| | Detailed breakdown of stockpiled materials | |
|
---|
Est Nbr: | 0005 | | |
|
Item Nbr | Item Cd | Item Desc | Adj Amt | Invoice Nbr
|
0167 | 6131.50 | EPOXY COATED REINFORCING STEEL | |
|
| | S.P. Initial Payment | 31,608.21 | 1342/43/44
|
| | EPOXY COATED RE-STEEL | |
|
| | Total for estimate 0005: | 31,608.21 |
|
Est Nbr: | 0006 | | |
|
Item Nbr | Item Cd | Item Desc | Adj Amt | Invoice Nbr
|
0171 | 6210.14 | HP 310 mm X 79 kg STEEL PILING | |
|
| | S.P. Initial Payment | 30,812.70 | 010769
|
| | HP 310mmX79 Kg STEEL PILING | |
|
0172 | 6210.18 | HP 310 mm X 110 kg STEEL PILING | |
|
| | S.P. Initial Payment | 66,997.00 | 010769
|
| | HP 310mmX110 Kg STEEL PILING | |
|
| | Total for estimate 0006: | 97,809.70 |
|
Est Nbr: | 0007 | | |
|
Item Nbr | Item Cd | Item Desc | Adj Amt | Invoice Nbr
|
0167 | 6131.50 | EPOXY COATED REINFORCING STEEL | |
|
| | S.P. Initial Payment | 1,883.85 | 1310/1311
|
| | EPOXY COATED RE-STEEL | |
|
0172 | 6210.18 | HP 310 mm X 110 kg STEEL PILING | |
|
| | S.P. Adjustment | -18,466.40 | 010769
|
| | HP 310mmX110 Kg STEEL PILING | |
|
0173 | 6210.21 | HP 360 mm X 132 kg STEEL PILING | |
|
| | S.P. Initial Payment | 191,269.52 | 011720
|
| | HP 360mmX 132 Kg STEEL PILING | |
|
| | S.P. Adjustment | -4,605.64 | 011720
|
| | HP 360mmX 132 Kg STEEL PILING | |
|
| | Total for estimate 0007: | 170,081.33 |
|
Est Nbr: | 0008 | | |
|
Item Nbr | Item Cd | Item Desc | Adj Amt | Invoice Nbr
|
0167 | 6131.50 | EPOXY COATED REINFORCING STEEL | |
|
| | S.P. Adjustment | -3,461.04 | 1342/43/44
|
| | EPOXY COATED RE-STEEL | |
|
| | S.P. Adjustment | -1,883.85 | 1310/1311
|
| | EPOXY COATED RE-STEEL | |
|
0172 | 6210.18 | HP 310 mm X 110 kg STEEL PILING | |
|
| | S.P. Adjustment | -31,432.29 | 010769
|
| | HP 310mmX110 Kg STEEL PILING | |
|
| | Total for estimate 0008: | -36,777.18 |
|
Est Nbr: | 0009 | | |
|
Item Nbr | Item Cd | Item Desc | Adj Amt | Invoice Nbr
|
0034 | 4095.00 | CONCRETE FACE PANELS | |
|
| | S.P. Initial Payment | 36,131.45 | 32921
|
| | CONCRETE FACE PANELS | |
|
0170 | 6210.12 | HP 250 mm X 62 kg STEEL PILING | |
|
| | S.P. Initial Payment | 14,420.70 | 012868
|
| | HP 250X62 Kg STEEL PILING | |
|
0233 | 6210.12 | HP 250 mm X 62 kg STEEL PILING | |
|
| | S.P. Initial Payment | 3,400.80 | 012868
|
| | HP 250X62 Kg STEEL PILING | |
|
0258 | 6210.12 | HP 250 mm X 62 kg STEEL PILING | |
|
| | S.P. Initial Payment | 2,158.20 | 012868
|
| | HP 250X62 Kg STEEL PILING | |
|
0268 | 6210.12 | HP 250 mm X 62 kg STEEL PILING | |
|
| | S.P. Initial Payment | 5,035.80 | 012868
|
| | HP 250X62 Kg STEEL PILING | |
|
0277 | 6210.12 | HP 250 mm X 62 kg STEEL PILING | |
|
| | S.P. Initial Payment | 2,648.70 | 012868
|
| | HP 250X62 Kg STEEL PILING | |
|
0287 | 6210.12 | HP 250 mm X 62 kg STEEL PILING | |
|
| | S.P. Initial Payment | 2,583.30 | 012868
|
| | HP 250X62 Kg STEEL PILING | |
|
0296 | 6210.12 | HP 250 mm X 62 kg STEEL PILING | |
|
| | S.P. Initial Payment | 2,746.80 | 012868
|
| | HP 250X62 Kg STEEL PILING | |
|
0306 | 6210.12 | HP 250 mm X 62 kg STEEL PILING | |
|
| | S.P. Initial Payment | 2,616.00 | 012868
|
| | HP 250X62 Kg STEEL PILING | |
|
| | Total for estimate 0009: | 71,741.75 |
|
Est Nbr: | 0010 | | |
|
Item Nbr | Item Cd | Item Desc | Adj Amt | Invoice Nbr
|
0167 | 6131.50 | EPOXY COATED REINFORCING STEEL | |
|
| | S.P. Adjustment | -3,835.53 | 1342/43/44
|
| | EPOXY COATED RE-STEEL | |
|
| | Total for estimate 0010: | -3,835.53 |
|
Est Nbr: | 0011 | | |
|
Item Nbr | Item Cd | Item Desc | Adj Amt | Invoice Nbr
|
0167 | 6131.50 | EPOXY COATED REINFORCING STEEL | |
|
| | S.P. Adjustment | -6,827.46 | 1342/43/44
|
| | EPOXY COATED RE-STEEL | |
|
0173 | 6210.21 | HP 360 mm X 132 kg STEEL PILING | |
|
| | S.P. Adjustment | -28,920.71 | 011720
|
| | HP 360mmX 132 Kg STEEL PILING | |
|
| | Total for estimate 0011: | -35,748.17 |
|
Est Nbr: | 0012 | | |
|
Item Nbr | Item Cd | Item Desc | Adj Amt | Invoice Nbr
|
0167 | 6131.50 | EPOXY COATED REINFORCING STEEL | |
|
| | S.P. Adjustment | -4,626.12 | 1342/43/44
|
| | EPOXY COATED RE-STEEL | |
|
0170 | 6210.12 | HP 250 mm X 62 kg STEEL PILING | |
|
| | S.P. Adjustment | -9,156.00 | 012868
|
| | HP 250X62 Kg STEEL PILING | |
|
0171 | 6210.14 | HP 310 mm X 79 kg STEEL PILING | |
|
| | S.P. Adjustment | -11,056.80 | 010769
|
| | HP 310mmX79 Kg STEEL PILING | |
|
0233 | 6210.12 | HP 250 mm X 62 kg STEEL PILING | |
|
| | S.P. Adjustment | -3,368.10 | 012868
|
| | HP 250X62 Kg STEEL PILING | |
|
| | Total for estimate 0012: | -28,207.02 |
|
Est Nbr: | 0013 | | |
|
Item Nbr | Item Cd | Item Desc | Adj Amt | Invoice Nbr
|
0034 | 4095.00 | CONCRETE FACE PANELS | |
|
| | S.P. Adjustment | -25,191.25 | 32921
|
| | CONCRETE FACE PANELS | |
|
0167 | 6131.50 | EPOXY COATED REINFORCING STEEL | |
|
| | S.P. Adjustment | -125.40 | 1342/43/44
|
| | EPOXY COATED RE-STEEL | |
|
0171 | 6210.14 | HP 310 mm X 79 kg STEEL PILING | |
|
| | S.P. Adjustment | -7,642.20 | 010769
|
| | HP 310mmX79 Kg STEEL PILING | |
|
| | Total for estimate 0013: | -32,958.85 |
|
Est Nbr: | 0014 | | |
|
Item Nbr | Item Cd | Item Desc | Adj Amt | Invoice Nbr
|
0034 | 4095.00 | CONCRETE FACE PANELS | |
|
| | S.P. Adjustment | -10,940.20 | 32921
|
| | CONCRETE FACE PANELS | |
|
0172 | 6210.18 | HP 310 mm X 110 kg STEEL PILING | |
|
| | S.P. Adjustment | -3,715.80 | 010769
|
| | HP 310mmX110 Kg STEEL PILING | |
|
| | Total for estimate 0014: | -14,656.00 |
|
Est Nbr: | 0015 | | |
|
Item Nbr | Item Cd | Item Desc | Adj Amt | Invoice Nbr
|
0139 | A001.50 | PULL BOX | |
|
| | S.P. Initial Payment | 37,500.00 | 19623
|
| | PULL BOX | |
|
0167 | 6131.50 | EPOXY COATED REINFORCING STEEL | |
|
| | S.P. Adjustment | -2,236.68 | 1342/43/44
|
| | EPOXY COATED RE-STEEL | |
|
| | S.P. Initial Payment | 13,197.21 | 1549
|
| | EPOXY COATED RE-STEEL | |
|
| | S.P. Initial Payment | 12,308.58 | 1550
|
| | EPOXY COATED RE-STEEL | |
|
| | S.P. Initial Payment | 11,865.69 | 1554
|
| | EPOXY COATED RE-STEEL | |
|
| | S.P. Initial Payment | 10,819.17 | 1555
|
| | EPOXY COATED RE-STEEL | |
|
| | S.P. Initial Payment | 13,661.76 | 1565
|
| | EPOXY COATED RE-STEEL | |
|
| | S.P. Initial Payment | 10,295.91 | 1566
|
| | EPOXY COATED RE-STEEL | |
|
0171 | 6210.14 | HP 310 mm X 79 kg STEEL PILING | |
|
| | S.P. Adjustment | -731.70 | 010769
|
| | HP 310mmX79 Kg STEEL PILING | |
|
0172 | 6210.18 | HP 310 mm X 110 kg STEEL PILING | |
|
| | S.P. Adjustment | -337.80 | 010769
|
| | HP 310mmX110 Kg STEEL PILING | |
|
0173 | 6210.21 | HP 360 mm X 132 kg STEEL PILING | |
|
| | S.P. Adjustment | -4,605.64 | 011720
|
| | HP 360mmX 132 Kg STEEL PILING | |
|
0233 | 6210.12 | HP 250 mm X 62 kg STEEL PILING | |
|
| | S.P. Adjustment | -32.70 | 012868
|
| | HP 250X62 Kg STEEL PILING | |
|
0314 | A004.00 | TRAFFIC SIGNAL, TYPE TS-1 | |
|
| | S.P. Initial Payment | 8,372.00 | 15068
|
| | TRAFFIC SIGNAL, TYPE TS-1 | |
|
0315 | A004.04 | TRAFFIC SIGNAL, TYPE TS-1LL | |
|
| | S.P. Initial Payment | 1,044.00 | 15068
|
| | TRAFFIC SIGNAL, TYPE TS-1LL | |
|
0316 | A004.10 | TRAFFIC SIGNAL, TYPE TS-1A | |
|
| | S.P. Initial Payment | 4,760.00 | 15068
|
| | TRAFFIC SIGNAL,TYPE TS-1A | |
|
0317 | A005.25 | TRAFFIC SIGNAL CONTROLLER, TYPE TC-170 | |
|
| | S.P. Initial Payment | 10,994.00 | 15060
|
| | TRAF SIG CONTROL, TYPE TC-170 | |
|
0318 | A006.15 | PEDESTRIAN SIGNAL, TYPE PS-1 | |
|
| | S.P. Initial Payment | 4,816.00 | 15068
|
| | PEDESTRIAN SIGNAL, TYPE PS-1 | |
|
0319 | A006.70 | PEDESTRIAN PUSHBUTTON, TYPE PPB | |
|
| | S.P. Initial Payment | 312.00 | 15068
|
| | PEDESTRIAN PUSHBUTTON, PPB | |
|
0366 | 7315.90 | INSTALL OVERHEAD SIGNS | |
|
| | S.P. Initial Payment | 385.00 | 15068
|
| | SIGN BRACKETS | |
|
0367 | 7320.50 | STREET NAME SIGN | |
|
| | S.P. Initial Payment | 872.00 | 15068
|
| | SIGN BRACKETS | |
|
| | Total for estimate 0015: | 133,258.80 |
|
Est Nbr: | 0016 | | |
|
Item Nbr | Item Cd | Item Desc | Adj Amt | Invoice Nbr
|
0167 | 6131.50 | EPOXY COATED REINFORCING STEEL | |
|
| | S.P. Adjustment | -4,012.12 | 1342/43/44
|
| | EPOXY COATED RE-STEEL | |
|
0172 | 6210.18 | HP 310 mm X 110 kg STEEL PILING | |
|
| | S.P. Adjustment | -13,044.71 | 010769
|
| | HP 310mmX110 Kg STEEL PILING | |
|
| | Total for estimate 0016: | -17,056.83 |
|
Est Nbr: | 0017 | | |
|
Item Nbr | Item Cd | Item Desc | Adj Amt | Invoice Nbr
|
0159 | 6005.11 | DECK JOINT SEAL, TYPE II | |
|
| | S.P. Initial Payment | 23,132.47 | 103687
|
| | DECK JOINT SEAL, TYPE II | |
|
0160 | 6005.12 | DECK JOINT SEAL, TYPE III | |
|
| | S.P. Initial Payment | 34,317.36 | 103687
|
| | DECK JOINT SEAL, TYPE III | |
|
0173 | 6210.21 | HP 360 mm X 132 kg STEEL PILING | |
|
| | S.P. Adjustment | -64,953.07 | 011720
|
| | HP 360mmX 132 Kg STEEL PILING | |
|
| | Total for estimate 0017: | -7,503.24 |
|
Est Nbr: | 0018 | | |
|
Item Nbr | Item Cd | Item Desc | Adj Amt | Invoice Nbr
|
0167 | 6131.50 | EPOXY COATED REINFORCING STEEL | |
|
| | S.P. Adjustment | -6,483.86 | 1342/43/44
|
| | EPOXY COATED RE-STEEL | |
|
| | S.P. Adjustment | -4,887.64 | 1549
|
| | EPOXY COATED RE-STEEL | |
|
| | Total for estimate 0018: | -11,371.50 |
|
Est Nbr: | 0019 | | |
|
Item Nbr | Item Cd | Item Desc | Adj Amt | Invoice Nbr
|
0166 | 6071.13 | STEEL SUPERSTRUCTURE | |
|
| | S.P. Initial Payment | 600,000.00 | 010666
|
| | STEEL SUPERSTRUCTURE | |
|
| | S.P. Adjustment | -48,000.00 | 010666
|
| | STEEL SUPERSTRUCTURE | |
|
0167 | 6131.50 | EPOXY COATED REINFORCING STEEL | |
|
| | S.P. Adjustment | -3,045.23 | 1549
|
| | EPOXY COATED RE-STEEL | |
|
0181 | 6610.45 | STRIP SEALS | |
|
| | S.P. Initial Payment | 8,531.53 | 19625
|
| | STRIP SEALS | |
|
0314 | A004.00 | TRAFFIC SIGNAL, TYPE TS-1 | |
|
| | S.P. Adjustment | -2,576.00 | 15068
|
| | TRAFFIC SIGNAL, TYPE TS-1 | |
|
0316 | A004.10 | TRAFFIC SIGNAL, TYPE TS-1A | |
|
| | S.P. Adjustment | -1,785.00 | 15068
|
| | TRAFFIC SIGNAL,TYPE TS-1A | |
|
0317 | A005.25 | TRAFFIC SIGNAL CONTROLLER, TYPE TC-170 | |
|
| | S.P. Adjustment | -5,497.00 | 15060
|
| | TRAF SIG CONTROL, TYPE TC-170 | |
|
| | Total for estimate 0019: | 547,628.30 |
|
Est Nbr: | 0020 | | |
|
Item Nbr | Item Cd | Item Desc | Adj Amt | Invoice Nbr
|
0070 | 4165.12 | RAILING | |
|
| | S.P. Initial Payment | 41,810.00 | 19621
|
| | RAILING | |
|
0167 | 6131.50 | EPOXY COATED REINFORCING STEEL | |
|
| | S.P. Adjustment | -5,264.35 | 1549
|
| | EPOXY COATED RE-STEEL | |
|
| | S.P. Adjustment | -6,258.09 | 1550
|
| | EPOXY COATED RE-STEEL | |
|
0173 | 6210.21 | HP 360 mm X 132 kg STEEL PILING | |
|
| | S.P. Adjustment | -42,839.23 | 011720
|
| | HP 360mmX 132 Kg STEEL PILING | |
|
0177 | 6415.00 | DRAINAGE SYSTEM | |
|
| | S.P. Initial Payment | 23,000.00 | 19622
|
| | DRAINGE SYSTEM | |
|
0236 | 6415.00 | DRAINAGE SYSTEM | |
|
| | S.P. Initial Payment | 2,875.00 | 19622
|
| | DRAINGE SYSTEM | |
|
0258 | 6210.12 | HP 250 mm X 62 kg STEEL PILING | |
|
| | S.P. Adjustment | -2,158.20 | 012868
|
| | HP 250X62 Kg STEEL PILING | |
|
0268 | 6210.12 | HP 250 mm X 62 kg STEEL PILING | |
|
| | S.P. Adjustment | -3,889.60 | 012868
|
| | HP 250X62 Kg STEEL PILING | |
|
0309 | A001.01 | PULL BOX, TYPE PB-1 | |
|
| | S.P. Initial Payment | 1,053.00 | 104858
|
| | PULL BOX, TYPE PB-1 | |
|
0310 | A001.02 | PULL BOX, TYPE PB-1A | |
|
| | S.P. Initial Payment | 1,174.50 | 104858
|
| | PULL BOX, TYPE PB-1A | |
|
0311 | A001.05 | PULL BOX, TYPE PB-2 | |
|
| | S.P. Initial Payment | 848.00 | 104859
|
| | PULL BOX, TYPE PB-2 | |
|
0314 | A004.00 | TRAFFIC SIGNAL, TYPE TS-1 | |
|
| | S.P. Adjustment | -1,288.00 | 15068
|
| | TRAFFIC SIGNAL, TYPE TS-1 | |
|
0316 | A004.10 | TRAFFIC SIGNAL, TYPE TS-1A | |
|
| | S.P. Adjustment | -595.00 | 15068
|
| | TRAFFIC SIGNAL,TYPE TS-1A | |
|
0318 | A006.15 | PEDESTRIAN SIGNAL, TYPE PS-1 | |
|
| | S.P. Adjustment | -2,408.00 | 15068
|
| | PEDESTRIAN SIGNAL, TYPE PS-1 | |
|
0319 | A006.70 | PEDESTRIAN PUSHBUTTON, TYPE PPB | |
|
| | S.P. Adjustment | -156.00 | 15068
|
| | PEDESTRIAN PUSHBUTTON, PPB | |
|
0326 | A011.54 | COMBINATION MAST ARM SIGNAL AND LIGHTING POLE, | |
|
| | S.P. Initial Payment | 4,815.00 | 1240598943
|
| | C.M.A. SIGNAL& LIGHT POLE, CMP-12.5-0 | |
|
0328 | A011.89 | COMBINATION MAST ARM SIGNAL AND LIGHTING POLE, | |
|
| | S.P. Initial Payment | 5,990.00 | 1240598943
|
| | C.M.A. SIGNAL& LIGHT POLE, CMP-14-0 | |
|
0330 | A012.39 | COMBINATION MAST ARM SIGNAL AND LIGHTING POLE, | |
|
| | S.P. Initial Payment | 13,250.00 | 1240598943
|
| | C.M.A. SIGNAL& LIGHT POLE, CMP-15.5-0 | |
|
0342 | A070.14 | 50 mm CONDUIT IN TRENCH | |
|
| | S.P. Initial Payment | 1,206.00 | 1240598676
|
| | 50 mm CONDUIT IN TRENCH | |
|
0367 | 7320.50 | STREET NAME SIGN | |
|
| | S.P. Adjustment | -436.00 | 15068
|
| | SIGN BRACKETS | |
|
| | Total for estimate 0020: | 30,729.03 |
|
Est Nbr: | 0021 | | |
|
Item Nbr | Item Cd | Item Desc | Adj Amt | Invoice Nbr
|
0142 | 3051.10 | EPOXY COATED REINFORCING STEEL FOR PAVEMENT APPROACHES | |
|
| | S.P. Initial Payment | 3,515.76 | 1805
|
| | EPOXY STEEL FOR PVMT APPROACH | |
|
0167 | 6131.50 | EPOXY COATED REINFORCING STEEL | |
|
| | S.P. Adjustment | -6,050.49 | 1550
|
| | EPOXY COATED RE-STEEL | |
|
| | S.P. Adjustment | -3,678.27 | 1554
|
| | EPOXY COATED RE-STEEL | |
|
| | S.P. Initial Payment | 1,783.53 | 1806
|
| | EPOXY COATED RE-STEEL | |
|
| | S.P. Initial Payment | 7,626.60 | 1805
|
| | EPOXY COATED RE-STEEL | |
|
| | S.P. Initial Payment | 12,500.67 | 1809
|
| | EPOXY COATED RE-STEEL | |
|
| | S.P. Initial Payment | 12,467.61 | 1808
|
| | EPOXY COATED RE-STEEL | |
|
0256 | 6131.50 | EPOXY COATED REINFORCING STEEL | |
|
| | S.P. Initial Payment | 6,155.43 | 1817
|
| | EPOXY COATED STEEL | |
|
| | S.P. Initial Payment | 323.76 | 1805
|
| | EPOXY COATED STEEL | |
|
0277 | 6210.12 | HP 250 mm X 62 kg STEEL PILING | |
|
| | S.P. Adjustment | -2,407.11 | 012868
|
| | HP 250X62 Kg STEEL PILING | |
|
0296 | 6210.12 | HP 250 mm X 62 kg STEEL PILING | |
|
| | S.P. Adjustment | -2,746.80 | 012868
|
| | HP 250X62 Kg STEEL PILING | |
|
0309 | A001.01 | PULL BOX, TYPE PB-1 | |
|
| | S.P. Adjustment | -175.50 | 104858
|
| | PULL BOX, TYPE PB-1 | |
|
0310 | A001.02 | PULL BOX, TYPE PB-1A | |
|
| | S.P. Adjustment | -130.50 | 104858
|
| | PULL BOX, TYPE PB-1A | |
|
0313 | A002.43 | EMERGENCY VEHICLE PREEMPTION SYSTEM | |
