure
01816131.50 EPOXY COATED REINFORCING STEEL
S.P. Adjustment-2,175.972695
Epoxy Coated Re-Steel
Total for estimate 0010:-7,085.97
Est Nbr:0011
Item NbrItem CdItem DescAdj AmtInvoice Nbr
01816131.50 EPOXY COATED REINFORCING STEEL
S.P. Adjustment-1,567.502695
Epoxy Coated Re-Steel
Total for estimate 0011:-1,567.50
Est Nbr:0012
Item NbrItem CdItem DescAdj AmtInvoice Nbr
01746005.85 GUIDED BEARING DEVICE, TYPE II
S.P. Adjustment-22,900.00108576
Guided Bearing DVC, Type II
01816131.50 EPOXY COATED REINFORCING STEEL
S.P. Adjustment-1,339.502695
Epoxy Coated Re-Steel
Total for estimate 0012:-24,239.50
Est Nbr:0013
Item NbrItem CdItem DescAdj AmtInvoice Nbr
01816131.50 EPOXY COATED REINFORCING STEEL
S.P. Adjustment-1,658.702695
Epoxy Coated Re-Steel
Total for estimate 0013:-1,658.70
Est Nbr:0014
Item NbrItem CdItem DescAdj AmtInvoice Nbr
01816131.50 EPOXY COATED REINFORCING STEEL
S.P. Adjustment-12,932.132695
Epoxy Coated Re-Steel
Total for estimate 0014:-12,932.13
Est Nbr:0016
Item NbrItem CdItem DescAdj AmtInvoice Nbr
01683051.10 EPOXY COATED REINFORCING STEEL FOR PAVEMENT APPROACHES
S.P. Initial Payment18,025.393094
Epoxy Coated Re-Steel for PVMT Approach
01816131.50 EPOXY COATED REINFORCING STEEL
S.P. Initial Payment19,903.263095
Epoxy Coated Re-Steel
S.P. Adjustment-13,079.903095
Epoxy Coated Re-Steel
Total for estimate 0016:24,848.75
Est Nbr:0017
Item NbrItem CdItem DescAdj AmtInvoice Nbr
01816131.50 EPOXY COATED REINFORCING STEEL
S.P. Adjustment-934.803095
Epoxy Coated Re-Steel
Total for estimate 0017:-934.80
Est Nbr:0021
Item NbrItem CdItem DescAdj AmtInvoice Nbr
01816131.50 EPOXY COATED REINFORCING STEEL
S.P. Adjustment-4,845.003095
Epoxy Coated Re-Steel
Total for estimate 0021:-4,845.00
Est Nbr:0024
Item NbrItem CdItem DescAdj AmtInvoice Nbr
01816131.50 EPOXY COATED REINFORCING STEEL
S.P. Adjustment-684.003095
Epoxy Coated Re-Steel
Total for estimate 0024:-684.00
Est Nbr:0025
Item NbrItem CdItem DescAdj AmtInvoice Nbr
01683051.10 EPOXY COATED REINFORCING STEEL FOR PAVEMENT APPROACHES
S.P. Adjustment-1,710.003094
Epoxy Coated Re-Steel for PVMT Approach
Total for estimate 0025:-1,710.00
Est Nbr:0026
Item NbrItem CdItem DescAdj AmtInvoice Nbr
01683051.10 EPOXY COATED REINFORCING STEEL FOR PAVEMENT APPROACHES
S.P. Adjustment-6,697.503094
Epoxy Coated Re-Steel for PVMT Approach
Total for estimate 0026:-6,697.50
Total remaining for contract:284,819.24
1. Contracted
2. Current
3. To date
Item Nbr        Item CodeUnit Price4. This Est
Item DescriptionUnitsQtyAmount
GROUP 1 GRADING
0001                          L006.00 119.5179.0009,441.29
COVER CROP SEEDING ACRE79.0009,441.29
74.0008,843.74
0.0000.00

0002                          L020.00 1.3010,861.00014,119.30
EROSION CONTROL SY 10,861.00014,119.30
9,990.00012,987.00
0.0000.00

0003                          L020.01 4.7311,054.00052,285.42
EROSION CONTROL, TYPE A SY 11,054.00052,285.42
1,683.0007,960.59
0.0000.00

0004                          L020.08 5.052,878.00014,533.90
EROSION CONTROL, TYPE AA SY 2,878.00014,533.90
985.0004,974.25
0.0000.00

0005                          L020.09 10.32841.0008,679.12
EROSION CONTROL, TYPE AAA SY 841.0008,679.12
47.000485.04
0.0000.00

0006                          L020.10 1.4116,435.00023,173.35
EROSION CONTROL, TYPE HV SY 16,435.00023,173.35
3,738.0005,270.58
0.0000.00

0007                          L020.13 1.301,460.0001,898.00
EROSION CONTROL, TYPE J SY 1,460.0001,898.00
0.0000.00
0.0000.00

0008                          L021.01 17.38643.00011,175.34
EROSION CHECKS, TYPE A BALE643.00011,175.34
112.0001,946.56
0.0000.00

0009                          L021.06 15.21715.00010,875.15
EROSION CHECKS, TYPE HV BALE715.00010,875.15
288.0004,380.48
0.0000.00

0010                          L021.21 17.93168.0003,012.24
EROSION CHECKS, TYPE AA BALE168.0003,012.24
42.000753.06
0.0000.00

0011                          L021.22 21.7342.000912.66
EROSION CHECKS, TYPE AAA BALE42.000912.66
0.0000.00
0.0000.00

0012                          L022.11 1.963,785.0007,418.60
FABRIC SILT FENCE-LOW POROSITY LF 3,785.0007,418.60
3,807.0007,461.72
0.0000.00

0013                          L022.12 2.44124.000302.56
FABRIC SILT FENCE-HIGH POROSITY LF 124.000302.56
303.000739.32
0.0000.00

0014                          L022.23 4.351,322.0005,750.70
FABRIC SILT FENCE-WP-WW-LOW POROSITY LF 1,322.0005,750.70
0.0000.00
0.0000.00

0015                          L022.24 4.891,616.0007,902.24
FABRIC SILT FENCE-WP-WW-HIGH POROSITY LF 1,616.0007,902.24
0.0000.00
0.0000.00

0016                          0030.10 43,701.001.00043,701.00
MOBILIZATION LS 1.00043,701.00
1.00043,701.00
0.0000.00

0017                          1000.00 543.004.0002,172.00
LARGE TREE REMOVAL EACH4.0002,172.00
5.0002,715.00
0.0000.00

0018                          1009.00 27,161.001.00027,161.00
GENERAL CLEARING AND GRUBBING LS 1.00027,161.00
0.85023,086.85
0.0000.00

0019                          1010.01 2.99375,870.0001,123,851.30
EXCAVATION (ESTABLISHED QUANTITY) CY 375,971.0001,124,153.29
312,013.000932,918.87
0.0000.00

0020                          1011.00 7.601,190.0009,044.00
WATER MGAL1,190.0009,044.00
0.0000.00
0.0000.00

0021                          1021.10 3.26280.000912.80
REMOVE DELINEATOR UNITS EACH280.000912.80
280.000912.80
0.0000.00

0022                          1045.00 3,873.004.60017,815.80
RESTORE BORROW PIT ACRE4.60017,815.80
0.0000.00
0.0000.00

0023                          1101.25 2.502,104.0005,260.00
SAWING PAVEMENT LF 2,442.0006,105.00
1,676.0004,190.00
0.0000.00

0024                          1107.00 5.4349.000266.07
REMOVE WALK SY 49.000266.07
0.0000.00
0.0000.00

0025                          1109.00 2.391,297.0003,099.83
REMOVE CURB LF 1,297.0003,099.83
0.0000.00
0.0000.00

0026                          1111.00 0.9726,049.00025,267.53
REMOVE FENCE LF 26,049.00025,267.53
16,076.00015,593.72
0.0000.00

0027                          1122.01 3.262,141.0006,979.66
REMOVE CONCRETE MEDIAN SURFACING SY 2,141.0006,979.66
0.0000.00
0.0000.00

0028                          1123.00 4.35259.0001,126.65
REMOVE CONCRETE DITCH LINER SY 259.0001,126.65
217.000943.95
0.0000.00

