Nebraska Department of Roads
Estimate Summary to Contractor
Vendor ID:1742 HERBST CONSTRUCTION, INC.
Contract ID:1535X
Estimate Number:0005
Pay Period End Date:02.10.2003
Contract Location:
BROCK EASTEstimate Type:FINL
Contractor:
HERBST CONSTRUCTION, INC.Date Let:02.07.2002
16022 HWY 75Date Awarded:02.14.2002
PO BOX 728Date Contract Executed:02.26.2002
Date Notice to Proceed:02.26.2002
LE MARS IA 51031-0728Date Work Began:10.22.2002
Phone:Date Physical Work Completed:
(712)546-5653Date Accepted:12.03.2002
Escrow Agent:
Surety Co:
MERCHANTS BONDING COMPANY (MUTUAL)
Counties
NEMAHA
Project Number PCT Fed State Project Number Description
12535 000  0.000 STR-67-1(1016)  BRIDGE
Total to DatePrev to DateThis Estimate
Current Contract AmtTotal Earnings$25,754.00$25,754.00$.00
$27,151.50Stockpiled Materials$.00$.00$.00
Original Contract AmtGross Earnings$25,754.00$25,754.00$.00
$26,809.50Retainage$.00$-257.54$257.54
Escrow Amount$.00$.00$.00
Percent CompleteSecurities Encumbered$.00$.00$.00
94.85%Net Earnings$25,754.00$25,496.46$257.54
Liquidated Damages$.00$.00$.00
Incentives$.00$.00$.00
Disincentives$.00$.00$.00
Other Contract Adj$.00$.00$.00
Appl of Training Adj$.00$.00$.00
Training Rates Adj$.00$.00$.00
Fuel Adj$.00$.00$.00
Bituminous Adj$.00$.00$.00
Autopay Adj$.00$.00$.00
Gasoline Adj$.00$.00$.00
Other Adj$.00$.00$.00
Price Adj$.00$.00$.00
Substandard Item Adj$.00$.00$.00
Asphalt Adj$.00$.00$.00
Diesel Fuel Adj$.00$.00$.00
Petrol Adj$.00$.00$.00
Total for Adjustments$.00$.00$.00
Payment$25,754.00$25,496.46$257.54
Project ManagerDiv. Head/Dist. Eng.
Hitzeman, Don03.13.2003Sklenar, Michael J03.14.2003
Constr. Estimate Eng.Materials Eng.
Davis, Carl03.27.2003Hall, David03.27.2003
Controller Div. Processed
Harring, Joyce04.04.2003
Detailed breakdown of stockpiled materials
Total remaining for contract:0.00
1. Contracted
2. Current
3. To date
Item Nbr        Item CodeUnit Price4. This Est
Item DescriptionUnitsQtyAmount
GROUP 6 BRIDGE AT R.P. 35+78
0001                          0001.08 0.5075.00037.50
BARRICADE, TYPE II BDAY75.00037.50
12.0006.00
0.0000.00

0002                          0001.10 3.0054.000162.00
BARRICADE, TYPE III BDAY72.000216.00
72.000216.00
0.0000.00

0003                          0001.30 1.5054.00081.00
TYPE B HIGH INTENSITY WARNING LIGHT LDAY54.00081.00
0.0000.00
0.0000.00

0004                          0001.75 4.0040.000160.00
TEMPORARY SIGN DAY EACH40.000160.00
0.0000.00
0.0000.00

0005                          0001.90 2.00432.000864.00
SIGN DAY EACH504.0001,008.00
504.0001,008.00
0.0000.00

0006                          0003.10 125.0010.0001,250.00
FLAGGING DAY 10.0001,250.00
1.000125.00
0.0000.00

0007                          0030.60 2,500.001.0002,500.00
MOBILIZATION LS 1.0002,500.00
1.0002,500.00
0.0000.00

0008                          6001.00 1,750.001.0001,750.00
BENT NO.1 EXCAVATION LS 1.0001,750.00
1.0001,750.00
0.0000.00

0009                          6001.01 1,750.001.0001,750.00
BENT NO.2 EXCAVATION LS 1.0001,750.00
1.0001,750.00
0.0000.00

0010                          6010.26 450.0026.30011,835.00
CLASS 47BD-4000 CONCRETE FOR BRIDGE CY 27.38012,321.00
27.38012,321.00
0.0000.00

0011                          6020.00 2.001,110.0002,220.00
REINFORCING STEEL FOR BRIDGE LB 1,110.0002,220.00
1,110.0002,220.00
0.0000.00

0012                          6210.12 30.00140.0004,200.00
HP 10"X42# STEEL PILING LF 111.5003,345.00
111.5003,345.00
0.0000.00

6001                          6210.32 18.000.0000.00
PAY CUT-OFF 10" X 42# STEEL PILING LF 28.500513.00
28.500513.00
0.0000.00

GROUP 6 BRIDGE AT R.P. 35+78Contracted26,809.50
Current27,151.50
In place25,754.00
This Estimate0.00

Totals for contractContracted26,809.50
Current27,151.50
In place25,754.00
This Estimate0.00