|
| | S.P. Initial Payment | 4,650.50 | 01-244
|
| | EMERGENCY VEHICLE PREEMPT SYSTEM | |
|
0333 | A030.04 | SERVICE DISCONNECT PEDESTAL | |
|
| | S.P. Initial Payment | 3,650.00 | 01-244
|
| | SERVICE DISCONNECT PEDESTAL | |
|
| | Total for estimate 0021: | 37,485.19 |
|
Est Nbr: | 0022 | | |
|
Item Nbr | Item Cd | Item Desc | Adj Amt | Invoice Nbr
|
0161 | 6005.78 | EXPANSION BEARING, TFE TYPE | |
|
| | S.P. Initial Payment | 39,645.48 | E20066
|
| | EXPANSION BEARING, TFE TYPE | |
|
| | S.P. Adjustment | -3,775.76 | E20066
|
| | EXPANSION BEARING, TFE TYPE | |
|
0162 | 6005.83 | FIXED BEARING | |
|
| | S.P. Initial Payment | 5,219.13 | E20066
|
| | FIXED BEARING | |
|
0166 | 6071.13 | STEEL SUPERSTRUCTURE | |
|
| | S.P. Adjustment | -40,000.00 | 010666
|
| | STEEL SUPERSTRUCTURE | |
|
0167 | 6131.50 | EPOXY COATED REINFORCING STEEL | |
|
| | S.P. Adjustment | -3,803.04 | 1554
|
| | EPOXY COATED RE-STEEL | |
|
| | Total for estimate 0022: | -2,714.19 |
|
Est Nbr: | 0023 | | |
|
Item Nbr | Item Cd | Item Desc | Adj Amt | Invoice Nbr
|
0068 | 4163.25 | REINFORCING STEEL | |
|
| | S.P. Initial Payment | 1,122.90 | 1877
|
| | REINFORCING STEEL | |
|
0161 | 6005.78 | EXPANSION BEARING, TFE TYPE | |
|
| | S.P. Adjustment | -14,159.10 | E20066
|
| | EXPANSION BEARING, TFE TYPE | |
|
0166 | 6071.13 | STEEL SUPERSTRUCTURE | |
|
| | S.P. Adjustment | -192,000.00 | 010666
|
| | STEEL SUPERSTRUCTURE | |
|
0167 | 6131.50 | EPOXY COATED REINFORCING STEEL | |
|
| | S.P. Adjustment | -4,384.38 | 1554
|
| | EPOXY COATED RE-STEEL | |
|
| | S.P. Adjustment | -10,819.17 | 1555
|
| | EPOXY COATED RE-STEEL | |
|
| | S.P. Adjustment | -13,661.76 | 1565
|
| | EPOXY COATED RE-STEEL | |
|
| | S.P. Adjustment | -10,295.91 | 1566
|
| | EPOXY COATED RE-STEEL | |
|
| | S.P. Adjustment | -1,783.53 | 1806
|
| | EPOXY COATED RE-STEEL | |
|
| | S.P. Adjustment | -7,626.60 | 1805
|
| | EPOXY COATED RE-STEEL | |
|
| | S.P. Adjustment | -4,785.21 | 1809
|
| | EPOXY COATED RE-STEEL | |
|
| | S.P. Initial Payment | 1,902.66 | 1875
|
| | EPOXY COATED RE-STEEL | |
|
| | S.P. Initial Payment | 6,402.81 | 1876
|
| | EPOXY COATED RE-STEEL | |
|
0266 | 6131.50 | EPOXY COATED REINFORCING STEEL | |
|
| | S.P. Initial Payment | 3,968.34 | 1874
|
| | EPOXY COATED RE-STEEL | |
|
0275 | 6131.50 | EPOXY COATED REINFORCING STEEL | |
|
| | S.P. Initial Payment | 3,459.33 | 1874
|
| | EPOXY COATED RE-STEEL | |
|
0285 | 6131.50 | EPOXY COATED REINFORCING STEEL | |
|
| | S.P. Initial Payment | 2,337.00 | 1874
|
| | EPOXY COATED RE-STEEL | |
|
0294 | 6131.50 | EPOXY COATED REINFORCING STEEL | |
|
| | S.P. Initial Payment | 2,656.20 | 1874
|
| | EPOXY COATED RE-STEEL | |
|
| | Total for estimate 0023: | -237,666.42 |
|
Est Nbr: | 0024 | | |
|
Item Nbr | Item Cd | Item Desc | Adj Amt | Invoice Nbr
|
0161 | 6005.78 | EXPANSION BEARING, TFE TYPE | |
|
| | S.P. Adjustment | -8,495.46 | E20066
|
| | EXPANSION BEARING, TFE TYPE | |
|
0166 | 6071.13 | STEEL SUPERSTRUCTURE | |
|
| | S.P. Adjustment | -168,000.00 | 010666
|
| | STEEL SUPERSTRUCTURE | |
|
0167 | 6131.50 | EPOXY COATED REINFORCING STEEL | |
|
| | S.P. Adjustment | -4,761.78 | 1809
|
| | EPOXY COATED RE-STEEL | |
|
0173 | 6210.21 | HP 360 mm X 132 kg STEEL PILING | |
|
| | S.P. Adjustment | -21,944.52 | 011720
|
| | HP 360mmX 132 Kg STEEL PILING | |
|
| | Total for estimate 0024: | -203,201.76 |
|
Est Nbr: | 0025 | | |
|
Item Nbr | Item Cd | Item Desc | Adj Amt | Invoice Nbr
|
0069 | 4165.11 | RAILING | |
|
| | S.P. Initial Payment | 4,450.60 | 19621
|
| | RAILING | |
|
0161 | 6005.78 | EXPANSION BEARING, TFE TYPE | |
|
| | S.P. Adjustment | -6,607.58 | E20066
|
| | EXPANSION BEARING, TFE TYPE | |
|
0162 | 6005.83 | FIXED BEARING | |
|
| | S.P. Adjustment | -5,219.13 | E20066
|
| | FIXED BEARING | |
|
0166 | 6071.13 | STEEL SUPERSTRUCTURE | |
|
| | S.P. Adjustment | -80,000.00 | 010666
|
| | STEEL SUPERSTRUCTURE | |
|
0167 | 6131.50 | EPOXY COATED REINFORCING STEEL | |
|
| | S.P. Adjustment | -2,953.68 | 1809
|
| | EPOXY COATED RE-STEEL | |
|
| | S.P. Adjustment | -7,339.95 | 1808
|
| | EPOXY COATED RE-STEEL | |
|
0170 | 6210.12 | HP 250 mm X 62 kg STEEL PILING | |
|
| | S.P. Adjustment | -4,224.48 | 012868
|
| | HP 250X62 Kg STEEL PILING | |
|
0171 | 6210.14 | HP 310 mm X 79 kg STEEL PILING | |
|
| | S.P. Adjustment | -9,739.33 | 010769
|
| | HP 310mmX79 Kg STEEL PILING | |
|
0173 | 6210.21 | HP 360 mm X 132 kg STEEL PILING | |
|
| | S.P. Adjustment | -17,933.68 | 011720
|
| | HP 360mmX 132 Kg STEEL PILING | |
|
0175 | 6390.56 | METAL RAILING | |
|
| | S.P. Initial Payment | 73,296.00 | 19621
|
| | METAL RAILING | |
|
0209 | 6390.55 | METAL RAILING | |
|
| | S.P. Initial Payment | 10,805.20 | 19621
|
| | METAL RAILING | |
|
0210 | 6406.05 | METAL HANDRAIL | |
|
| | S.P. Initial Payment | 1,750.00 | 19621
|
| | METAL HANDRAIL | |
|
| | Total for estimate 0025: | -43,716.03 |
|
Est Nbr: | 0026 | | |
|
Item Nbr | Item Cd | Item Desc | Adj Amt | Invoice Nbr
|
0142 | 3051.10 | EPOXY COATED REINFORCING STEEL FOR PAVEMENT APPROACHES | |
|
| | S.P. Adjustment | -2,610.60 | 1805
|
| | EPOXY STEEL FOR PVMT APPROACH | |
|
0161 | 6005.78 | EXPANSION BEARING, TFE TYPE | |
|
| | S.P. Adjustment | -6,607.58 | E20066
|
| | EXPANSION BEARING, TFE TYPE | |
|
0166 | 6071.13 | STEEL SUPERSTRUCTURE | |
|
| | S.P. Adjustment | -40,000.00 | 010666
|
| | STEEL SUPERSTRUCTURE | |
|
0167 | 6131.50 | EPOXY COATED REINFORCING STEEL | |
|
| | S.P. Adjustment | -5,127.66 | 1808
|
| | EPOXY COATED RE-STEEL | |
|
| | S.P. Adjustment | -237.75 | 1875
|
| | EPOXY COATED RE-STEEL | |
|
| | Total for estimate 0026: | -54,583.59 |
|
Est Nbr: | 0027 | | |
|
Item Nbr | Item Cd | Item Desc | Adj Amt | Invoice Nbr
|
0166 | 6071.13 | STEEL SUPERSTRUCTURE | |
|
| | S.P. Adjustment | -32,000.00 | 010666
|
| | STEEL SUPERSTRUCTURE | |
|
0266 | 6131.50 | EPOXY COATED REINFORCING STEEL | |
|
| | S.P. Adjustment | -974.70 | 1874
|
| | EPOXY COATED RE-STEEL | |
|
0333 | A030.04 | SERVICE DISCONNECT PEDESTAL | |
|
| | S.P. Adjustment | -1,825.00 | 01-244
|
| | SERVICE DISCONNECT PEDESTAL | |
|
| | Total for estimate 0027: | -34,799.70 |
|
Est Nbr: | 0028 | | |
|
Item Nbr | Item Cd | Item Desc | Adj Amt | Invoice Nbr
|
0068 | 4163.25 | REINFORCING STEEL | |
|
| | S.P. Adjustment | -1,122.90 | 1877
|
| | REINFORCING STEEL | |
|
0142 | 3051.10 | EPOXY COATED REINFORCING STEEL FOR PAVEMENT APPROACHES | |
|
| | S.P. Initial Payment | 3,926.73 | 2096
|
| | EPOXY STEEL FOR PVMT APPROACH | |
|
0143 | 4048.95 | PRECAST CONCRETE POST | |
|
| | S.P. Initial Payment | 50,844.54 | 3493
|
| | | |
|
| | S.P. Adjustment | -1,753.26 | 3493
|
| | | |
|
0167 | 6131.50 | EPOXY COATED REINFORCING STEEL | |
|
| | S.P. Adjustment | -1,664.91 | 1875
|
| | EPOXY COATED RE-STEEL | |
|
| | S.P. Adjustment | -6,402.81 | 1876
|
| | EPOXY COATED RE-STEEL | |
|
| | S.P. Initial Payment | 10,305.03 | 2098
|
| | EPOXY COATED RE-STEEL | |
|
| | S.P. Adjustment | -10,305.03 | 2098
|
| | EPOXY COATED RE-STEEL | |
|
| | S.P. Initial Payment | 11,211.33 | 2095
|
| | EPOXY COATED RE-STEEL | |
|
| | S.P. Adjustment | -11,211.33 | 2095
|
| | EPOXY COATED RE-STEEL | |
|
| | S.P. Initial Payment | 8,588.76 | 2096
|
| | EPOXY COATED RE-STEEL | |
|
| | S.P. Adjustment | -8,588.76 | 2096
|
| | EPOXY COATED RE-STEEL | |
|
| | S.P. Initial Payment | 10,541.01 | 2104
|
| | EPOXY COATED RE-STEEL | |
|
| | S.P. Adjustment | -10,541.01 | 2104
|
| | EPOXY COATED RE-STEEL | |
|
| | S.P. Initial Payment | 9,973.29 | 2112
|
| | EPOXY COATED RE-STEEL | |
|
| | S.P. Adjustment | -4,524.15 | 2112
|
| | EPOXY COATED RE-STEEL | |
|
| | S.P. Initial Payment | 195.51 | 2028
|
| | EPOXY COATED RE-STEEL | |
|
0181 | 6610.45 | STRIP SEALS | |
|
| | S.P. Adjustment | -8,531.53 | 19625
|
| | STRIP SEALS | |
|
| | Total for estimate 0028: | 40,940.51 |
|
Est Nbr: | 0029 | | |
|
Item Nbr | Item Cd | Item Desc | Adj Amt | Invoice Nbr
|
0167 | 6131.50 | EPOXY COATED REINFORCING STEEL | |
|
| | S.P. Adjustment | -5,449.14 | 2112
|
| | EPOXY COATED RE-STEEL | |
|
| | S.P. Adjustment | -195.51 | 2028
|
| | EPOXY COATED RE-STEEL | |
|
0256 | 6131.50 | EPOXY COATED REINFORCING STEEL | |
|
| | S.P. Adjustment | -4,084.62 | 1817
|
| | EPOXY COATED STEEL | |
|
| | Total for estimate 0029: | -9,729.27 |
|
Est Nbr: | 0030 | | |
|
Item Nbr | Item Cd | Item Desc | Adj Amt | Invoice Nbr
|
0143 | 4048.95 | PRECAST CONCRETE POST | |
|
| | S.P. Adjustment | -10,519.56 | 3493
|
| | | |
|
0160 | 6005.12 | DECK JOINT SEAL, TYPE III | |
|
| | S.P. Adjustment | -34,317.36 | 103687
|
| | DECK JOINT SEAL, TYPE III | |
|
0180 | 6600.02 | 50 mm CONDUIT IN BRIDGE | |
|
| | S.P. Initial Payment | 9,139.22 | 0671753001
|
| | 50 mm CONDUIT IN BRIDGE | |
|
0256 | 6131.50 | EPOXY COATED REINFORCING STEEL | |
|
| | S.P. Adjustment | -2,028.63 | 1817
|
| | EPOXY COATED STEEL | |
|
0332 | A020.36 | LIGHTING CONTROL CENTER, TYPE R-2 | |
|
| | S.P. Initial Payment | 1,501.46 | 1696197001
|
| | LIGHTING CONTROL CENTER, R-2 | |
|
4012 | 4012.50 | JUNCTION BOX | |
|
| | S.P. Initial Payment | 568.20 | 0671759001
|
| | JUNCTION BOX | |
|
4013 | 4012.50 | JUNCTION BOX | |
|
| | S.P. Initial Payment | 221.50 | 0671759001
|
| | JUNCTION BOX | |
|
| | Total for estimate 0030: | -35,435.17 |
|
Est Nbr: | 0031 | | |
|
Item Nbr | Item Cd | Item Desc | Adj Amt | Invoice Nbr
|
0143 | 4048.95 | PRECAST CONCRETE POST | |
|
| | S.P. Adjustment | -10,519.56 | 3493
|
| | | |
|
0266 | 6131.50 | EPOXY COATED REINFORCING STEEL | |
|
| | S.P. Adjustment | -965.58 | 1874
|
| | EPOXY COATED RE-STEEL | |
|
0275 | 6131.50 | EPOXY COATED REINFORCING STEEL | |
|
| | S.P. Adjustment | -226.29 | 1874
|
| | EPOXY COATED RE-STEEL | |
|
0285 | 6131.50 | EPOXY COATED REINFORCING STEEL | |
|
| | S.P. Adjustment | -226.29 | 1874
|
| | EPOXY COATED RE-STEEL | |
|
0311 | A001.05 | PULL BOX, TYPE PB-2 | |
|
| | S.P. Adjustment | -424.00 | 104859
|
| | PULL BOX, TYPE PB-2 | |
|
0328 | A011.89 | COMBINATION MAST ARM SIGNAL AND LIGHTING POLE, | |
|
| | S.P. Adjustment | -2,995.00 | 1240598943
|
| | C.M.A. SIGNAL& LIGHT POLE, CMP-14-0 | |
|
0330 | A012.39 | COMBINATION MAST ARM SIGNAL AND LIGHTING POLE, | |
|
| | S.P. Adjustment | -3,312.50 | 1240598943
|
| | C.M.A. SIGNAL& LIGHT POLE, CMP-15.5-0 | |
|
| | Total for estimate 0031: | -18,669.22 |
|
Est Nbr: | 0032 | | |
|
Item Nbr | Item Cd | Item Desc | Adj Amt | Invoice Nbr
|
0024 | 4048.95 | PRECAST CONCRETE POST | |
|
| | S.P. Initial Payment | 5,259.78 | 1218
|
| | PRECAST CONC POST | |
|
0025 | 4048.96 | PRECAST CONCRETE POST | |
|
| | S.P. Initial Payment | 2,629.89 | 1218
|
| | PRECAST CONC POST | |
|
0040 | 6406.05 | METAL HANDRAIL | |
|
| | S.P. Initial Payment | 7,219.20 | 19621
|
| | METAL HAND RAIL | |
|
0065 | 4048.95 | PRECAST CONCRETE POST | |
|
| | S.P. Initial Payment | 3,506.52 | 1218
|
| | PRECAST CON POST | |
|
0143 | 4048.95 | PRECAST CONCRETE POST | |
|
| | S.P. Adjustment | -8,766.30 | 3493
|
| | | |
|
| | S.P. Initial Payment | 18,409.23 | 1218
|
| | PRECAST CONC POST | |
|
0144 | 4048.96 | PRECAST CONCRETE POST | |
|
| | S.P. Initial Payment | 34,188.57 | 1218
|
| | PRECAST CONC POST | |
|
| | S.P. Adjustment | -5,259.78 | 1218
|
| | PRECAST CONC POST | |
|
0202 | 4048.95 | PRECAST CONCRETE POST | |
|
| | S.P. Initial Payment | 5,259.78 | 1218
|
| | PRECAST CONC POST | |
|
0203 | 4048.96 | PRECAST CONCRETE POST | |
|
| | S.P. Initial Payment | 876.63 | 1218
|
| | PRECAST CONC POST | |
|
0234 | 6390.55 | METAL RAILING | |
|
| | S.P. Initial Payment | 3,132.00 | 19621
|
| | METAL RAILING | |
|
0246 | 6390.55 | METAL RAILING | |
|
| | S.P. Initial Payment | 11,852.40 | 19621
|
| | METAL RAILING | |
|
0259 | 6390.55 | METAL RAILING | |
|
| | S.P. Initial Payment | 214.20 | 19621
|
| | METAL RAILING | |
|
0260 | 6390.56 | METAL RAILING | |
|
| | S.P. Initial Payment | 4,968.00 | 19621
|
| | METAL RAILING | |
|
0266 | 6131.50 | EPOXY COATED REINFORCING STEEL | |
|
| | S.P. Adjustment | -106.59 | 1874
|
| | EPOXY COATED RE-STEEL | |
|
0275 | 6131.50 | EPOXY COATED REINFORCING STEEL | |
|
| | S.P. Adjustment | -1,003.20 | 1874
|
| | EPOXY COATED RE-STEEL | |
|
0285 | 6131.50 | EPOXY COATED REINFORCING STEEL | |
|
| | S.P. Adjustment | -878.77 | 1874
|
| | EPOXY COATED RE-STEEL | |
|
0330 | A012.39 | COMBINATION MAST ARM SIGNAL AND LIGHTING POLE, | |
|
| | S.P. Adjustment | -3,312.50 | 1240598943
|
| | C.M.A. SIGNAL& LIGHT POLE, CMP-15.5-0 | |
|
0333 | A030.04 | SERVICE DISCONNECT PEDESTAL | |
|
| | S.P. Adjustment | -1,825.00 | 01-244
|
| | SERVICE DISCONNECT PEDESTAL | |
|
0342 | A070.14 | 50 mm CONDUIT IN TRENCH | |
|
| | S.P. Adjustment | -21.37 | 1240598676
|
| | 50 mm CONDUIT IN TRENCH | |
|
| | Total for estimate 0032: | 76,342.69 |
|
Est Nbr: | 0033 | | |
|
Item Nbr | Item Cd | Item Desc | Adj Amt | Invoice Nbr
|
0070 | 4165.12 | RAILING | |
|
| | S.P. Adjustment | -37,855.00 | 19621
|
| | RAILING | |
|
0139 | A001.50 | PULL BOX | |
|
| | S.P. Adjustment | -37,500.00 | 19623
|
| | PULL BOX | |
|
0143 | 4048.95 | PRECAST CONCRETE POST | |
|
| | S.P. Adjustment | -10,519.56 | 3493
|
| | | |
|
0144 | 4048.96 | PRECAST CONCRETE POST | |
|
| | S.P. Adjustment | -6,136.41 | 1218
|
| | PRECAST CONC POST | |
|
0159 | 6005.11 | DECK JOINT SEAL, TYPE II | |
|
| | S.P. Adjustment | -23,132.47 | 103687
|
| | DECK JOINT SEAL, TYPE II | |
|
0174 | 6390.55 | METAL RAILING | |
|
| | S.P. Initial Payment | 92,881.13 | 19621
|
| | METAL RAILING | |
|
0231 | 6131.50 | EPOXY COATED REINFORCING STEEL | |
|
| | S.P. Initial Payment | 2,515.01 | 2076
|
| | EPOXY COATED STEEL | |
|
0266 | 6131.50 | EPOXY COATED REINFORCING STEEL | |
|
| | S.P. Adjustment | -471.68 | 1874
|
| | EPOXY COATED RE-STEEL | |
|
| | Total for estimate 0033: | -20,218.98 |
|
Est Nbr: | 0034 | | |
|
Item Nbr | Item Cd | Item Desc | Adj Amt | Invoice Nbr
|
0143 | 4048.95 | PRECAST CONCRETE POST | |
|
| | S.P. Adjustment | -8,766.30 | 3493
|
| | | |
|
| | S.P. Adjustment | -1,753.26 | 1218
|
| | PRECAST CONC POST | |
|
0144 | 4048.96 | PRECAST CONCRETE POST | |
|
| | S.P. Adjustment | -5,259.78 | 1218
|
| | PRECAST CONC POST | |
|
0231 | 6131.50 | EPOXY COATED REINFORCING STEEL | |
|
| | S.P. Adjustment | -1,710.00 | 2076
|
| | EPOXY COATED STEEL | |