0029                          3275.20 4.83124,795.000602,759.85
CRUSH CONCRETE PAVEMENT SY 124,795.000602,759.85
60,396.000291,712.68
0.0000.00

0030                          7017.00 1.098,461.0009,222.49
REMOVE GUARDRAIL LF 8,461.0009,222.49
7,295.0007,951.55
0.0000.00

0031                          9110.01 108.6470.0007,604.80
RENTAL OF LOADER, FULLY OPERATED HOUR70.0007,604.80
30.7503,340.68
0.0000.00

0032                          9110.03 65.1970.0004,563.30
RENTAL OF DUMP TRUCK, FULLY OPERATED HOUR70.0004,563.30
34.5002,249.07
0.0000.00

0033                          9110.07 97.7870.0006,844.60
RENTAL OF SKID LOADER, FULLY OPERATED HOUR70.0006,844.60
62.5006,111.25
0.0000.00

0401                          1102.00 5.250.0000.00
REMOVE ASPHALT SURFACE SY 1,050.0005,512.50
1,050.0005,512.50
0.0000.00

GROUP 1 GRADINGContracted2,069,132.55
Current2,075,792.04
In place1,396,742.26
This Estimate0.00

GROUP 1A MSE WALL
0034                          0030.10 5,933.001.0005,933.00
MOBILIZATION LS 1.0005,933.00
0.0000.00
0.0000.00

0035                          4095.00 15.943,519.00056,092.86
CONCRETE FACE PANELS SF 3,519.00056,092.86
0.0000.00
0.0000.00

0036                          4095.10 9.12577.0005,262.24
CONCRETE LEVELING PADS LF 577.0005,262.24
0.0000.00
0.0000.00

0037                          4095.20 34.17602.00020,570.34
COPING LF 602.00020,570.34
0.0000.00
0.0000.00

0038                          8024.75 11.981,910.00022,881.80
SELECT GRANULAR BACKFILL FOR MSE WALL CY 1,910.00022,881.80
0.0000.00
0.0000.00

GROUP 1A MSE WALLContracted110,740.24
Current110,740.24
In place0.00
This Estimate0.00

GROUP 3 CONCRETE PAVEMENT
0039                          A069.15 4.073,760.00015,303.20
1 1/2-INCH CONDUIT IN MEDIAN BARRIER LF 3,760.00015,303.20
3,760.00015,303.20
360.0001,465.20

0040                          0002.61 32.32880.00028,441.60
PLOWABLE PAVEMENT MARKER EACH880.00028,441.60
0.0000.00
0.0000.00

0041                          0030.30 948,837.001.000948,837.00
MOBILIZATION LS 1.000948,837.00
1.000948,837.00
0.0000.00

0042                          1020.01 9.78173.0001,691.94
DELINEATOR, TYPE I EACH173.0001,691.94
0.0000.00
0.0000.00

0043                          1020.02 10.86205.0002,226.30
DELINEATOR, TYPE II EACH205.0002,226.30
0.0000.00
0.0000.00

0044                          2010.03 18.21476.0008,667.96
CRUSHED ROCK SURFACE COURSE TON 476.0008,667.96
476.0008,667.96
476.0008,667.96

0045                          3008.05 3.65460.0001,679.00
TIE BARS EACH460.0001,679.00
587.0002,142.55
0.0000.00

0046                          3010.12 6.171,287.0007,940.79
CONCRETE CLASS 47B-3500 LIP CURB, TYPE II LF 1,287.0007,940.79
0.0000.00
0.0000.00

0047                          3011.25 6.40922.0005,900.80
CONCRETE CLASS 47B-3500 CURB TYPE II LF 922.0005,900.80
0.0000.00
0.0000.00

0048                          3013.13 25.14650.00016,341.00
CONCRETE CLASS 47BD-4000 BARRIER CURB LF 650.00016,341.00
0.0000.00
0.0000.00

0049                          3013.30 814.002.0001,628.00
CONCRETE CLASS 47BD-4000 BARRIER TRANSITION SECTION EACH2.0001,628.00
0.0000.00
0.0000.00

0050                          3016.03 22.3450.0001,117.00
CONCRETE CLASS 47B-3000 SIDEWALK 5" SY 50.0001,117.00
0.0000.00
0.0000.00

0051                          3017.40 16.543,628.00060,007.12
CONCRETE CLASS 47B-3000 MEDIAN SURFACING SY 3,628.00060,007.12
1,029.00017,019.66
0.0000.00

0052                          3017.43 21.62354.0007,653.48
6" CONCRETE CLASS 47B-3000 MEDIAN SURFACING SY 354.0007,653.48
0.0000.00
0.0000.00

0053                          3025.00 31.508,601.000270,931.50
CONCRETE CLASS 47BD-4000 MEDIAN BARRIER LF 8,022.000252,693.00
6,638.000209,097.00
1,610.00050,715.00

0054                          3025.04 40.022,050.00082,041.00
CONCRETE CLASS 47BD-4000 MEDIAN BARRIER LF 2,050.00082,041.00
DOWELED 233.0009,324.66
233.0009,324.66

0055                          3027.00 1,935.0010.00019,350.00
CONCRETE CLASS 47BD-4000 MEDIAN BARRIER TRANSITION SECTION EACH8.00015,480.00
8.00015,480.00
0.0000.00

0056                          3027.03 2,284.002.0004,568.00
CONCRETE CLASS 47BD-4000 MEDIAN BARRIER TRANSITION SECTION EACH2.0004,568.00
(MODIFIED) 2.0004,568.00
2.0004,568.00

0057                          3075.52 24.3715,819.000385,509.03
10" CONCRETE PAVEMENT, CLASS 47B-3500 SY 15,819.000385,509.03
14,306.970348,660.87
2,070.97050,469.54

0058                          3075.56 25.5630,192.000771,707.52
10" DOWELED CONCRETE PAVEMENT, CLASS 47B-3500 SY 30,192.000771,707.52
23,500.228600,665.84
0.0000.00

0059                          3075.92 29.2468,541.0002,004,138.84
14" CONCRETE PAVEMENT, CLASS 47B-3500 SY 68,679.0002,008,173.96
38,412.5501,123,182.96
2,595.62075,895.93

0060                          3075.96 31.46141,603.0004,454,830.38
14" DOWELED CONCRETE PAVEMENT, CLASS 47B-3500 SY 141,603.0004,454,830.38
61,280.2251,927,875.87
977.78030,760.96

0061                          3089.25 23.9647,530.0001,138,818.80
TEMPORARY SURFACING SY 47,530.0001,138,818.80
10" 42,968.8801,029,534.37
0.0000.00

0062                          3091.27 34.371,413.00048,564.81
10" DOWELED CONCRETE PAVEMENT, CLASS 47B-HE-3500 SY 1,413.00048,564.81
1,355.72046,596.09
0.0000.00

0063                          3091.32 42.282,289.00096,778.92
14" DOWELED CONCRETE PAVEMENT, CLASS 47B-HE-3500 SY 2,289.00096,778.92
0.0000.00
0.0000.00

0064                          3300.50 47,653.001.00047,653.00
PORTLAND CEMENT CONCRETE SMOOTHNESS TESTING LS 1.00047,653.00
0.0000.00
0.0000.00

0065                          3300.65 74.70130.0009,711.00
CONCRETE PAVEMENT THICKNESS CORE EACH130.0009,711.00
60.0004,482.00
0.0000.00

0066                          4763.26 54.24144.0007,810.56
UNDERDRAIN HEADWALL EACH144.0007,810.56
51.0002,766.24
9.000488.16

0067                          4764.34 2.332,340.0005,452.20
4" NONPERFORATED PIPE UNDERDRAIN LF 2,340.0005,452.20
870.0002,027.10
120.000279.60

0068                          4764.35 2.3145,906.000106,042.86
4" PERFORATED PIPE UNDERDRAIN LF 45,906.000106,042.86
27,475.00063,467.25
4,438.00010,251.78

0069                          6010.75 293.93147.60043,384.07
CLASS 47BD-4000 CONCRETE FOR PIER PROTECTION CY 147.60043,384.07
117.10034,419.21
0.0000.00

0070                          6107.00 61.30169.00010,359.70
CONCRETE SLOPE PROTECTION SY 169.00010,359.70
183.51011,249.16
0.0000.00

