Return to District Map


Nebraska Department of Roads
Estimate Summary to Contractor
Vendor ID:0103 VRANA & SON CONSTRUCTION CO./CHAS.
Contract ID:27201
Estimate Number:0002
Pay Period End Date:01.11.2003
Contract Location:
IN GRETNAEstimate Type:PROG
Contractor:
VRANA & SON CONSTRUCTION CO./CHAS.Date Let:10.10.2002
4816 F STDate Awarded:10.24.2002
Date Contract Executed:11.08.2002
Date Notice to Proceed:11.08.2002
OMAHA NE 68117-1481Date Work Began:12.02.2002
Phone:Date Physical Work Completed:
(402)733-5200Date Accepted:
Escrow Agent:
Surety Co:
HARTFORD FIRE INSURANCE COMPANY
Counties
SARPY
Project Number PCT Fed State Project Number Description
21720 1001  0.000 BRO-TMT-7077(52)  GR CONC PAVE CULV BR GDRL
Total to DatePrev to DateThis Estimate
Current Contract AmtTotal Earnings$64,659.40$64,319.20$340.20
$764,280.93Stockpiled Materials$1,556.62$1,556.62$.00
Original Contract AmtGross Earnings$66,216.02$65,875.82$340.20
$764,280.93Retainage$-646.59$-643.19$-3.40
Escrow Amount$.00$.00$.00
Percent CompleteSecurities Encumbered$.00$.00$.00
8.46%Net Earnings$65,569.43$65,232.63$336.80
Liquidated Damages$.00$.00$.00
Incentives$.00$.00$.00
Disincentives$.00$.00$.00
Other Contract Adj$.00$.00$.00
Appl of Training Adj$.00$.00$.00
Training Rates Adj$.00$.00$.00
Fuel Adj$.00$.00$.00
Bituminous Adj$.00$.00$.00
Autopay Adj$.00$.00$.00
Gasoline Adj$.00$.00$.00
Other Adj$.00$.00$.00
Price Adj$.00$.00$.00
Substandard Item Adj$.00$.00$.00
Asphalt Adj$.00$.00$.00
Diesel Fuel Adj$.00$.00$.00
Petrol Adj$.00$.00$.00
Total for Adjustments$.00$.00$.00
Payment$65,569.43$65,232.63$336.80
Project ManagerDiv. Head/Dist. Eng.
Weander, Marty01.13.2003Lech, Marvin (Marv)01.13.2003
Constr. Estimate Eng.Materials Eng.
Bartos, Steve01.14.2003
Controller Div. Processed
Burling, Laurie01.14.2003
Detailed breakdown of stockpiled materials
Est Nbr:0001
Item NbrItem CdItem DescAdj AmtInvoice Nbr
00554003.00 CAST IRON COVER, FRAME, AND FLANGE
S.P. Initial Payment249.66117008
00564004.50 CAST IRON GRATE AND FRAME
S.P. Initial Payment889.60117008
00574005.00 CAST IRON RING AND COVER
S.P. Initial Payment243.36117008
00594011.68 AREA INLET
S.P. Initial Payment174.00117008
Total for estimate 0001:1,556.62
Total remaining for contract:1,556.62
1. Contracted
2. Current
3. To date
Item Nbr        Item CodeUnit Price4. This Est
Item DescriptionUnitsQtyAmount
GROUP 1 GRADING
0001                          L006.00 330.000.770254.10
COVER CROP SEEDING ha 0.770254.10
0.0000.00
0.0000.00

0002                          L020.00 2.00627.8001,255.60
EROSION CONTROL m2 627.8001,255.60
0.0000.00
0.0000.00

0003                          L022.11 9.5013.700130.15
FABRIC SILT FENCE-LOW POROSITY m 13.700130.15
0.0000.00
0.0000.00

0004                          L022.12 8.00423.8003,390.40
FABRIC SILT FENCE-HIGH POROSITY m 423.8003,390.40
120.000960.00
0.0000.00

