| | | 1. Contracted
|
|---|
| | | 2. Current
|
|---|
| | | 3. To date
|
|---|
| Item Nbr Item Code | Unit Price | | 4. This Est
|
|---|
| Item Description | Units | Qty | Amount
|
|---|
| GROUP 1 GRADING | | |
|
| 0001 L006.00 | 130.00 | 7.700 | 1,001.00
|
| COVER CROP SEEDING | ha | 7.700 | 1,001.00
|
| | | 7.700 | 1,001.00
|
| | 0.000 | 0.00
|
| | |
|
| 0002 L020.00 | 1.60 | 1,542.000 | 2,467.20
|
| EROSION CONTROL | m2 | 1,542.000 | 2,467.20
|
| | | 2,040.300 | 3,264.48
|
| | 0.000 | 0.00
|
| | |
|
| 0003 L020.01 | 6.20 | 2,266.500 | 14,052.30
|
| EROSION CONTROL, TYPE A | m2 | 2,266.500 | 14,052.30
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 0004 L020.09 | 12.00 | 348.400 | 4,180.80
|
| EROSION CONTROL, TYPE AAA | m2 | 348.400 | 4,180.80
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 0005 L020.10 | 1.70 | 8,773.300 | 14,914.61
|
| EROSION CONTROL, TYPE HV | m2 | 8,773.300 | 14,914.61
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 0006 L021.01 | 14.50 | 168.000 | 2,436.00
|
| EROSION CHECKS, TYPE A | BALE | 168.000 | 2,436.00
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 0007 L021.06 | 13.50 | 385.000 | 5,197.50
|
| EROSION CHECKS, TYPE HV | BALE | 385.000 | 5,197.50
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 0008 L021.15 | 18.00 | 84.000 | 1,512.00
|
| EROSION CHECKS, TYPE ST-HV | BALE | 84.000 | 1,512.00
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 0009 L022.11 | 7.00 | 388.500 | 2,719.50
|
| FABRIC SILT FENCE-LOW POROSITY | m | 388.500 | 2,719.50
|
| | | 745.200 | 5,216.40
|
| | 0.000 | 0.00
|
| | |
|
| 0010 L022.12 | 8.00 | 163.500 | 1,308.00
|
| FABRIC SILT FENCE-HIGH POROSITY | m | 163.500 | 1,308.00
|
| | | 180.100 | 1,440.80
|
| | 0.000 | 0.00
|
| | |
|
| 0011 0030.10 | 5,000.00 | 1.000 | 5,000.00
|
| MOBILIZATION | LS | 1.000 | 5,000.00
|
| | | 1.000 | 5,000.00
|
| | 0.000 | 0.00
|
| | |
|
| 0012 1009.00 | 6,000.00 | 1.000 | 6,000.00
|
| GENERAL CLEARING AND GRUBBING | LS | 1.000 | 6,000.00
|
| | | 1.000 | 6,000.00
|
| | 0.000 | 0.00
|
| | |
|
| 0013 1010.00 | 2.40 | 36,749.000 | 88,197.60
|
| EXCAVATION | m3 | 36,749.000 | 88,197.60
|
| | | 36,913.250 | 88,591.80
|
| | 164.250 | 394.20
|
| | |
|
| 0014 1011.00 | 3.00 | 920.000 | 2,760.00
|
| WATER | kL | 920.000 | 2,760.00
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 0015 1012.00 | 62.00 | 48.000 | 2,976.00
|
| RIGHT-OF-WAY MARKERS | EACH | 48.000 | 2,976.00
|
| | | 48.000 | 2,976.00
|
| | 0.000 | 0.00
|
| | |
|
| 0016 1043.50 | 1.90 | 3,456.000 | 6,566.40
|
| RIPRAP FILTER FABRIC | m2 | 3,456.000 | 6,566.40
|
| | | 3,737.405 | 7,101.07
|
| | 0.000 | 0.00
|
| | |
|
| 0017 1060.03 | 400.00 | 3.000 | 1,200.00
|
| GABION, TYPE C | EACH | 3.000 | 1,200.00
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 0018 1060.06 | 250.00 | 3.000 | 750.00
