Nebraska Department of Roads
Estimate Summary to Contractor
Vendor ID:0462 WEBB CONTRACTOR, INC./L. J.
Contract ID:1666X
Estimate Number:0013
Pay Period End Date:01.10.2003
Contract Location:
STAPLEHURST SOUTHEASTEstimate Type:PROG
Contractor:
WEBB CONTRACTOR, INC./L. J.Date Let:02.07.2002
918 N 13TH STDate Awarded:02.20.2002
PO BOX 386Date Contract Executed:03.08.2002
Date Notice to Proceed:03.08.2002
GENEVA NE 68361-0386Date Work Began:
Phone:Date Physical Work Completed:
(402)759-4160Date Accepted:
Escrow Agent:
Surety Co:
UNIVERSAL SURETY COMPANY
Counties
SEWARD
Project Number PCT Fed State Project Number Description
11666 000B  0.000 BRO-7080(19)  BRIDGES
Total to DatePrev to DateThis Estimate
Current Contract AmtTotal Earnings$348,289.39$343,274.70$5,014.69
$349,915.15Stockpiled Materials$.00$.00$.00
Original Contract AmtGross Earnings$348,289.39$343,274.70$5,014.69
$346,761.19Retainage$-3,482.89$-3,432.75$-50.14
Escrow Amount$.00$.00$.00
Percent CompleteSecurities Encumbered$.00$.00$.00
99.54%Net Earnings$344,806.50$339,841.95$4,964.55
Liquidated Damages-$4,680.00-$4,680.00$.00
Incentives$.00$.00$.00
Disincentives$.00$.00$.00
Other Contract Adj$.00$.00$.00
Appl of Training Adj$.00$.00$.00
Training Rates Adj$.00$.00$.00
Fuel Adj$546.20$546.20$.00
Bituminous Adj$.00$.00$.00
Autopay Adj$.00$.00$.00
Gasoline Adj$.00$.00$.00
Other Adj$.00$.00$.00
Price Adj$.00$.00$.00
Substandard Item Adj$.00$.00$.00
Asphalt Adj$.00$.00$.00
Diesel Fuel Adj$.00$.00$.00
Petrol Adj$.00$.00$.00
Total for Adjustments-$4,133.80-$4,133.80$.00
Payment$340,672.70$335,708.15$4,964.55
Project ManagerDiv. Head/Dist. Eng.
England, Jim01.13.2003Sklenar, Michael J01.14.2003
Constr. Estimate Eng.Materials Eng.
Bartos, Steve01.14.2003
Controller Div. Processed
Burling, Laurie01.14.2003
Detailed breakdown of stockpiled materials
Total remaining for contract:0.00
1. Contracted
2. Current
3. To date
Item Nbr        Item CodeUnit Price4. This Est
Item DescriptionUnitsQtyAmount
GROUP 6 BRIDGE AT STA. 20+87
0001                          L006.00 100.005.000500.00
COVER CROP SEEDING ACRE5.000500.00
5.000500.00
0.0000.00

0002                          0001.10 1.102,109.0002,319.90
BARRICADE, TYPE III BDAY2,109.0002,319.90
2,184.0002,402.40
98.000107.80

0003                          0001.30 0.95292.000277.40
TYPE B HIGH INTENSITY WARNING LIGHT LDAY292.000277.40
0.0000.00
-98.000-93.10

0004                          0001.90 0.401,752.000700.80
SIGN DAY EACH1,752.000700.80
936.000374.40
0.0000.00

0005                          0030.60 20,300.001.00020,300.00
MOBILIZATION LS 1.00020,300.00
1.00020,300.00
0.0000.00

0006                          1000.00 150.001.000150.00
LARGE TREE REMOVAL EACH1.000150.00
0.0000.00
0.0000.00

0007                          1009.00 2,900.001.0002,900.00
GENERAL CLEARING AND GRUBBING LS 1.0002,900.00
1.0002,900.00
0.0000.00

0008                          1011.00 9.9943.000429.57
WATER MGAL43.000429.57
0.0000.00
0.0000.00

0009                          1030.00 1.3511,876.00016,032.60
EARTHWORK MEASURED IN EMBANKMENT CY 11,876.00016,032.60
11,876.00016,032.60
0.0000.00

0010                          1300.24 12.4632.000398.72
24" DRIVEWAY CULVERT PIPE LF 32.000398.72
32.000398.72
0.0000.00

0011                          1300.36 22.8834.000777.92
36" DRIVEWAY CULVERT PIPE LF 34.000777.92
34.000777.92
0.0000.00

0012                          1305.24 13.5628.000379.68
24" ROUND EQUIVALENT DRIVEWAY CULVERT PIPE LF 28.000379.68
28.000379.68
0.0000.00