0071                          6131.75 0.9315,333.00014,259.69
EPOXY COATED REINFORCING STEEL FOR PIER PROTECTION LB 15,333.00014,259.69
15,333.00014,259.69
0.0000.00

0072                          7492.14 1.0233,500.00034,170.00
4" WHITE DURABLE LIQUID PAVEMENT MARKING LF 33,500.00034,170.00
0.0000.00
0.0000.00

0073                          7492.24 1.0242,500.00043,350.00
4" YELLOW DURABLE LIQUID PAVEMENT MARKING LF 42,500.00043,350.00
0.0000.00
0.0000.00

0074                          7502.14 2.9914,000.00041,860.00
4" WHITE PREFORMED PAVEMENT MARKING, TYPE 4, GROOVED LF 14,000.00041,860.00
0.0000.00
0.0000.00

0075                          7508.14 5.708,600.00049,020.00
12" WHITE PREFORMED PAVEMENT MARKING, TYPE 4, GROOVED LF 8,600.00049,020.00
0.0000.00
0.0000.00

0076                          8011.05 5.6720,207.000114,573.69
CRUSHED ROCK FOUNDATION COURSE 6" SY 20,207.000114,573.69
17,413.09098,732.22
0.0000.00

0077                          8032.04 2.5740,965.000105,280.05
CRUSHED CONCRETE FOUNDATION COURSE 4" SY 40,965.000105,280.05
34,935.89889,785.25
0.0000.00

0078                          8032.05 1.60212,153.000339,444.80
CRUSHED CONCRETE FOUNDATION COURSE 5" SY 212,153.000339,444.80
99,693.075159,508.90
3,573.4005,717.44

0079                          9009.88 21.219,222.000195,598.62
SURFACING 10" SY 9,222.000195,598.62
4,694.00099,559.74
0.0000.00

0080                          9111.00 5.01888.0004,448.88
WATER MGAL888.0004,448.88
252.0001,262.52
0.0000.00

0081                          9170.00 106.47513.27454,648.28
EARTH SHOULDER CONSTRUCTION STA 513.27454,648.28
0.0000.00
0.0000.00

0082                          9173.20 0.87258,846.000225,196.02
SUBGRADE PREPARATION SY 258,846.000225,196.02
136,784.723119,002.74
3,573.4003,108.86

0083                          9179.34 2.6451,633.000136,311.12
COLD MILLING, CLASS 4 SY 51,633.000136,311.12
44,618.000117,791.52
0.0000.00

0084                          9188.01 12.06303.0003,654.18
BITUMINOUS SURFACE COURSE SY 303.0003,654.18
14" 303.0003,654.18
0.0000.00

0085                          9188.50 17.82512.0009,123.84
SURFACING UNDER GUARDRAIL SY 512.0009,123.84
44.560794.06
0.0000.00

0402                          3014.10 14.450.0000.00
COMBINATION CONCRETE CLASS 47B-3000 CURB AND GUTTER LF 338.0004,884.10
382.0005,519.90
0.0000.00

0405                          9190.50 17.950.0000.00
FLY ASH TON 3,184.01057,152.98
3,184.01057,152.98
0.0000.00

GROUP 3 CONCRETE PAVEMENTContracted11,986,026.55
Current12,029,990.25
In place7,192,390.69
This Estimate251,713.09

GROUP 4 CULVERTS
0086                          P070.12 12.20250.0003,050.00
12" CULVERT PIPE, TYPE 2,3,4,5,6,7 OR 8 LF 250.0003,050.00
105.0001,281.00
0.0000.00

0087                          P070.18 14.81142.0002,103.02
18" CULVERT PIPE, TYPE 2,3,4,5,6,7 OR 8 LF 142.0002,103.02
142.0002,103.02
0.0000.00

0088                          P070.24 28.9028.000809.20
24" CULVERT PIPE, TYPE 2,3,4,5,6,7 OR 8 LF 28.000809.20
89.0002,572.10
0.0000.00

0089                          P120.18 17.65103.0001,817.95
18" CULVERT PIPE, TYPE 2 LF 103.0001,817.95
124.0002,188.60
0.0000.00

0090                          P120.24 33.62276.0009,279.12
24" CULVERT PIPE, TYPE 2 LF 276.0009,279.12
249.0008,371.38
0.0000.00

0091                          P120.30 30.93201.0006,216.93
30" CULVERT PIPE, TYPE 2 LF 201.0006,216.93
209.0006,464.37
0.0000.00

0092                          P120.36 45.0526.0001,171.30
36" CULVERT PIPE, TYPE 2 LF 26.0001,171.30
0.0000.00
0.0000.00

0093                          P120.48 70.7530.0002,122.50
48" CULVERT PIPE, TYPE 2 LF 30.0002,122.50
30.0002,122.50
0.0000.00

0094                          P128.18 14.2040.000568.00
18" CULVERT PIPE, TYPE 2 CLASS IV LF 40.000568.00
40.000568.00
0.0000.00

0095                          P128.24 24.5132.000784.32
24" CULVERT PIPE, TYPE 2 CLASS IV LF 32.000784.32
32.000784.32
0.0000.00

0096                          P300.48 49.6066.0003,273.60
48" CULVERT PIPE, TYPE 3,4 OR 5 LF 66.0003,273.60
66.0003,273.60
0.0000.00

0097                          P402.24 26.50161.0004,266.50
24" CULVERT PIPE, TYPE 3,4,5 OR 6 LF 161.0004,266.50
161.0004,266.50
0.0000.00

0098                          P402.36 34.47119.0004,101.93
36" CULVERT PIPE, TYPE 3,4,5 OR 6 LF 119.0004,101.93
119.0004,101.93
0.0000.00

0099                          P406.48 51.1462.0003,170.68
48" CULVERT PIPE, TYPE 2,3,4 OR 5 LF 62.0003,170.68
62.0003,170.68
0.0000.00

0100                          P406.60 65.4358.0003,794.94
60" CULVERT PIPE, TYPE 2,3,4 OR 5 LF 58.0003,794.94
58.0003,794.94
0.0000.00

0101                          P700.18 13.477,837.000105,564.39
18" STORM SEWER PIPE, TYPE 1,7 OR 8 LF 7,521.000101,307.87
7,521.000101,307.87
0.0000.00

0102                          P700.21 19.21942.00018,095.82
21" STORM SEWER PIPE, TYPE 1,7 OR 8 LF 942.00018,095.82
478.0009,182.38
0.0000.00

0103                          P702.18 19.50104.0002,028.00
18" STORM SEWER PIPE, TYPE 1 LF 104.0002,028.00
121.0002,359.50
0.0000.00

0104                          0030.40 45,727.001.00045,727.00
MOBILIZATION LS 1.00045,727.00
1.00045,727.00
0.0000.00

0105                          1043.50 0.80325.000260.00
RIPRAP FILTER FABRIC SY 325.000260.00
325.000260.00
0.0000.00

0106                          1090.02 581.002.0001,162.00
ABANDON INLET EACH2.0001,162.00
2.0001,162.00
0.0000.00

0107                          1117.00 253.002.000506.00
REMOVE MANHOLE EACH2.000506.00
1.000253.00
0.0000.00

0108                          1119.00 252.7715.0003,791.55
REMOVE INLET EACH15.0003,791.55
14.0003,538.78
0.0000.00

0109                          4004.50 1.17102,850.000120,334.50
CAST IRON GRATE AND FRAME LB 99,910.000116,894.70
99,910.000116,894.70
0.0000.00

0110                          4005.00 0.741,025.000758.50
CAST IRON RING AND COVER LB 1,025.000758.50
690.000510.60
0.0000.00

0111                          4015.50 1,031.003.0003,093.00
RECONSTRUCT MANHOLE EACH4.0004,124.00
3.0003,093.00
0.0000.00

0112                          4016.00 1,517.001.0001,517.00
MANHOLE EACH1.0001,517.00
AT STA. 387+08 LT. 1.0001,517.00
0.0000.00

0113                          4016.01 3,314.001.0003,314.00
MANHOLE EACH1.0003,314.00
AT STA. 813+00 RT. 0.0000.00
0.0000.00

0114                          4018.00 472.001.000472.00
TAPPING EXISTING STRUCTURE EACH1.000472.00
1.000472.00
0.0000.00

0115                          4035.00 98.0311.0001,078.33
REMOVE FLARED-END SECTION EACH11.0001,078.33
10.000980.30
0.0000.00