|
| GABION, TYPE F | EACH | 3.000 | 750.00
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 0019 1101.00 | 3.70 | 8,439.000 | 31,224.30
|
| REMOVE PAVEMENT | m2 | 8,439.000 | 31,224.30
|
| | | 8,052.033 | 29,792.52
|
| | 0.000 | 0.00
|
| | |
|
| 0020 1102.00 | 3.10 | 43.000 | 133.30
|
| REMOVE ASPHALT SURFACE | m2 | 343.000 | 1,063.30
|
| | | 122.434 | 379.55
|
| | 0.000 | 0.00
|
| | |
|
| 0021 1143.00 | 3.10 | 41.000 | 127.10
|
| REMOVE DRIVEWAY CULVERT PIPE | m | 41.000 | 127.10
|
| | | 41.000 | 127.10
|
| | 0.000 | 0.00
|
| | |
|
| 0022 1405.00 | 19.00 | 41.000 | 779.00
|
| RELAYING DRIVEWAY CULVERT PIPE | m | 34.000 | 646.00
|
| | | 34.000 | 646.00
|
| | 0.000 | 0.00
|
| | |
|
| 0023 1701.24 | 55.00 | 139.800 | 7,689.00
|
| 600 mm DRIVEWAY CULVERT PIPE, TYPE 2,3,4,5,6,7 OR 8 | m | 139.800 | 7,689.00
|
| | | 137.500 | 7,562.50
|
| | 0.000 | 0.00
|
| | |
|
| 0024 1701.48 | 64.00 | 33.000 | 2,112.00
|
| 1200 mm DRIVEWAY CULVERT PIPE, TYPE 2,3,4,5,6,7 OR 8 | m | 33.000 | 2,112.00
|
| | | 33.000 | 2,112.00
|
| | 0.000 | 0.00
|
| | |
|
| 0025 6105.02 | 23.00 | 3,324.000 | 76,452.00
|
| ROCK RIPRAP, TYPE B | Mg | 3,324.000 | 76,452.00
|
| | | 3,279.284 | 75,423.53
|
| | 0.053 | 1.22
|
| | |
|
| 4014 2011.05 | 24.31 | 0.000 | 0.00
|
| CRUSHED ROCK FOR TEMPORARY SURFACING | Mg | 250.000 | 6,077.50
|
| | | 341.774 | 8,308.52
|
| | 0.534 | 12.98
|
| | |
|
| 4016 0095.00 | 669.38 | 0.000 | 0.00
|
| ADDITIONAL FREIGHT | LS | 1.000 | 669.38
|
| FOR ADDITIONAL DRIVEWAY CULVERT PIPES | | 1.000 | 669.38
|
| | 0.000 | 0.00
|
| | |
|
| 4017 1705.48 | 44.80 | 0.000 | 0.00
|
| 1200 mm ROUND EQUIVALENT DRIVEWAY CULVERT PIPE,TYPE 2,3,4 OR 5 | m | 34.000 | 1,523.20
|
| STA. 39+40 RT | | 34.000 | 1,523.20
|
| | 0.000 | 0.00
|
| | |
|
| GROUP 1 GRADING | | Contracted | 281,755.61
|
| | Current | 290,822.69
|
| | In place | 247,135.85
|
| | This Estimate | 408.40
|
| | |
|
| GROUP 4 CULVERTS | | |
|
| 0026 P127.48 | 454.00 | 107.500 | 48,805.00
|
| 1200 mm ROUND EQUIVALENT CULVERT PIPE, TYPE 2 | m | 107.500 | 48,805.00
|
| | | 107.500 | 48,805.00
|
| | 0.000 | 0.00
|
| | |
|
| 0027 P140.36 | 135.00 | 22.100 | 2,983.50
|
| 900 mm CULVERT PIPE, TYPE 4 | m | 22.100 | 2,983.50
|
| | | 22.100 | 2,983.50
|
| | 0.000 | 0.00
|
| | |
|
| 0028 P300.18 | 83.00 | 28.100 | 2,332.30
|
| 450 mm CULVERT PIPE, TYPE 3,4 OR 5 | m | 21.100 | 1,751.30
|
| | | 18.800 | 1,560.40
|
| | 0.000 | 0.00
|
| | |
|
| 0029 P300.24 | 89.00 | 24.900 | 2,216.10
|
| 600 mm CULVERT PIPE, TYPE 3,4 OR 5 | m | 31.900 | 2,839.10
|
| | | 33.100 | 2,945.90
|
| | 0.000 | 0.00
|
| | |
|
| 0030 P300.48 | 150.00 | 9.700 | 1,455.00
|
| 1200 mm CULVERT PIPE, TYPE 3,4 OR 5 | m | 9.700 | 1,455.00
|
| | | 9.700 | 1,455.00
|
| | 0.000 | 0.00
|
| | |
|