0005                          0030.10 11,400.001.00011,400.00
MOBILIZATION LS 1.00011,400.00
0.060684.00
0.0000.00

0006                          1000.00 450.007.0003,150.00
LARGE TREE REMOVAL EACH7.0003,150.00
6.0002,700.00
0.0000.00

0007                          1009.00 13,000.001.00013,000.00
GENERAL CLEARING AND GRUBBING LS 1.00013,000.00
1.00013,000.00
0.0000.00

0008                          1011.00 2.20276.000607.20
WATER kL 276.000607.20
0.0000.00
0.0000.00

0009                          1030.00 7.203,805.00027,396.00
EARTHWORK MEASURED IN EMBANKMENT m3 3,805.00027,396.00
0.0000.00
0.0000.00

0010                          1041.00 0.607,700.0004,620.00
SALVAGING AND PLACING TOPSOIL m2 7,700.0004,620.00
0.0000.00
0.0000.00

0011                          1101.00 5.001,195.8005,979.00
REMOVE PAVEMENT m2 1,195.8005,979.00
147.800739.00
0.0000.00

0012                          1101.25 8.2039.700325.54
SAWING PAVEMENT m 39.700325.54
0.0000.00
0.0000.00

0013                          1102.00 4.50879.1003,955.95
REMOVE ASPHALT SURFACE m2 879.1003,955.95
0.0000.00
0.0000.00

0014                          1106.00 5.00210.7001,053.50
REMOVE DRIVEWAY m2 210.7001,053.50
0.0000.00
0.0000.00

0015                          1107.00 5.00148.200741.00
REMOVE WALK m2 148.200741.00
0.0000.00
0.0000.00

0016                          1116.00 25.003.00075.00
REMOVE GUARD POST EACH3.00075.00
0.0000.00
0.0000.00

0017                          1121.00 140.001.000140.00
REMOVE CONCRETE FLUME EACH1.000140.00
0.0000.00
0.0000.00

0018                          1136.01 3,000.001.0003,000.00
REMOVE EACH1.0003,000.00
FIRE HYDRANT 0.0000.00
0.0000.00

0019                          4102.11 520.0035.66018,543.20
CLASS 47B-20 OR AX-20 CONCRETE FOR RETAINING WALL m3 35.66018,543.20
0.0000.00
0.0000.00

0020                          4152.00 1.252,150.0002,687.50
REINFORCING STEEL FOR RETAINING WALL kg 2,150.0002,687.50
0.0000.00
0.0000.00

0021                          9110.01 110.0010.0001,100.00
RENTAL OF LOADER, FULLY OPERATED HOUR10.0001,100.00
0.0000.00
0.0000.00

0022                          9110.03 60.0010.000600.00
RENTAL OF DUMP TRUCK, FULLY OPERATED HOUR10.000600.00
0.0000.00
0.0000.00

0023                          9110.07 80.0010.000800.00
RENTAL OF SKID LOADER, FULLY OPERATED HOUR10.000800.00
0.0000.00
0.0000.00

GROUP 1 GRADINGContracted104,204.14
Current104,204.14
In place18,083.00
This Estimate0.00

GROUP 3 CONCRETE PAVEMENT
0024                          L001.01 3,200.000.6201,984.00
SEEDING, TYPE A ha 0.6201,984.00
0.0000.00
0.0000.00

0025                          L001.02 3,600.000.150540.00
SEEDING, TYPE B ha 0.150540.00
0.0000.00
0.0000.00

0026                          L010.00 5.50247.4001,360.70
SODDING m2 247.4001,360.70
0.0000.00
0.0000.00

0027                          L032.75 100.002.800280.00
MULCH Mg 2.800280.00
0.0000.00
0.0000.00

0028                          L032.80 500.000.400200.00
HYDROMULCH Mg 0.400200.00
0.0000.00
0.0000.00

0029                          W600.03 120.001.000120.00
ADJUST VALVE BOX TO GRADE EACH1.000120.00
0.0000.00
0.0000.00

0030                          0002.76 0.751,172.000879.00
PERMANENT PAVEMENT MARKING PAINT m 1,172.000879.00
0.0000.00
0.0000.00