|
0266 | 6131.50 | EPOXY COATED REINFORCING STEEL | |
|
| | S.P. Adjustment | -473.10 | 1874
|
| | EPOXY COATED RE-STEEL | |
|
0294 | 6131.50 | EPOXY COATED REINFORCING STEEL | |
|
| | S.P. Adjustment | -2,507.43 | 1874
|
| | EPOXY COATED RE-STEEL | |
|
| | Total for estimate 0034: | -20,469.87 |
|
Est Nbr: | 0035 | | |
|
Item Nbr | Item Cd | Item Desc | Adj Amt | Invoice Nbr
|
0031 | 6390.55 | METAL RAILING | |
|
| | S.P. Initial Payment | 10,622.40 | 19651
|
| | METAL RAILING | |
|
0143 | 4048.95 | PRECAST CONCRETE POST | |
|
| | S.P. Adjustment | -5,259.78 | 1218
|
| | PRECAST CONC POST | |
|
0144 | 4048.96 | PRECAST CONCRETE POST | |
|
| | S.P. Adjustment | -2,629.89 | 1218
|
| | PRECAST CONC POST | |
|
0174 | 6390.55 | METAL RAILING | |
|
| | S.P. Adjustment | -1,558.60 | 19621
|
| | METAL RAILING | |
|
0175 | 6390.56 | METAL RAILING | |
|
| | S.P. Adjustment | -33,480.00 | 19621
|
| | METAL RAILING | |
|
0220 | 6415.00 | DRAINAGE SYSTEM | |
|
| | S.P. Initial Payment | 7,600.00 | 19622
|
| | DRAINAGE SYSTEM | |
|
0317 | A005.25 | TRAFFIC SIGNAL CONTROLLER, TYPE TC-170 | |
|
| | S.P. Adjustment | -5,497.00 | 15060
|
| | TRAF SIG CONTROL, TYPE TC-170 | |
|
0330 | A012.39 | COMBINATION MAST ARM SIGNAL AND LIGHTING POLE, | |
|
| | S.P. Adjustment | -3,312.50 | 1240598943
|
| | C.M.A. SIGNAL& LIGHT POLE, CMP-15.5-0 | |
|
0332 | A020.36 | LIGHTING CONTROL CENTER, TYPE R-2 | |
|
| | S.P. Adjustment | -1,501.46 | 1696197001
|
| | LIGHTING CONTROL CENTER, R-2 | |
|
4016 | 6415.00 | DRAINAGE SYSTEM | |
|
| | S.P. Initial Payment | 4,725.00 | 19622
|
| | DRAINAGE SYSTEM | |
|
4017 | 6415.01 | DRAINAGE SYSTEM | |
|
| | S.P. Initial Payment | 3,200.00 | 19622
|
| | DRAINAGE SYSTEM | |
|
| | Total for estimate 0035: | -27,091.83 |
|
Est Nbr: | 0036 | | |
|
Item Nbr | Item Cd | Item Desc | Adj Amt | Invoice Nbr
|
0142 | 3051.10 | EPOXY COATED REINFORCING STEEL FOR PAVEMENT APPROACHES | |
|
| | S.P. Adjustment | -905.16 | 1805
|
| | EPOXY STEEL FOR PVMT APPROACH | |
|
| | S.P. Adjustment | -257.07 | 2096
|
| | EPOXY STEEL FOR PVMT APPROACH | |
|
0174 | 6390.55 | METAL RAILING | |
|
| | S.P. Adjustment | -35,963.30 | 19621
|
| | METAL RAILING | |
|
0231 | 6131.50 | EPOXY COATED REINFORCING STEEL | |
|
| | S.P. Adjustment | -178.07 | 2076
|
| | EPOXY COATED STEEL | |
|
0266 | 6131.50 | EPOXY COATED REINFORCING STEEL | |
|
| | S.P. Adjustment | -976.70 | 1874
|
| | EPOXY COATED RE-STEEL | |
|
0275 | 6131.50 | EPOXY COATED REINFORCING STEEL | |
|
| | S.P. Adjustment | -2,037.75 | 1874
|
| | EPOXY COATED RE-STEEL | |
|
0285 | 6131.50 | EPOXY COATED REINFORCING STEEL | |
|
| | S.P. Adjustment | -1,174.94 | 1874
|
| | EPOXY COATED RE-STEEL | |
|
0287 | 6210.12 | HP 250 mm X 62 kg STEEL PILING | |
|
| | S.P. Adjustment | -2,557.14 | 012868
|
| | HP 250X62 Kg STEEL PILING | |
|
0294 | 6131.50 | EPOXY COATED REINFORCING STEEL | |
|
| | S.P. Adjustment | -76.89 | 1874
|
| | EPOXY COATED RE-STEEL | |
|
0313 | A002.43 | EMERGENCY VEHICLE PREEMPTION SYSTEM | |
|
| | S.P. Adjustment | -4,650.50 | 01-244
|
| | EMERGENCY VEHICLE PREEMPT SYSTEM | |
|
0314 | A004.00 | TRAFFIC SIGNAL, TYPE TS-1 | |
|
| | S.P. Adjustment | -3,864.00 | 15068
|
| | TRAFFIC SIGNAL, TYPE TS-1 | |
|
0316 | A004.10 | TRAFFIC SIGNAL, TYPE TS-1A | |
|
| | S.P. Adjustment | -1,785.00 | 15068
|
| | TRAFFIC SIGNAL,TYPE TS-1A | |
|
0318 | A006.15 | PEDESTRIAN SIGNAL, TYPE PS-1 | |
|
| | S.P. Adjustment | -1,806.00 | 15068
|
| | PEDESTRIAN SIGNAL, TYPE PS-1 | |
|
0319 | A006.70 | PEDESTRIAN PUSHBUTTON, TYPE PPB | |
|
| | S.P. Adjustment | -117.00 | 15068
|
| | PEDESTRIAN PUSHBUTTON, PPB | |
|
0328 | A011.89 | COMBINATION MAST ARM SIGNAL AND LIGHTING POLE, | |
|
| | S.P. Adjustment | -2,995.00 | 1240598943
|
| | C.M.A. SIGNAL& LIGHT POLE, CMP-14-0 | |
|
0330 | A012.39 | COMBINATION MAST ARM SIGNAL AND LIGHTING POLE, | |
|
| | S.P. Adjustment | -3,312.50 | 1240598943
|
| | C.M.A. SIGNAL& LIGHT POLE, CMP-15.5-0 | |
|
| | Total for estimate 0036: | -62,657.02 |
|
Est Nbr: | 0037 | | |
|
Item Nbr | Item Cd | Item Desc | Adj Amt | Invoice Nbr
|
0024 | 4048.95 | PRECAST CONCRETE POST | |
|
| | S.P. Adjustment | -4,383.15 | 1218
|
| | PRECAST CONC POST | |
|
0025 | 4048.96 | PRECAST CONCRETE POST | |
|
| | S.P. Adjustment | -1,753.26 | 1218
|
| | PRECAST CONC POST | |
|
0040 | 6406.05 | METAL HANDRAIL | |
|
| | S.P. Adjustment | -7,219.20 | 19621
|
| | METAL HAND RAIL | |
|
0070 | 4165.12 | RAILING | |
|
| | S.P. Adjustment | -3,955.00 | 19621
|
| | RAILING | |
|
0202 | 4048.95 | PRECAST CONCRETE POST | |
|
| | S.P. Adjustment | -5,259.78 | 1218
|
| | PRECAST CONC POST | |
|
0203 | 4048.96 | PRECAST CONCRETE POST | |
|
| | S.P. Adjustment | -876.63 | 1218
|
| | PRECAST CONC POST | |
|
0231 | 6131.50 | EPOXY COATED REINFORCING STEEL | |
|
| | S.P. Adjustment | -264.14 | 2076
|
| | EPOXY COATED STEEL | |
|
4016 | 6415.00 | DRAINAGE SYSTEM | |
|
| | S.P. Adjustment | -4,725.00 | 19622
|
| | DRAINAGE SYSTEM | |
|
| | Total for estimate 0037: | -28,436.16 |
|
Est Nbr: | 0038 | | |
|
Item Nbr | Item Cd | Item Desc | Adj Amt | Invoice Nbr
|
0143 | 4048.95 | PRECAST CONCRETE POST | |
|
| | S.P. Adjustment | -6,136.41 | 1218
|
| | PRECAST CONC POST | |
|
0144 | 4048.96 | PRECAST CONCRETE POST | |
|
| | S.P. Adjustment | -2,629.89 | 1218
|
| | PRECAST CONC POST | |
|
0174 | 6390.55 | METAL RAILING | |
|
| | S.P. Adjustment | -27,131.22 | 19621
|
| | METAL RAILING | |
|
0231 | 6131.50 | EPOXY COATED REINFORCING STEEL | |
|
| | S.P. Adjustment | -171.00 | 2076
|
| | EPOXY COATED STEEL | |
|
0309 | A001.01 | PULL BOX, TYPE PB-1 | |
|
| | S.P. Adjustment | -351.00 | 104858
|
| | PULL BOX, TYPE PB-1 | |
|
0310 | A001.02 | PULL BOX, TYPE PB-1A | |
|
| | S.P. Adjustment | -391.50 | 104858
|
| | PULL BOX, TYPE PB-1A | |
|
0326 | A011.54 | COMBINATION MAST ARM SIGNAL AND LIGHTING POLE, | |
|
| | S.P. Adjustment | -2,407.50 | 1240598943
|
| | C.M.A. SIGNAL& LIGHT POLE, CMP-12.5-0 | |
|
| | Total for estimate 0038: | -39,218.52 |
|
Est Nbr: | 0039 | | |
|
Item Nbr | Item Cd | Item Desc | Adj Amt | Invoice Nbr
|
0174 | 6390.55 | METAL RAILING | |
|
| | S.P. Adjustment | -14,431.50 | 19621
|
| | METAL RAILING | |
|
0175 | 6390.56 | METAL RAILING | |
|
| | S.P. Adjustment | -29,520.00 | 19621
|
| | METAL RAILING | |
|
0180 | 6600.02 | 50 mm CONDUIT IN BRIDGE | |
|
| | S.P. Adjustment | -9,139.22 | 0671753001
|
| | 50 mm CONDUIT IN BRIDGE | |
|
0210 | 6406.05 | METAL HANDRAIL | |
|
| | S.P. Adjustment | -1,750.00 | 19621
|
| | METAL HANDRAIL | |
|
0256 | 6131.50 | EPOXY COATED REINFORCING STEEL | |
|
| | S.P. Adjustment | -42.18 | 1817
|
| | EPOXY COATED STEEL | |
|
| | S.P. Adjustment | -49.59 | 1805
|
| | EPOXY COATED STEEL | |
|
0285 | 6131.50 | EPOXY COATED REINFORCING STEEL | |
|
| | S.P. Adjustment | -57.00 | 1874
|
| | EPOXY COATED RE-STEEL | |
|
0294 | 6131.50 | EPOXY COATED REINFORCING STEEL | |
|
| | S.P. Adjustment | -71.88 | 1874
|
| | EPOXY COATED RE-STEEL | |
|
0309 | A001.01 | PULL BOX, TYPE PB-1 | |
|
| | S.P. Adjustment | -351.00 | 104858
|
| | PULL BOX, TYPE PB-1 | |
|
0310 | A001.02 | PULL BOX, TYPE PB-1A | |
|
| | S.P. Adjustment | -391.50 | 104858
|
| | PULL BOX, TYPE PB-1A | |
|
0342 | A070.14 | 50 mm CONDUIT IN TRENCH | |
|
| | S.P. Adjustment | -639.79 | 1240598676
|
| | 50 mm CONDUIT IN TRENCH | |
|
0366 | 7315.90 | INSTALL OVERHEAD SIGNS | |
|
| | S.P. Adjustment | -192.50 | 15068
|
| | SIGN BRACKETS | |
|
0367 | 7320.50 | STREET NAME SIGN | |
|
| | S.P. Adjustment | -218.00 | 15068
|
| | SIGN BRACKETS | |
|
| | Total for estimate 0039: | -56,854.16 |
|
Est Nbr: | 0040 | | |
|
Item Nbr | Item Cd | Item Desc | Adj Amt | Invoice Nbr
|
0031 | 6390.55 | METAL RAILING | |
|
| | S.P. Adjustment | -9,010.07 | 19651
|
| | METAL RAILING | |
|
0142 | 3051.10 | EPOXY COATED REINFORCING STEEL FOR PAVEMENT APPROACHES | |
|
| | S.P. Adjustment | -3,593.74 | 2096
|
| | EPOXY STEEL FOR PVMT APPROACH | |
|
0174 | 6390.55 | METAL RAILING | |
|
| | S.P. Adjustment | -2,559.19 | 19621
|
| | METAL RAILING | |
|
0175 | 6390.56 | METAL RAILING | |
|
| | S.P. Adjustment | -9,360.00 | 19621
|
| | METAL RAILING | |
|
0209 | 6390.55 | METAL RAILING | |
|
| | S.P. Adjustment | -7,378.00 | 19621
|
| | METAL RAILING | |
|
| | Total for estimate 0040: | -31,901.00 |
|
Est Nbr: | 0041 | | |
|
Item Nbr | Item Cd | Item Desc | Adj Amt | Invoice Nbr
|
0024 | 4048.95 | PRECAST CONCRETE POST | |
|
| | S.P. Adjustment | -876.63 | 1218
|
| | PRECAST CONC POST | |
|
0031 | 6390.55 | METAL RAILING | |
|
| | S.P. Adjustment | -1,612.33 | 19651
|
| | METAL RAILING | |
|
0065 | 4048.95 | PRECAST CONCRETE POST | |
|
| | S.P. Adjustment | -3,506.52 | 1218
|
| | PRECAST CON POST | |
|
0069 | 4165.11 | RAILING | |
|
| | S.P. Adjustment | -4,450.60 | 19621
|
| | RAILING | |
|
0209 | 6390.55 | METAL RAILING | |
|
| | S.P. Adjustment | -3,427.20 | 19621
|
| | METAL RAILING | |
|
0231 | 6131.50 | EPOXY COATED REINFORCING STEEL | |
|
| | S.P. Adjustment | -191.80 | 2076
|
| | EPOXY COATED STEEL | |
|
0234 | 6390.55 | METAL RAILING | |
|
| | S.P. Adjustment | -3,132.00 | 19621
|
| | METAL RAILING | |
|
0256 | 6131.50 | EPOXY COATED REINFORCING STEEL | |
|
| | S.P. Adjustment | -148.20 | 1805
|
| | EPOXY COATED STEEL | |
|
0275 | 6131.50 | EPOXY COATED REINFORCING STEEL | |
|
| | S.P. Adjustment | -156.75 | 1874
|
| | EPOXY COATED RE-STEEL | |
|
0309 | A001.01 | PULL BOX, TYPE PB-1 | |
|
| | S.P. Adjustment | -175.50 | 104858
|
| | PULL BOX, TYPE PB-1 | |
|
0310 | A001.02 | PULL BOX, TYPE PB-1A | |
|
| | S.P. Adjustment | -261.00 | 104858
|
| | PULL BOX, TYPE PB-1A | |
|
0311 | A001.05 | PULL BOX, TYPE PB-2 | |
|
| | S.P. Adjustment | -424.00 | 104859
|
| | PULL BOX, TYPE PB-2 | |
|
0314 | A004.00 | TRAFFIC SIGNAL, TYPE TS-1 | |
|
| | S.P. Adjustment | -644.00 | 15068
|
| | TRAFFIC SIGNAL, TYPE TS-1 | |
|
0316 | A004.10 | TRAFFIC SIGNAL, TYPE TS-1A | |
|
| | S.P. Adjustment | -595.00 | 15068
|
| | TRAFFIC SIGNAL,TYPE TS-1A | |
|
0318 | A006.15 | PEDESTRIAN SIGNAL, TYPE PS-1 | |
|
| | S.P. Adjustment | -602.00 | 15068
|
| | PEDESTRIAN SIGNAL, TYPE PS-1 | |
|
0319 | A006.70 | PEDESTRIAN PUSHBUTTON, TYPE PPB | |
|
| | S.P. Adjustment | -39.00 | 15068
|
| | PEDESTRIAN PUSHBUTTON, PPB | |
|
0326 | A011.54 | COMBINATION MAST ARM SIGNAL AND LIGHTING POLE, | |
|
| | S.P. Adjustment | -2,407.50 | 1240598943
|
| | C.M.A. SIGNAL& LIGHT POLE, CMP-12.5-0 | |
|
0342 | A070.14 | 50 mm CONDUIT IN TRENCH | |
|
| | S.P. Adjustment | -319.89 | 1240598676
|
| | 50 mm CONDUIT IN TRENCH | |
|
4012 | 4012.50 | JUNCTION BOX | |
|
| | S.P. Adjustment | -568.20 | 0671759001
|
| | JUNCTION BOX | |
|
4013 | 4012.50 | JUNCTION BOX | |
|
| | S.P. Adjustment | -221.50 | 0671759001
|
| | JUNCTION BOX | |
|
4017 | 6415.01 | DRAINAGE SYSTEM | |
|
| | S.P. Adjustment | -1,600.00 | 19622
|
| | DRAINAGE SYSTEM | |
|
| | Total for estimate 0041: | -25,359.62 |
|
Est Nbr: | 0042 | | |
|
Item Nbr | Item Cd | Item Desc | Adj Amt | Invoice Nbr
|
0142 | 3051.10 | EPOXY COATED REINFORCING STEEL FOR PAVEMENT APPROACHES | |
|
| | S.P. Adjustment | -75.92 | 2096
|
| | EPOXY STEEL FOR PVMT APPROACH | |
|
0143 | 4048.95 | PRECAST CONCRETE POST | |
|
| | S.P. Adjustment | -5,259.78 | 1218
|
| | PRECAST CONC POST | |
|
0246 | 6390.55 | METAL RAILING | |
|
| | S.P. Adjustment | -5,950.00 | 19621
|
| | METAL RAILING | |
|
0256 | 6131.50 | EPOXY COATED REINFORCING STEEL | |
|
| | S.P. Adjustment | -125.97 | 1805
|
| | EPOXY COATED STEEL | |
|
0259 | 6390.55 | METAL RAILING | |
|
| | S.P. Adjustment | -214.20 | 19621
|
| | METAL RAILING | |
|
0260 | 6390.56 | METAL RAILING | |
|
| | S.P. Adjustment | -4,968.00 | 19621
|
| | METAL RAILING | |
|
0275 | 6131.50 | EPOXY COATED REINFORCING STEEL | |
|
| | S.P. Adjustment | -35.34 | 1874
|
| | EPOXY COATED RE-STEEL | |
|
0315 | A004.04 | TRAFFIC SIGNAL, TYPE TS-1LL | |
|
| | S.P. Adjustment | -1,044.00 | 15068
|
| | TRAFFIC SIGNAL, TYPE TS-1LL | |
|
0366 | 7315.90 | INSTALL OVERHEAD SIGNS | |
|
| | S.P. Adjustment | -192.50 | 15068
|
| | SIGN BRACKETS | |
|
0367 | 7320.50 | STREET NAME SIGN | |
|
| | S.P. Adjustment | -218.00 | 15068
|
| | SIGN BRACKETS | |
|
4017 | 6415.01 | DRAINAGE SYSTEM | |
|
| | S.P. Adjustment | -1,600.00 | 19622
|
| | DRAINAGE SYSTEM | |
|
| | Total for estimate 0042: | -19,683.71 |
|
Est Nbr: | 0043 | | |
|
Item Nbr | Item Cd | Item Desc | Adj Amt | Invoice Nbr
|
0025 | 4048.96 | PRECAST CONCRETE POST | |
|
| | S.P. Adjustment | -876.63 | 1218
|
| | PRECAST CONC POST | |
|
0174 | 6390.55 | METAL RAILING | |
|
| | S.P. Adjustment | -11,237.33 | 19621
|
| | METAL RAILING | |
|
0175 | 6390.56 | METAL RAILING | |
|
| | S.P. Adjustment | -936.00 | 19621
|
| | METAL RAILING | |
|
| | Total for estimate 0043: | -13,049.96 |
|
| | Total remaining for contract: | 64,055.01 |
|
---|
| | | 1. Contracted
|
---|
| | | 2. Current
|
---|
| | | 3. To date
|
---|
Item Nbr Item Code | Unit Price | | 4. This Est
|
---|
Item Description | Units | Qty | Amount
|
---|
GROUP 6K BRIDGE AT STA. 13+33.33 | | |
|
4029 6004.50 | 73.00 | 0.000 | 0.00
|
EXPANSION JOINT | m | 10.150 | 740.95
|
JEENE JOINT SEAL | | 10.150 | 740.95
|
| | 0.000 | 0.00
|
| | |
|
4030 6175.00 | 22.05 | 0.000 | 0.00
|
PILE TIPS | EACH | 6.000 | 132.30
|
PILE POINTS | | 6.000 | 132.30
|
| | 0.000 | 0.00
|
| | |
|
4040 3900.26 | 31.09 | 0.000 | 0.00
|
ADDITIONAL COST | m2 | 1,850.000 | 57,516.50
|
SANDBLAST CURB | | 1,850.000 | 57,516.50
|
| | 0.000 | 0.00
|
| | |
|
4041 A110.02 | 14,945.32 | 0.000 | 0.00
|
REPAIR | LS | 1.000 | 14,945.32
|
REPAIR ASPHALT SURFACE | | 1.000 | 14,945.32
|
| | 0.000 | 0.00
|
| | |
|
4053 A580.79 | 3,357.38 | 0.000 | 0.00
|
INSTALL LIGHTING UNIT | EACH | 6.000 | 20,144.28
|
SINGLE LIGHT ADAPTERS FOR HISTORIC LIGHT STANDARDS, TYPE"B" | | 6.000 | 20,144.28
|
| | 0.000 | 0.00
|
| | |
|
4055 5999.92 | 4,876.19 | 0.000 | 0.00
|
ELECTRICAL | LS | 1.000 | 4,876.19
|
ELECTRICAL SERVICE TO DURHAM WESTERN HERITAGE MUSEUM SIGN | | 1.000 | 4,876.19
|
| | 1.000 | 4,876.19
|
| | |
|
GROUP 6K BRIDGE AT STA. 13+33.33 | | Contracted | 0.00
|
| | Current | 98,355.54
|
| | In place | 98,355.54
|
| | This Estimate | 4,876.19
|
| | |
|
GROUP 1 GRADING | | |
|
0001 L022.19 | 15.92 | 484.000 | 7,705.28
|
FABRIC SILT FENCE, TYPE OB | m | 484.000 | 7,705.28