| 0031 P500.24 | 100.00 | 20.000 | 2,000.00
|
| 600 mm CULVERT PIPE, TYPE 2,4,5,7 OR 8 | m | 20.000 | 2,000.00
|
| | | 20.000 | 2,000.00
|
| | 0.000 | 0.00
|
| | |
|
| 0032 0030.40 | 9,000.00 | 1.000 | 9,000.00
|
| MOBILIZATION | LS | 1.000 | 9,000.00
|
| | | 1.000 | 9,000.00
|
| | 0.000 | 0.00
|
| | |
|
| 0033 4004.50 | 2.20 | 290.000 | 638.00
|
| CAST IRON GRATE AND FRAME | kg | 501.000 | 1,102.20
|
| | | 501.000 | 1,102.20
|
| | 0.000 | 0.00
|
| | |
|
| 0034 4035.00 | 100.00 | 6.000 | 600.00
|
| REMOVE FLARED-END SECTION | EACH | 6.000 | 600.00
|
| | | 6.000 | 600.00
|
| | 0.000 | 0.00
|
| | |
|
| 0035 4040.00 | 150.00 | 2.000 | 300.00
|
| REMOVE HEADWALLS FROM CULVERTS | EACH | 2.000 | 300.00
|
| | | 2.000 | 300.00
|
| | 0.000 | 0.00
|
| | |
|
| 0036 4044.00 | 2,000.00 | 1.000 | 2,000.00
|
| PREPARATION OF STRUCTURE | EACH | 1.000 | 2,000.00
|
| AT STA. 20+54.11 | | 1.000 | 2,000.00
|
| | 0.000 | 0.00
|
| | |
|
| 0037 4044.01 | 2,000.00 | 1.000 | 2,000.00
|
| PREPARATION OF STRUCTURE | EACH | 1.000 | 2,000.00
|
| AT STA. 23+25.78 | | 1.000 | 2,000.00
|
| | 0.000 | 0.00
|
| | |
|
| 0038 4050.01 | 58.00 | 232.000 | 13,456.00
|
| EXCAVATION FOR PIPE, PIPE-ARCH CULVERTS, AND HEADWALLS | m3 | 228.600 | 13,258.80
|
| | | 228.600 | 13,258.80
|
| | 0.000 | 0.00
|
| | |
|
| 0039 4051.01 | 51.00 | 165.000 | 8,415.00
|
| EXCAVATION FOR BOX CULVERTS | m3 | 194.781 | 9,933.83
|
| | | 194.781 | 9,933.83
|
| | 0.000 | 0.00
|
| | |
|
| 0040 4100.06 | 800.00 | 6.760 | 5,408.00
|
| CLASS 47B-20 OR AX-20 CONCRETE FOR HEADWALL | m3 | 6.760 | 5,408.00
|
| | | 8.860 | 7,088.00
|
| | 0.000 | 0.00
|
| | |
|
| 0041 4101.06 | 430.00 | 81.810 | 35,178.30
|
| CLASS 47B-20 OR AX-20 CONCRETE FOR BOX CULVERT | m3 | 88.992 | 38,266.56
|
| | | 88.922 | 38,236.46
|
| | 0.000 | 0.00
|
| | |
|
| 0042 4105.59 | 800.00 | 1.530 | 1,224.00
|
| CLASS 47B-20 CONCRETE FOR INLET AND JUNCTION BOX | m3 | 2.100 | 1,680.00
|
| | | 2.100 | 1,680.00
|
| | 0.000 | 0.00
|
| | |
|
| 0043 4107.07 | 430.00 | 0.830 | 356.90
|
| CLASS 47B-20 OR AX-20 CONCRETE FOR CONCRETE COLLARS | m3 | 1.500 | 645.00
|
| | | 1.500 | 645.00
|
| | 0.000 | 0.00
|
| | |
|
| 0044 4150.00 | 2.20 | 563.000 | 1,238.60
|
| REINFORCING STEEL FOR HEADWALL | kg | 563.000 | 1,238.60
|
| | | 743.000 | 1,634.60
|
| | 0.000 | 0.00
|
| | |
|
| 0045 4151.00 | 1.30 | 4,075.000 | 5,297.50
|
| REINFORCING STEEL FOR BOX CULVERT | kg | 4,391.997 | 5,709.60
|
| | | 4,391.997 | 5,709.60
|
| | 0.000 | 0.00
|
| | |
|
| 0046 4155.50 | 2.20 | 49.000 | 107.80
|
| REINFORCING STEEL FOR INLET AND JUNCTION BOX | kg | 70.000 | 154.00
|
| | | 70.000 | 154.00
|
| | 0.000 | 0.00
|
| | |
|
| 0047 4157.00 | 2.20 | 27.000 | 59.40
|
| REINFORCING STEEL FOR COLLARS | kg | 73.000 | 160.60
|
| | | 73.000 | 160.60
|
| | 0.000 | 0.00
|
| | |
|