0031                          0030.30 5,000.001.0005,000.00
MOBILIZATION LS 1.0005,000.00
0.0000.00
0.0000.00

0032                          2010.03 22.0063.0001,386.00
CRUSHED ROCK SURFACE COURSE Mg 63.0001,386.00
0.0000.00
0.0000.00

0033                          2021.00 95.001.00095.00
MAILBOX POST EACH1.00095.00
0.0000.00
0.0000.00

0034                          3008.05 3.9019.00074.10
TIE BARS EACH19.00074.10
0.0000.00
0.0000.00

0035                          3014.10 51.0092.3004,707.30
COMBINATION CONCRETE CLASS 47B-20 CURB AND GUTTER m 92.3004,707.30
0.0000.00
0.0000.00

0036                          3016.21 27.10348.5009,444.35
CONCRETE CLASS 47B-20 SIDEWALKS m2 348.5009,444.35
0.0000.00
0.0000.00

0037                          3020.26 27.50218.4006,006.00
CONCRETE CLASS 47B-25 DRIVEWAY m2 218.4006,006.00
0.0000.00
0.0000.00

0038                          3020.30 29.3077.0002,256.10
CONCRETE CLASS 47B-25 DRIVEWAY m2 77.0002,256.10
175 mm 0.0000.00
0.0000.00

0039                          3075.12 25.60489.90012,541.44
155 mm CONCRETE PAVEMENT, CLASS 47B-25 m2 489.90012,541.44
0.0000.00
0.0000.00

0040                          3075.42 29.90728.50021,782.15
230 mm CONCRETE PAVEMENT, CLASS 47B-25 m2 728.50021,782.15
0.0000.00
0.0000.00

0041                          4015.00 140.003.000420.00
ADJUST MANHOLE TO GRADE EACH3.000420.00
0.0000.00
0.0000.00

0042                          4024.59 540.001.000540.00
CONCRETE FLUME EACH1.000540.00
0.0000.00
0.0000.00

0043                          9005.35 40.00420.00016,800.00
ASPHALTIC CONCRETE, TYPE SP3(12.5) Mg 420.00016,800.00
0.0000.00
0.0000.00

0044                          9021.01 210.0022.6804,762.80
PERFORMANCE GRADED BINDER (64-22) Mg 22.6804,762.80
0.0000.00
0.0000.00

0045                          9053.00 1.00540.000540.00
TACK COAT L 540.000540.00
0.0000.00
0.0000.00

0046                          9111.00 1.70839.0001,426.30
WATER kL 839.0001,426.30
0.0000.00
0.0000.00

0047                          9170.00 1,300.001.9672,557.10
EARTH SHOULDER CONSTRUCTION StaM1.9672,557.10
0.0000.00
0.0000.00

0048                          9173.20 2.002,570.0005,140.00
SUBGRADE PREPARATION m2 2,570.0005,140.00
0.0000.00
0.0000.00

0049                          9179.34 1.00232.000232.00
COLD MILLING, CLASS 4 m2 232.000232.00
0.0000.00
0.0000.00

GROUP 3 CONCRETE PAVEMENTContracted101,074.34
Current101,074.34
In place0.00
This Estimate0.00

GROUP 4 CULVERTS
0050                          W176.12 125.0031.0003,875.00
50 mm COPPER WATER SERVICE m 31.0003,875.00
0.0000.00
0.0000.00

0051                          W180.66 3,500.001.0003,500.00
WATER METER PIT ASSEMBLY EACH1.0003,500.00
0.0000.00
0.0000.00

0052                          W222.06 4,500.002.0009,000.00
150 mm FIRE HYDRANT EACH2.0009,000.00
0.0000.00
0.0000.00

0053                          0030.40 5,000.001.0005,000.00
MOBILIZATION LS 1.0005,000.00
0.0000.00
0.0000.00

0054                          1117.00 1,150.002.0002,300.00
REMOVE MANHOLE EACH2.0002,300.00
0.0000.00
0.0000.00

0055                          4003.00 3.20114.000364.80
CAST IRON COVER, FRAME, AND FLANGE kg 114.000364.80
0.0000.00
0.0000.00