|
| | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0002 0030.10 | 25,186.00 | 1.000 | 25,186.00
|
MOBILIZATION | LS | 1.000 | 25,186.00
|
| | 1.000 | 25,186.00
|
| | 0.000 | 0.00
|
| | |
|
0003 1009.00 | 19,206.00 | 1.000 | 19,206.00
|
GENERAL CLEARING AND GRUBBING | LS | 1.000 | 19,206.00
|
| | 1.000 | 19,206.00
|
| | 0.000 | 0.00
|
| | |
|
0004 1010.50 | 86.63 | 150.000 | 12,994.50
|
REMOVAL OF UNSUITABLE MATERIAL | m3 | 150.000 | 12,994.50
|
| | 150.000 | 12,994.50
|
| | 0.000 | 0.00
|
| | |
|
0005 1011.00 | 2.60 | 336.000 | 873.60
|
WATER | kL | 336.000 | 873.60
|
| | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0006 1030.00 | 6.42 | 5,084.000 | 32,639.28
|
EARTHWORK MEASURED IN EMBANKMENT | m3 | 5,084.000 | 32,639.28
|
| | 5,084.000 | 32,639.28
|
| | 0.000 | 0.00
|
| | |
|
0007 1043.61 | 0.36 | 1,245.000 | 448.20
|
GEOTEXTILE FABRIC | m2 | 1,245.000 | 448.20
|
| | 1,245.000 | 448.20
|
| | 0.000 | 0.00
|
| | |
|
0008 1101.00 | 3.96 | 8,899.000 | 35,240.04
|
REMOVE PAVEMENT | m2 | 8,899.000 | 35,240.04
|
| | 8,831.500 | 34,972.74
|
| | 0.000 | 0.00
|
| | |
|
0009 1101.25 | 8.20 | 600.000 | 4,920.00
|
SAWING PAVEMENT | m | 600.000 | 4,920.00
|
| | 355.300 | 2,913.46
|
| | 65.400 | 536.28
|
| | |
|
0010 1101.75 | 3.95 | 298.000 | 1,177.10
|
REMOVE TEMPORARY SURFACING | m2 | 298.000 | 1,177.10
|
| | 159.790 | 631.17
|
| | 159.790 | 631.17
|
| | |
|
0011 1106.00 | 3.91 | 33.000 | 129.03
|
REMOVE DRIVEWAY | m2 | 33.000 | 129.03
|
| | 33.000 | 129.03
|
| | 0.000 | 0.00
|
| | |
|
0012 1107.00 | 3.96 | 2,071.000 | 8,201.16
|
REMOVE WALK | m2 | 2,071.000 | 8,201.16
|
| | 2,018.000 | 7,991.28
|
| | 0.000 | 0.00
|
| | |
|
0013 1114.10 | 45.26 | 131.600 | 5,956.22
|
REMOVE RETAINING WALL | m | 131.600 | 5,956.22
|
| | 152.600 | 6,906.68
|
| | 0.000 | 0.00
|
| | |
|
0014 1122.01 | 3.95 | 52.000 | 205.40
|
REMOVE CONCRETE MEDIAN SURFACING | m2 | 52.000 | 205.40
|
| | 52.000 | 205.40
|
| | 0.000 | 0.00
|
| | |
|
0015 1124.28 | 1,061.00 | 1.000 | 1,061.00
|
REMOVE BUILDING | EACH | 1.000 | 1,061.00
|
DOCK | | 1.000 | 1,061.00
|
| | 0.000 | 0.00
|
| | |
|
0016 1133.00 | 19.48 | 153.000 | 2,980.44
|
REMOVE TRACK | m | 153.000 | 2,980.44
|
| | 151.300 | 2,947.33
|
| | 0.000 | 0.00
|
| | |
|
0017 1136.09 | 19.48 | 350.000 | 6,818.00
|
REMOVE | m | 350.000 | 6,818.00
|
TROLLEY RAILS | | 404.000 | 7,869.92
|
| | 0.000 | 0.00
|
| | |
|
0018 1900.12 | 22,601.00 | 1.000 | 22,601.00
|
ASBESTOS ABATEMENT | LS | 1.000 | 22,601.00
|
| | 1.000 | 22,601.00
|
| | 0.000 | 0.00
|
| | |
|
0019 8091.15 | 50.59 | 1,116.000 | 56,458.44
|
LIGHTWEIGHT BACKFILL | m3 | 1,116.000 | 56,458.44
|
| | 1,144.300 | 57,890.14
|
| | 0.000 | 0.00
|
| | |
|
0020 9110.01 | 113.00 | 10.000 | 1,130.00
|
RENTAL OF LOADER, FULLY OPERATED | HOUR | 10.000 | 1,130.00
|
| | 58.500 | 6,610.50
|
| | 0.000 | 0.00
|
| | |
|
0021 9110.03 | 85.00 | 10.000 | 850.00
|
RENTAL OF DUMP TRUCK, FULLY OPERATED | HOUR | 10.000 | 850.00
|
| | 53.500 | 4,547.50
|
| | 0.000 | 0.00
|
| | |
|
0022 9110.07 | 56.00 | 10.000 | 560.00
|
RENTAL OF SKID LOADER, FULLY OPERATED | HOUR | 10.000 | 560.00
|
| | 17.500 | 980.00
|
| | 0.000 | 0.00
|
| | |
|
GROUP 1 GRADING | | Contracted | 247,340.69
|
| | Current | 247,340.69
|
| | In place | 248,731.13
|
| | This Estimate | 1,167.45
|
| | |
|
GROUP 1A MSE WALL | | |
|
0023 0030.10 | 10,694.00 | 1.000 | 10,694.00
|
MOBILIZATION | LS | 1.000 | 10,694.00
|
| | 1.000 | 10,694.00
|
| | 0.000 | 0.00
|
| | |
|
0024 4048.95 | 2,468.00 | 6.000 | 14,808.00
|
PRECAST CONCRETE POST | EACH | 6.000 | 14,808.00
|
WITH STANCHION | | 6.000 | 14,808.00
|
| | 0.000 | 0.00
|
| | |
|
0025 4048.96 | 2,020.00 | 3.000 | 6,060.00
|
PRECAST CONCRETE POST | EACH | 3.000 | 6,060.00
|
WITH LIGHT SUPPORT | | 3.000 | 6,060.00
|
| | 1.000 | 2,020.00
|
| | |
|
0026 4095.65 | 225.05 | 66.400 | 14,943.32
|
WIRE MESH | m2 | 66.400 | 14,943.32
|
MSE WALL WITH CONCRETE FACING | | 66.400 | 14,943.32
|
| | 0.000 | 0.00
|
| | |
|
0027 4115.25 | 459.03 | 52.300 | 24,007.27
|
CLASS 47B-20 CONCRETE | m3 | 52.300 | 24,007.27
|
FOR BRIDGE | | 52.300 | 24,007.27
|
| | 0.000 | 0.00
|
| | |
|
0028 4115.26 | 878.80 | 12.000 | 10,545.60
|
CLASS 47BD-30 CONCRETE | m3 | 12.000 | 10,545.60
|
FOR BRIDGE | | 12.000 | 10,545.60
|
| | 0.000 | 0.00
|
| | |
|
0029 6107.00 | 55.45 | 69.400 | 3,848.23
|
CONCRETE SLOPE PROTECTION | m2 | 69.400 | 3,848.23
|
| | 72.500 | 4,020.13
|
| | 0.000 | 0.00
|
| | |
|
0030 6133.15 | 12.07 | 202.700 | 2,446.59
|
ANTI-GRAFFITI COATING | m2 | 202.700 | 2,446.59
|
| | 200.000 | 2,414.00
|
| | 0.000 | 0.00
|
| | |
|
0031 6390.55 | 307.20 | 44.800 | 13,762.56
|
METAL RAILING | m | 44.800 | 13,762.56
|
700 mm | | 44.800 | 13,762.56
|
| | 0.000 | 0.00
|
| | |
|
0032 8024.75 | 198.45 | 57.000 | 11,311.65
|
SELECT GRANULAR BACKFILL FOR MSE WALL | m3 | 57.000 | 11,311.65
|
| | 57.000 | 11,311.65
|
| | 0.000 | 0.00
|
| | |
|
GROUP 1A MSE WALL | | Contracted | 112,427.22
|
| | Current | 112,427.22
|
| | In place | 112,566.53
|
| | This Estimate | 2,020.00
|
| | |
|
GROUP 1B MSE WALL | | |
|
0033 0030.10 | 13,121.00 | 1.000 | 13,121.00
|
MOBILIZATION | LS | 1.000 | 13,121.00
|
| | 1.000 | 13,121.00
|
| | 0.000 | 0.00
|
| | |
|
0034 4095.00 | 204.41 | 322.000 | 65,820.02
|
CONCRETE FACE PANELS | m2 | 322.000 | 65,820.02
|
| | 316.000 | 64,593.56
|
| | 0.000 | 0.00
|
| | |
|
0035 4095.10 | 40.44 | 46.800 | 1,892.59
|
CONCRETE LEVELING PADS | m | 46.800 | 1,892.59
|
| | 46.800 | 1,892.59
|
| | 0.000 | 0.00
|
| | |
|
0036 4095.20 | 153.55 | 59.100 | 9,074.81
|
COPING | m | 59.100 | 9,074.81
|
| | 59.100 | 9,074.82
|
| | 0.000 | 0.00
|
| | |
|
0037 4350.18 | 28.08 | 140.400 | 3,942.43
|
450 mm CORRUGATED METAL PIPE | m | 140.400 | 3,942.43
|
| | 140.400 | 3,942.43
|
| | 0.000 | 0.00
|
| | |
|
0038 6107.00 | 55.97 | 37.700 | 2,110.07
|
CONCRETE SLOPE PROTECTION | m2 | 37.700 | 2,110.07
|
| | 25.800 | 1,444.03
|
| | 0.000 | 0.00
|
| | |
|
0039 6133.15 | 12.07 | 211.100 | 2,547.98
|
ANTI-GRAFFITI COATING | m2 | 211.100 | 2,547.98
|
| | 200.000 | 2,414.00
|
| | 0.000 | 0.00
|
| | |
|
0040 6406.05 | 923.00 | 9.400 | 8,676.20
|
METAL HANDRAIL | m | 9.400 | 8,676.20
|
1070 mm | | 9.400 | 8,676.20
|
| | 0.000 | 0.00
|
| | |
|
0041 8024.75 | 33.75 | 1,587.000 | 53,561.25
|
SELECT GRANULAR BACKFILL FOR MSE WALL | m3 | 1,587.000 | 53,561.25
|
| | 1,551.000 | 52,346.25
|
| | 0.000 | 0.00
|
| | |
|
4003 3030.99 | 30.37 | 0.000 | 0.00
|
CRUSHED CONCRETE BASE COURSE | Mg | 863.000 | 26,209.31
|
CRUSHED CONCRETE BASE FOR MSE WALL | | 627.390 | 19,053.83
|
| | 0.000 | 0.00
|
| | |
|
GROUP 1B MSE WALL | | Contracted | 160,746.35
|
| | Current | 186,955.66
|
| | In place | 176,558.71
|
| | This Estimate | 0.00
|
| | |
|
GROUP 1C MSE WALL | | |
|
0042 0030.10 | 7,148.00 | 1.000 | 7,148.00
|
MOBILIZATION | LS | 1.000 | 7,148.00
|
| | 1.000 | 7,148.00
|
| | 0.000 | 0.00
|
| | |
|
0043 4095.00 | 210.84 | 197.700 | 41,683.07
|
CONCRETE FACE PANELS | m2 | 197.700 | 41,683.07
|
| | 197.700 | 41,683.06
|
| | 0.000 | 0.00
|
| | |
|
0044 4095.10 | 41.50 | 50.300 | 2,087.45
|
CONCRETE LEVELING PADS | m | 50.300 | 2,087.45
|
| | 50.300 | 2,087.45
|
| | 0.000 | 0.00
|
| | |
|
0045 4095.20 | 150.98 | 54.200 | 8,183.12
|
COPING | m | 54.200 | 8,183.12
|
| | 54.200 | 8,183.12
|
| | 0.000 | 0.00
|
| | |
|
0046 4350.18 | 28.08 | 40.200 | 1,128.82
|
450 mm CORRUGATED METAL PIPE | m | 40.200 | 1,128.82
|
| | 40.200 | 1,128.82
|
| | 0.000 | 0.00
|
| | |
|
0047 6133.15 | 12.09 | 167.300 | 2,022.66
|
ANTI-GRAFFITI COATING | m2 | 167.300 | 2,022.66
|
| | 167.300 | 2,022.66
|
| | 0.000 | 0.00
|
| | |
|
0048 8024.75 | 52.02 | 608.100 | 31,633.36
|
SELECT GRANULAR BACKFILL FOR MSE WALL | m3 | 608.100 | 31,633.36
|
| | 608.100 | 31,633.36
|
| | 0.000 | 0.00
|
| | |
|
4002 W176.52 | 49.30 | 0.000 | 0.00
|
WATER SERVICE | m | 61.000 | 3,007.30
|
25MM Copper Water Service | | 61.000 | 3,007.30
|
| | 0.000 | 0.00
|
| | |
|
4005 4940.10 | 3,681.44 | 0.000 | 0.00
|
LOCATE | EACH | 1.000 | 3,681.44
|
LOCATE EXISTING WATERLINE | | 1.000 | 3,681.44
|
| | 0.000 | 0.00
|
| | |
|
GROUP 1C MSE WALL | | Contracted | 93,886.47
|
| | Current | 100,575.21
|
| | In place | 100,575.21
|
| | This Estimate | 0.00
|
| | |
|
GROUP 3 CONCRETE PAVEMENT | | |
|
0049 L001.02 | 5,643.98 | 0.480 | 2,709.11
|
SEEDING, TYPE B | ha | 0.480 | 2,709.11
|
| | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0050 L010.00 | 6.43 | 963.000 | 6,192.09
|
SODDING | m2 | 963.000 | 6,192.09
|
| | 989.650 | 6,363.45
|
| | 989.650 | 6,363.45
|
| | |
|
0051 L032.75 | 62.00 | 2.400 | 148.80
|
MULCH | Mg | 2.400 | 148.80
|
| | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0052 0030.30 | 59,712.00 | 1.000 | 59,712.00
|
MOBILIZATION | LS | 1.000 | 59,712.00
|
| | 1.000 | 59,712.00
|
| | 0.000 | 0.00
|
| | |
|
0053 2010.03 | 20.47 | 200.000 | 4,094.00
|
CRUSHED ROCK SURFACE COURSE | Mg | 200.000 | 4,094.00
|
| | 283.980 | 5,813.07
|
| | 14.400 | 294.77
|
| | |
|
0054 3016.19 | 48.08 | 37.000 | 1,778.96
|
REINFORCED CONCRETE CLASS 47B-20 SIDEWALK | m2 | 37.000 | 1,778.96
|
300 mm | | 37.000 | 1,778.96
|
| | 0.000 | 0.00
|
| | |
|
0055 3016.21 | 30.66 | 130.000 | 3,985.80
|
CONCRETE CLASS 47B-20 SIDEWALKS | m2 | 130.000 | 3,985.80
|
| | 375.300 | 11,506.70
|
| | 0.000 | 0.00
|
| | |
|
0056 3016.23 | 31.83 | 1,736.000 | 55,256.88
|
150 mm CONCRETE CLASS 47B-20 SIDEWALKS | m2 | 1,736.000 | 55,256.88
|
| | 1,747.640 | 55,627.39
|
| | 275.840 | 8,779.99
|
| | |
|
0057 3016.25 | 31.19 | 22.000 | 686.18
|
CONCRETE CLASS 47B-20 SIDEWALK | m2 | 22.000 | 686.18
|
WITH THICKENED EDGE | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0058 3016.26 | 862.00 | 1.430 | 1,232.66
|
CONCRETE CLASS 47B-20 SIDEWALK | m3 | 1.430 | 1,232.66
|
CURBWALL | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0059 3017.39 | 42.05 | 31.000 | 1,303.55
|
CONCRETE CLASS 47B-20 MEDIAN SURFACING | m2 | 31.000 | 1,303.55
|
150 mm | | 30.000 | 1,261.50
|
| | 0.000 | 0.00
|
| | |
|
0060 3020.26 | 32.80 | 33.000 | 1,082.40
|
CONCRETE CLASS 47B-25 DRIVEWAY | m2 | 33.000 | 1,082.40
|
| | 50.120 | 1,643.94
|
| | 0.000 | 0.00
|
| | |
|
0061 3089.80 | 214.00 | 9.000 | 1,926.00
|
FLOWABLE FILL CONCRETE | m3 | 9.000 | 1,926.00
|
| | 11.088 | 2,372.83
|
| | 0.000 | 0.00
|
| | |
|
0062 3091.10 | 40.18 | 7,221.000 | 290,139.78
|
255 mm CONCRETE PAVEMENT, CLASS 47B-SPECIAL-25 | m2 | 7,221.000 | 290,139.78
|
| | 7,514.460 | 301,931.00
|
| | -275.540 | -11,071.20
|
| | |
|
0063 4013.01 | 516.00 | 4.000 | 2,064.00
|
TREE GRATE | EACH | 4.000 | 2,064.00
|
| | 4.000 | 2,064.00
|
| | 0.000 | 0.00
|
| | |
|
0064 4015.00 | 302.37 | 21.000 | 6,349.77
|
ADJUST MANHOLE TO GRADE | EACH | 21.000 | 6,349.77
|
| | 19.000 | 5,745.03
|
| | 0.000 | 0.00
|
| | |
|
0065 4048.95 | 2,595.00 | 4.000 | 10,380.00
|
PRECAST CONCRETE POST | EACH | 4.000 | 10,380.00
|
WITH STANCHIONS | | 4.000 | 10,380.00
|
| | 0.000 | 0.00
|
| | |
|
0066 4094.01 | 122.00 | 2.200 | 268.40
|
CMU WALL | m2 | 2.200 | 268.40
|
200 mm | | 5.700 | 695.40
|
| | 0.000 | 0.00
|
| | |
|
0067 4115.25 | 357.82 | 57.700 | 20,646.21
|
CLASS 47B-20 CONCRETE | m3 | 57.700 | 20,646.21
|
FOR BRIDGE | | 88.920 | 31,817.35
|
| | 0.920 | 329.19
|
| | |
|
0068 4163.25 | 1.69 | 1,970.000 | 3,329.30
|
REINFORCING STEEL | kg | 1,970.000 | 3,329.30
|
| | 3,602.000 | 6,087.38
|
| | 0.000 | 0.00
|
| | |
|
0069 4165.11 | 299.71 | 18.700 | 5,604.58
|
RAILING | m | 18.700 | 5,604.58
|
700 mm | | 18.700 | 5,604.58
|
| | 0.000 | 0.00
|
| | |
|
0070 4165.12 | 667.05 | 74.000 | 49,361.70
|
RAILING | m | 74.000 | 49,361.70
|
740 mm | | 74.000 | 49,361.70
|
| | 0.000 | 0.00
|
| | |
|
0071 4900.56 | 128.00 | 5.000 | 640.00
|
ADJUST | EACH | 5.000 | 640.00
|
TREE PLANTER GRATE TO GRADE | | 5.000 | 640.00
|
| | 0.000 | 0.00
|
| | |
|
0072 6004.00 | 21.06 | 164.000 | 3,453.84
|
SAND FILL | m3 | 164.000 | 3,453.84
|
| | 181.200 | 3,816.07
|
| | 0.000 | 0.00
|
| | |
|
0073 6107.00 | 49.93 | 59.000 | 2,945.87
|
CONCRETE SLOPE PROTECTION | m2 | 59.000 | 2,945.87
|
| | 56.480 | 2,820.05
|
| | -2.520 | -125.82
|
| | |
|
0074 6131.50 | 1.33 | 2,334.000 | 3,104.22
|
EPOXY COATED REINFORCING STEEL | kg | 2,334.000 | 3,104.22
|
| | 2,271.700 | 3,021.36
|
| | 0.000 | 0.00
|
| | |
|
0075 7110.54 | 121.91 | 20.000 | 2,438.20
|
1.2 m CHAIN-LINK FENCE VINYL COATED | m | 20.000 | 2,438.20
|
| | 36.450 | 4,443.62
|
| | 0.000 | 0.00
|
| | |
|
0076 7115.54 | 254.00 | 2.000 | 508.00
|
END POST FOR 1.2 METER CHAIN-LINK FENCE VINYL COATED | EACH | 2.000 | 508.00
|
| | 6.000 | 1,524.00
|
| | 0.000 | 0.00
|
| | |
|
0077 7116.54 | 322.00 | 1.000 | 322.00
|
CORNER POST FOR 1.2 METER CHAIN-LINK FENCE VINYL COATED | EACH | 1.000 | 322.00
|
| | 1.000 | 322.00
|
| | 0.000 | 0.00
|
| | |
|
0078 7500.32 | 254.00 | 6.000 | 1,524.00
|
ARROW, PREFORMED PAVEMENT MARKING, TYPE 4 | EACH | 6.000 | 1,524.00
|
| | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0079 7502.14 | 9.03 | 204.200 | 1,843.93
|
100 mm WHITE PREFORMED PAVEMENT MARKING, TYPE 4, GROOVED | m | 204.200 | 1,843.93
|
| | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0080 7503.14 | 9.03 | 1,103.500 | 9,964.61
|
100 mm YELLOW PREFORMED PAVEMENT MARKING, TYPE 4, GROOVED | m | 1,103.500 | 9,964.61
|
| | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0081 7512.14 | 54.18 | 150.000 | 8,127.00
|
600 mm WHITE PREFORMED PAVEMENT MARKING, TYPE 4, GROOVED | m | 150.000 | 8,127.00
|
| | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0082 9000.01 | 91.11 | 190.000 | 17,310.90
|
ASPHALTIC CONCRETE | Mg | 190.000 | 17,310.90
|
| | 80.410 | 7,326.15
|
| | 0.000 | 0.00
|
| | |
|
0083 9111.00 | 2.82 | 98.000 | 276.36
|
WATER | kL | 98.000 | 276.36
|
| | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0084 9173.20 | 2.17 | 7,805.000 | 16,936.85
|
SUBGRADE PREPARATION | m2 | 7,805.000 | 16,936.85
|
| | 8,300.000 | 18,011.00
|
| | 0.000 | 0.00
|
| | |
|
3001 1137.50 | 1,512.37 | 0.000 | 0.00
|
REMOVE AND RESET | LS | 1.000 | 1,512.37
|
REMOVE AND RESET PAVING FORMS | | 1.000 | 1,512.37
|
| | 0.000 | 0.00
|
| | |
|
4035 3014.12 | 43.69 | 0.000 | 0.00
|
COMBINATION CONCRETE CLASS 47B-25 CURB AND GUTTER | m | 75.000 | 3,276.75
|
COMBINATION CONCRETE CLASS 47B-25 CURB AND GUTTER | | 91.350 | 3,991.08
|
| | 0.000 | 0.00
|
| | |
|