| 0048 4310.18 | 130.00 | 2.000 | 260.00
|
| 450 mm FLARED-END SECTION | EACH | 2.000 | 260.00
|
| | | 2.000 | 260.00
|
| | 0.000 | 0.00
|
| | |
|
| 0049 4310.24 | 160.00 | 4.000 | 640.00
|
| 600 mm FLARED-END SECTION | EACH | 4.000 | 640.00
|
| | | 4.000 | 640.00
|
| | 0.000 | 0.00
|
| | |
|
| 0050 4310.48 | 900.00 | 2.000 | 1,800.00
|
| 1200 mm FLARED-END SECTION | EACH | 2.000 | 1,800.00
|
| | | 2.000 | 1,800.00
|
| | 0.000 | 0.00
|
| | |
|
| 0051 4764.54 | 16.00 | 1.000 | 16.00
|
| 100 mm PERFORATED P.V.C. PIPE UNDERDRAIN | m | 1.000 | 16.00
|
| | | 1.000 | 16.00
|
| | 0.000 | 0.00
|
| | |
|
| 4003 3008.05 | 6.30 | 0.000 | 0.00
|
| TIE BARS | EACH | 94.000 | 592.20
|
| BOX FLOOR STA. 20+54.11 | | 94.000 | 592.20
|
| | 0.000 | 0.00
|
| | |
|
| 4004 4976.05 | 1,260.00 | 0.000 | 0.00
|
| ADDITIONAL WORK | LS | 1.000 | 1,260.00
|
| BOX CULVERT CAP STA. 20+54.11 LT | | 1.000 | 1,260.00
|
| | 0.000 | 0.00
|
| | |
|
| 4005 6105.02 | 42.00 | 0.000 | 0.00
|
| ROCK RIPRAP, TYPE B | Mg | 24.000 | 1,008.00
|
| | | 26.607 | 1,117.49
|
| | 0.000 | 0.00
|
| | |
|
| 4006 1043.50 | 3.00 | 0.000 | 0.00
|
| RIPRAP FILTER FABRIC | m2 | 33.000 | 99.00
|
| | | 24.000 | 72.00
|
| | 0.000 | 0.00
|
| | |
|
| 4018 P120.18 | 92.40 | 0.000 | 0.00
|
| 450 mm CULVERT PIPE, TYPE 2 | m | 3.000 | 277.20
|
| STA. 46+95, 10.3M LT TO 7.3M LT | | 3.000 | 277.20
|
| | 0.000 | 0.00
|
| | |
|
| 4019 4977.00 | 234.30 | 0.000 | 0.00
|
| DELIVERED NOT USED | EACH | 1.000 | 234.30
|
| 450 mm x 5.0 m CMP STA. 46+96 TO 47+01.24 | | 1.000 | 234.30
|
| | 0.000 | 0.00
|
| | |
|
| 6001 4051.12 | 43.00 | 0.000 | 0.00
|
| GRANULAR MATERIAL FOR FOUNDATION OF BOX CULVERT | m3 | 22.458 | 965.69
|
| BOX FLOOR STA. 20+54.11 | | 22.458 | 965.69
|
| | 0.000 | 0.00
|
| | |
|
| GROUP 4 CULVERTS | | Contracted | 147,787.40
|
| | Current | 158,443.48
|
| | In place | 160,487.77
|
| | This Estimate | 0.00
|
| | |
|
| GROUP 5 SEEDING | | |
|
| 0052 L001.01 | 1,400.00 | 5.500 | 7,700.00
|
| SEEDING, TYPE A | ha | 5.500 | 7,700.00
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 0053 L001.02 | 1,000.00 | 2.200 | 2,200.00
|
| SEEDING, TYPE B | ha | 2.200 | 2,200.00
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 0054 L032.75 | 80.00 | 38.500 | 3,080.00
|
| MULCH | Mg | 38.500 | 3,080.00
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 0055 0030.50 | 50.00 | 1.000 | 50.00
|
| MOBILIZATION | LS | 1.000 | 50.00
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| GROUP 5 SEEDING | | Contracted | 13,030.00
|
| | Current | 13,030.00
|
| | In place | 0.00
|
| | This Estimate | 0.00
|
| | |
|
| GROUP 6 BRIDGE AT STA. 46+12 | | |
|
| 0056 0030.60 | 60,000.00 | 1.000 | 60,000.00
|
| MOBILIZATION | LS | 1.000 | 60,000.00
|
| | | 1.000 | 60,000.00
|
| | 0.000 | 0.00
|
| | |
|
