Nebraska Department of Roads | |
---|---|
Estimate Summary to Contractor | |
Vendor ID: | 2122 WATTS ELECTRIC COMPANY |
Contract ID: | 2029X |
Estimate Number: | 0002 |
Pay Period End Date: | 02.06.2002 |
Contract Location: | ||
JCT N-50/N-1 | Estimate Type: | FINL |
Contractor: | ||
WATTS ELECTRIC COMPANY | Date Let: | 08.31.2000 |
330 N STATE ST | Date Awarded: | 09.07.2000 |
PO BOX 196 | Date Contract Executed: | 09.19.2000 |
Date Notice to Proceed: | 09.19.2000 | |
OSCEOLA NE 68651-0196 | Date Work Began: | 12.10.2001 |
Phone: | Date Physical Work Completed: | |
(402)747-8201 | Date Accepted: | |
Escrow Agent: | ||
Surety Co: | ||
MERCHANTS BONDING COMPANY (MUTUAL) |
Counties |
---|
CASS |
Project Number |   | PCT |   | Fed State Project Number |   | Description | |
---|---|---|---|---|---|---|---|
22029 000 |   | 0.000 |   | ELEC-50-2(1019) |   | ELECTRICAL |
Total to Date | Prev to Date | This Estimate | ||
Current Contract Amt | Total Earnings | $17,964.00 | $17,964.00 | $.00 |
$17,482.50 | Stockpiled Materials | $.00 | $.00 | $.00 |
Original Contract Amt | Gross Earnings | $17,964.00 | $17,964.00 | $.00 |
$11,647.50 | Retainage | $.00 | $-179.64 | $179.64 |
Escrow Amount | $.00 | $.00 | $.00 | |
Percent Complete | Securities Encumbered | $.00 | $.00 | $.00 |
102.75% | Net Earnings | $17,964.00 | $17,784.36 | $179.64 |
Liquidated Damages | $.00 | $.00 | $.00 | |
Incentives | $.00 | $.00 | $.00 | |
Disincentives | $.00 | $.00 | $.00 | |
Other Contract Adj | $.00 | $.00 | $.00 | |
Appl of Training Adj | $.00 | $.00 | $.00 | |
Training Rates Adj | $.00 | $.00 | $.00 | |
Fuel Adj | $.00 | $.00 | $.00 | |
Bituminous Adj | $.00 | $.00 | $.00 | |
Autopay Adj | $.00 | $.00 | $.00 | |
Gasoline Adj | $.00 | $.00 | $.00 | |
Other Adj | $.00 | $.00 | $.00 | |
Price Adj | $.00 | $.00 | $.00 | |
Substandard Item Adj | $.00 | $.00 | $.00 | |
Asphalt Adj | $.00 | $.00 | $.00 | |
Diesel Fuel Adj | $.00 | $.00 | $.00 | |
Petrol Adj | $.00 | $.00 | $.00 | |
Total for Adjustments | $.00 | $.00 | $.00 | |
Payment | $17,964.00 | $17,784.36 | $179.64 | |
Project Manager | Div. Head/Dist. Eng. | |||
Zelensky, Rich | 02.06.2002 | Lech, Marvin (Marv) | 02.06.2002 | |
Constr. Estimate Eng. | Materials Eng. | |||
Davis, Carl | 03.21.2002 | Hall, David | 03.21.2002 | |
Controller Div. Processed | ||||
Harring, Joyce | 04.24.2002 |
Detailed breakdown of stockpiled materials | ||||
---|---|---|---|---|
Total remaining for contract: | 0.00 |
1. Contracted | |||
---|---|---|---|
2. Current | |||
3. To date | |||
Item Nbr Item Code | Unit Price | 4. This Est | |
Item Description | Units | Qty | Amount |
GROUP 8B ELECTRICAL | |||
0001 A009.16 | 1,850.00 | 4.000 | 7,400.00 |
STREET LIGHTING UNIT, TYPE SL-BT-40-12-0.20 | EACH | 4.000 | 7,400.00 |
4.000 | 7,400.00 | ||
0.000 | 0.00 | ||
0002 A070.10 | 2.50 | 395.000 | 987.50 |
1 1/2-INCH CONDUIT IN TRENCH | LF | 395.000 | 987.50 |
502.000 | 1,255.00 | ||
0.000 | 0.00 | ||
0003 A074.12 | 14.00 | 115.000 | 1,610.00 |
1 1/2-INCH CONDUIT, JACKED | LF | 115.000 | 1,610.00 |
115.000 | 1,610.00 | ||
0.000 | 0.00 | ||
0004 A080.22 | 0.60 | 510.000 | 306.00 |
STREET LIGHTING CABLE, NO. 6 BARE | LF | 510.000 | 306.00 |
617.000 | 370.20 | ||
0.000 | 0.00 | ||
0005 A080.24 | 0.70 | 1,020.000 | 714.00 |
STREET LIGHTING CABLE, NO. 6 USE | LF | 1,020.000 | 714.00 |
1,234.000 | 863.80 | ||
0.000 | 0.00 | ||
0006 0001.90 | 1.50 | 20.000 | 30.00 |
SIGN DAY | EACH | 20.000 | 30.00 |
20.000 | 30.00 | ||
0.000 | 0.00 | ||
0007 0030.81 | 600.00 | 1.000 | 600.00 |
MOBILIZATION | LS | 1.000 | 600.00 |
1.000 | 600.00 | ||
0.000 | 0.00 | ||
4001 A005.90 | 860.00 | 0.000 | 0.00 |
TRAFFIC SIGNAL CONTROLLER | EACH | 1.000 | 860.00 |
traffic signal controller type flasher | 1.000 | 860.00 | |
0.000 | 0.00 | ||
4002 A004.30 | 1,785.00 | 0.000 | 0.00 |
TRAFFIC SIGNAL, TYPE TS-4 | EACH | 1.000 | 1,785.00 |
1.000 | 1,785.00 | ||
0.000 | 0.00 | ||
4003 A014.50 | 1,595.00 | 0.000 | 0.00 |
WOOD POLE | EACH | 2.000 | 3,190.00 |
2.000 | 3,190.00 | ||
0.000 | 0.00 | ||
GROUP 8B ELECTRICAL | Contracted | 11,647.50 | |
Current | 17,482.50 | ||
In place | 17,964.00 | ||
This Estimate | 0.00 | ||
Totals for contract | Contracted | 11,647.50 | |
Current | 17,482.50 | ||
In place | 17,964.00 | ||
This Estimate | 0.00 |