0056                          4004.50 1.90640.0001,216.00
CAST IRON GRATE AND FRAME kg 640.0001,216.00
0.0000.00
0.0000.00

0057                          4005.00 2.50156.000390.00
CAST IRON RING AND COVER kg 156.000390.00
0.0000.00
0.0000.00

0058                          4011.66 1,710.001.0001,710.00
AREA INLET EACH1.0001,710.00
TYPE 1 AT STA. 2+00.3 - 20.7 m LT. 0.0000.00
0.0000.00

0059                          4011.68 1,600.001.0001,600.00
AREA INLET EACH1.0001,600.00
TYPE II AT STA, 0+07.8 - 7.9 m LT. 0.0000.00
0.0000.00

0060                          4016.00 1,490.001.0001,490.00
MANHOLE EACH1.0001,490.00
AT STA. 1+89.6 - 30.5 m LT. 0.0000.00
0.0000.00

0061                          4020.14 97.0040.4003,918.80
CONCRETE DITCH LINING - 2.4 m m 40.4003,918.80
0.0000.00
0.0000.00

0062                          4040.00 300.001.000300.00
REMOVE HEADWALLS FROM CULVERTS EACH1.000300.00
0.0000.00
0.0000.00

0063                          4105.59 370.009.0403,344.80
CLASS 47B-20 CONCRETE FOR INLET AND JUNCTION BOX m3 9.0403,344.80
0.0000.00
0.0000.00

0064                          4155.50 2.10401.000842.10
REINFORCING STEEL FOR INLET AND JUNCTION BOX kg 401.000842.10
0.0000.00
0.0000.00

0065                          4230.21 150.001.000150.00
BAR GRATE FOR 525 mm CONCRETE FLARED-END SECTION EACH1.000150.00
0.0000.00
0.0000.00

0066                          4460.21 290.001.000290.00
525 mm CONCRETE FLARED-END SECTION EACH1.000290.00
0.0000.00
0.0000.00

0067                          4600.15 72.1038.6002,783.06
375 mm REINFORCED CONCRETE SEWER PIPE m 38.6002,783.06
0.0000.00
0.0000.00

0068                          4600.18 86.9066.0005,735.40
450 mm REINFORCED CONCRETE SEWER PIPE m 66.0005,735.40
0.0000.00
0.0000.00

0069                          4600.21 103.508.100838.35
525 mm REINFORCED CONCRETE SEWER PIPE m 8.100838.35
0.0000.00
0.0000.00

0070                          4766.06 170.0012.7002,159.00
150 mm DUCTILE IRON PIPE m 12.7002,159.00
0.0000.00
0.0000.00

0071                          6105.02 39.0012.000468.00
ROCK RIPRAP, TYPE B Mg 12.000468.00
0.0000.00
0.0000.00

GROUP 4 CULVERTSContracted51,275.31
Current51,275.31
In place0.00
This Estimate0.00

GROUP 6 BRIDGE AT STA. 1+49.964
0072                          0030.60 30,000.001.00030,000.00
MOBILIZATION LS 1.00030,000.00
0.0401,200.00
0.0000.00

0073                          3050.15 245.50121.30029,779.15
CONCRETE FOR PAVEMENT APPROACHES CLASS 47BD-30 m3 121.30029,779.15
0.0000.00
0.0000.00

0074                          3051.10 1.2510,550.00013,187.50
EPOXY COATED REINFORCING STEEL FOR PAVEMENT APPROACHES kg 10,550.00013,187.50
0.0000.00
0.0000.00

0075                          6000.10 1,030.001.0001,030.00
ABUTMENT NO.1 EXCAVATION LS 1.0001,030.00
0.0000.00
0.0000.00

0076                          6000.11 1,030.001.0001,030.00
ABUTMENT NO.2 EXCAVATION LS 1.0001,030.00
0.0000.00
0.0000.00