0116                          4040.00 158.0319.0003,002.57
REMOVE HEADWALLS FROM CULVERTS EACH19.0003,002.57
9.0001,422.27
0.0000.00

0117                          4043.50 3.871,634.0006,323.58
REMOVE SEWER PIPE LF 1,634.0006,323.58
1,028.0003,978.36
0.0000.00

0118                          4044.00 5,041.001.0005,041.00
PREPARATION OF STRUCTURE EACH1.0005,041.00
AT STA. 354+08.1 1.0005,041.00
0.0000.00

0119                          4044.01 2,788.001.0002,788.00
PREPARATION OF STRUCTURE EACH1.0002,788.00
AT STA. 372+13.2 1.0002,788.00
0.0000.00

0120                          4044.02 1,448.001.0001,448.00
PREPARATION OF STRUCTURE EACH1.0001,448.00
AT STA. 394+46.2 1.0001,448.00
0.0000.00

0121                          4044.03 2,788.001.0002,788.00
PREPARATION OF STRUCTURE EACH1.0002,788.00
AT STA. 1099+22.2 1.0002,788.00
0.0000.00

0122                          4044.04 2,897.001.0002,897.00
PREPARATION OF STRUCTURE EACH1.0002,897.00
AT STA. 1120+95.3 1.0002,897.00
0.0000.00

0123                          4044.05 2,788.001.0002,788.00
PREPARATION OF STRUCTURE EACH1.0002,788.00
AT STA. 1325+75.4 1.0002,788.00
0.0000.00

0124                          4044.06 2,788.001.0002,788.00
PREPARATION OF STRUCTURE EACH1.0002,788.00
AT STA. 1502+33.5 1.0002,788.00
0.0000.00

0125                          4045.00 670.001.000670.00
REMOVE STRUCTURE EACH1.000670.00
AT STA. 387+08.5 RT. 1.000670.00
0.0000.00

0126                          4045.01 1,339.001.0001,339.00
REMOVE STRUCTURE EACH1.0001,339.00
AT STA. 422+60 RT. 1.0001,339.00
0.0000.00

0127                          4045.02 670.001.000670.00
REMOVE STRUCTURE EACH1.000670.00
AT STA. 423+11 LT. 1.000670.00
0.0000.00

0128                          4045.03 670.001.000670.00
REMOVE STRUCTURE EACH1.000670.00
AT STA. 430+98 RT. 1.000670.00
0.0000.00

0129                          4045.04 670.001.000670.00
REMOVE STRUCTURE EACH1.000670.00
AT STA. 431+45 LT. 1.000670.00
0.0000.00

0130                          4045.05 670.001.000670.00
REMOVE STRUCTURE EACH1.000670.00
AT STA. 1624+78 TO STA. 1624+99 RT. 1.000670.00
0.0000.00

0131                          4050.01 2.481,084.0002,688.32
EXCAVATION FOR PIPE, PIPE-ARCH CULVERTS, AND HEADWALLS CY 1,084.0002,688.32
785.0001,946.80
0.0000.00

0132                          4051.01 8.45581.0004,909.45
EXCAVATION FOR BOX CULVERTS CY 581.0004,909.45
771.9006,522.56
0.0000.00

0133                          4100.06 493.001.200591.60
CLASS 47B-3000 OR AX-3000 CONCRETE FOR HEADWALL CY 1.200591.60
0.800394.40
0.0000.00

0134                          4101.06 278.30415.800115,717.14
CLASS 47B-3000 OR AX-3000 CONCRETE FOR BOX CULVERT CY 415.800115,717.14
416.600115,939.78
0.0000.00

0135                          4105.59 435.72260.560113,531.20
CLASS 47B-3000 CONCRETE FOR INLET AND JUNCTION BOX CY 253.660110,524.74
253.760110,568.30
0.0000.00

0136                          4107.07 337.6611.1303,758.16
CLASS 47B-3000 OR AX-3000 CONCRETE FOR CONCRETE COLLARS CY 11.1303,758.16
7.9102,670.90
0.0000.00

0137                          4130.06 778.580.860669.58
CLASS 47B-3000 OR AX-3000 CONCRETE FOR PIPE CULVERT PLUG CY 0.860669.58
0.690537.22
0.0000.00

0138                          4135.01 0.2650.00013.00
REINFORCING STEEL FOR PIPE CULVERT PLUG LB 50.00013.00
50.00013.00
0.0000.00

0139                          4150.00 0.26113.00029.38
REINFORCING STEEL FOR HEADWALL LB 113.00029.38
66.00017.16
0.0000.00

0140                          4151.00 0.6040,189.00024,113.40
REINFORCING STEEL FOR BOX CULVERT LB 40,189.00024,113.40
40,189.00024,113.40
0.0000.00

0141                          4155.50 0.2627,371.0007,116.46
REINFORCING STEEL FOR INLET AND JUNCTION BOX LB 26,625.0006,922.50
26,625.0006,922.50
0.0000.00

0142                          4157.00 0.26862.000224.12
REINFORCING STEEL FOR COLLARS LB 862.000224.12
533.000138.58
0.0000.00

0143                          4310.18 306.1416.0004,898.24
18" FLARED-END SECTION EACH16.0004,898.24
10.0003,061.40
0.0000.00

0144                          4310.21 333.001.000333.00
21" FLARED-END SECTION EACH1.000333.00
0.0000.00
0.0000.00

0145                          4310.24 315.0311.0003,465.33
24" FLARED-END SECTION EACH11.0003,465.33
10.0003,150.30
0.0000.00

0146                          4310.30 365.007.0002,555.00
30" FLARED-END SECTION EACH7.0002,555.00
5.0001,825.00
0.0000.00

0147                          4310.36 283.005.0001,415.00
36" FLARED-END SECTION EACH5.0001,415.00
2.000566.00
0.0000.00

0148                          4310.48 698.002.0001,396.00
48" FLARED-END SECTION EACH2.0001,396.00
3.0002,094.00
0.0000.00

0149                          4670.05 117.008.000936.00
CULVERT SANDFILL CY 8.000936.00
8.000936.00
0.0000.00

0150                          4850.18 136.2340.0005,449.20
JACKING 18" CULVERT PIPE, TYPE LF 40.0005,449.20
2 CLASS IV 40.0005,449.20
0.0000.00

0151                          4850.24 178.4432.0005,710.08
JACKING 24" CULVERT PIPE, TYPE LF 32.0005,710.08
2 CLASS IV 32.0005,710.08
0.0000.00

0152                          6105.02 14.51262.0003,801.62
ROCK RIPRAP, TYPE B TON 262.0003,801.62
262.0003,801.62
0.0000.00

0404                          3300.03 -354.140.0000.00
DEDUCTION LS 1.000-354.14
1.000-354.14
0.0000.00

GROUP 4 CULVERTSContracted692,106.51
Current681,886.62
In place658,972.76
This Estimate0.00

GROUP 5 SEEDING
0153                          L001.01 613.8369.00042,354.27
SEEDING, TYPE A ACRE69.00042,354.27
0.0000.00
0.0000.00

0154                          L001.02 494.3215.0007,414.80
SEEDING, TYPE B ACRE15.0007,414.80
0.0000.00
0.0000.00

0155                          L020.07 3.376,221.00020,964.77
EROSION CONTROL, TYPE B-1 SY 6,221.00020,964.77
0.0000.00
0.0000.00

0156                          L032.75 65.19189.00012,320.91
MULCH TON 189.00012,320.91
0.0000.00
0.0000.00

0157                          0030.50 109.001.000109.00
MOBILIZATION LS 1.000109.00
0.0000.00
0.0000.00

GROUP 5 SEEDINGContracted83,163.75
Current83,163.75
In place0.00
This Estimate0.00

GROUP 6 BRIDGE AT STA. 1465+23.95
0158                          0030.60 5,597.001.0005,597.00
MOBILIZATION LS 1.0005,597.00
0.0000.00
0.0000.00

0159                          6005.35 33.2734.0001,131.18
PRECOMPRESSED POLYURETHANE FOAM JOINT LF 34.0001,131.18
0.0000.00
0.0000.00

0160                          6008.40 11.48489.0005,613.72
PLACING, FINISHING, AND CURING CONCRETE OVERLAY-SF SY 489.0005,613.72
0.0000.00
0.0000.00