| 0057 3050.15 | 230.00 | 126.200 | 29,026.00
|
| CONCRETE FOR PAVEMENT APPROACHES CLASS 47BD-30 | m3 | 126.200 | 29,026.00
|
| | | 126.200 | 29,026.00
|
| | 0.000 | 0.00
|
| | |
|
| 0058 3051.10 | 1.10 | 9,022.000 | 9,924.20
|
| EPOXY COATED REINFORCING STEEL FOR PAVEMENT APPROACHES | kg | 9,022.000 | 9,924.20
|
| | | 9,022.000 | 9,924.20
|
| | 0.000 | 0.00
|
| | |
|
| 0059 4095.20 | 340.00 | 53.000 | 18,020.00
|
| COPING | m | 53.000 | 18,020.00
|
| | | 48.050 | 16,337.00
|
| | 0.000 | 0.00
|
| | |
|
| 0060 6000.10 | 5,000.00 | 1.000 | 5,000.00
|
| ABUTMENT NO.1 EXCAVATION | LS | 1.000 | 5,000.00
|
| | | 1.000 | 5,000.00
|
| | 0.000 | 0.00
|
| | |
|
| 0061 6000.11 | 5,000.00 | 1.000 | 5,000.00
|
| ABUTMENT NO.2 EXCAVATION | LS | 1.000 | 5,000.00
|
| | | 1.000 | 5,000.00
|
| | 0.000 | 0.00
|
| | |
|
| 0062 6001.50 | 12,000.00 | 1.000 | 12,000.00
|
| BENT NO.1 EXCAVATION | LS | 1.000 | 12,000.00
|
| | | 1.000 | 12,000.00
|
| | 0.000 | 0.00
|
| | |
|
| 0063 6001.51 | 12,000.00 | 1.000 | 12,000.00
|
| BENT NO.2 EXCAVATION | LS | 1.000 | 12,000.00
|
| | | 1.000 | 12,000.00
|
| | 0.000 | 0.00
|
| | |
|
| 0064 6008.45 | 160.00 | 311.800 | 49,888.00
|
| PLACING, FINISHING, AND CURING CONDUCTIVE CONCRETE | m2 | 0.000 | 0.00
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 0065 6010.22 | 320.00 | 139.000 | 44,480.00
|
| CLASS 47B-20 CONCRETE FOR BRIDGE | m3 | 139.000 | 44,480.00
|
| | | 139.000 | 44,480.00
|
| | 0.000 | 0.00
|
| | |
|
| 0066 6010.26 | 310.00 | 179.600 | 55,676.00
|
| CLASS 47BD-30 CONCRETE FOR BRIDGE | m3 | 179.600 | 55,676.00
|
| | | 179.600 | 55,676.00
|
| | 0.000 | 0.00
|
| | |
|
| 0067 6010.35 | 2,200.00 | 31.200 | 68,640.00
|
| CONDUCTIVE CONCRETE | m3 | 0.000 | 0.00
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 0068 6040.00 | 45,000.00 | 1.000 | 45,000.00
|
| REMOVE STRUCTURE | EACH | 1.000 | 45,000.00
|
| AT STA. 46+41 | | 1.000 | 45,000.00
|
| | 0.000 | 0.00
|
| | |
|
| 0069 6080.00 | 9.00 | 490.000 | 4,410.00
|
| STRUCTURAL STEEL FOR SUBSTRUCTURE | kg | 490.000 | 4,410.00
|
| | | 490.000 | 4,410.00
|
| | 0.000 | 0.00
|
| | |
|
| 0070 6131.50 | 1.20 | 35,215.000 | 42,258.00
|
| EPOXY COATED REINFORCING STEEL | kg | 35,215.000 | 42,258.00
|
| | | 35,215.000 | 42,258.00
|
| | 0.000 | 0.00
|
| | |
|
| 0071 6210.12 | 70.00 | 274.000 | 19,180.00
|
| HP 250 mm X 62 kg STEEL PILING | m | 274.000 | 19,180.00
|
| | | 243.869 | 17,070.83
|
| | 0.000 | 0.00
|
| | |
|
| 0072 6251.40 | 1,600.00 | 19.200 | 30,720.00
|
| ROCK SOCKET | m | 19.200 | 30,720.00
|
| | | 20.883 | 33,412.80
|
| | 0.000 | 0.00
|
| | |
|
| 0073 6251.50 | 1,700.00 | 39.200 | 66,640.00
|
| DRILLED SHAFT | m | 39.200 | 66,640.00
|
| | | 37.557 | 63,846.90
|
| | 0.000 | 0.00
|
| | |
|
| 0074 6310.00 | 130.00 | 451.400 | 58,682.00
|
| STEEL SHEET PILING | m2 | 451.400 | 58,682.00
