Return to District Map


Nebraska Department of Roads
Estimate Summary to Contractor
Vendor ID:0574 CONSTRUCTORS, INC.
Contract ID:1993X
Estimate Number:0005
Pay Period End Date:11.16.2002
Contract Location:
BLUESTEM LAKE INTERIOR REC ROADEstimate Type:PROG
Contractor:
CONSTRUCTORS, INC.Date Let:12.06.2001
1815 Y STREETDate Awarded:12.18.2001
PO BOX 80268Date Contract Executed:12.26.2001
Date Notice to Proceed:12.26.2001
LINCOLN NE 68501Date Work Began:08.26.2002
Phone:Date Physical Work Completed:
(402)434-1764Date Accepted:
Escrow Agent:
Surety Co:
UNIVERSAL SURETY COMPANY
Counties
LANCASTER
Project Number PCT Fed State Project Number Description
11993 000  0.000 SRR-55(106)  BITUMINOUS
12358 000  0.000 RD-S55B(1012)  BITUMINOUS
Total to DatePrev to DateThis Estimate
Current Contract AmtTotal Earnings$302,014.25$274,024.14$27,990.11
$333,760.28Stockpiled Materials$.00$.00$.00
Original Contract AmtGross Earnings$302,014.25$274,024.14$27,990.11
$333,760.28Retainage$-3,020.14$-2,740.24$-279.90
Escrow Amount$.00$.00$.00
Percent CompleteSecurities Encumbered$.00$.00$.00
90.49%Net Earnings$298,994.11$271,283.90$27,710.21
Liquidated Damages$.00$.00$.00
Incentives$.00$.00$.00
Disincentives$.00$.00$.00
Other Contract Adj$.00$.00$.00
Appl of Training Adj$.00$.00$.00
Training Rates Adj$.00$.00$.00
Fuel Adj$.00$.00$.00
Bituminous Adj$.00$.00$.00
Autopay Adj$.00$.00$.00
Gasoline Adj$.00$.00$.00
Other Adj$.00$.00$.00
Price Adj$.00$.00$.00
Substandard Item Adj$.00$.00$.00
Asphalt Adj$.00$.00$.00
Diesel Fuel Adj$.00$.00$.00
Petrol Adj$.00$.00$.00
Total for Adjustments$.00$.00$.00
Payment$298,994.11$271,283.90$27,710.21
Project ManagerDiv. Head/Dist. Eng.
Traudt, Bob11.18.2002Sklenar, Michael J11.18.2002
Constr. Estimate Eng.Materials Eng.
Bartos, Steve11.18.2002
Controller Div. Processed
Burling, Laurie11.18.2002
Detailed breakdown of stockpiled materials
Total remaining for contract:0.00
1. Contracted
2. Current
3. To date
Item Nbr        Item CodeUnit Price4. This Est
Item DescriptionUnitsQtyAmount
GROUP 9 BITUMINOUS
0005                          0001.10 1.1520.00023.00
BARRICADE, TYPE III BDAY20.00023.00
72.00082.80
0.0000.00

0007                          0001.75 5.8530.000175.50
TEMPORARY SIGN DAY EACH30.000175.50
0.0000.00
0.0000.00

0008                          0001.90 0.3090.00027.00
SIGN DAY EACH90.00027.00
180.00054.00
0.0000.00

0011                          0003.10 180.006.0001,080.00
FLAGGING DAY 6.0001,080.00
0.50090.00
0.0000.00

0013                          0010.04 500.000.500250.00
FIELD OFFICE EACH0.500250.00
0.0000.00
0.0000.00

0014                          0030.90 1,418.971.0001,418.97
MOBILIZATION LS 1.0001,418.97
1.0001,418.97
0.0000.00

0025                          9005.00 52.0050.0002,600.00
ASPHALTIC CONCRETE FOR PATCHING, TYPE TON 50.0002,600.00
SPL 14.260741.52
0.0000.00

0027                          9005.24 21.001,190.00024,990.00
ASPHALTIC CONCRETE, TYPE SPL TON 1,190.00024,990.00
1,262.44026,511.24
0.0000.00