4037 4976.05 | 2,712.42 | 0.000 | 0.00
|
ADDITIONAL WORK | LS | 1.000 | 2,712.42
|
REPLACE BRICK SIDEWALK STA. 8+71.4, 13.8 M LT. | | 1.000 | 2,712.42
|
| | 0.000 | 0.00
|
| | |
|
4038 4976.05 | 8,983.71 | 0.000 | 0.00
|
ADDITIONAL WORK | LS | 1.000 | 8,983.71
|
BACKFILL EXISTING VAULT @ 1015 SOUTH 10 TH. ST. | | 1.000 | 8,983.71
|
| | 0.000 | 0.00
|
| | |
|
4050 1137.51 | 107.03 | 0.000 | 0.00
|
REMOVE AND RESET | EACH | 1.000 | 107.03
|
REMOVE AND RE-SET METAL RALING | | 1.000 | 107.03
|
| | 0.000 | 0.00
|
| | |
|
4051 3970.05 | 302.22 | 0.000 | 0.00
|
REPAIR | LS | 1.000 | 302.22
|
REPAIR RETAINING WALL | | 1.000 | 302.22
|
| | 0.000 | 0.00
|
| | |
|
GROUP 3 CONCRETE PAVEMENT | | Contracted | 597,647.94
|
| | Current | 614,542.44
|
| | In place | 619,299.36
|
| | This Estimate | 4,570.38
|
| | |
|
GROUP 4 CULVERTS | | |
|
0085 W176.12 | 73.82 | 19.600 | 1,446.87
|
50 mm COPPER WATER SERVICE | m | 19.600 | 1,446.87
|
| | 18.300 | 1,350.91
|
| | 0.000 | 0.00
|
| | |
|
0086 W176.15 | 83.25 | 50.600 | 4,212.45
|
75 mm COPPER WATER SERVICE | m | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0087 W601.10 | 542.00 | 7.000 | 3,794.00
|
RECONSTRUCT VALVE BOX | EACH | 7.000 | 3,794.00
|
| | 2.000 | 1,084.00
|
| | 0.000 | 0.00
|
| | |
|
0088 W725.00 | 339.00 | 4.000 | 1,356.00
|
RECONNECT WATER SERVICE | EACH | 4.000 | 1,356.00
|
| | 4.000 | 1,356.00
|
| | 0.000 | 0.00
|
| | |
|
0089 0030.40 | 28,188.00 | 1.000 | 28,188.00
|
MOBILIZATION | LS | 1.000 | 28,188.00
|
| | 1.000 | 28,188.00
|
| | 0.000 | 0.00
|
| | |
|
0090 1117.00 | 1,129.00 | 5.000 | 5,645.00
|
REMOVE MANHOLE | EACH | 5.000 | 5,645.00
|
| | 5.000 | 5,645.00
|
| | 0.000 | 0.00
|
| | |
|
0091 1119.00 | 112.88 | 14.000 | 1,580.32
|
REMOVE INLET | EACH | 14.000 | 1,580.32
|
| | 14.000 | 1,580.32
|
| | 0.000 | 0.00
|
| | |
|
0092 4002.00 | 2.20 | 114.000 | 250.80
|
CAST IRON COVER AND FRAME | kg | 114.000 | 250.80
|
| | 181.000 | 398.20
|
| | 0.000 | 0.00
|
| | |
|
0093 4005.00 | 1.21 | 2,782.000 | 3,366.22
|
CAST IRON RING AND COVER | kg | 2,782.000 | 3,366.22
|
| | 2,312.000 | 2,797.52
|
| | 0.000 | 0.00
|
| | |
|
0094 4012.01 | 2,120.00 | 9.000 | 19,080.00
|
INLET | EACH | 9.000 | 19,080.00
|
TYPE AA DOUBLE | | 9.000 | 19,080.00
|
| | 0.000 | 0.00
|
| | |
|
0095 4012.02 | 1,867.00 | 2.000 | 3,734.00
|
INLET | EACH | 2.000 | 3,734.00
|
TYPE AA DOUBLE (ALTERNATE) | | 1.000 | 1,867.00
|
| | 0.000 | 0.00
|
| | |
|
0096 4014.70 | 302.00 | 3.000 | 906.00
|
ADJUSTING INLET TO GRADE | EACH | 3.000 | 906.00
|
| | 4.000 | 1,208.00
|
| | 0.000 | 0.00
|
| | |
|
0097 4015.50 | 583.00 | 5.000 | 2,915.00
|
RECONSTRUCT MANHOLE | EACH | 5.000 | 2,915.00
|
| | 2.000 | 1,166.00
|
| | 0.000 | 0.00
|
| | |
|
0098 4016.00 | 3,403.00 | 1.000 | 3,403.00
|
MANHOLE | EACH | 1.000 | 3,403.00
|
AT STA. 9+94 RT. | | 1.000 | 3,403.00
|
| | 0.000 | 0.00
|
| | |
|
0099 4016.01 | 3,138.00 | 1.000 | 3,138.00
|
MANHOLE | EACH | 1.000 | 3,138.00
|
AT STA. 10+25.5 LT. | | 1.000 | 3,138.00
|
| | 0.000 | 0.00
|
| | |
|
0100 4016.02 | 5,885.00 | 1.000 | 5,885.00
|
MANHOLE | EACH | 1.000 | 5,885.00
|
AT STA. 10+80.2 | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0101 4016.03 | 3,914.00 | 1.000 | 3,914.00
|
MANHOLE | EACH | 0.000 | 0.00
|
AT STA. 10+82.8 LT. | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0102 4016.04 | 5,447.00 | 1.000 | 5,447.00
|
MANHOLE | EACH | 0.000 | 0.00
|
AT STA. 11+20.9 LT. | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0103 4016.05 | 4,380.00 | 1.000 | 4,380.00
|
MANHOLE | EACH | 0.000 | 0.00
|
AT STA. 11+27.7 LT. | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0104 4016.06 | 3,208.00 | 1.000 | 3,208.00
|
MANHOLE | EACH | 0.000 | 0.00
|
AT STA. 12+24.3 LT. | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0105 4016.07 | 2,356.00 | 1.000 | 2,356.00
|
MANHOLE | EACH | 1.000 | 2,356.00
|
AT STA. 12+44.5 RT. | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0106 4016.08 | 2,501.00 | 1.000 | 2,501.00
|
MANHOLE | EACH | 0.000 | 0.00
|
AT STA. 12+85 LT. | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0107 4016.09 | 3,208.00 | 1.000 | 3,208.00
|
MANHOLE | EACH | 1.000 | 3,208.00
|
AT STA. 13+57 | | 1.000 | 3,208.00
|
| | 0.000 | 0.00
|
| | |
|
0108 4016.10 | 2,079.00 | 1.000 | 2,079.00
|
MANHOLE | EACH | 1.000 | 2,079.00
|
AT STA. 14+15.5 | | 1.000 | 2,079.00
|
| | 0.000 | 0.00
|
| | |
|
0109 4016.11 | 1,196.00 | 1.000 | 1,196.00
|
MANHOLE | EACH | 1.000 | 1,196.00
|
AT STA. 14+59.6 LT. | | 1.000 | 1,196.00
|
| | 0.000 | 0.00
|
| | |
|
0110 4016.12 | 2,624.00 | 1.000 | 2,624.00
|
MANHOLE | EACH | 1.000 | 2,624.00
|
AT STA. 109+83.8 LT. | | 1.000 | 2,624.00
|
| | 0.000 | 0.00
|
| | |
|
0111 4016.13 | 3,731.00 | 1.000 | 3,731.00
|
MANHOLE | EACH | 1.000 | 3,731.00
|
AT STA. 400+34.4 RT. | | 1.000 | 3,731.00
|
| | 0.000 | 0.00
|
| | |
|
0112 4016.14 | 2,192.00 | 1.000 | 2,192.00
|
MANHOLE | EACH | 1.000 | 2,192.00
|
AT STA. 400+52.1 RT. | | 1.000 | 2,192.00
|
| | 0.000 | 0.00
|
| | |
|
0113 4016.20 | 3,908.00 | 1.000 | 3,908.00
|
MANHOLE | EACH | 1.000 | 3,908.00
|
AT STA. 10+05-15 m LT. | | 1.000 | 3,908.00
|
| | 0.000 | 0.00
|
| | |
|
0114 4018.00 | 1,042.15 | 16.000 | 16,674.40
|
TAPPING EXISTING STRUCTURE | EACH | 16.000 | 16,674.40
|
| | 5.000 | 5,210.75
|
| | 0.000 | 0.00
|
| | |
|
0115 4043.50 | 39.73 | 235.000 | 9,336.55
|
REMOVE SEWER PIPE | m | 235.000 | 9,336.55
|
| | 125.880 | 5,001.21
|
| | 0.000 | 0.00
|
| | |
|
0116 4105.59 | 491.00 | 6.240 | 3,063.84
|
CLASS 47B-20 CONCRETE FOR INLET AND JUNCTION BOX | m3 | 6.240 | 3,063.84
|
| | 2.000 | 982.00
|
| | 0.000 | 0.00
|
| | |
|
0117 4130.06 | 4,749.21 | 0.140 | 664.89
|
CLASS 47B-20 OR AX-20 CONCRETE FOR PIPE CULVERT PLUG | m3 | 0.140 | 664.89
|
| | 0.400 | 1,899.68
|
| | 0.000 | 0.00
|
| | |
|
0118 4155.50 | 0.70 | 281.000 | 196.70
|
REINFORCING STEEL FOR INLET AND JUNCTION BOX | kg | 281.000 | 196.70
|
| | 76.000 | 53.20
|
| | 0.000 | 0.00
|
| | |
|
0119 4180.00 | 707.00 | 3.000 | 2,121.00
|
CONCRETE COLLAR | EACH | 3.000 | 2,121.00
|
| | 2.000 | 1,414.00
|
| | 0.000 | 0.00
|
| | |
|
0120 4600.12 | 101.64 | 264.500 | 26,883.78
|
300 mm REINFORCED CONCRETE SEWER PIPE | m | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0121 4600.15 | 95.34 | 230.900 | 22,014.01
|
375 mm REINFORCED CONCRETE SEWER PIPE | m | 230.900 | 22,014.01
|
| | 216.100 | 20,602.97
|
| | 0.000 | 0.00
|
| | |
|
0122 4600.18 | 162.53 | 75.500 | 12,271.02
|
450 mm REINFORCED CONCRETE SEWER PIPE | m | 75.500 | 12,271.02
|
| | 67.100 | 10,905.77
|
| | 0.000 | 0.00
|
| | |
|
0123 4600.24 | 140.82 | 13.500 | 1,901.07
|
600 mm REINFORCED CONCRETE SEWER PIPE | m | 13.500 | 1,901.07
|
| | 27.400 | 3,858.47
|
| | 0.000 | 0.00
|
| | |
|
0124 4600.30 | 247.30 | 213.100 | 52,699.63
|
750 mm REINFORCED CONCRETE SEWER PIPE | m | 0.000 | 0.00
|
COMBINED | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0125 4601.30 | 209.06 | 20.000 | 4,181.20
|
750 mm REINFORCED CONCRETE SEWER PIPE CLASS IV | m | 0.000 | 0.00
|
COMBINED | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0126 4602.30 | 621.27 | 66.500 | 41,314.46
|
750 mm REINFORCED CONCRETE SEWER PIPE CLASS V | m | 0.000 | 0.00
|
COMBINED | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0127 4670.00 | 16.94 | 384.500 | 6,513.43
|
CULVERT SANDFILL | m | 384.500 | 6,513.43
|
| | 102.200 | 1,731.27
|
| | 0.000 | 0.00
|
| | |
|
0128 4762.04 | 46.70 | 34.300 | 1,601.81
|
100 mm DUCTILE IRON SEWER PIPE | m | 34.300 | 1,601.81
|
| | 70.000 | 3,269.00
|
| | 0.000 | 0.00
|
| | |
|
0129 4762.06 | 65.24 | 30.300 | 1,976.77
|
150 mm DUCTILE IRON SEWER PIPE | m | 30.300 | 1,976.77
|
| | 27.000 | 1,761.48
|
| | 0.000 | 0.00
|
| | |
|
0130 4762.08 | 84.00 | 4.000 | 336.00
|
200 mm DUCTILE IRON SEWER PIPE | m | 4.000 | 336.00
|
| | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0131 4762.24 | 1,416.31 | 19.000 | 26,909.89
|
600 mm DUCTILE IRON SEWER PIPE | m | 19.000 | 26,909.89
|
| | 15.600 | 22,094.44
|
| | 0.000 | 0.00
|
| | |
|
0132 4795.02 | 525.34 | 22.000 | 11,557.48
|
REINFORCED CONCRETE WYE | EACH | 7.000 | 3,677.38
|
750 mm X 300 mm | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0133 4822.30 | 732.59 | 20.000 | 14,651.80
|
JACKING 750 mm REINFORCED CONCRETE SEWER PIPE, CLASS IV | m | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0134 4900.05 | 481.76 | 56.000 | 26,978.56
|
CURED IN PLACE PIPE | m | 0.000 | 0.00
|
600 mm | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0135 4900.21 | 172.00 | 7.000 | 1,204.00
|
CATCH BASIN | EACH | 7.000 | 1,204.00
|
| | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0136 4900.57 | 128.63 | 99.500 | 12,798.69
|
CONNECT | m | 99.500 | 12,798.69
|
EXISTING SEWER LATERAL | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0137 4900.58 | 1.00 | 5.000 | 5.00
|
RECONNECT | EACH | 5.000 | 5.00
|
GAS SERVICE | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0138 4900.59 | 282.00 | 1.000 | 282.00
|
REINSTATE | EACH | 1.000 | 282.00
|
SERVICE CONNECTION | | 10.000 | 2,820.00
|
| | 0.000 | 0.00
|
| | |
|
4001 W800.91 | 257.05 | 0.000 | 0.00
|
BORING | m | 20.000 | 5,141.00
|
255 MM STEEL CASING-BORED | | 20.000 | 5,141.00
|
| | 0.000 | 0.00
|
| | |
|
4006 4016.01 | 3,270.00 | 0.000 | 0.00
|
MANHOLE | EACH | 1.000 | 3,270.00
|
RE-BUILD EXISTING MANHOLE AT STA. 10+00.5 | | 1.000 | 3,270.00
|
| | 0.000 | 0.00
|
| | |
|
4008 1136.09 | 71.7674 | 0.000 | 0.00
|
REMOVE | m | 73.153 | 5,250.00
|
REMOVE ASBESTOS @ POST OFFICE ANNEX | | 73.153 | 5,250.00
|
| | 0.000 | 0.00
|
| | |
|
4014 4900.05 | 458.82 | 0.000 | 0.00
|
CURED IN PLACE PIPE | m | 322.000 | 147,740.04
|
CURED IN PLACE PIPE (REVISED) | | 322.000 | 147,740.04
|
| | 0.000 | 0.00
|
| | |
|
4028 W176.70 | 2,291.42 | 0.000 | 0.00
|
WATER SERVICE CONNECTION | EACH | 1.000 | 2,291.42
|
REINSTALL WATER SERVICE AT 1002 SOUTH 10 TH. STREET | | 1.000 | 2,291.42
|
| | 0.000 | 0.00
|
| | |
|
4031 W176.70 | 2,724.75 | 0.000 | 0.00
|
WATER SERVICE CONNECTION | EACH | 1.000 | 2,724.75
|
REINSTALL WATER SERVICE (BORED) | | 1.000 | 2,724.75
|
| | 0.000 | 0.00
|
| | |
|
4036 W176.50 | 1,158.68 | 0.000 | 0.00
|
WATER SERVICE | LS | 1.000 | 1,158.68
|
WATER SERVICE TO 1022 JACKSON STREET | | 1.000 | 1,158.68
|
| | 0.000 | 0.00
|
| | |
|
4044 W760.03 | 1,454.25 | 0.000 | 0.00
|
WATER MAIN RELOCATION | EACH | 1.000 | 1,454.25
|
RELOCATE WATER SERVICE TO 1015 SOUTH 10 TH. STREET | | 1.000 | 1,454.25
|
| | 0.000 | 0.00
|
| | |
|
4045 W760.03 | 2,037.00 | 0.000 | 0.00
|
WATER MAIN RELOCATION | EACH | 1.000 | 2,037.00
|
RELOCATE WATER SERVICE TO 1017-1019 SOUTH 10 TH. STREET | | 1.000 | 2,037.00
|
| | 0.000 | 0.00
|
| | |
|
4046 W176.50 | 2,891.00 | 0.000 | 0.00
|
WATER SERVICE | LS | 1.000 | 2,891.00
|
Replace Water Service At 1001 South 10 Th. Street, Rt. | | 1.000 | 2,891.00
|
| | 0.000 | 0.00
|
| | |
|
4047 W176.50 | 1,531.13 | 0.000 | 0.00
|
WATER SERVICE | LS | 1.000 | 1,531.13
|
Replace Water Service At 1012 South 10 Th. Street,Lt. | | 1.000 | 1,531.13
|
| | 0.000 | 0.00
|
| | |
|
4048 W176.50 | 1,347.27 | 0.000 | 0.00
|
WATER SERVICE | LS | 1.000 | 1,347.27
|
Replace Water Service At 1006 South 10 Th. Street,Lt.(#1) | | 1.000 | 1,347.27
|
| | 1.000 | 1,347.27
|
| | |
|
4049 W176.50 | 1,345.85 | 0.000 | 0.00
|
WATER SERVICE | LS | 1.000 | 1,345.85
|
Replace Water Service At 1006 South 10 Th. Street,Lt.(#2) | | 1.000 | 1,345.85
|
| | 1.000 | 1,345.85
|
| | |
|
GROUP 4 CULVERTS | | Contracted | 427,782.62
|
| | Current | 407,713.04
|
| | In place | 350,986.58
|
| | This Estimate | 2,693.12
|
| | |
|
GROUP 6 BRIDGE AT STA. 12+17.6 | | |
|
0139 A001.50 | 18,497.00 | 3.000 | 55,491.00
|
PULL BOX | EACH | 3.000 | 55,491.00
|
UTILITY | | 3.000 | 55,491.00
|
| | 0.000 | 0.00
|
| | |
|
0140 0030.60 | 756,352.00 | 1.000 | 756,352.00
|
MOBILIZATION | LS | 1.000 | 756,352.00
|
| | 1.000 | 756,352.00
|
| | 0.000 | 0.00
|
| | |
|
0141 3050.15 | 211.85 | 231.600 | 49,064.46
|
CONCRETE FOR PAVEMENT APPROACHES CLASS 47BD-30 | m3 | 231.600 | 49,064.46
|
| | 231.600 | 49,064.47
|
| | 0.000 | 0.00
|
| | |
|
0142 3051.10 | 1.32 | 13,503.000 | 17,823.96
|
EPOXY COATED REINFORCING STEEL FOR PAVEMENT APPROACHES | kg | 13,503.000 | 17,823.96
|
| | 13,503.000 | 17,823.96
|
| | 0.000 | 0.00
|
| | |
|
0143 4048.95 | 2,468.48 | 79.000 | 195,009.92
|
PRECAST CONCRETE POST | EACH | 79.000 | 195,009.92
|
WITH STANCHION | | 79.000 | 195,009.92
|
| | 0.000 | 0.00
|
| | |
|
0144 4048.96 | 1,963.09 | 39.000 | 76,560.51
|
PRECAST CONCRETE POST | EACH | 39.000 | 76,560.51
|
WITH LIGHT SUPPORT | | 40.000 | 78,523.60
|
| | 0.000 | 0.00
|
| | |
|
0145 6000.10 | 2,254.00 | 1.000 | 2,254.00
|
ABUTMENT NO.1 EXCAVATION | LS | 1.000 | 2,254.00
|
| | 1.000 | 2,254.00
|
| | 0.000 | 0.00
|
| | |
|
0146 6000.11 | 2,254.00 | 1.000 | 2,254.00
|
ABUTMENT NO.2 EXCAVATION | LS | 1.000 | 2,254.00
|
| | 1.000 | 2,254.00
|
| | 0.000 | 0.00
|
| | |
|
0147 6000.22 | 5,287.00 | 1.000 | 5,287.00
|
PIER NO.3 EXCAVATION | LS | 1.000 | 5,287.00
|
| | 1.000 | 5,287.00
|
| | 0.000 | 0.00
|
| | |
|
0148 6000.25 | 4,889.00 | 1.000 | 4,889.00
|
PIER NO.6 EXCAVATION | LS | 1.000 | 4,889.00
|
| | 1.000 | 4,889.00
|
| | 0.000 | 0.00
|
| | |
|
0149 6000.26 | 4,415.00 | 1.000 | 4,415.00
|
PIER NO.7 EXCAVATION | LS | 1.000 | 4,415.00
|
| | 1.000 | 4,415.00
|
| | 0.000 | 0.00
|
| | |
|
0150 6000.27 | 4,415.00 | 1.000 | 4,415.00
|
PIER NO.8 EXCAVATION | LS | 1.000 | 4,415.00
|
| | 1.000 | 4,415.00
|
| | 0.000 | 0.00
|
| | |
|
0151 6000.28 | 4,415.00 | 1.000 | 4,415.00
|
PIER NO.9 EXCAVATION | LS | 1.000 | 4,415.00
|
| | 1.000 | 4,415.00
|
| | 0.000 | 0.00
|
| | |
|
0152 6000.29 | 3,850.00 | 1.000 | 3,850.00
|
PIER NO.10 EXCAVATION | LS | 1.000 | 3,850.00
|
| | 1.000 | 3,850.00
|
| | 0.000 | 0.00
|
| | |
|
0153 6000.30 | 4,415.00 | 1.000 | 4,415.00
|
PIER NO.11 EXCAVATION | LS | 1.000 | 4,415.00
|
| | 1.000 | 4,415.00
|
| | 0.000 | 0.00
|
| | |
|
0154 6000.31 | 4,415.00 | 1.000 | 4,415.00
|
PIER NO.12 EXCAVATION | LS | 1.000 | 4,415.00
|
| | 1.000 | 4,415.00
|
| | 0.000 | 0.00
|
| | |
|
0155 6001.00 | 1,262.00 | 1.000 | 1,262.00
|
BENT NO.1 EXCAVATION | LS | 1.000 | 1,262.00
|
| | 1.000 | 1,262.00
|
| | 0.000 | 0.00
|
| | |
|
0156 6001.01 | 1,262.00 | 1.000 | 1,262.00
|
BENT NO.2 EXCAVATION | LS | 1.000 | 1,262.00
|
| | 1.000 | 1,262.00
|