0161                          6010.26 150.88112.40016,958.91
CLASS 47BD-4000 CONCRETE FOR BRIDGE CY 112.40016,958.91
0.0000.00
0.0000.00

0162                          6016.02 197.5435.0006,913.90
CONCRETE FOR OVERLAYS-SF CY 35.0006,913.90
0.0000.00
0.0000.00

0163                          6030.00 17,523.001.00017,523.00
PREPARATION OF BRIDGE EACH1.00017,523.00
AT STA. 1465+23.95 0.0000.00
0.0000.00

0164                          6131.50 0.643,517.0002,250.88
EPOXY COATED REINFORCING STEEL LB 3,517.0002,250.88
0.0000.00
0.0000.00

GROUP 6 BRIDGE AT STA. 1465+23.95Contracted55,988.59
Current55,988.59
In place0.00
This Estimate0.00

GROUP 7 GUARDRAIL
0187                          0003.58 2,580.001.0002,580.00
INERTIAL BARRIER SYSTEM EACH2.0005,160.00
0.0000.00
0.0000.00

0188                          0030.70 1,304.001.0001,304.00
MOBILIZATION LS 1.0001,304.00
0.0000.00
0.0000.00

0189                          7011.20 21.21450.0009,544.50
W-BEAM GUARDRAIL LF 450.0009,544.50
225.0004,772.25
0.0000.00

0190                          7018.01 14.05320.0004,496.00
RESET GUARDRAIL LF 320.0004,496.00
75.0001,053.75
0.0000.00

0191                          7019.50 37,656.001.00037,656.00
IMPACT ATTENUATOR EACH0.0000.00
0.0000.00
0.0000.00

0192                          7020.00 1,304.005.0006,520.00
BRIDGE APPROACH SECTIONS EACH5.0006,520.00
2.0002,608.00
0.0000.00

0193                          7024.25 2,114.005.00010,570.00
GUARDRAIL END TREATMENT, TYPE I EACH5.00010,570.00
2.0004,228.00
0.0000.00

0403                          1137.50 2,887.500.0000.00
REMOVE AND RESET LS 1.0002,887.50
2.0005,775.00
0.0000.00

GROUP 7 GUARDRAILContracted72,670.50
Current40,482.00
In place18,437.00
This Estimate0.00

GROUP 7B FENCING
0194                          0030.71 1.001.0001.00
MOBILIZATION LS 1.0001.00
1.0001.00
0.0000.00

0195                          7100.00 7.94139.0001,103.66
RIGHT-OF-WAY FENCE LF 139.0001,103.66
SPECIAL 0.0000.00
0.0000.00

0196                          7103.00 90.004.000360.00
END POSTS EACH4.000360.00
0.0000.00
0.0000.00

0197                          7104.00 90.005.000450.00
PULL POSTS EACH5.000450.00
0.0000.00
0.0000.00

0198                          7105.00 90.005.000450.00
CORNER POSTS EACH5.000450.00
0.0000.00
0.0000.00

0199                          7106.20 668.001.000668.00
20' VEHICLE GATE EACH1.000668.00
0.0000.00
0.0000.00

0200                          7110.05 6.4126,690.000171,082.90
5 FOOT CHAIN-LINK FENCE LF 26,690.000171,082.90
8,905.00057,081.05
0.0000.00

0201                          7114.15 163.001.000163.00
CHANNEL CROSSING, TYPE A FOR 5 FOOT CHAIN-LINK FENCE EACH1.000163.00
0.0000.00
0.0000.00

0202                          7115.05 80.4723.0001,850.81
END POST FOR 5 FOOT CHAIN-LINK FENCE EACH23.0001,850.81
3.000241.41
0.0000.00

0203                          7116.05 88.7965.0005,771.35
CORNER POST FOR 5 FOOT CHAIN-LINK FENCE EACH65.0005,771.35
14.0001,243.06
0.0000.00

0204                          7117.05 88.7863.0005,593.14
PULL POST FOR 5 FOOT CHAIN-LINK FENCE EACH63.0005,593.14
23.0002,041.94
0.0000.00

0205                          7130.00 1.302,681.0003,485.30
BARBED WIRE FENCE LF 2,681.0003,485.30
0.0000.00
0.0000.00

GROUP 7B FENCINGContracted190,979.16
Current190,979.16
In place60,608.46
This Estimate0.00

GROUP 8B ELECTRICAL
0206                          A001.01 570.3761.00034,792.57
PULL BOX, TYPE PB-1 EACH61.00034,792.57
14.0007,985.18
0.0000.00

0207                          A001.02 543.2114.0007,604.94
PULL BOX, TYPE PB-1A EACH14.0007,604.94
5.0002,716.05
0.0000.00

0208                          A001.06 782.002.0001,564.00
PULL BOX, TYPE PB-2A EACH2.0001,564.00
0.0000.00
0.0000.00

0209                          A001.12 500.007.0003,500.00
PULL BOX, TYPE PB-5 EACH7.0003,500.00
3.0001,500.00
0.0000.00

0210                          A001.16 554.0828.00015,514.24
PULL BOX, TYPE PB-6 EACH28.00015,514.24
19.00010,527.52
0.0000.00

0211                          A001.55 717.004.0002,868.00
SERVICE BOX EACH4.0002,868.00
24" X 36" 0.0000.00
0.0000.00

0212                          A004.00 814.8232.00026,074.24
TRAFFIC SIGNAL, TYPE TS-1 EACH32.00026,074.24
6.0004,888.92
0.0000.00

0213                          A004.04 1,184.006.0007,104.00
TRAFFIC SIGNAL, TYPE TS-1LL EACH6.0007,104.00
0.0000.00
0.0000.00

0214                          A004.20 793.002.0001,586.00
TRAFFIC SIGNAL, TYPE TS-1L EACH2.0001,586.00
0.0000.00
0.0000.00

0215                          A004.22 1,043.002.0002,086.00
TRAFFIC SIGNAL, TYPE TS-1LB EACH2.0002,086.00
0.0000.00
0.0000.00

0216                          A004.40 598.001.000598.00
TRAFFIC SIGNAL, TYPE TS-2 EACH1.000598.00
1.000598.00
0.0000.00

0217                          A006.84 679.001.000679.00
PEDESTAL POLE, TYPE PP-10 EACH1.000679.00
1.000679.00
0.0000.00

0218                          A006.98 206.4255.00011,353.10
VEHICLE DETECTOR, TYPE A PREFORMED EACH55.00011,353.10
20.0004,128.40
0.0000.00

0219                          A007.00 228.1551.00011,635.65
VEHICLE DETECTOR, TYPE B PREFORMED EACH51.00011,635.65
28.0006,388.20
0.0000.00

0220                          A007.08 565.004.0002,260.00
VEHICLE DETECTOR, TYPE TD-3 EACH4.0002,260.00
0.0000.00
0.0000.00

0221                          A007.15 543.003.0001,629.00
VEHICLE DETECTOR, TYPE TD-5 EACH3.0001,629.00
0.0000.00
0.0000.00

0222                          A009.59 2,108.002.0004,216.00
STREET LIGHTING UNIT, TYPE SL-BT-45-12-0.20 EACH2.0004,216.00
2.0004,216.00
0.0000.00

0223                          A009.73 2,020.7522.00044,456.50
STREET LIGHTING UNIT, TYPE SL-S-45-6 & 6-0.20 EACH22.00044,456.50
20.00040,415.00
0.0000.00

0224                          A010.20 798.5248.00038,328.96
LUMINAIRE, TYPE HML-A-1KW EACH48.00038,328.96
42.00033,537.84
18.00014,373.36

0225                          A010.26 798.5236.00028,746.72
LUMINAIRE, TYPE HML-V-1KW EACH36.00028,746.72
30.00023,955.60
12.0009,582.24

0226                          A010.59 598.004.0002,392.00
UNDERDECK LUMINAIRE, TYPE UD-200 EACH4.0002,392.00
0.0000.00
0.0000.00

0227                          A012.05 6,274.001.0006,274.00
COMBINATION MAST ARM SIGNAL AND LIGHTING POLE,TYPE CMP-45-12 EACH1.0006,274.00
0.0000.00
0.0000.00