|
| | | 435.268 | 56,584.84
|
| | 0.000 | 0.00
|
| | |
|
| 0075 8091.00 | 32.00 | 94.000 | 3,008.00
|
| GRANULAR BACKFILL | m3 | 94.000 | 3,008.00
|
| | | 94.000 | 3,008.00
|
| | 0.000 | 0.00
|
| | |
|
| 4009 6008.45 | 160.42 | 0.000 | 0.00
|
| PLACING, FINISHING, AND CURING CONDUCTIVE CONCRETE | m2 | 311.800 | 50,018.96
|
| REVISED PRICE | | 311.800 | 50,018.96
|
| | 0.000 | 0.00
|
| | |
|
| 4010 6010.35 | 2,457.31 | 0.000 | 0.00
|
| CONDUCTIVE CONCRETE | m3 | 31.200 | 76,668.07
|
| REVISED PRICE | | 31.200 | 76,668.08
|
| | 3.000 | 7,371.93
|
| | |
|
| 4011 0095.00 | 226.35 | 0.000 | 0.00
|
| ADDITIONAL FREIGHT | LS | 1.000 | 226.35
|
| FOR EPOXY COATED RE-STEEL | | 1.000 | 226.35
|
| | 0.000 | 0.00
|
| | |
|
| 4012 6131.50 | 3.22 | 0.000 | 0.00
|
| EPOXY COATED REINFORCING STEEL | kg | 41.000 | 132.02
|
| ADDITIONAL B1001 BARS | | 41.000 | 132.02
|
| | 0.000 | 0.00
|
| | |
|
| 4015 3900.22 | 126.67 | 0.000 | 0.00
|
| ADDITIONAL COST | m3 | 31.200 | 3,952.10
|
| CONDUCTIVE CONCRETE MATERIALS | | 31.200 | 3,952.10
|
| | 0.000 | 0.00
|
| | |
|
| 4020 6960.02 | 2,340.50 | 0.000 | 0.00
|
| ADDITIONAL WORK | LS | 1.000 | 2,340.50
|
| (BRIDGE DECK GRINDING) | | 1.000 | 2,340.50
|
| | 0.000 | 0.00
|
| | |
|
| 4021 A820.00 | 62,536.00 | 0.000 | 0.00
|
| CONTROLLER CABINET | EACH | 1.000 | 62,536.00
|
| (BRIDGE DEICING CONTROLLER) | | 0.900 | 56,282.40
|
| | 0.900 | 56,282.40
|
| | |
|
| 6002 6210.32 | 42.00 | 0.000 | 0.00
|
| PAY CUT-OFF FOR 250 mm X 62 kg STEEL PILING | m | 30.131 | 1,265.50
|
| | | 30.131 | 1,265.50
|
| | 0.000 | 0.00
|
| | |
|
| GROUP 6 BRIDGE AT STA. 46+12 | | Contracted | 639,552.20
|
| | Current | 718,163.70
|
| | In place | 705,920.48
|
| | This Estimate | 63,654.33
|
| | |
|
| GROUP 7 GUARDRAIL | | |
|
| 0076 0030.70 | 250.00 | 1.000 | 250.00
|
| MOBILIZATION | LS | 1.000 | 250.00
|
| | | 1.000 | 250.00
|
| | 0.000 | 0.00
|
| | |
|
| 0077 7011.20 | 40.00 | 15.200 | 608.00
|
| W-BEAM GUARDRAIL | m | 15.200 | 608.00
|
| | | 15.200 | 608.00
|
| | 0.000 | 0.00
|
| | |
|
| 0078 7020.00 | 1,200.00 | 4.000 | 4,800.00
|
| BRIDGE APPROACH SECTIONS | EACH | 4.000 | 4,800.00
|
| | | 4.000 | 4,800.00
|
| | 0.000 | 0.00
|
| | |
|
| 0079 7024.27 | 1,600.00 | 4.000 | 6,400.00
|
| GUARDRAIL END TREATMENT, TYPE II | EACH | 4.000 | 6,400.00
|
| | | 4.000 | 6,400.00
|
| | 0.000 | 0.00
|
| | |
|
| GROUP 7 GUARDRAIL | | Contracted | 12,058.00
|
| | Current | 12,058.00
|
| | In place | 12,058.00
|
| | This Estimate | 0.00
|
| | |
|
| GROUP 9 BITUMINOUS | | |
|
| 0080 0002.55 | 25.00 | 64.920 | 1,623.00
|
| OVERLAY BROKEN LINES | StaM | 64.920 | 1,623.00
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 0081 0002.60 | 25.00 | 64.920 | 1,623.00
|
| OVERLAY SOLID LINES | StaM | 64.920 | 1,623.00