0029                          9009.00 3.50442.0001,547.00
PLACEMENT OF ASPHALTIC CONCRETE FOR DRIVEWAYS ANDINTERSECTIONS SY 442.0001,547.00
422.0001,477.00
0.0000.00

0030                          9021.01 146.0066.9609,776.16
PERFORMANCE GRADED BINDER (64-22) TON 66.9609,776.16
31.0594,534.61
0.0000.00

0031                          9053.00 0.851,150.000977.50
TACK COAT GAL 1,150.000977.50
900.000765.00
0.0000.00

0032                          9110.01 55.0010.000550.00
RENTAL OF LOADER, FULLY OPERATED HOUR10.000550.00
0.0000.00
0.0000.00

0033                          9110.02 65.0010.000650.00
RENTAL OF MOTOR GRADER, FULLY OPERATED HOUR10.000650.00
0.0000.00
0.0000.00

0034                          9110.03 45.0010.000450.00
RENTAL OF DUMP TRUCK, FULLY OPERATED HOUR10.000450.00
2.00090.00
0.0000.00

0035                          9110.07 40.0010.000400.00
RENTAL OF SKID LOADER, FULLY OPERATED HOUR10.000400.00
3.000120.00
0.0000.00

0036                          9111.00 8.0012.00096.00
WATER MGAL12.00096.00
0.0000.00
0.0000.00

0037                          9170.00 55.0047.2602,599.30
EARTH SHOULDER CONSTRUCTION STA 47.2602,599.30
47.2602,599.30
0.0000.00

0001                          L001.02 875.003.4002,975.00
SEEDING, TYPE B ACRE3.4002,975.00
4.7604,165.00
4.7604,165.00

0002                          L020.00 1.503,346.0005,019.00
EROSION CONTROL SY 3,346.0005,019.00
5,338.6108,007.92
5,338.6108,007.92

0003                          L032.75 78.008.000624.00
MULCH TON 8.000624.00
9.520742.56
9.520742.56

0004                          0001.08 0.505,320.0002,660.00
BARRICADE, TYPE II BDAY5,320.0002,660.00
3,530.0001,765.00
0.0000.00

0005                          0001.10 1.15132.000151.80
BARRICADE, TYPE III BDAY132.000151.80
1,436.0001,651.40
80.00092.00

0006                          0001.30 1.15132.000151.80
TYPE B HIGH INTENSITY WARNING LIGHT LDAY132.000151.80
0.0000.00
0.0000.00

0007                          0001.75 5.85150.000877.50
TEMPORARY SIGN DAY EACH150.000877.50
122.000713.70
0.0000.00

0008                          0001.90 0.301,316.000394.80
SIGN DAY EACH1,316.000394.80
2,175.000652.50
325.00097.50

0009                          0002.55 8.00272.0002,176.00
OVERLAY BROKEN LINES STA 272.0002,176.00
277.3602,218.88
0.0000.00

0010                          0002.60 8.00544.0004,352.00
OVERLAY SOLID LINES STA 544.0004,352.00
554.7204,437.76
0.0000.00

0011                          0003.10 180.0030.0005,400.00
FLAGGING DAY 30.0005,400.00
40.0007,200.00
0.0000.00

0012                          0003.20 215.0015.0003,225.00
FURNISHING AND OPERATING PILOT VEHICLE DAY 15.0003,225.00
1.000215.00
0.0000.00

0013                          0010.04 500.000.500250.00
FIELD OFFICE EACH0.500250.00
0.0000.00
0.0000.00

0014                          0030.90 6,581.031.0006,581.03
MOBILIZATION LS 1.0006,581.03
1.0006,581.03
0.0000.00

0015                          1009.00 550.001.000550.00
GENERAL CLEARING AND GRUBBING LS 1.000550.00
1.000550.00
0.0000.00

0016                          1033.00 885.0015.32013,558.20
ROADWAY GRADING STA 15.32013,558.20
15.32013,558.20
0.0000.00