0077                          6000.20 2,770.001.0002,770.00
PIER NO.1 EXCAVATION LS 1.0002,770.00
0.0000.00
0.0000.00

0078                          6000.21 1,410.001.0001,410.00
PIER NO.2 EXCAVATION LS 1.0001,410.00
0.0000.00
0.0000.00

0079                          6005.83 580.008.0004,640.00
FIXED BEARING EACH8.0004,640.00
0.0000.00
0.0000.00

0080                          6010.22 345.30146.10050,448.33
CLASS 47B-20 CONCRETE FOR BRIDGE m3 146.10050,448.33
0.0000.00
0.0000.00

0081                          6010.26 432.60151.60065,582.16
CLASS 47BD-30 CONCRETE FOR BRIDGE m3 151.60065,582.16
0.0000.00
0.0000.00

0082                          6040.00 44,720.001.00044,720.00
REMOVE STRUCTURE EACH1.00044,720.00
AT STA. 1+53.467 1.00044,720.00
0.0000.00

0083                          6071.11 95,350.001.00095,350.00
STEEL SUPERSTRUCTURE LS 1.00095,350.00
AT STA. 1+49.964 0.0000.00
0.0000.00

0084                          6080.00 21.90160.0003,504.00
STRUCTURAL STEEL FOR SUBSTRUCTURE kg 160.0003,504.00
0.0000.00
0.0000.00

0085                          6107.00 51.10670.00034,237.00
CONCRETE SLOPE PROTECTION m2 670.00034,237.00
0.0000.00
0.0000.00

0086                          6131.50 1.3029,970.00038,961.00
EPOXY COATED REINFORCING STEEL kg 29,970.00038,961.00
0.0000.00
0.0000.00

0087                          6139.50 39.0043.0001,677.00
SUBSURFACE DRAINAGE MATTING m2 43.0001,677.00
0.0000.00
0.0000.00

0088                          6210.12 49.50906.00044,847.00
HP 250 mm X 62 kg STEEL PILING m 906.00044,847.00
0.0000.00
0.0000.00

0089                          6401.00 72.8066.5004,841.20
PEDESTRIAN BARRIER RAIL m 66.5004,841.20
0.0000.00
0.0000.00

0090                          6404.00 160.0061.0009,760.00
PEDESTRIAN RAILING (CHAIN LINK TYPE) m 61.0009,760.00
0.0000.00
0.0000.00

0091                          6610.45 405.0022.0008,910.00
STRIP SEALS m 22.0008,910.00
0.0000.00
0.0000.00

0092                          8091.00 53.20115.0006,118.00
GRANULAR BACKFILL m3 115.0006,118.00
0.0000.00
0.0000.00

GROUP 6 BRIDGE AT STA. 1+49.964Contracted492,802.34
Current492,802.34
In place45,920.00
This Estimate0.00

GROUP 7 GUARDRAIL
0093                          0030.70 100.001.000100.00
MOBILIZATION LS 1.000100.00
0.0000.00
0.0000.00

0094                          7020.00 3,200.001.0003,200.00
BRIDGE APPROACH SECTIONS EACH1.0003,200.00
0.0000.00
0.0000.00

0095                          7021.45 1,050.001.0001,050.00
BREAKAWAY CABLE TERMINAL EACH1.0001,050.00
0.0000.00
0.0000.00

GROUP 7 GUARDRAILContracted4,350.00
Current4,350.00
In place0.00
This Estimate0.00

GROUP 10 GENERAL ITEMS
0096                          0001.10 2.002,672.0005,344.00
BARRICADE, TYPE III BDAY2,672.0005,344.00
324.000648.00
168.000336.00

0097                          0001.90 0.301,336.000400.80
SIGN DAY EACH1,336.000400.80
28.0008.40
14.0004.20

0098                          0010.04 2,830.001.0002,830.00
FIELD OFFICE EACH1.0002,830.00
0.0000.00
0.0000.00

0099                          0030.00 2,000.001.0002,000.00
MOBILIZATION LS 1.0002,000.00
0.0000.00
0.0000.00

GROUP 10 GENERAL ITEMSContracted10,574.80
Current10,574.80
In place656.40
This Estimate340.20

Totals for contractContracted764,280.93
Current764,280.93
In place64,659.40
This Estimate340.20