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 0082 0030.90 | 25,000.00 | 1.000 | 25,000.00
|
| MOBILIZATION | LS | 1.000 | 25,000.00
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 0083 1020.03 | 14.00 | 47.000 | 658.00
|
| DELINEATOR, TYPE III | EACH | 47.000 | 658.00
|
| | | 47.000 | 658.00
|
| | 0.000 | 0.00
|
| | |
|
| 0084 1020.20 | 24.00 | 16.000 | 384.00
|
| INSTALL CHEVRONS | EACH | 16.000 | 384.00
|
| | | 16.000 | 384.00
|
| | 0.000 | 0.00
|
| | |
|
| 0085 2001.03 | 19.00 | 58.000 | 1,102.00
|
| GRAVEL SURFACE COURSE | Mg | 58.000 | 1,102.00
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 0086 2020.00 | 9.00 | 115.000 | 1,035.00
|
| SPECIAL SURFACE COURSE FOR MAILBOX TURNOUTS | m2 | 115.000 | 1,035.00
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 0087 2021.00 | 50.00 | 4.000 | 200.00
|
| MAILBOX POST | EACH | 4.000 | 200.00
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 0088 9005.00 | 38.00 | 100.000 | 3,800.00
|
| ASPHALTIC CONCRETE FOR PATCHING, TYPE | Mg | 100.000 | 3,800.00
|
| SP1(12.5) | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 0089 9005.25 | 25.50 | 7,350.000 | 187,425.00
|
| ASPHALTIC CONCRETE, TYPE SP1(12.5) | Mg | 7,350.000 | 187,425.00
|
| | | 2,934.120 | 74,820.06
|
| | 0.000 | 0.00
|
| | |
|
| 0090 9009.00 | 2.50 | 1,116.000 | 2,790.00
|
| PLACEMENT OF ASPHALTIC CONCRETE FOR DRIVEWAYS ANDINTERSECTIONS | m2 | 1,116.000 | 2,790.00
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 0091 9021.01 | 170.00 | 402.300 | 68,391.00
|
| PERFORMANCE GRADED BINDER (64-22) | Mg | 402.300 | 68,391.00
|
| | | 120.063 | 20,410.71
|
| | 0.000 | 0.00
|
| | |
|
| 0092 9034.00 | 1.05 | 1,116.000 | 1,171.80
|
| PREPARATION OF INTERSECTIONS AND DRIVEWAYS | m2 | 1,116.000 | 1,171.80
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 0093 9053.00 | 0.25 | 17,530.000 | 4,382.50
|
| TACK COAT | L | 17,530.000 | 4,382.50
|
| | | 4,731.787 | 1,182.95
|
| | 0.000 | 0.00
|
| | |
|
| 0094 9111.00 | 2.90 | 332.000 | 962.80
|
| WATER | kL | 332.000 | 962.80
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 0095 9170.00 | 210.00 | 63.582 | 13,352.22
|
| EARTH SHOULDER CONSTRUCTION | StaM | 63.582 | 13,352.22
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 0096 9173.00 | 700.00 | 11.782 | 8,247.40
|
| SUBGRADE PREPARATION | StaM | 11.782 | 8,247.40
|
| | | 11.796 | 8,257.20
|
| | 0.000 | 0.00
|
| | |
|
| 0097 9188.50 | 17.50 | 242.000 | 4,235.00
|
| SURFACING UNDER GUARDRAIL | m2 | 242.000 | 4,235.00
|
| | | 254.996 | 4,462.43
|
| | 0.000 | 0.00
|
| | |
|
| 0098 9300.50 | 1,200.00 | 1.000 | 1,200.00
|
| ASPHALT PAVEMENT SMOOTHNESS TESTING | LS | 1.000 | 1,200.00
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| GROUP 9 BITUMINOUS | | Contracted | 327,582.72
|
| | Current | 327,582.72
|