0228                          A012.60 6,301.001.0006,301.00
COMBINATION MAST ARM SIGNAL AND LIGHTING POLETYPE CMP-50-12 EACH1.0006,301.00
0.0000.00
0.0000.00

0229                          A012.90 8,126.005.00040,630.00
COMBINATION MAST ARM SIGNAL AND LIGHTING POLE,TYPE CMP-60-12 EACH5.00040,630.00
2.00016,252.00
0.0000.00

0230                          A012.95 8,311.003.00024,933.00
COMBINATION MAST ARM SIGNAL AND LIGHTING POLE,TYPE CMP-65-12 EACH3.00024,933.00
0.0000.00
0.0000.00

0231                          A016.74 7,127.002.00014,254.00
MAST ARM SIGNAL POLE, TYPE MP-50-45 EACH2.00014,254.00
0.0000.00
0.0000.00

0232                          A016.80 6,817.001.0006,817.00
MAST ARM SIGNAL POLE, TYPE MP-60 EACH1.0006,817.00
1.0006,817.00
0.0000.00

0233                          A016.90 7,703.001.0007,703.00
MAST ARM SIGNAL POLE, TYPE MP-70 EACH1.0007,703.00
0.0000.00
0.0000.00

0234                          A016.95 8,691.001.0008,691.00
MAST ARM SIGNAL POLE, TYPE MP-75 EACH1.0008,691.00
0.0000.00
0.0000.00

0235                          A018.81 2,759.5211.00030,354.72
FOUNDATION DESIGN EACH11.00030,354.72
11.00030,354.72
0.0000.00

0236                          A018.82 157.53165.00025,992.45
CONCRETE FOR FOUNDATION CY 165.00025,992.45
155.10024,432.91
0.0000.00

0237                          A018.83 1.4113,343.00018,813.63
REINFORCING STEEL LB 13,343.00018,813.63
12,925.00018,224.25
0.0000.00

0238                          A018.84 141.2466.0009,321.84
ANCHOR BOLTS EACH66.0009,321.84
50.0007,062.00
0.0000.00

0239                          A020.17 2,064.002.0004,128.00
LIGHTING CONTROL CENTER, TYPE P EACH2.0004,128.00
0.0000.00
0.0000.00

0240                          A020.36 5,432.004.00021,728.00
LIGHTING CONTROL CENTER, TYPE R-2 EACH4.00021,728.00
1.0005,432.00
0.0000.00

0241                          A070.10 3.159,495.00029,909.25
1 1/2-INCH CONDUIT IN TRENCH LF 9,495.00029,909.25
5,073.00015,979.95
0.0000.00

0242                          A070.14 3.269,803.00031,957.78
2-INCH CONDUIT IN TRENCH LF 9,803.00031,957.78
5,235.00017,066.10
0.0000.00

0243                          A070.18 3.91426.0001,665.66
3-INCH CONDUIT IN TRENCH LF 426.0001,665.66
127.000496.57
0.0000.00

0244                          A072.10 3.371,735.0005,846.95
1 1/2-INCH CONDUIT UNDER ROADWAY LF 1,735.0005,846.95
520.0001,752.40
0.0000.00

0245                          A072.14 3.481,545.0005,376.60
2-INCH CONDUIT UNDER ROADWAY LF 1,545.0005,376.60
376.0001,308.48
0.0000.00

0246                          A072.18 4.89987.0004,826.43
3-INCH CONDUIT UNDER ROADWAY LF 987.0004,826.43
596.0002,914.45
0.0000.00

0247                          A074.12 13.0470.000912.80
1 1/2-INCH CONDUIT, JACKED LF 70.000912.80
150.0001,956.00
0.0000.00

0248                          A077.13 0.81765.000619.65
3/C #14 AWG TRAFFIC SIGNAL CABLE LF 765.000619.65
765.000619.65
0.0000.00

0249                          A077.17 1.037,132.0007,345.96
7/C #14 AWG TRAFFIC SIGNAL CABLE LF 7,132.0007,345.96
0.0000.00
0.0000.00

0250                          A077.22 1.523,055.0004,643.60
12/C #14 AWG TRAFFIC SIGNAL CABLE LF 3,055.0004,643.60
415.000630.80
0.0000.00

0251                          A079.01 0.813,597.0002,913.57
2/C #14 AWG DETECTOR LEAD-IN CABLE LF 3,597.0002,913.57
700.000567.00
0.0000.00

0252                          A079.50 0.659,387.0006,101.55
GROUNDING CONDUCTOR LF 9,387.0006,101.55
4,505.0002,928.25
0.0000.00

0253                          A079.55 0.811,830.0001,482.30
SERVICE CABLE LF 1,830.0001,482.30
200.000162.00
0.0000.00

0254                          A080.10 1.0940,280.00043,905.20
STREET LIGHTING CABLE, NO. 2 USE LF 40,280.00043,905.20
19,784.00021,564.56
5,052.0005,506.68

0255                          A080.22 0.6515,775.00010,253.75
STREET LIGHTING CABLE, NO. 6 BARE LF 15,775.00010,253.75
8,888.0005,777.20
1,070.000695.50

0256                          A080.24 0.6519,350.00012,577.50
STREET LIGHTING CABLE, NO. 6 USE LF 19,350.00012,577.50
11,094.0007,211.10
1,424.000925.60

0257                          A082.05 1.14765.000872.10
DIRECT BURIAL CABLE, NO. 1/0 LF 765.000872.10
1,415.0001,613.10
0.0000.00

0258                          A500.20 2,428.005.00012,140.00
INSTALL TRAFFIC SIGNAL CONTROLLER, TYPE TC-170 EACH5.00012,140.00
1.0002,428.00
0.0000.00

0259                          A600.00 380.002.000760.00
REMOVE LIGHTING UNIT EACH2.000760.00
0.0000.00
0.0000.00

0260                          A610.00 2,906.001.0002,906.00
REMOVE TRAFFIC SIGNAL EACH1.0002,906.00
AT N-50 & SAPP BROTHERS DRIVE 0.0000.00
0.0000.00

0261                          A610.01 1,928.001.0001,928.00
REMOVE TRAFFIC SIGNAL EACH1.0001,928.00
AT N-50 & WB RAMP 0.0000.00
0.0000.00

0262                          A610.02 1,928.001.0001,928.00
REMOVE TRAFFIC SIGNAL EACH1.0001,928.00
AT N-50 & EB RAMP 0.0000.00
0.0000.00

0263                          A610.03 3,118.001.0003,118.00
REMOVE TRAFFIC SIGNAL EACH1.0003,118.00
AT N-50 & FRONTIER ROAD 0.0000.00
0.0000.00

0264                          A620.02 652.002.0001,304.00
REMOVE LIGHTING CONTROL CENTER EACH2.0001,304.00
0.0000.00
0.0000.00

0265                          A630.20 81.007.000567.00
REMOVE PULL BOX EACH7.000567.00
3.000243.00
0.0000.00

0266                          A699.90 1,304.002.0002,608.00
REMOVE EACH2.0002,608.00
AND TRANSFER TEMPORARY LIGHTING SYSTEM 1.0001,304.00
0.0000.00

0267                          A699.91 652.001.000652.00
REMOVE EACH1.000652.00
AND REINSTALL LIGHTING UNIT 0.0000.00
0.0000.00

0268                          A700.20 923.003.0002,769.00
RELOCATE STREET LIGHTING UNIT EACH3.0002,769.00
0.0000.00
0.0000.00

0269                          A750.10 17,328.005.00086,640.00
MODIFY HIGH MAST TOWER EACH5.00086,640.00
TYPE A 5.00086,640.00
0.0000.00

0270                          A750.11 17,709.003.00053,127.00
MODIFY HIGH MAST TOWER EACH3.00053,127.00
TYPE B 2.00035,418.00
0.0000.00

0271                          A750.12 15,351.003.00046,053.00
MODIFY HIGH MAST TOWER EACH3.00046,053.00
TYPE C 3.00046,053.00
1.00015,351.00

0272                          A750.13 17,003.001.00017,003.00
MODIFY HIGH MAST TOWER EACH1.00017,003.00
TYPE D 0.0000.00
0.0000.00

0273                          A750.14 17,383.002.00034,766.00
MODIFY HIGH MAST TOWER EACH2.00034,766.00
TYPE E 1.00017,383.00
1.00017,383.00