0013                          2021.00 50.001.00050.00
MAILBOX POST EACH1.00050.00
0.0000.00
0.0000.00

0014                          4040.00 101.002.000202.00
REMOVE HEADWALLS FROM CULVERTS EACH2.000202.00
2.000202.00
0.0000.00

0015                          4043.00 3.21140.000449.40
REMOVE CULVERT PIPE LF 140.000449.40
36.000115.56
0.0000.00

0016                          4050.01 6.99707.0004,941.93
EXCAVATION FOR PIPE, PIPE-ARCH CULVERTS, AND HEADWALLS CY 707.0004,941.93
707.0004,941.93
0.0000.00

0017                          4300.24 14.83198.0002,936.34
24" CULVERT PIPE LF 198.0002,936.34
198.0002,936.34
0.0000.00

0018                          4305.24 15.4336.000555.48
24" ROUND EQUIVALENT CULVERT PIPE LF 36.000555.48
36.000555.48
0.0000.00

0019                          4305.60 82.50120.0009,900.00
60" ROUND EQUIVALENT CULVERT PIPE LF 120.0009,900.00
120.0009,900.00
0.0000.00

0020                          4310.24 125.122.000250.24
24" FLARED-END SECTION EACH2.000250.24
2.000250.24
0.0000.00

0021                          4320.24 122.002.000244.00
24" ROUND EQUIVALENT FLARED-END SECTION EACH2.000244.00
2.000244.00
0.0000.00

0022                          4320.60 866.416.0005,198.46
60" ROUND EQUIVALENT FLARED-END SECTION EACH6.0005,198.46
6.0005,198.46
0.0000.00

0023                          6000.10 2,000.001.0002,000.00
ABUTMENT NO.1 EXCAVATION LS 1.0002,000.00
1.0002,000.00
0.0000.00

0024                          6000.11 2,000.001.0002,000.00
ABUTMENT NO.2 EXCAVATION LS 1.0002,000.00
1.0002,000.00
0.5001,000.00

0025                          6001.00 8,000.001.0008,000.00
BENT NO.1 EXCAVATION LS 1.0008,000.00
1.0008,000.00
0.0000.00

0026                          6001.01 8,000.001.0008,000.00
BENT NO.2 EXCAVATION LS 1.0008,000.00
1.0008,000.00
0.5004,000.00

0027                          6010.22 270.00298.40080,568.00
CLASS 47B-3000 CONCRETE FOR BRIDGE CY 298.40080,568.00
298.40080,568.00
0.0000.00

0028                          6010.26 290.00200.30058,087.00
CLASS 47BD-4000 CONCRETE FOR BRIDGE CY 200.30058,087.00
200.30058,087.00
0.0000.00

0029                          6020.00 0.5553,145.00029,229.75
REINFORCING STEEL FOR BRIDGE LB 53,145.00029,229.75
53,145.00029,229.76
0.0000.00

0030                          6040.00 8,000.001.0008,000.00
REMOVE STRUCTURE EACH1.0008,000.00
AT STA 20+88 1.0008,000.00
0.0000.00

0031                          6080.00 2.503,270.0008,175.00
STRUCTURAL STEEL FOR SUBSTRUCTURE LB 3,270.0008,175.00
3,270.0008,175.00
0.0000.00

0032                          6105.02 33.00729.00024,057.00
ROCK RIPRAP, TYPE B TON 729.00024,057.00
722.17023,831.61
0.0000.00

0033                          6210.12 21.001,950.00040,950.00
HP 10"X42# STEEL PILING LF 1,950.00040,950.00
1,950.00040,950.00
0.0000.00

0034                          7020.00 1,000.004.0004,000.00
BRIDGE APPROACH SECTIONS EACH4.0004,000.00
4.0004,000.00
0.0000.00

0035                          7021.45 950.004.0003,800.00
BREAKAWAY CABLE TERMINAL EACH4.0003,800.00
4.0003,800.00
0.0000.00

0401                          0001.99 0.680.0000.00
CONTRACTOR FURNISHED SIGN DAY EACH500.000340.00
624.000424.32
0.0000.00

601                           4051.12 27.320.0000.00
GRANULAR MATERIAL FOR FOUNDATIONS OF BOX CULVERTS CY 103.0002,813.96
GRANULAR MATERIAL FOR FOUNDATIONSGRANULAR MATERIAL FOR FOUNDATIONS 103.0002,813.96
0.0000.00

GROUP 6 BRIDGE AT STA. 20+87Contracted346,761.19
Current349,915.15
In place348,289.38
This Estimate5,014.70

Totals for contractContracted346,761.19
Current349,915.15
In place348,289.38
This Estimate5,014.70