0017                          2010.03 25.5070.0001,785.00
CRUSHED ROCK SURFACE COURSE TON 70.0001,785.00
67.5301,722.02
0.0000.00

0018                          2021.00 55.007.000385.00
MAILBOX POST EACH7.000385.00
7.000385.00
7.000385.00

0019                          7001.50 365.003.0001,095.00
CULVERT MOUNTED GUARDRAIL POST EACH3.0001,095.00
3.0001,095.00
3.0001,095.00

0020                          7011.20 13.50650.0008,775.00
W-BEAM GUARDRAIL LF 650.0008,775.00
650.0008,775.01
118.7501,603.13

0021                          7015.00 7.25352.0002,552.00
CABLE GUARDRAIL LF 352.0002,552.00
352.0002,552.00
352.0002,552.00

0022                          7017.00 2.25995.0002,238.75
REMOVE GUARDRAIL LF 995.0002,238.75
1,024.0002,304.00
0.0000.00

0023                          7023.00 1,275.004.0005,100.00
TERMINAL ANCHORAGE SECTIONS EACH4.0005,100.00
4.0005,100.00
4.0005,100.00

0024                          7024.27 1,775.0012.00021,300.00
GUARDRAIL END TREATMENT, TYPE II EACH12.00021,300.00
12.00021,300.00
2.0003,550.00

0026                          9005.01 52.00100.0005,200.00
ASPHALTIC CONCRETE FOR PATCHING, TYPE TON 100.0005,200.00
SP1(0.5) 16.160840.32
0.0000.00

0028                          9005.25 20.005,030.000100,600.00
ASPHALTIC CONCRETE, TYPE SP1(0.5) TON 5,030.000100,600.00
4,864.11097,282.20
0.0000.00

0029                          9009.00 3.501,287.0004,504.50
PLACEMENT OF ASPHALTIC CONCRETE FOR DRIVEWAYS ANDINTERSECTIONS SY 1,287.0004,504.50
1,188.0004,158.00
0.0000.00

0030                          9021.01 146.00277.02040,444.92
PERFORMANCE GRADED BINDER (64-22) TON 277.02040,444.92
163.91523,931.59
0.0000.00

0031                          9053.00 0.854,890.0004,156.50
TACK COAT GAL 4,890.0004,156.50
4,975.0004,228.75
0.0000.00

0032                          9110.01 55.0010.000550.00
RENTAL OF LOADER, FULLY OPERATED HOUR10.000550.00
0.0000.00
0.0000.00

0033                          9110.02 65.0010.000650.00
RENTAL OF MOTOR GRADER, FULLY OPERATED HOUR10.000650.00
0.0000.00
0.0000.00

0034                          9110.03 45.0010.000450.00
RENTAL OF DUMP TRUCK, FULLY OPERATED HOUR10.000450.00
0.0000.00
0.0000.00

0035                          9110.07 40.0010.000400.00
RENTAL OF SKID LOADER, FULLY OPERATED HOUR10.000400.00
3.000120.00
0.0000.00

0036                          9111.00 8.0046.000368.00
WATER MGAL46.000368.00
0.0000.00
0.0000.00

0037                          9170.00 55.00185.34010,193.70
EARTH SHOULDER CONSTRUCTION STA 185.34010,193.70
185.34010,193.70
0.0000.00

0038                          9179.21 155.0092.67014,363.85
COLD MILLING, CLASS 1 STA 92.67014,363.85
92.67014,363.85
0.0000.00

0039                          9188.50 11.75978.00011,491.50
SURFACING UNDER GUARDRAIL SY 978.00011,491.50
1,031.44012,119.42
0.0000.00

0040                          9300.50 600.001.000600.00
ASPHALT PAVEMENT SMOOTHNESS TESTING LS 1.000600.00
1.000600.00
1.000600.00

GROUP 9 BITUMINOUSContracted333,760.28
Current333,760.28
In place302,014.25
This Estimate27,990.11

Totals for contractContracted333,760.28
Current333,760.28
In place302,014.25
This Estimate27,990.11