0274                          A780.05 11,190.001.00011,190.00
TEMPORARY LIGHTING SYSTEM EACH1.00011,190.00
AT STA. 337+40 1.00011,190.00
0.0000.00

0275                          A780.06 4,835.001.0004,835.00
TEMPORARY LIGHTING SYSTEM EACH1.0004,835.00
AT STA. 415+00 0.6603,191.10
0.0000.00

0276                          A780.07 3,314.001.0003,314.00
TEMPORARY LIGHTING SYSTEM EACH1.0003,314.00
AT STA. 424+00 0.6602,187.24
0.0000.00

0277                          A780.09 5,595.001.0005,595.00
TEMPORARY LIGHTING SYSTEM EACH1.0005,595.00
AT STA. 1096+50 1.0005,595.00
0.0000.00

0278                          A780.16 4,530.001.0004,530.00
TEMPORARY LIGHTING SYSTEM EACH1.0004,530.00
AT STA. 1125+80 0.0000.00
0.0000.00

0279                          A800.55 8.69244.0002,120.36
OPERATION AND MAINTENANCE OF TEMPORARY LIGHTING SYSTEM DAY 244.0002,120.36
AT STA. 337+40 136.0001,181.84
14.000121.66

0280                          A800.56 27.1630.000814.80
OPERATION AND MAINTENANCE OF TEMPORARY LIGHTING SYSTEM DAY 30.000814.80
AT STA. 415+00 31.000841.96
0.0000.00

0281                          A800.57 16.3090.0001,467.00
OPERATION AND MAINTENANCE OF TEMPORARY LIGHTING SYSTEM DAY 90.0001,467.00
AT STA. 424+00 90.0001,467.00
0.0000.00

0282                          A800.65 13.04115.0001,499.60
OPERATION AND MAINTENANCE OF TEMPORARY LIGHTING SYSTEM DAY 115.0001,499.60
AT STA. 1096+50 117.0001,525.68
0.0000.00

0283                          A800.66 13.04230.0002,999.20
OPERATION AND MAINTENANCE OF TEMPORARY LIGHTING SYSTEM DAY 230.0002,999.20
AT STA. 1125+80 0.0000.00
0.0000.00

0284                          A800.70 4.35867.0003,771.45
MAINTENANCE OF LIGHTING UNITS DAY 867.0003,771.45
482.0002,096.70
14.00060.90

0285                          0003.75 11,951.001.00011,951.00
TEMPORARY TRAFFIC SIGNAL EACH1.00011,951.00
AT N-50 & SAPP BROTHERS DRIVE 0.0000.00
0.0000.00

0286                          0003.76 10,701.001.00010,701.00
TEMPORARY TRAFFIC SIGNAL EACH1.00010,701.00
AT N-50 & WB RAMP 0.0000.00
0.0000.00

0287                          0003.77 10,701.001.00010,701.00
TEMPORARY TRAFFIC SIGNAL EACH1.00010,701.00
AT N-50 & EB RAMP 1.00010,701.00
0.0000.00

0288                          0003.78 12,059.001.00012,059.00
TEMPORARY TRAFFIC SIGNAL EACH1.00012,059.00
AT N-50 & FRONTIER ROAD 0.0000.00
0.0000.00

0289                          0030.81 10,864.001.00010,864.00
MOBILIZATION LS 1.00010,864.00
1.00010,864.00
0.0000.00

GROUP 8B ELECTRICALContracted1,012,822.62
Current1,012,822.62
In place572,968.72
This Estimate63,999.94

GROUP 8C SIGNING
0290                          A010.08 869.1423.00019,990.22
LUMINAIRE, TYPE HPS-150 EACH20.00017,382.80
0.0000.00
0.0000.00

0291                          0030.82 8,691.001.0008,691.00
MOBILIZATION LS 1.0008,691.00
0.0000.00
0.0000.00

0292                          7308.00 1,738.004.0006,952.00
REMOVE SIGN, STRUCTURE, AND FOUNDATION EACH4.0006,952.00
0.0000.00
0.0000.00

0293                          7312.00 25,314.001.00025,314.00
OVERHEAD SIGN SUPPORT, LOCATION EACH1.00025,314.00
16 0.0000.00
0.0000.00

0294                          7312.01 25,314.001.00025,314.00
OVERHEAD SIGN SUPPORT, LOCATION EACH1.00025,314.00
17 0.0000.00
0.0000.00

0295                          7312.02 25,314.001.00025,314.00
OVERHEAD SIGN SUPPORT, LOCATION EACH1.00025,314.00
18 0.0000.00
0.0000.00

0296                          7312.03 25,314.001.00025,314.00
OVERHEAD SIGN SUPPORT, LOCATION EACH1.00025,314.00
19 0.0000.00
0.0000.00

0297                          7312.04 52,094.001.00052,094.00
OVERHEAD SIGN SUPPORT, LOCATION EACH0.0000.00
20 0.0000.00
0.0000.00

0298                          7312.05 49,541.001.00049,541.00
OVERHEAD SIGN SUPPORT, LOCATION EACH1.00049,541.00
25 0.0000.00
0.0000.00

0299                          7312.06 47,911.001.00047,911.00
OVERHEAD SIGN SUPPORT, LOCATION EACH1.00047,911.00
26 0.0000.00
0.0000.00

0300                          7312.07 46,390.001.00046,390.00
OVERHEAD SIGN SUPPORT, LOCATION EACH1.00046,390.00
27 0.0000.00
0.0000.00

0301                          7312.08 46,064.001.00046,064.00
OVERHEAD SIGN SUPPORT, LOCATION EACH1.00046,064.00
28 0.0000.00
0.0000.00

0302                          7312.09 25,314.001.00025,314.00
OVERHEAD SIGN SUPPORT, LOCATION EACH1.00025,314.00
31 0.0000.00
0.0000.00

0303                          7312.10 25,314.001.00025,314.00
OVERHEAD SIGN SUPPORT, LOCATION EACH1.00025,314.00
32 0.0000.00
0.0000.00

0304                          7312.11 25,314.001.00025,314.00
OVERHEAD SIGN SUPPORT, LOCATION EACH1.00025,314.00
33 0.0000.00
0.0000.00

0305                          7312.12 25,314.001.00025,314.00
OVERHEAD SIGN SUPPORT, LOCATION EACH1.00025,314.00
34 0.0000.00
0.0000.00

0306                          7322.01 173.83299.00051,975.17
TYPE B SIGN SY 259.11145,041.27
0.0000.00
0.0000.00

0307                          7340.00 2.282,505.0005,711.40
STRUCTURAL STEEL FOR SIGN SUPPORTS LB 2,505.0005,711.40
0.0000.00
0.0000.00

0308                          7360.24 543.2112.0006,518.52
24" SIGN SUPPORT FOOTING EACH12.0006,518.52
0.0000.00
0.0000.00

0309                          7390.10 679.0211.0007,469.22
REMOVE SIGN, POST, AND FOOTING EACH11.0007,469.22
8.0005,432.16
0.0000.00

GROUP 8C SIGNINGContracted551,819.53
Current490,184.21
In place5,432.16
This Estimate0.00

GROUP 10 GENERAL ITEMS
0310                          0001.08 0.21147,642.00031,004.82
BARRICADE, TYPE II BDAY147,642.00031,004.82
57,676.00012,111.96
3,600.000756.00

0311                          0001.10 3.2617,396.00056,710.96
BARRICADE, TYPE III BDAY17,396.00056,710.96
14,643.00047,736.18
658.0002,145.08

0312                          0001.30 3.265,434.00017,714.84
TYPE B HIGH INTENSITY WARNING LIGHT LDAY5,434.00017,714.84
275.000896.50
0.0000.00

0313                          0001.75 2.172,304.0004,999.68
TEMPORARY SIGN DAY EACH2,304.0004,999.68
806.0001,749.02
51.000110.67

0314                          0001.90 1.0950,478.00055,021.02
SIGN DAY EACH50,478.00055,021.02
34,720.00037,844.80
1,554.0001,693.86

0315                          0002.30 0.23147,000.00033,810.00
PAVEMENT MARKING REMOVAL LF 147,000.00033,810.00
28,452.0006,543.96
0.0000.00