| | In place | 110,175.35
|
| | This Estimate | 0.00
|
| | |
|
| GROUP 10 GENERAL ITEMS | | |
|
| 0099 0001.10 | 1.50 | 5,184.000 | 7,776.00
|
| BARRICADE, TYPE III | BDAY | 5,184.000 | 7,776.00
|
| | | 5,327.000 | 7,990.50
|
| | 0.000 | 0.00
|
| | |
|
| 0100 0001.30 | 1.10 | 1,296.000 | 1,425.60
|
| TYPE B HIGH INTENSITY WARNING LIGHT | LDAY | 1,296.000 | 1,425.60
|
| | | 235.000 | 258.50
|
| | 0.000 | 0.00
|
| | |
|
| 0101 0001.90 | 0.50 | 3,456.000 | 1,728.00
|
| SIGN DAY | EACH | 3,456.000 | 1,728.00
|
| | | 3,236.000 | 1,618.00
|
| | 183.000 | 91.50
|
| | |
|
| 0102 0010.04 | 3,000.00 | 1.000 | 3,000.00
|
| FIELD OFFICE | EACH | 1.000 | 3,000.00
|
| | | 1.000 | 3,000.00
|
| | 0.000 | 0.00
|
| | |
|
| 0103 0030.00 | 2,000.00 | 1.000 | 2,000.00
|
| MOBILIZATION | LS | 1.000 | 2,000.00
|
| | | 1.000 | 2,000.00
|
| | 0.000 | 0.00
|
| | |
|
| 0104 1017.00 | 34,000.00 | 1.000 | 34,000.00
|
| CONSTRUCTION STAKING AND SURVEYING | LS | 1.000 | 34,000.00
|
| | | 0.850 | 28,900.00
|
| | 0.000 | 0.00
|
| | |
|
| 0105 9110.01 | 65.00 | 35.000 | 2,275.00
|
| RENTAL OF LOADER, FULLY OPERATED | HOUR | 35.000 | 2,275.00
|
| | | 8.500 | 552.50
|
| | 0.000 | 0.00
|
| | |
|
| 0106 9110.02 | 50.00 | 20.000 | 1,000.00
|
| RENTAL OF MOTOR GRADER, FULLY OPERATED | HOUR | 20.000 | 1,000.00
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 0107 9110.03 | 45.00 | 35.000 | 1,575.00
|
| RENTAL OF DUMP TRUCK, FULLY OPERATED | HOUR | 35.000 | 1,575.00
|
| | | 27.000 | 1,215.00
|
| | 0.000 | 0.00
|
| | |
|
| 0108 9110.07 | 45.00 | 35.000 | 1,575.00
|
| RENTAL OF SKID LOADER, FULLY OPERATED | HOUR | 35.000 | 1,575.00
|
| | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
| 4001 0001.99 | 0.58 | 0.000 | 0.00
|
| CONTRACTOR FURNISHED SIGN DAY | EACH | 648.000 | 375.84
|
| | | 723.000 | 419.34
|
| | 0.000 | 0.00
|
| | |
|
| 4002 0001.99 | 0.58 | 0.000 | 0.00
|
| CONTRACTOR FURNISHED SIGN DAY | EACH | 432.000 | 250.56
|
| | | 482.000 | 279.56
|
| | 0.000 | 0.00
|
| | |
|
| 4007 9110.21 | 126.34 | 0.000 | 0.00
|
| RENTAL OF CRANE, FULLY OPERATED | HOUR | 1.000 | 126.34
|
| | | 1.000 | 126.34
|
| | 0.000 | 0.00
|
| | |
|
| 4008 9110.06 | 89.38 | 0.000 | 0.00
|
| RENTAL OF BACKHOE, FULLY OPERATED | HOUR | 1.000 | 89.38
|
| 1985 KOMATSU | | 1.000 | 89.38
|
| | 0.000 | 0.00
|
| | |
|
| 4013 9110.06 | 111.52 | 0.000 | 0.00
|
| RENTAL OF BACKHOE, FULLY OPERATED | HOUR | 14.000 | 1,561.28
|
| 1999 JOHN DEERE | | 15.000 | 1,672.80
|
| | 0.000 | 0.00
|
| | |
|
| GROUP 10 GENERAL ITEMS | | Contracted | 56,354.60
|
| | Current | 58,758.00
|
| | In place | 48,121.92
|
| | This Estimate | 91.50
|
| | |
|
| Totals for contract | | Contracted | 1,478,120.53
|
|---|
| | Current | 1,578,858.60
|
|---|
| | In place | 1,283,899.37
|
|---|
| | This Estimate | 64,154.23
|
|---|