| | 0.000 | 0.00
|
| | |
|
0157 6001.03 | 1,224.00 | 1.000 | 1,224.00
|
BENT NO.4 EXCAVATION | LS | 1.000 | 1,224.00
|
| | 1.000 | 1,224.00
|
| | 0.000 | 0.00
|
| | |
|
0158 6001.04 | 1,224.00 | 1.000 | 1,224.00
|
BENT NO.5 EXCAVATION | LS | 1.000 | 1,224.00
|
| | 1.000 | 1,224.00
|
| | 0.000 | 0.00
|
| | |
|
0159 6005.11 | 1,493.33 | 16.300 | 24,341.28
|
DECK JOINT SEAL, TYPE II | m | 16.300 | 24,341.28
|
| | 16.300 | 24,341.28
|
| | 0.000 | 0.00
|
| | |
|
0160 6005.12 | 2,449.66 | 16.300 | 39,929.46
|
DECK JOINT SEAL, TYPE III | m | 16.300 | 39,929.46
|
| | 16.300 | 39,929.46
|
| | 0.000 | 0.00
|
| | |
|
0161 6005.78 | 1,420.04 | 109.000 | 154,784.36
|
EXPANSION BEARING, TFE TYPE | EACH | 109.000 | 154,784.36
|
| | 109.000 | 154,784.36
|
| | 0.000 | 0.00
|
| | |
|
0162 6005.83 | 1,344.41 | 17.000 | 22,854.97
|
FIXED BEARING | EACH | 17.000 | 22,854.97
|
| | 17.000 | 22,854.97
|
| | 0.000 | 0.00
|
| | |
|
0163 6010.22 | 286.17 | 2,475.700 | 708,471.07
|
CLASS 47B-20 CONCRETE FOR BRIDGE | m3 | 2,475.700 | 708,471.07
|
| | 2,475.700 | 708,471.08
|
| | 0.000 | 0.00
|
| | |
|
0164 6010.26 | 300.70 | 2,627.100 | 789,968.97
|
CLASS 47BD-30 CONCRETE FOR BRIDGE | m3 | 2,627.100 | 789,968.97
|
| | 2,627.100 | 789,968.97
|
| | 0.000 | 0.00
|
| | |
|
0165 6040.00 | 1,021,985.00 | 1.000 | 1,021,985.00
|
REMOVE STRUCTURE | EACH | 1.000 | 1,021,985.00
|
AT STA. 12+17 | | 1.000 | 1,021,985.01
|
| | 0.000 | 0.00
|
| | |
|
0166 6071.13 | 2,251,679.00 | 1.000 | 2,251,679.00
|
STEEL SUPERSTRUCTURE | LS | 1.000 | 2,251,679.00
|
AT STA. 12+17.6 | | 1.000 | 2,251,679.00
|
| | 0.000 | 0.00
|
| | |
|
0167 6131.50 | 1.32 | 442,402.000 | 583,970.64
|
EPOXY COATED REINFORCING STEEL | kg | 442,402.000 | 583,970.64
|
| | 446,710.000 | 589,657.20
|
| | 0.000 | 0.00
|
| | |
|
0168 6133.15 | 12.07 | 2,654.700 | 32,042.23
|
ANTI-GRAFFITI COATING | m2 | 2,654.700 | 32,042.23
|
| | 2,559.000 | 30,887.13
|
| | 100.000 | 1,207.00
|
| | |
|
0169 6139.50 | 11.21 | 128.000 | 1,434.88
|
SUBSURFACE DRAINAGE MATTING | m2 | 128.000 | 1,434.88
|
| | 128.000 | 1,434.88
|
| | 0.000 | 0.00
|
| | |
|
0170 6210.12 | 66.16 | 444.800 | 29,427.97
|
HP 250 mm X 62 kg STEEL PILING | m | 444.800 | 29,427.97
|
| | 409.189 | 27,071.94
|
| | 0.000 | 0.00
|
| | |
|
0171 6210.14 | 74.92 | 768.000 | 57,538.56
|
HP 310 mm X 79 kg STEEL PILING | m | 768.000 | 57,538.56
|
| | 717.590 | 53,761.84
|
| | 0.000 | 0.00
|
| | |
|
0172 6210.18 | 85.62 | 2,215.000 | 189,648.30
|
HP 310 mm X 110 kg STEEL PILING | m | 2,215.000 | 189,648.30
|
| | 2,206.774 | 188,943.99
|
| | 0.000 | 0.00
|
| | |
|
0173 6210.21 | 99.51 | 2,987.400 | 297,276.17
|
HP 360 mm X 132 kg STEEL PILING | m | 2,987.400 | 297,276.17
|
| | 2,743.282 | 272,984.00
|
| | 0.000 | 0.00
|
| | |
|
0174 6390.55 | 300.25 | 482.700 | 144,930.67
|
METAL RAILING | m | 482.700 | 144,930.67
|
700 mm | | 489.000 | 146,822.27
|
| | 64.700 | 19,426.18
|
| | |
|
0175 6390.56 | 437.97 | 203.600 | 89,170.69
|
METAL RAILING | m | 203.600 | 89,170.69
|
1800 mm | | 203.600 | 89,170.69
|
| | 2.600 | 1,138.72
|
| | |
|
0176 6406.05 | 917.08 | 25.800 | 23,660.66
|
METAL HANDRAIL | m | 25.800 | 23,660.66
|
1070 mm | | 25.800 | 23,660.66
|
| | 0.000 | 0.00
|
| | |
|
0177 6415.00 | 109,006.00 | 1.000 | 109,006.00
|
DRAINAGE SYSTEM | EACH | 0.000 | 0.00
|
AT STA. 12+17.6 | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0178 6510.51 | 25,527.00 | 1.000 | 25,527.00
|
TEMPORARY BRIDGE SHORING | LS | 1.000 | 25,527.00
|
| | 1.000 | 25,527.00
|
| | 0.000 | 0.00
|
| | |
|
0179 6510.65 | 6,327.00 | 1.000 | 6,327.00
|
BRIDGE SHORING | LS | 1.000 | 6,327.00
|
| | 1.000 | 6,327.00
|
| | 0.000 | 0.00
|
| | |
|
0180 6600.02 | 37.25 | 2,125.400 | 79,171.15
|
50 mm CONDUIT IN BRIDGE | m | 2,125.400 | 79,171.15
|
| | 2,125.400 | 79,171.15
|
| | 0.000 | 0.00
|
| | |
|
0181 6610.45 | 392.56 | 31.610 | 12,408.82
|
STRIP SEALS | m | 31.610 | 12,408.82
|
| | 31.610 | 12,408.82
|
| | 0.000 | 0.00
|
| | |
|
0182 8091.00 | 16.70 | 371.000 | 6,195.70
|
GRANULAR BACKFILL | m3 | 371.000 | 6,195.70
|
| | 371.000 | 6,195.70
|
| | 0.000 | 0.00
|
| | |
|
2054 5100.00 | 6,894.77 | 0.000 | 0.00
|
REMOVAL OF EXISTING STRUCTURES | EACH | 1.000 | 6,894.77
|
REMOVE EXISTING TUNNEL STRUCTURE AT STA. 13+13, LT. & RT. | | 1.000 | 6,894.77
|
| | 0.000 | 0.00
|
| | |
|
4004 A580.92 | 3,828.30 | 0.000 | 0.00
|
INSTALL | LS | 1.000 | 3,828.30
|
SCAFFOLDING FOR AMTRACK LOADING PLATEFORM | | 1.000 | 3,828.30
|
| | 0.000 | 0.00
|
| | |
|
4015 6415.01 | 114,641.00 | 0.000 | 0.00
|
DRAINAGE SYSTEM | EACH | 1.000 | 114,641.00
|
DRAINAGE SYSTEM AT STA. 12+17.6 (REVISED) | | 1.000 | 114,641.00
|
| | 0.000 | 0.00
|
| | |
|
4018 6960.02 | 2,814.00 | 0.000 | 0.00
|
ADDITIONAL WORK | LS | 1.000 | 2,814.00
|
BLAST AND PRIME PERMANENT SHORING AT STA. 10+14.8, RT. | | 1.000 | 2,814.00
|
| | 0.000 | 0.00
|
| | |
|
4019 W202.12 | 107.61 | 0.000 | 0.00
|
200 mm P.V.C. PIPE AND FITTINGS | m | 260.000 | 27,978.60
|
200 MM PVC (SDR-35) INCLUDING BEDDING | | 232.380 | 25,006.42
|
| | 52.780 | 5,679.66
|
| | |
|
4020 W356.16 | 545.70 | 0.000 | 0.00
|
200 mm X 200 mm TEE | EACH | 22.000 | 12,005.40
|
200 MM INSERT-A-TEE | | 5.000 | 2,728.50
|
| | 2.000 | 1,091.40
|
| | |
|
4021 A580.94 | 17.66 | 0.000 | 0.00
|
INSTALL | EACH | 22.000 | 388.52
|
200 MM FERNCO COUPLER | | 18.000 | 317.88
|
| | 4.000 | 70.64
|
| | |
|
4022 3089.80 | 106.80 | 0.000 | 0.00
|
FLOWABLE FILL CONCRETE | m3 | 34.000 | 3,631.20
|
FLOWABLE FILL | | 3.800 | 405.84
|
| | 1.520 | 162.34
|
| | |
|
4039 A001.50 | 4,317.60 | 0.000 | 0.00
|
PULL BOX | EACH | 1.000 | 4,317.60
|
RETURN AND REFABRICATE ELECTRICAL PULL BOXES | | 1.000 | 4,317.60
|
| | 0.000 | 0.00
|
| | |
|
4042 A580.92 | 6,713.03 | 0.000 | 0.00
|
INSTALL | LS | 1.000 | 6,713.03
|
PEDESTRIAN LIGHTING AT AMTRAK LOADING PLATFORM | | 1.000 | 6,713.03
|
| | 0.000 | 0.00
|
| | |
|
4043 1136.10 | 2,468.65 | 0.000 | 0.00
|
REMOVE | LS | 1.000 | 2,468.65
|
REMOVE EXISTING SIDEWALK BEHIND RETAINING WALL "A" | | 1.000 | 2,468.65
|
| | 0.000 | 0.00
|
| | |
|
410 6210.32 | 39.696 | 0.000 | 0.00
|
PAY CUT-OFF FOR 250 mm X 62 kg STEEL PILING | m | 15.030 | 596.63
|
PAY CUT-OFF HP 250 mm X 62 Kg STEEL PILING | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
411 6210.34 | 44.952 | 0.000 | 0.00
|
PAY CUT-OFF FOR 310 mm X 79 kg STEEL PILING | m | 14.560 | 654.50
|
PAY CUT-OFF HP 310 mm X 79 KG STEEL PILING | | 28.874 | 1,297.94
|
| | 0.000 | 0.00
|
| | |
|
6002 6210.68 | 51.372 | 0.000 | 0.00
|
PAY CUT-OFF FOR 310 mm X 110 kg STEEL PILING | m | 32.470 | 1,668.05
|
PAY CUT-OFF 310mm X 110 Kg STEEL PILING | | 100.446 | 5,160.12
|
| | 0.000 | 0.00
|
| | |
|
6003 6210.59 | 59.706 | 0.000 | 0.00
|
PAY CUT-OFF | m | 4.558 | 272.14
|
PAY CUT-OFF HP 360mm X 132 Kg STEEL PILING | | 167.480 | 9,999.56
|
| | 0.000 | 0.00
|
| | |
|
GROUP 6 BRIDGE AT STA. 12+17.6 | | Contracted | 7,897,633.41
|
| | Current | 7,977,499.80
|
| | In place | 7,952,477.96
|
| | This Estimate | 28,775.94
|
| | |
|
GROUP 6A BRIDGE AT STA. 300+75.034 | | |
|
0183 0030.60 | 70,282.00 | 1.000 | 70,282.00
|
MOBILIZATION | LS | 1.000 | 70,282.00
|
| | 1.000 | 70,282.00
|
| | 0.000 | 0.00
|
| | |
|
0184 3050.15 | 243.98 | 106.100 | 25,886.28
|
CONCRETE FOR PAVEMENT APPROACHES CLASS 47BD-30 | m3 | 106.100 | 25,886.28
|
| | 106.100 | 25,886.28
|
| | 0.000 | 0.00
|
| | |
|
0185 3051.10 | 1.32 | 10,725.000 | 14,157.00
|
EPOXY COATED REINFORCING STEEL FOR PAVEMENT APPROACHES | kg | 10,725.000 | 14,157.00
|
| | 10,725.000 | 14,157.00
|
| | 0.000 | 0.00
|
| | |
|
0186 4095.60 | 254.03 | 479.300 | 121,756.58
|
PRECAST CONCRETE FASCIA PANEL | m2 | 479.300 | 121,756.58
|
| | 475.000 | 120,664.25
|
| | 0.000 | 0.00
|
| | |
|
0187 6000.10 | 705.00 | 1.000 | 705.00
|
ABUTMENT NO.1 EXCAVATION | LS | 1.000 | 705.00
|
| | 1.000 | 705.00
|
| | 0.000 | 0.00
|
| | |
|
0188 6005.78 | 756.00 | 4.000 | 3,024.00
|
EXPANSION BEARING, TFE TYPE | EACH | 4.000 | 3,024.00
|
| | 4.000 | 3,024.00
|
| | 0.000 | 0.00
|
| | |
|
0189 6010.22 | 244.85 | 12.700 | 3,109.60
|
CLASS 47B-20 CONCRETE FOR BRIDGE | m3 | 12.700 | 3,109.60
|
| | 12.700 | 3,109.60
|
| | 0.000 | 0.00
|
| | |
|
0190 6010.26 | 464.28 | 221.200 | 102,698.74
|
CLASS 47BD-30 CONCRETE FOR BRIDGE | m3 | 221.200 | 102,698.74
|
| | 221.200 | 102,698.74
|
| | 0.000 | 0.00
|
| | |
|
0191 6071.12 | 214,518.00 | 1.000 | 214,518.00
|
STEEL SUPERSTRUCTURE | LS | 1.000 | 214,518.00
|
AT STA. 300+75.034 | | 1.000 | 214,518.00
|
| | 0.000 | 0.00
|
| | |
|
0192 6080.00 | 3.41 | 34,499.000 | 117,641.59
|
STRUCTURAL STEEL FOR SUBSTRUCTURE | kg | 34,499.000 | 117,641.59
|
| | 38,000.000 | 129,580.00
|
| | 0.000 | 0.00
|
| | |
|
0193 6107.00 | 64.00 | 8.200 | 524.80
|
CONCRETE SLOPE PROTECTION | m2 | 8.200 | 524.80
|
| | 8.200 | 524.80
|
| | 0.000 | 0.00
|
| | |
|
0194 6131.50 | 1.32 | 28,639.000 | 37,803.48
|
EPOXY COATED REINFORCING STEEL | kg | 28,639.000 | 37,803.48
|
| | 28,639.000 | 37,803.48
|
| | 0.000 | 0.00
|
| | |
|
0195 6139.50 | 11.36 | 11.500 | 130.64
|
SUBSURFACE DRAINAGE MATTING | m2 | 11.500 | 130.64
|
| | 11.500 | 130.64
|
| | 0.000 | 0.00
|
| | |
|
0196 6210.12 | 56.75 | 329.100 | 18,676.43
|
HP 250 mm X 62 kg STEEL PILING | m | 329.100 | 18,676.43
|
| | 314.677 | 17,857.92
|
| | 0.000 | 0.00
|
| | |
|
0197 6210.19 | 98.52 | 736.700 | 72,579.68
|
HP 310 mm X 125 kg STEEL PILING | m | 736.700 | 72,579.68
|
| | 703.000 | 69,259.56
|
| | 0.000 | 0.00
|
| | |
|
0198 6451.05 | 49.67 | 862.300 | 42,830.44
|
PAINTING BARRIER RAIL AND FASCIA PANEL | m2 | 862.300 | 42,830.44
|
| | 862.300 | 42,830.44
|
| | 0.000 | 0.00
|
| | |
|
0199 6610.45 | 431.62 | 15.100 | 6,517.46
|
STRIP SEALS | m | 15.100 | 6,517.46
|
| | 15.100 | 6,517.46
|
| | 0.000 | 0.00
|
| | |
|
0200 8091.00 | 16.74 | 58.000 | 970.92
|
GRANULAR BACKFILL | m3 | 58.000 | 970.92
|
| | 58.000 | 970.92
|
| | 0.000 | 0.00
|
| | |
|
4009 A700.10 | 3,263.80 | 0.000 | 0.00
|
RELOCATE ELECTRIC SERVICE | EACH | 1.000 | 3,263.80
|
RELOCATE ELECTRICAL SERVICE TO MUSEUM LIGHTS | | 1.000 | 3,263.80
|
| | 0.000 | 0.00
|
| | |
|
4023 6451.05 | 38.845 | 0.000 | 0.00
|
PAINTING BARRIER RAIL AND FASCIA PANEL | m2 | 223.000 | 8,662.44
|
PAINT INTERIOR FACE OF PRE-CAST FACIA PANELS AT STA. 300+75.034 | | 223.000 | 8,662.44
|
| | 0.000 | 0.00
|
| | |
|
6001 6210.61 | 113.50 | 0.000 | 0.00
|
PILE SPLICE | EACH | 1.000 | 113.50
|
HP 250X62 PAY SPLICE | | 1.000 | 113.50
|
| | 0.000 | 0.00
|
| | |
|
6004 6210.59 | 59.112 | 0.000 | 0.00
|
PAY CUT-OFF | m | 21.883 | 1,293.55
|
PAY CUT-OFF HP 310mm X 125 Kg STEEL PILING | | 20.699 | 1,223.56
|
| | 0.000 | 0.00
|
| | |
|
6005 6210.32 | 34.05 | 0.000 | 0.00
|
PAY CUT-OFF FOR 250 mm X 62 kg STEEL PILING | m | 15.023 | 511.53
|
PAY CUT-OFF HP 250mm X 62 Kg STEEL PILING | | 15.023 | 511.53
|
| | 0.000 | 0.00
|
| | |
|
GROUP 6A BRIDGE AT STA. 300+75.034 | | Contracted | 853,812.63
|
| | Current | 867,657.45
|
| | In place | 874,294.92
|
| | This Estimate | 0.00
|
| | |
|
GROUP 6B BRIDGE AT STA. 9+68.923 | | |
|
0201 0030.60 | 6,829.00 | 1.000 | 6,829.00
|
MOBILIZATION | LS | 1.000 | 6,829.00
|
| | 1.000 | 6,829.00
|
| | 0.000 | 0.00
|
| | |
|
0202 4048.95 | 2,468.00 | 6.000 | 14,808.00
|
PRECAST CONCRETE POST | EACH | 6.000 | 14,808.00
|
WITH STANCHION | | 6.000 | 14,808.00
|
| | 0.000 | 0.00
|
| | |
|
0203 4048.96 | 1,963.00 | 3.000 | 5,889.00
|
PRECAST CONCRETE POST | EACH | 3.000 | 5,889.00
|
WITH LIGHT SUPPORT | | 3.000 | 5,889.00
|
| | 0.000 | 0.00
|
| | |
|
0204 4115.25 | 325.59 | 59.200 | 19,274.93
|
CLASS 47B-20 CONCRETE | m3 | 59.200 | 19,274.93
|
FOR BRIDGE | | 64.900 | 21,130.80
|
| | 0.000 | 0.00
|
| | |
|
0205 4115.26 | 552.81 | 10.800 | 5,970.35
|
CLASS 47BD-30 CONCRETE | m3 | 10.800 | 5,970.35
|
FOR BRIDGE | | 10.800 | 5,970.35
|
| | 0.000 | 0.00
|
| | |
|
0206 6131.50 | 1.32 | 5,032.000 | 6,642.24
|
EPOXY COATED REINFORCING STEEL | kg | 5,032.000 | 6,642.24
|
| | 5,166.000 | 6,819.12
|
| | 0.000 | 0.00
|
| | |
|
0207 6133.15 | 12.07 | 188.300 | 2,272.78
|
ANTI-GRAFFITI COATING | m2 | 188.300 | 2,272.78
|
| | 180.000 | 2,172.60
|
| | 0.000 | 0.00
|
| | |
|
0208 6139.50 | 18.18 | 106.200 | 1,930.72
|
SUBSURFACE DRAINAGE MATTING | m2 | 106.200 | 1,930.72
|
| | 100.000 | 1,818.00
|
| | 0.000 | 0.00
|
| | |
|
0209 6390.55 | 302.20 | 45.400 | 13,719.88
|
METAL RAILING | m | 45.400 | 13,719.88
|
700 mm | | 45.400 | 13,719.88
|
| | 0.000 | 0.00
|
| | |
|
0210 6406.05 | 821.00 | 2.500 | 2,052.50
|
METAL HANDRAIL | m | 2.500 | 2,052.50
|
965 mm | | 3.800 | 3,119.80
|
| | 0.000 | 0.00
|
| | |
|
0211 8091.00 | 27.53 | 156.000 | 4,294.68
|
GRANULAR BACKFILL | m3 | 156.000 | 4,294.68
|
| | 156.000 | 4,294.68
|
| | 0.000 | 0.00
|
| | |
|
GROUP 6B BRIDGE AT STA. 9+68.923 | | Contracted | 83,684.07
|
| | Current | 83,684.07
|
| | In place | 86,571.23
|
| | This Estimate | 0.00
|
| | |
|
GROUP 6C BRIDGE AT STA. 9+97.95 | | |
|
0212 0030.60 | 5,412.00 | 1.000 | 5,412.00
|
MOBILIZATION | LS | 1.000 | 5,412.00
|
| | 1.000 | 5,412.00
|
| | 0.000 | 0.00
|
| | |
|
0213 4115.25 | 1,141.00 | 8.400 | 9,584.40
|
CLASS 47B-20 CONCRETE | m3 | 8.400 | 9,584.40
|
FOR BRIDGE | | 8.400 | 9,584.40
|
| | 0.000 | 0.00
|
| | |
|
0214 6081.00 | 4.18 | 2,372.000 | 9,914.96
|
STRUCTURAL STEEL FOR SUPERSTRUCTURE | kg | 2,372.000 | 9,914.96
|
| | 2,372.000 | 9,914.96
|
| | 0.000 | 0.00
|
| | |
|
0215 6131.50 | 1.36 | 597.000 | 811.92
|
EPOXY COATED REINFORCING STEEL | kg | 597.000 | 811.92
|
| | 597.000 | 811.92
|
| | 0.000 | 0.00
|
| | |
|
0216 6133.15 | 12.06 | 22.600 | 272.56
|
ANTI-GRAFFITI COATING | m2 | 22.600 | 272.56
|
| | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0217 6133.16 | 255.11 | 22.600 | 5,765.49
|
E.I.F. CLADDING | m2 | 22.600 | 5,765.49
|
| | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0218 6406.05 | 924.16 | 67.200 | 62,103.55
|
METAL HANDRAIL | m | 67.200 | 62,103.55
|
1070 mm | | 67.200 | 62,103.55
|
| | 0.000 | 0.00
|
| | |
|
0219 6406.06 | 105.80 | 17.300 | 1,830.34
|
METAL HANDRAIL | m | 17.300 | 1,830.34
|
38 mm DIAMETER | | 17.000 | 1,798.60
|
| | 0.000 | 0.00
|
| | |
|
0220 6415.00 | 10,312.00 | 1.000 | 10,312.00
|
DRAINAGE SYSTEM | EACH | 1.000 | 10,312.00
|
AT STA. 9+97.95, 11.15 m RT. | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
4052 A580.95 | 1,175.37 | 0.000 | 0.00
|