0316                          0002.44 0.10295,000.00029,500.00
TEMPORARY PAVEMENT MARKING, TYPE PAINT LF 295,000.00029,500.00
271,978.00027,197.80
27,330.0002,733.00

0317                          0002.47 0.16144,000.00023,040.00
TEMPORARY PAVEMENT MARKING SURFACE PREPARATION LF 144,000.00023,040.00
116,160.00018,585.60
25,830.0004,132.80

0318                          0002.48 4.352,000.0008,700.00
TEMPORARY RAISED PAVEMENT MARKER EACH2,000.0008,700.00
2,421.00010,531.35
0.0000.00

0319                          0002.85 42.3760.0002,542.20
TUBULAR POST EACH60.0002,542.20
0.0000.00
0.0000.00

0320                          0002.97 92.35335.00030,937.25
FLASHING ARROW PANEL DAY 335.00030,937.25
273.50025,257.74
9.000831.15

0321                          0003.10 354.3340.00014,173.20
FLAGGING DAY 40.00014,173.20
14.0004,960.62
0.0000.00

0322                          0003.51 2.4126,525.00063,925.25
INSTALL CONCRETE PROTECTION BARRIER LF 26,525.00063,925.25
27,110.00065,335.10
0.0000.00

0323                          0003.53 6.4612,500.00080,750.00
TEMPORARY GLARE SCREEN LF 12,500.00080,750.00
12,400.00080,104.00
0.0000.00

0324                          0003.56 2.3516,200.00038,070.00
RELOCATE CONCRETE PROTECTION BARRIER LF 16,200.00038,070.00
13,780.00032,383.00
0.0000.00

0325                          0003.57 543.0010.0005,430.00
RELOCATE INERTIAL BARRIER SYSTEM EACH11.0005,973.00
8.0004,344.00
0.0000.00

0326                          0003.58 2,580.005.00012,900.00
INERTIAL BARRIER SYSTEM EACH5.00012,900.00
6.00015,480.00
0.0000.00

0327                          0003.64 646.005.0003,230.00
REPLACEMENT MODULE EACH5.0003,230.00
7.0004,522.00
0.0000.00

0328                          0005.10 162.96200.00032,592.00
TRAFFIC CONTROL MANAGEMENT DAY 200.00032,592.00
57.0009,288.72
0.0000.00

0329                          0010.04 2,134.001.0002,134.00
FIELD OFFICE EACH1.0002,134.00
1.0002,134.00
0.0000.00

0330                          0030.00 4,767.131.0004,767.13
MOBILIZATION LS 1.0004,767.13
1.0004,767.13
0.0000.00

0331                          1017.00 198,273.001.000198,273.00
CONSTRUCTION STAKING AND SURVEYING LS 1.000198,273.00
0.550109,050.15
0.0000.00

0332                          7019.60 8,691.002.00017,382.00
INSTALL IMPACT ATTENUATOR EACH2.00017,382.00
0.0000.00
0.0000.00

0333                          7019.65 1,086.005.0005,430.00
RELOCATE IMPACT ATTENUATOR EACH5.0005,430.00
0.0000.00
0.0000.00

GROUP 10 GENERAL ITEMSContracted773,037.35
Current773,580.35
In place520,823.63
This Estimate12,402.56

GROUP 6A BRIDGE AT STA. 368+64.62
0165                          0020.00 0.801,000.000800.00
TRAINING HOUR1,000.000800.00
830.500664.40
0.0000.00

0166                          0030.60 125,124.001.000125,124.00
MOBILIZATION LS 1.000125,124.00
1.000125,124.00
0.0000.00

0167                          3050.15 146.82795.900116,854.04
CONCRETE FOR PAVEMENT APPROACHES CLASS 47BD-4000 CY 795.900116,854.04
405.50059,535.51
0.0000.00

0168                          3051.10 0.6479,360.00050,790.40
EPOXY COATED REINFORCING STEEL FOR PAVEMENT APPROACHES LB 79,360.00050,790.40
39,100.00025,024.00
0.0000.00

0169                          6000.10 4,843.001.0004,843.00
ABUTMENT NO.1 EXCAVATION LS 1.0004,843.00
1.0004,843.00
0.0000.00

0170                          6000.11 4,843.001.0004,843.00
ABUTMENT NO.2 EXCAVATION LS 1.0004,843.00
1.0004,843.00
0.0000.00

0171                          6000.20 10,369.001.00010,369.00
PIER NO.1 EXCAVATION LS 1.00010,369.00
1.00010,369.00
0.0000.00

0172                          6000.21 6,878.001.0006,878.00
PIER NO.2 EXCAVATION LS 1.0006,878.00
1.0006,878.00
0.0000.00

0173                          6005.35 27.93315.0008,797.95
PRECOMPRESSED POLYURETHANE FOAM JOINT LF 315.0008,797.95
0.0000.00
0.0000.00

0174                          6005.85 3,749.0010.00037,490.00
GUIDED BEARING DEVICE, TYPE II EACH10.00037,490.00
10.00037,490.00
0.0000.00

0175                          6010.22 248.09475.500117,966.80
CLASS 47B-3000 CONCRETE FOR BRIDGE CY 475.500117,966.80
475.500117,966.79
0.0000.00

0176                          6010.26 246.86412.900101,928.49
CLASS 47BD-4000 CONCRETE FOR BRIDGE CY 412.900101,928.49
385.00095,041.10
0.0000.00

0177                          6030.01 43,445.001.00043,445.00
PREPARATION OF BRIDGE EACH1.00043,445.00
AT STA. 368+64.62 1.00043,445.00
0.0000.00

0178                          6080.00 1.85815.0001,507.75
STRUCTURAL STEEL FOR SUBSTRUCTURE LB 815.0001,507.75
815.0001,507.75
0.0000.00

0179                          6081.00 0.94409,005.000384,464.70
STRUCTURAL STEEL FOR SUPERSTRUCTURE LB 409,005.000384,464.70
409,005.000384,464.70
0.0000.00

0180                          6107.00 36.01428.00015,412.28
CONCRETE SLOPE PROTECTION SY 428.00015,412.28
428.00015,412.28
0.0000.00

0181                          6131.50 0.64177,150.000113,376.00
EPOXY COATED REINFORCING STEEL LB 177,150.000113,376.00
174,830.500111,891.52
0.0000.00

0182                          6139.50 52.51110.0005,776.10
SUBSURFACE DRAINAGE MATTING SY 110.0005,776.10
56.0002,940.56
0.0000.00

0183                          6210.14 17.295,000.00086,450.00
HP 12"X53# STEEL PILING LF 5,000.00086,450.00
4,400.00076,076.00
0.0000.00

0184                          6601.15 15.21500.0007,605.00
1 1/2" CONDUIT IN BRIDGE LF 500.0007,605.00
500.0007,605.00
0.0000.00

0185                          6951.12 1.702,850.0004,845.00
SHEAR CONNECTORS EACH2,850.0004,845.00
2,850.0004,845.00
0.0000.00

0186                          8091.00 10.28430.0004,420.40
GRANULAR BACKFILL CY 430.0004,420.40
210.0002,158.80
0.0000.00

GROUP 6A BRIDGE AT STA. 368+64.62Contracted1,253,986.91
Current1,253,986.91
In place1,138,125.41
This Estimate0.00

GROUP 10 GENERAL ITEMS
0310                          0001.08 0.2120,340.0004,271.40
BARRICADE, TYPE II BDAY20,340.0004,271.40
100.00021.00
0.0000.00

0311                          0001.10 3.2648.000156.48
BARRICADE, TYPE III BDAY48.000156.48
0.0000.00
0.0000.00

0313                          0001.75 2.1772.000156.24
TEMPORARY SIGN DAY EACH72.000156.24
24.00052.08
0.0000.00

0314                          0001.90 1.09904.000985.36
SIGN DAY EACH904.000985.36
0.0000.00
0.0000.00

0321                          0003.10 354.3312.0004,251.96
FLAGGING DAY 12.0004,251.96
0.0000.00
0.0000.00

0330                          0030.00 96.871.00096.87
MOBILIZATION LS 1.00096.87
0.0000.00
0.0000.00

GROUP 10 GENERAL ITEMSContracted9,918.31
Current9,918.31
In place73.08
This Estimate0.00

Totals for contractContracted18,862,392.57
Current18,809,515.04
In place11,564,574.17
This Estimate328,115.59