INSTALL | EACH | 1.000 | 1,175.37
|
BUILD CONCRETE PEDESTALS FOR BURLINGTON NORTHERN DEPOT RAMP | | 1.000 | 1,175.37
|
| | 0.000 | 0.00
|
| | |
|
GROUP 6C BRIDGE AT STA. 9+97.95 | | Contracted | 106,007.21
|
| | Current | 107,182.58
|
| | In place | 90,800.80
|
| | This Estimate | 0.00
|
| | |
|
GROUP 6D BRIDGE AT STA. 10+15.445 | | |
|
0221 0030.60 | 18,174.00 | 1.000 | 18,174.00
|
MOBILIZATION | LS | 1.000 | 18,174.00
|
| | 1.000 | 18,174.00
|
| | 0.000 | 0.00
|
| | |
|
0222 1010.09 | 1,504.00 | 1.000 | 1,504.00
|
SPECIAL EXCAVATION | LS | 1.000 | 1,504.00
|
| | 1.000 | 1,504.00
|
| | 0.000 | 0.00
|
| | |
|
0223 4044.19 | 20,404.00 | 1.000 | 20,404.00
|
PREPARATION OF STRUCTURE | EACH | 1.000 | 20,404.00
|
AT STA. 10+15.445, 11.791 m RT. | | 1.000 | 20,404.00
|
| | 0.000 | 0.00
|
| | |
|
0224 4048.95 | 2,468.00 | 1.000 | 2,468.00
|
PRECAST CONCRETE POST | EACH | 1.000 | 2,468.00
|
WITH STANCHION | | 1.000 | 2,468.00
|
| | 0.000 | 0.00
|
| | |
|
0225 4048.96 | 1,963.00 | 1.000 | 1,963.00
|
PRECAST CONCRETE POST | EACH | 1.000 | 1,963.00
|
WITH LIGHT SUPPORT | | 1.000 | 1,963.00
|
| | 0.000 | 0.00
|
| | |
|
0226 4094.01 | 101.30 | 153.100 | 15,509.03
|
CMU WALL | m2 | 153.100 | 15,509.03
|
200 mm | | 122.950 | 12,454.83
|
| | 12.740 | 1,290.56
|
| | |
|
0227 4115.25 | 716.33 | 10.800 | 7,736.36
|
CLASS 47B-20 CONCRETE | m3 | 10.800 | 7,736.36
|
FOR BRIDGE | | 10.800 | 7,736.36
|
| | 0.000 | 0.00
|
| | |
|
0228 4115.26 | 618.82 | 36.200 | 22,401.28
|
CLASS 47BD-30 CONCRETE | m3 | 36.200 | 22,401.28
|
FOR BRIDGE | | 36.200 | 22,401.29
|
| | 0.000 | 0.00
|
| | |
|
0229 6005.78 | 738.24 | 12.000 | 8,858.88
|
EXPANSION BEARING, TFE TYPE | EACH | 12.000 | 8,858.88
|
| | 12.000 | 8,858.88
|
| | 0.000 | 0.00
|
| | |
|
0230 6081.00 | 4.77 | 8,137.000 | 38,813.49
|
STRUCTURAL STEEL FOR SUPERSTRUCTURE | kg | 8,137.000 | 38,813.49
|
| | 8,137.000 | 38,813.49
|
| | 0.000 | 0.00
|
| | |
|
0231 6131.50 | 1.32 | 5,165.000 | 6,817.80
|
EPOXY COATED REINFORCING STEEL | kg | 5,165.000 | 6,817.80
|
| | 5,165.000 | 6,817.80
|
| | 0.000 | 0.00
|
| | |
|
0232 6133.15 | 12.07 | 69.900 | 843.69
|
ANTI-GRAFFITI COATING | m2 | 69.900 | 843.69
|
| | 35.000 | 422.45
|
| | 0.000 | 0.00
|
| | |
|
0233 6210.12 | 83.11 | 106.800 | 8,876.15
|
HP 250 mm X 62 kg STEEL PILING | m | 106.800 | 8,876.15
|
| | 208.100 | 17,295.19
|
| | 0.000 | 0.00
|
| | |
|
0234 6390.55 | 447.00 | 8.700 | 3,888.90
|
METAL RAILING | m | 8.700 | 3,888.90
|
1800 mm | | 8.700 | 3,888.90
|
| | 0.000 | 0.00
|
| | |
|
0235 6406.05 | 881.96 | 12.000 | 10,583.52
|
METAL HANDRAIL | m | 12.000 | 10,583.52
|
965 mm | | 12.000 | 10,583.52
|
| | 0.000 | 0.00
|
| | |
|
0236 6415.00 | 12,280.00 | 1.000 | 12,280.00
|
DRAINAGE SYSTEM | EACH | 0.000 | 0.00
|
AT STA. 10+15.445, 11.791 m LT. | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0237 6600.02 | 45.15 | 12.200 | 550.83
|
50 mm CONDUIT IN BRIDGE | m | 12.200 | 550.83
|
| | 12.200 | 550.83
|
| | 0.000 | 0.00
|
| | |
|
4016 6415.00 | 12,561.75 | 0.000 | 0.00
|
DRAINAGE SYSTEM | EACH | 1.000 | 12,561.75
|
DRAINAGE SYSTEM AT STA. 10+15.445 (REVISED) | | 1.000 | 12,561.75
|
| | 0.000 | 0.00
|
| | |
|
GROUP 6D BRIDGE AT STA. 10+15.445 | | Contracted | 181,672.94
|
| | Current | 181,954.69
|
| | In place | 186,898.29
|
| | This Estimate | 1,290.56
|
| | |
|
GROUP 6E BRIDGE AT STA. 14+33.905 | | |
|
0238 0030.60 | 9,225.00 | 1.000 | 9,225.00
|
MOBILIZATION | LS | 1.000 | 9,225.00
|
| | 1.000 | 9,225.00
|
| | 0.000 | 0.00
|
| | |
|
0239 4048.95 | 2,468.00 | 6.000 | 14,808.00
|
PRECAST CONCRETE POST | EACH | 6.000 | 14,808.00
|
WITH STANCHION | | 6.000 | 14,808.00
|
| | 0.000 | 0.00
|
| | |
|
0240 4048.96 | 1,963.00 | 4.000 | 7,852.00
|
PRECAST CONCRETE POST | EACH | 4.000 | 7,852.00
|
WITH LIGHT SUPPORT | | 4.000 | 7,852.00
|
| | 0.000 | 0.00
|
| | |
|
0241 4115.25 | 320.17 | 97.100 | 31,088.51
|
CLASS 47B-20 CONCRETE | m3 | 97.100 | 31,088.51
|
FOR BRIDGE | | 97.100 | 31,088.51
|
| | 0.000 | 0.00
|
| | |
|
0242 4115.26 | 380.21 | 18.200 | 6,919.82
|
CLASS 47BD-30 CONCRETE | m3 | 18.200 | 6,919.82
|
FOR BRIDGE | | 18.200 | 6,919.82
|
| | 0.000 | 0.00
|
| | |
|
0243 6131.50 | 1.31 | 7,341.000 | 9,616.71
|
EPOXY COATED REINFORCING STEEL | kg | 7,341.000 | 9,616.71
|
| | 7,341.000 | 9,616.71
|
| | 0.000 | 0.00
|
| | |
|
0244 6133.15 | 12.07 | 274.500 | 3,313.22
|
ANTI-GRAFFITI COATING | m2 | 274.500 | 3,313.22
|
| | 100.000 | 1,207.00
|
| | 0.000 | 0.00
|
| | |
|
0245 6139.50 | 14.74 | 144.000 | 2,122.56
|
SUBSURFACE DRAINAGE MATTING | m2 | 144.000 | 2,122.56
|
| | 144.000 | 2,122.56
|
| | 0.000 | 0.00
|
| | |
|
0246 6390.55 | 306.05 | 49.800 | 15,241.29
|
METAL RAILING | m | 49.800 | 15,241.29
|
700 mm | | 25.000 | 7,651.25
|
| | 0.000 | 0.00
|
| | |
|
0247 8091.00 | 27.53 | 301.000 | 8,286.53
|
GRANULAR BACKFILL | m3 | 301.000 | 8,286.53
|
| | 301.000 | 8,286.54
|
| | 0.000 | 0.00
|
| | |
|
GROUP 6E BRIDGE AT STA. 14+33.905 | | Contracted | 108,473.63
|
| | Current | 108,473.63
|
| | In place | 98,777.39
|
| | This Estimate | 0.00
|
| | |
|
GROUP 6F BRIDGE AT STA. 11+42.86 | | |
|
0248 0030.60 | 32,435.00 | 1.000 | 32,435.00
|
MOBILIZATION | LS | 1.000 | 32,435.00
|
| | 1.000 | 32,435.00
|
| | 0.000 | 0.00
|
| | |
|
0249 1010.09 | 2,284.00 | 1.000 | 2,284.00
|
SPECIAL EXCAVATION | LS | 1.000 | 2,284.00
|
| | 1.000 | 2,284.00
|
| | 0.000 | 0.00
|
| | |
|
0250 4044.20 | 70,687.00 | 1.000 | 70,687.00
|
PREPARATION OF STRUCTURE | EACH | 1.000 | 70,687.00
|
AT STA. 11+42.86, 11.975 m RT. | | 1.000 | 70,687.00
|
| | 0.000 | 0.00
|
| | |
|
0251 4048.95 | 2,468.00 | 2.000 | 4,936.00
|
PRECAST CONCRETE POST | EACH | 2.000 | 4,936.00
|
WITH STANCHION | | 2.000 | 4,936.00
|
| | 0.000 | 0.00
|
| | |
|
0252 4115.25 | 969.00 | 5.700 | 5,523.30
|
CLASS 47B-20 CONCRETE | m3 | 5.700 | 5,523.30
|
FOR BRIDGE | | 5.700 | 5,523.30
|
| | 0.000 | 0.00
|
| | |
|
0253 4115.26 | 532.29 | 80.900 | 43,062.26
|
CLASS 47BD-30 CONCRETE | m3 | 80.900 | 43,062.26
|
FOR BRIDGE | | 80.900 | 43,062.26
|
| | 0.000 | 0.00
|
| | |
|
0254 6080.00 | 3.15 | 13,133.000 | 41,368.95
|
STRUCTURAL STEEL FOR SUBSTRUCTURE | kg | 13,133.000 | 41,368.95
|
| | 13,133.000 | 41,368.95
|
| | 0.000 | 0.00
|
| | |
|
0255 6081.00 | 3.09 | 31,260.000 | 96,593.40
|
STRUCTURAL STEEL FOR SUPERSTRUCTURE | kg | 31,260.000 | 96,593.40
|
| | 31,260.000 | 96,593.40
|
| | 0.000 | 0.00
|
| | |
|
0256 6131.50 | 1.32 | 11,368.000 | 15,005.76
|
EPOXY COATED REINFORCING STEEL | kg | 11,368.000 | 15,005.76
|
| | 11,368.000 | 15,005.76
|
| | 0.000 | 0.00
|
| | |
|
0257 6133.15 | 12.07 | 26.300 | 317.44
|
ANTI-GRAFFITI COATING | m2 | 26.300 | 317.44
|
| | 20.000 | 241.40
|
| | 0.000 | 0.00
|
| | |
|
0258 6210.12 | 66.69 | 69.000 | 4,601.61
|
HP 250 mm X 62 kg STEEL PILING | m | 69.000 | 4,601.61
|
| | 68.580 | 4,573.60
|
| | 0.000 | 0.00
|
| | |
|
0259 6390.55 | 390.12 | 0.900 | 351.11
|
METAL RAILING | m | 0.900 | 351.11
|
700 mm | | 0.900 | 351.11
|
| | 0.000 | 0.00
|
| | |
|
0260 6390.56 | 442.52 | 13.800 | 6,106.78
|
METAL RAILING | m | 13.800 | 6,106.78
|
1800 mm | | 13.800 | 6,106.78
|
| | 0.000 | 0.00
|
| | |
|
0261 6415.00 | 4,608.00 | 1.000 | 4,608.00
|
DRAINAGE SYSTEM | EACH | 0.000 | 0.00
|
AT STA. 11+42.86, 11.975 m RT. | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
4017 6415.01 | 4,889.75 | 0.000 | 0.00
|
DRAINAGE SYSTEM | EACH | 1.000 | 4,889.75
|
DRAINAGE SYSTEM AT STA. 11+42.86 (REVISED) | | 1.000 | 4,889.76
|
| | 0.000 | 0.00
|
| | |
|
GROUP 6F BRIDGE AT STA. 11+42.86 | | Contracted | 327,880.61
|
| | Current | 328,162.36
|
| | In place | 328,058.32
|
| | This Estimate | 0.00
|
| | |
|
GROUP 6G BRIDGE AT STA. 12+47.638 | | |
|
0262 0030.60 | 13,067.00 | 1.000 | 13,067.00
|
MOBILIZATION | LS | 1.000 | 13,067.00
|
| | 1.000 | 13,067.00
|
| | 0.000 | 0.00
|
| | |
|
0263 1010.09 | 2,189.00 | 1.000 | 2,189.00
|
SPECIAL EXCAVATION | LS | 1.000 | 2,189.00
|
| | 1.000 | 2,189.00
|
| | 0.000 | 0.00
|
| | |
|
0264 4115.25 | 182.33 | 20.900 | 3,810.70
|
CLASS 47B-20 CONCRETE | m3 | 20.900 | 3,810.70
|
FOR BRIDGE | | 20.900 | 3,810.70
|
| | 0.000 | 0.00
|
| | |
|
0265 4115.26 | 1,295.85 | 31.400 | 40,689.69
|
CLASS 47BD-30 CONCRETE | m3 | 31.400 | 40,689.69
|
FOR BRIDGE | | 31.400 | 40,689.71
|
| | 0.000 | 0.00
|
| | |
|
0266 6131.50 | 1.32 | 6,963.000 | 9,191.16
|
EPOXY COATED REINFORCING STEEL | kg | 6,963.000 | 9,191.16
|
| | 6,963.000 | 9,191.16
|
| | 0.000 | 0.00
|
| | |
|
0267 6133.15 | 12.07 | 121.800 | 1,470.13
|
ANTI-GRAFFITI COATING | m2 | 121.800 | 1,470.13
|
| | 100.000 | 1,207.00
|
| | 0.000 | 0.00
|
| | |
|
0268 6210.12 | 67.14 | 157.600 | 10,581.26
|
HP 250 mm X 62 kg STEEL PILING | m | 157.600 | 10,581.26
|
| | 118.948 | 7,986.17
|
| | 0.000 | 0.00
|
| | |
|
0269 6406.05 | 932.30 | 57.800 | 53,886.94
|
METAL HANDRAIL | m | 57.800 | 53,886.94
|
1070 mm | | 57.800 | 53,886.94
|
| | 0.000 | 0.00
|
| | |
|
4024 6210.32 | 40.284 | 0.000 | 0.00
|
PAY CUT-OFF FOR 250 mm X 62 kg STEEL PILING | m | 27.372 | 1,102.65
|
PAY CUT-OFF HP 250 mm X 62 Kg STEEL PILING | | 27.372 | 1,102.65
|
| | 0.000 | 0.00
|
| | |
|
4054 A580.92 | 4,235.37 | 0.000 | 0.00
|
INSTALL | LS | 1.000 | 4,235.37
|
INSTALL STAIR TOWER LIGHTS AT STA. 12+47, LT. | | 1.000 | 4,235.37
|
| | 0.000 | 0.00
|
| | |
|
GROUP 6G BRIDGE AT STA. 12+47.638 | | Contracted | 134,885.88
|
| | Current | 140,223.90
|
| | In place | 137,365.70
|
| | This Estimate | 0.00
|
| | |
|
GROUP 6H BRIDGE AT STA. 12+81.642 | | |
|
0270 0030.60 | 5,849.00 | 1.000 | 5,849.00
|
MOBILIZATION | LS | 1.000 | 5,849.00
|
| | 1.000 | 5,849.00
|
| | 0.000 | 0.00
|
| | |
|
0271 1010.09 | 761.00 | 1.000 | 761.00
|
SPECIAL EXCAVATION | LS | 1.000 | 761.00
|
| | 1.000 | 761.00
|
| | 0.000 | 0.00
|
| | |
|
0272 4044.21 | 8,821.00 | 1.000 | 8,821.00
|
PREPARATION OF STRUCTURE | EACH | 1.000 | 8,821.00
|
AT STA. 12+81.642, 13.625 m LT. | | 1.000 | 8,821.00
|
| | 0.000 | 0.00
|
| | |
|
0273 4115.25 | 521.56 | 11.400 | 5,945.78
|
CLASS 47B-20 CONCRETE | m3 | 11.400 | 5,945.78
|
FOR BRIDGE | | 11.400 | 5,945.79
|
| | 0.000 | 0.00
|
| | |
|
0274 4115.26 | 913.73 | 16.900 | 15,442.04
|
CLASS 47BD-30 CONCRETE | m3 | 16.900 | 15,442.04
|
FOR BRIDGE | | 16.900 | 15,442.04
|
| | 0.000 | 0.00
|
| | |
|
0275 6131.50 | 1.32 | 6,069.000 | 8,011.08
|
EPOXY COATED REINFORCING STEEL | kg | 6,069.000 | 8,011.08
|
| | 6,069.000 | 8,011.08
|
| | 0.000 | 0.00
|
| | |
|
0276 6133.15 | 12.07 | 56.200 | 678.33
|
ANTI-GRAFFITI COATING | m2 | 56.200 | 678.33
|
| | 50.000 | 603.50
|
| | 0.000 | 0.00
|
| | |
|
0277 6210.12 | 68.21 | 84.600 | 5,770.57
|
HP 250 mm X 62 kg STEEL PILING | m | 84.600 | 5,770.57
|
| | 73.612 | 5,021.07
|
| | 0.000 | 0.00
|
| | |
|
0278 6390.55 | 312.84 | 18.700 | 5,850.11
|
METAL RAILING | m | 18.700 | 5,850.11
|
700 mm | | 18.700 | 5,850.11
|
| | 0.000 | 0.00
|
| | |
|
0279 6406.05 | 909.00 | 2.400 | 2,181.60
|
METAL HANDRAIL | m | 2.400 | 2,181.60
|
965 mm | | 2.400 | 2,181.60
|
| | 0.000 | 0.00
|
| | |
|
4025 6210.32 | 40.926 | 0.000 | 0.00
|
PAY CUT-OFF FOR 250 mm X 62 kg STEEL PILING | m | 8.708 | 356.38
|
PAY CUT-OFF HP 250 mm X 62 Kg STEEL PILING | | 8.708 | 356.38
|
| | 0.000 | 0.00
|
| | |
|
GROUP 6H BRIDGE AT STA. 12+81.642 | | Contracted | 59,310.51
|
| | Current | 59,666.89
|
| | In place | 58,842.57
|
| | This Estimate | 0.00
|
| | |
|
GROUP 6I BRIDGE AT STA. 13+16.5 | | |
|
0280 0030.60 | 3,785.00 | 1.000 | 3,785.00
|
MOBILIZATION | LS | 1.000 | 3,785.00
|
| | 1.000 | 3,785.00
|
| | 0.000 | 0.00
|
| | |
|
0281 1010.09 | 761.00 | 1.000 | 761.00
|
SPECIAL EXCAVATION | LS | 1.000 | 761.00
|
| | 1.000 | 761.00
|
| | 0.000 | 0.00
|
| | |
|
0282 4044.22 | 4,132.00 | 1.000 | 4,132.00
|
PREPARATION OF STRUCTURE | EACH | 1.000 | 4,132.00
|
AT STA. 13+16.5, 13.37 m LT. | | 1.000 | 4,132.00
|
| | 0.000 | 0.00
|
| | |
|
0283 4115.25 | 524.00 | 10.000 | 5,240.00
|
CLASS 47B-20 CONCRETE | m3 | 10.000 | 5,240.00
|
FOR BRIDGE | | 10.000 | 5,240.00
|
| | 0.000 | 0.00
|
| | |
|
0284 4115.26 | 696.81 | 12.100 | 8,431.40
|
CLASS 47BD-30 CONCRETE | m3 | 12.100 | 8,431.40
|
FOR BRIDGE | | 12.100 | 8,431.41
|
| | 0.000 | 0.00
|
| | |
|
0285 6131.50 | 1.32 | 4,100.000 | 5,412.00
|
EPOXY COATED REINFORCING STEEL | kg | 4,100.000 | 5,412.00
|
| | 4,100.000 | 5,412.00
|
| | 0.000 | 0.00
|
| | |
|
0286 6133.15 | 12.07 | 42.200 | 509.35
|
ANTI-GRAFFITI COATING | m2 | 42.200 | 509.35
|
| | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0287 6210.12 | 68.28 | 82.200 | 5,612.62
|
HP 250 mm X 62 kg STEEL PILING | m | 82.200 | 5,612.62
|
| | 78.200 | 5,339.50
|
| | 0.000 | 0.00
|
| | |
|
0288 6390.55 | 341.19 | 10.100 | 3,446.02
|
METAL RAILING | m | 10.100 | 3,446.02
|
700 mm | | 10.100 | 3,446.02
|
| | 0.000 | 0.00
|
| | |
|
GROUP 6I BRIDGE AT STA. 13+16.5 | | Contracted | 37,329.39
|
| | Current | 37,329.39
|
| | In place | 36,546.93
|
| | This Estimate | 0.00
|
| | |
|
GROUP 6J BRIDGE AT STA. 13+05.068 | | |
|
0289 0030.60 | 5,357.00 | 1.000 | 5,357.00
|
MOBILIZATION | LS | 1.000 | 5,357.00
|
| | 1.000 | 5,357.00
|
| | 0.000 | 0.00
|
| | |
|
0290 1010.09 | 761.00 | 1.000 | 761.00
|
SPECIAL EXCAVATION | LS | 1.000 | 761.00
|
| | 1.000 | 761.00
|
| | 0.000 | 0.00
|
| | |
|
0291 4044.23 | 7,456.00 | 1.000 | 7,456.00
|
PREPARATION OF STRUCTURE | EACH | 1.000 | 7,456.00
|
AT STA. 13+05.068, 13.1 m RT. | | 1.000 | 7,456.00
|
| | 0.000 | 0.00
|
| | |
|
0292 4115.25 | 526.55 | 10.100 | 5,318.16
|
CLASS 47B-20 CONCRETE | m3 | 10.100 | 5,318.16
|
FOR BRIDGE | | 10.100 | 5,318.16
|
| | 0.000 | 0.00
|
| | |
|
0293 4115.26 | 835.17 | 14.500 | 12,109.97
|
CLASS 47BD-30 CONCRETE | m3 | 14.500 | 12,109.97
|
FOR BRIDGE | | 14.500 | 12,109.96
|
| | 0.000 | 0.00
|
| | |
|
0294 6131.50 | 1.31 | 4,811.000 | 6,302.41
|
EPOXY COATED REINFORCING STEEL | kg | 4,811.000 | 6,302.41
|
| | 4,811.000 | 6,302.41
|
| | 0.000 | 0.00
|
| | |
|
0295 6133.15 | 12.08 | 60.000 | 724.80
|
ANTI-GRAFFITI COATING | m2 | 60.000 | 724.80
|
| | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0296 6210.12 | 67.91 | 87.000 | 5,908.17
|
HP 250 mm X 62 kg STEEL PILING | m | 87.000 | 5,908.17
|
| | 87.000 | 5,908.17
|
| | 0.000 | 0.00
|
| | |
|
0297 6390.55 | 312.47 | 20.500 | 6,405.64
|
METAL RAILING | m | 20.500 | 6,405.64
|
700 mm | | 20.500 | 6,405.64
|
| | 0.000 | 0.00
|
| | |
|
0298 6406.05 | 886.00 | 4.000 | 3,544.00
|
METAL HANDRAIL | m | 4.000 | 3,544.00
|
965 mm | | 4.000 | 3,544.00
|
| | 0.000 | 0.00
|
| | |
|
4026 6210.32 | 40.746 | 0.000 | 0.00
|
PAY CUT-OFF FOR 250 mm X 62 kg STEEL PILING | m | 2.756 | 112.30
|
PAY CUT-OFF HP 250 mm X 62 Kg STEEL PILING | | 2.765 | 112.66
|
| | 0.000 | 0.00
|
| | |
|
4027 6210.42 | 135.82 | 0.000 | 0.00
|
HP 250 mm X 62 kg, PILE SPLICES | EACH | 3.000 | 407.46
|
HP 250 mm X 62 Kg STEEL PILING SPLICES | | 3.000 | 407.46
|
| | 0.000 | 0.00
|
| | |
|
GROUP 6J BRIDGE AT STA. 13+05.068 | | Contracted | 53,887.14
|
| | Current | 54,406.89
|
| | In place | 53,682.46
|
| | This Estimate | 0.00
|
| | |
|
GROUP 6K BRIDGE AT STA. 13+33.33 | | |
|
0299 0030.60 | 4,181.00 | 1.000 | 4,181.00
|
MOBILIZATION | LS | 1.000 | 4,181.00
|
| | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0300 1010.09 | 761.00 | 1.000 | 761.00
|
SPECIAL EXCAVATION | LS | 1.000 | 761.00
|
| | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0301 4044.24 | 1.00 | 1.000 | 1.00
|
PREPARATION OF STRUCTURE | EACH | 1.000 | 1.00
|
AT STA. 13+33.33, 13.1 m RT. | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0302 4115.25 | 524.00 | 9.400 | 4,925.60
|
CLASS 47B-20 CONCRETE | m3 | 9.400 | 4,925.60
|
FOR BRIDGE | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0303 4115.26 | 1,095.39 | 14.400 | 15,773.62
|
CLASS 47BD-30 CONCRETE | m3 | 14.400 | 15,773.62
|
FOR BRIDGE | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0304 6131.50 | 1.32 | 4,437.000 | 5,856.84
|
EPOXY COATED REINFORCING STEEL | kg | 4,437.000 | 5,856.84
|
| | 1,902.600 | 2,511.43
|
| | 0.000 | 0.00
|
| | |
|
0305 6133.15 | 12.07 | 58.100 | 701.27
|
ANTI-GRAFFITI COATING | m2 | 58.100 | 701.27
|
| | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0306 6210.12 | 68.26 | 82.800 | 5,651.93
|
HP 250 mm X 62 kg STEEL PILING | m | 82.800 | 5,651.93
|
| | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0307 6390.55 | 315.46 | 20.400 | 6,435.38
|
METAL RAILING | m | 20.400 | 6,435.38
|
700 mm | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0308 6406.05 | 961.00 | 1.500 | 1,441.50
|
METAL HANDRAIL | m | 1.500 | 1,441.50
|
965 mm | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
GROUP 6K BRIDGE AT STA. 13+33.33 | | Contracted | 45,729.14
|
| | Current | 45,729.14
|
| | In place | 2,511.43
|
| | This Estimate | 0.00
|
| | |
|
GROUP 8B ELECTRICAL | | |
|
0309 A001.01 | 598.00 | 6.000 | 3,588.00
|
PULL BOX, TYPE PB-1 | EACH | 6.000 | 3,588.00
|
| | 6.000 | 3,588.00
|
| | 0.000 | 0.00
|
| | |
|
0310 A001.02 | 564.00 | 9.000 | 5,076.00
|
PULL BOX, TYPE PB-1A | EACH | 9.000 | 5,076.00
|
| | 9.000 | 5,076.00
|
| | 0.000 | 0.00
|
| | |
|
0311 A001.05 | 847.00 | 4.000 | 3,388.00
|
PULL BOX, TYPE PB-2 | EACH | 4.000 | 3,388.00
|
| | 4.000 | 3,388.00
|
| | 0.000 | 0.00
|
| | |
|
0312 A002.42 | 6,999.00 | 1.000 | 6,999.00
|
EMERGENCY VEHICLE PREEMPTION SYSTEM | EACH | 1.000 | 6,999.00
|
AT 10th ST. & PACIFIC ST. | | 1.000 | 6,999.00
|
| | 0.000 | 0.00
|
| | |
|
0313 A002.43 | 6,999.00 | 1.000 | 6,999.00
|
EMERGENCY VEHICLE PREEMPTION SYSTEM | EACH | 1.000 | 6,999.00
|
AT 10th ST. & JACKSON ST. | | 1.000 | 6,999.00
|
| | 0.000 | 0.00
|
| | |
|
0314 A004.00 | 1,044.14 | 13.000 | 13,573.82
|
TRAFFIC SIGNAL, TYPE TS-1 | EACH | 13.000 | 13,573.82
|
| | 13.000 | 13,573.82
|
| | 0.000 | 0.00
|
| | |
|
0315 A004.04 | 1,535.00 | 1.000 | 1,535.00
|
TRAFFIC SIGNAL, TYPE TS-1LL | EACH | 1.000 | 1,535.00
|
| | 1.000 | 1,535.00
|
| | 0.000 | 0.00
|
| | |
|
0316 A004.10 | 959.00 | 8.000 | 7,672.00
|
TRAFFIC SIGNAL, TYPE TS-1A | EACH | 8.000 | 7,672.00
|
| | 8.000 | 7,672.00
|
| | 0.000 | 0.00
|
| | |
|
0317 A005.25 | 7,111.00 | 2.000 | 14,222.00
|
TRAFFIC SIGNAL CONTROLLER, TYPE TC-170 | EACH | 2.000 | 14,222.00
|
| | 2.000 | 14,222.00
|
| | 0.000 | 0.00
|
| | |
|
0318 A006.15 | 530.54 | 16.000 | 8,488.64
|
PEDESTRIAN SIGNAL, TYPE PS-1 | EACH | 16.000 | 8,488.64
|
| | 16.000 | 8,488.64
|
| | 0.000 | 0.00
|
| | |
|
0319 A006.70 | 130.00 | 8.000 | 1,040.00
|
PEDESTRIAN PUSHBUTTON, TYPE PPB | EACH | 8.000 | 1,040.00
|
| | 8.000 | 1,040.00
|
| | 0.000 | 0.00
|
| | |
|
0320 A007.15 | 248.34 | 22.000 | 5,463.48
|
VEHICLE DETECTOR, TYPE TD-5 | EACH | 22.000 | 5,463.48
|
| | 22.000 | 5,463.48
|
| | 0.000 | 0.00
|
| | |
|
0321 A007.16 | 260.00 | 1.000 | 260.00
|
VEHICLE DETECTOR, TYPE TD-5A | EACH | 1.000 | 260.00
|
| | 1.000 | 260.00
|
| | 0.000 | 0.00
|
| | |
|
0322 A007.19 | 271.00 | 1.000 | 271.00
|
VEHICLE DETECTOR, TYPE TD-5B | EACH | 1.000 | 271.00
|
| | 1.000 | 271.00
|
| | 0.000 | 0.00
|
| | |
|
0323 A007.22 | 531.00 | 3.000 | 1,593.00
|
VEHICLE DETECTOR, TYPE TD-5C | EACH | 3.000 | 1,593.00
|
| | 3.000 | 1,593.00
|
| | 0.000 | 0.00
|
| | |
|
0324 A007.24 | 587.00 | 3.000 | 1,761.00
|
VEHICLE DETECTOR, TYPE TD-5D | EACH | 3.000 | 1,761.00
|
| | 3.000 | 1,761.00
|
| | 0.000 | 0.00
|
| | |
|
0325 A011.08 | 5,362.00 | 2.000 | 10,724.00
|
COMBINATION MAST ARM SIGNAL AND LIGHTING POLE,TYPE CMP-8-3.7 | EACH | 2.000 | 10,724.00
|
| | 2.000 | 10,724.00
|
| | 0.000 | 0.00
|
| | |
|
0326 A011.54 | 7,817.00 | 1.000 | 7,817.00
|
COMBINATION MAST ARM SIGNAL AND LIGHTING POLE,TYPE CMP-12.5-0 | EACH | 1.000 | 7,817.00
|
| | 1.000 | 7,817.00
|
| | 0.000 | 0.00
|
| | |
|
0327 A011.65 | 7,930.00 | 1.000 | 7,930.00
|
COMBINATION MAST ARM SIGNAL AND LIGHTING POLE,TYPE CMP-12.5-3.7 | EACH | 1.000 | 7,930.00
|
| | 1.000 | 7,930.00
|
| | 0.000 | 0.00
|
| | |
|
0328 A011.89 | 10,470.00 | 1.000 | 10,470.00
|
COMBINATION MAST ARM SIGNAL AND LIGHTING POLE,TYPE CMP-14-0 | EACH | 1.000 | 10,470.00
|
| | 1.000 | 10,470.00
|
| | 0.000 | 0.00
|
| | |
|
0329 A012.05 | 10,611.00 | 1.000 | 10,611.00
|
COMBINATION MAST ARM SIGNAL AND LIGHTING POLE,TYPE CMP-14-3.7 | EACH | 1.000 | 10,611.00
|
| | 1.000 | 10,611.00
|
| | 0.000 | 0.00
|
| | |
|
0330 A012.39 | 11,175.00 | 2.000 | 22,350.00
|
COMBINATION MAST ARM SIGNAL AND LIGHTING POLE,TYPE CMP-15.5-0 | EACH | 2.000 | 22,350.00
|
| | 2.000 | 22,350.00
|
| | 0.000 | 0.00
|
| | |
|
0331 A017.56 | 587.00 | 9.000 | 5,283.00
|
STREET LIGHT FOUNDATION | EACH | 9.000 | 5,283.00
|
FOR HISTORIC LIGHT STANDARD TYPE B | | 9.000 | 5,283.00
|
| | 0.000 | 0.00
|
| | |
|
0332 A020.36 | 9,595.00 | 1.000 | 9,595.00
|
LIGHTING CONTROL CENTER, TYPE R-2 | EACH | 1.000 | 9,595.00
|
| | 1.000 | 9,595.00
|
| | 0.000 | 0.00
|
| | |
|
0333 A030.04 | 2,709.00 | 2.000 | 5,418.00
|
SERVICE DISCONNECT PEDESTAL | EACH | 2.000 | 5,418.00
|
| | 2.000 | 5,418.00
|
| | 0.000 | 0.00
|
| | |
|
0334 A065.54 | 31.61 | 59.800 | 1,890.28
|
50 mm PVC CONDUIT | m | 59.800 | 1,890.28
|
UNDER SIDEWALK | | 202.000 | 6,385.22
|
| | 0.000 | 0.00
|
| | |
|
0335 A065.58 | 65.47 | 10.300 | 674.34
|
75 mm PVC CONDUIT | m | 10.300 | 674.34
|
UNDER SIDEWALK | | 136.000 | 8,903.92
|
| | 0.000 | 0.00
|
| | |
|
0336 A065.70 | 12.42 | 274.200 | 3,405.56
|
50 mm PVC CONDUIT IN TRENCH | m | 274.200 | 3,405.56
|
| | 451.900 | 5,612.60
|
| | 0.000 | 0.00
|
| | |
|
0337 A065.71 | 19.19 | 64.300 | 1,233.92
|
75 mm PVC CONDUIT IN TRENCH | m | 64.300 | 1,233.92
|
| | 22.700 | 435.61
|
| | 0.000 | 0.00
|
| | |
|
0338 A065.74 | 40.64 | 74.700 | 3,035.81
|
50 mm PVC CONDUIT UNDER ROADWAY | m | 74.700 | 3,035.81
|
| | 113.200 | 4,600.45
|
| | 0.000 | 0.00
|
| | |
|
0339 A065.78 | 47.41 | 38.700 | 1,834.77
|
75 mm PVC CONDUIT UNDER ROADWAY | m | 38.700 | 1,834.77
|
| | 63.000 | 2,986.83
|
| | 0.000 | 0.00
|
| | |
|
0340 A070.09 | 9.03 | 301.000 | 2,718.03
|
20 mm CONDUIT IN TRENCH | m | 301.000 | 2,718.03
|
| | 260.800 | 2,355.02
|
| | 0.000 | 0.00
|
| | |
|
0341 A070.13 | 12.98 | 212.000 | 2,751.76
|
50 mm CONDUIT IN TRENCH | m | 212.000 | 2,751.76
|
WITH PULL ROPE | | 175.000 | 2,271.50
|
| | 0.000 | 0.00
|
| | |
|
0342 A070.14 | 12.42 | 1,885.000 | 23,411.70
|
50 mm CONDUIT IN TRENCH | m | 1,885.000 | 23,411.70
|
| | 1,533.400 | 19,044.83
|
| | 0.000 | 0.00
|
| | |
|
0343 A077.26 | 7.06 | 212.500 | 1,500.25
|
16/C #14 AWG TRAFFIC SIGNAL CABLE | m | 212.500 | 1,500.25
|
| | 205.800 | 1,452.95
|
| | 0.000 | 0.00
|
| | |
|
0344 A078.12 | 2.77 | 187.700 | 519.93
|
2/C #16 AWG PEDESTRIAN PUSHBUTTON LEAD-IN CABLE | m | 187.700 | 519.93
|
| | 180.900 | 501.10
|
| | 0.000 | 0.00
|
| | |
|
0345 A079.01 | 2.82 | 314.400 | 886.61
|
2/C #14 AWG DETECTOR LEAD-IN CABLE | m | 314.400 | 886.61
|
| | 297.600 | 839.23
|
| | 0.000 | 0.00
|
| | |
|
0346 A079.50 | 2.20 | 154.000 | 338.80
|
GROUNDING CONDUCTOR | m | 154.000 | 338.80
|
| | 154.000 | 338.80
|
| | 0.000 | 0.00
|
| | |
|
0347 A079.55 | 2.37 | 178.000 | 421.86
|
SERVICE CABLE | m | 178.000 | 421.86
|
| | 148.000 | 350.76
|
| | 0.000 | 0.00
|
| | |
|
0348 A079.60 | 7.34 | 196.800 | 1,444.51
|
STREET LIGHTING CABLE | m | 196.800 | 1,444.51
|
3/C #6 | | 193.100 | 1,417.35
|
| | 100.000 | 734.00
|
| | |
|
0349 A080.15 | 2.82 | 37,126.000 | 104,695.32
|
STREET LIGHTING CABLE, NO. 4 USE | m | 37,126.000 | 104,695.32
|
| | 8,962.300 | 25,273.69
|
| | -27.700 | -78.11
|
| | |
|
0350 A080.24 | 2.20 | 7,508.000 | 16,517.60
|
STREET LIGHTING CABLE, NO. 6 USE | m | 7,508.000 | 16,517.60
|
| | 742.000 | 1,632.40
|
| | 0.000 | 0.00
|
| | |
|
0351 A080.32 | 2.03 | 9,788.000 | 19,869.64
|
STREET LIGHTING CABLE, NO. 8 USE | m | 9,788.000 | 19,869.64
|
| | 2,287.700 | 4,644.03
|
| | 121.700 | 247.05
|
| | |
|
0352 A080.35 | 1.35 | 3,713.000 | 5,012.55
|
STREET LIGHTING CABLE, NO. 10 USE | m | 3,713.000 | 5,012.55
|
| | 918.000 | 1,239.30
|
| | 0.000 | 0.00
|
| | |
|
0353 A080.47 | 1.24 | 2,270.000 | 2,814.80
|
STREET LIGHTING CABLE, NO. 12 THWN | m | 2,270.000 | 2,814.80
|
IN POLE | | 2,340.000 | 2,901.60
|
| | 2,040.000 | 2,529.60
|
| | |
|
0354 A510.00 | 130.00 | 8.000 | 1,040.00
|
INSTALL LUMINAIRE | EACH | 8.000 | 1,040.00
|
| | 8.000 | 1,040.00
|
| | 0.000 | 0.00
|
| | |
|
0355 A610.00 | 6,208.00 | 1.000 | 6,208.00
|
REMOVE TRAFFIC SIGNAL | EACH | 1.000 | 6,208.00
|
AT 10th & PACIFIC | | 1.000 | 6,208.00
|
| | 0.000 | 0.00
|
| | |
|
0356 A610.01 | 3,386.00 | 1.000 | 3,386.00
|
REMOVE TRAFFIC SIGNAL | EACH | 1.000 | 3,386.00
|
AT 10th & JACKSON | | 1.000 | 3,386.00
|
| | 0.000 | 0.00
|
| | |
|
0357 A820.03 | 6,885.66 | 55.000 | 378,711.30
|
HISTORIC LIGHT STANDARD | EACH | 55.000 | 378,711.30
|
TYPE A | | 55.000 | 378,711.30
|
| | 25.000 | 172,141.50
|
| | |
|
0358 A820.03 | 8,014.46 | 14.000 | 112,202.44
|
HISTORIC LIGHT STANDARD | EACH | 14.000 | 112,202.44
|
TYPE B | | 13.000 | 104,187.98
|
| | 5.700 | 45,682.42
|
| | |
|
0359 A820.04 | 45.15 | 236.000 | 10,655.40
|
20 AMP FUSE | EACH | 236.000 | 10,655.40
|
IN POLE | | 236.000 | 10,655.40
|
| | 236.000 | 10,655.40
|
| | |
|
0360 0030.81 | 10,803.00 | 1.000 | 10,803.00
|
MOBILIZATION | LS | 1.000 | 10,803.00
|
| | 1.000 | 10,803.00
|
| | 0.000 | 0.00
|
| | |
|
0361 1117.00 | 621.00 | 1.000 | 621.00
|
REMOVE MANHOLE | EACH | 1.000 | 621.00
|
ELECTRICAL | | 1.000 | 621.00
|
| | 0.000 | 0.00
|
| | |
|
0362 4012.50 | 564.00 | 1.000 | 564.00
|
JUNCTION BOX | EACH | 1.000 | 564.00
|
305 mm X 203 mm X 152 mm | | 1.000 | 564.00
|
| | 0.000 | 0.00
|
| | |
|
0363 4012.51 | 818.38 | 18.000 | 14,730.84
|
JUNCTION BOX | EACH | 0.000 | 0.00
|
457 mm X 305 mm X 152 mm | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0364 4012.52 | 1,467.00 | 1.000 | 1,467.00
|
JUNCTION BOX | EACH | 0.000 | 0.00
|
610 mm X 457 mm X 152 mm | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0365 4900.56 | 275.00 | 1.000 | 275.00
|
ADJUST | EACH | 1.000 | 275.00
|
PULL BOX TO GRADE | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0366 7315.90 | 1,185.00 | 1.000 | 1,185.00
|
INSTALL OVERHEAD SIGNS | LS | 1.000 | 1,185.00
|
| | 1.000 | 1,185.00
|
| | 0.000 | 0.00
|
| | |
|
0367 7320.50 | 621.00 | 8.000 | 4,968.00
|
STREET NAME SIGN | EACH | 8.000 | 4,968.00
|
| | 8.000 | 4,968.00
|
| | 0.000 | 0.00
|
| | |
|
4007 A780.05 | 4,327.39 | 0.000 | 0.00
|
TEMPORARY LIGHTING SYSTEM | EACH | 1.000 | 4,327.39
|
TEMPORARY LIGHTING AT AMTRAK LOADING PLATFORM | | 1.000 | 4,327.39
|
| | 0.000 | 0.00
|
| | |
|
4012 4012.50 | 525.00 | 0.000 | 0.00
|
JUNCTION BOX | EACH | 17.000 | 8,925.00
|
JUNCTION BOX | | 17.000 | 8,925.00
|
| | 0.000 | 0.00
|
| | |
|
4013 4012.50 | 577.50 | 0.000 | 0.00
|
JUNCTION BOX | EACH | 1.000 | 577.50
|
JUNCTION BOX | | 1.000 | 577.50
|
| | 0.000 | 0.00
|
| | |
|
4032 A579.55 | 8.93 | 0.000 | 0.00
|
INSTALL SERVICE CABLE | m | 622.000 | 5,554.46
|
6 PAIR COMMUNICATION CABLE (INSTALLED) | | 622.000 | 5,554.46
|
| | 0.000 | 0.00
|
| | |
|
4033 A001.50 | 1,324.75 | 0.000 | 0.00
|
PULL BOX | EACH | 5.000 | 6,623.75
|
ELECTRICAL PULL BOXES FOR TRAFFIC SIGNAL INTERCONNECT | | 5.000 | 6,623.75
|
| | 0.000 | 0.00
|
| | |
|
GROUP 8B ELECTRICAL | | Contracted | 913,922.95
|
| | Current | 923,733.21
|
| | In place | 813,652.91
|
| | This Estimate | 231,911.86
|
| | |
|
GROUP 10 GENERAL ITEMS | | |
|
0368 0001.08 | 0.50 | 25,662.000 | 12,831.00
|
BARRICADE, TYPE II | BDAY | 25,662.000 | 12,831.00
|
| | 28,161.000 | 14,080.50
|
| | 686.000 | 343.00
|
| | |
|
0369 0001.10 | 0.80 | 30,352.000 | 24,281.60
|
BARRICADE, TYPE III | BDAY | 30,352.000 | 24,281.60
|
| | 26,403.000 | 21,122.40
|
| | 406.000 | 324.80
|
| | |
|
0370 0001.90 | 0.25 | 20,636.000 | 5,159.00
|
SIGN DAY | EACH | 20,636.000 | 5,159.00
|
| | 17,801.000 | 4,450.25
|
| | 294.000 | 73.50
|
| | |
|
0371 0002.40 | 113.00 | 7.350 | 830.55
|
TEMPORARY SOLID LINES | StaM | 7.350 | 830.55
|
| | 5.676 | 641.39
|
| | 0.000 | 0.00
|
| | |
|
0372 0003.10 | 212.43 | 90.000 | 19,118.70
|
FLAGGING | DAY | 90.000 | 19,118.70
|
| | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0373 0003.51 | 26.21 | 195.000 | 5,110.95
|
INSTALL CONCRETE PROTECTION BARRIER | m | 195.000 | 5,110.95
|
| | 207.300 | 5,433.34
|
| | 0.000 | 0.00
|
| | |
|
0374 0010.04 | 1,242.00 | 1.000 | 1,242.00
|
FIELD OFFICE | EACH | 1.000 | 1,242.00
|
| | 1.000 | 1,242.00
|
| | 0.000 | 0.00
|
| | |
|
0375 0030.00 | 564.00 | 1.000 | 564.00
|
MOBILIZATION | LS | 1.000 | 564.00
|
| | 1.000 | 564.00
|
| | 0.000 | 0.00
|
| | |
|
GROUP 10 GENERAL ITEMS | | Contracted | 69,137.80
|
| | Current | 69,137.80
|
| | In place | 47,533.88
|
| | This Estimate | 741.30
|
| | |
|
Totals for contract | | Contracted | 12,513,198.59
|
---|
| | Current | 12,752,751.60
|
---|
| | In place | 12,475,087.85
|
---|
| | This Estimate | 278,046.80
|
---|