Return to District Map


Nebraska Department of Roads
Estimate Summary to Contractor
Vendor ID:0880 CHRISTENSEN BROS., INC.
Contract ID:1272X
Estimate Number:0012
Pay Period End Date:02.07.2002
Contract Location:
AUBURN NORTHWESTEstimate Type:FINL
Contractor:
CHRISTENSEN BROS., INC.Date Let:12.07.2000
644 RIVER ROADDate Awarded:12.14.2000
PO BOX 478Date Contract Executed:12.27.2000
Date Notice to Proceed:12.27.2000
CHEROKEE IA 51012Date Work Began:01.22.2001
Phone:Date Physical Work Completed:
(712)225-6146Date Accepted:
Escrow Agent:
Surety Co:
NATIONAL FIRE INSURANCE COMPANY OF HARTFORD
Counties
NEMAHA
Project Number PCT Fed State Project Number Description
12272 000B  0.000 BRO-7064(8)  BRIDGE
Total to DatePrev to DateThis Estimate
Current Contract AmtTotal Earnings$397,516.45$397,926.05$-409.60
$392,640.93Stockpiled Materials$.00$.00$.00
Original Contract AmtGross Earnings$397,516.45$397,926.05$-409.60
$391,090.80Retainage$.00$-3,979.26$3,979.26
Escrow Amount$.00$.00$.00
Percent CompleteSecurities Encumbered$.00$.00$.00
101.24%Net Earnings$397,516.45$393,946.79$3,569.66
Liquidated Damages$.00$.00$.00
Incentives$.00$.00$.00
Disincentives$.00$.00$.00
Other Contract Adj$.00$.00$.00
Appl of Training Adj$.00$.00$.00
Training Rates Adj$.00$.00$.00
Fuel Adj$-77.52$-77.52$.00
Bituminous Adj$.00$.00$.00
Autopay Adj$.00$.00$.00
Gasoline Adj$.00$.00$.00
Other Adj$.00$.00$.00
Price Adj$.00$.00$.00
Substandard Item Adj$.00$.00$.00
Asphalt Adj$.00$.00$.00
Diesel Fuel Adj$.00$.00$.00
Petrol Adj$.00$.00$.00
Total for Adjustments-$77.52-$77.52$.00
Payment$397,438.93$393,869.27$3,569.66
Project ManagerDiv. Head/Dist. Eng.
Hitzeman, Don02.27.2002Sklenar, Michael J02.27.2002
Constr. Estimate Eng.Materials Eng.
Davis, Carl05.23.2002Hall, David05.23.2002
Controller Div. Processed
Harring, Joyce06.03.2002
Detailed breakdown of stockpiled materials
Total remaining for contract:0.00
1. Contracted
2. Current
3. To date
Item Nbr        Item CodeUnit Price4. This Est
Item DescriptionUnitsQtyAmount
GROUP 6 BRIDGE AT STA. 10+80.50
0001                          L006.00 500.002.0001,000.00
COVER CROP SEEDING ha 2.0001,000.00
2.0001,000.00
0.0000.00

0002                          0001.10 1.402,508.0003,511.20
BARRICADE, TYPE III BDAY2,508.0003,511.20
1,854.0002,595.60
0.0000.00

0003                          0001.30 1.00418.000418.00
TYPE B HIGH INTENSITY WARNING LIGHT LDAY418.000418.00
412.000412.00
0.0000.00

0004                          0001.90 0.404,598.0001,839.20
SIGN DAY EACH4,598.0001,839.20
2,133.000853.20
0.0000.00

0005                          0030.60 30,000.001.00030,000.00
MOBILIZATION LS 1.00030,000.00
1.00030,000.00
0.0000.00

0006                          1009.00 2,500.001.0002,500.00
GENERAL CLEARING AND GRUBBING LS 1.0002,500.00
1.0002,500.00
0.0000.00

0007                          1011.00 2.80124.000347.20
WATER kL 124.000347.20
79.500222.60
0.0000.00

0008                          1030.00 4.807,084.00034,003.20
EARTHWORK MEASURED IN EMBANKMENT m3 7,120.59034,178.83
7,120.59034,178.83
0.0000.00

0009                          1043.50 2.001,132.0002,264.00
RIPRAP FILTER FABRIC m2 1,132.0002,264.00
1,530.4583,060.92
0.0000.00

0010                          1300.24 50.0049.5002,475.00
600 mm DRIVEWAY CULVERT PIPE m 49.5002,475.00
49.5002,475.00
0.0000.00

0011                          2010.03 17.00325.0005,525.00
CRUSHED ROCK SURFACE COURSE Mg 325.0005,525.00
323.8105,504.77
0.0000.00

0012                          4050.01 5.30231.0001,224.30
EXCAVATION FOR PIPE, PIPE-ARCH CULVERTS, AND HEADWALLS m3 231.0001,224.30
231.0001,224.30
0.0000.00

0013                          4300.24 75.0096.5007,237.50
600 mm CULVERT PIPE m 96.5007,237.50
96.5007,237.50
0.0000.00

0014                          4310.24 530.004.0002,120.00
600 mm FLARED-END SECTION EACH4.0002,120.00
4.0002,120.00
0.0000.00

0015                          6000.10 3,000.001.0003,000.00
ABUTMENT NO.1 EXCAVATION LS 1.0003,000.00
1.0003,000.00
0.0000.00

0016                          6000.11 3,000.001.0003,000.00
ABUTMENT NO.2 EXCAVATION LS 1.0003,000.00
1.0003,000.00
0.0000.00

0017                          6001.50 8,000.001.0008,000.00
BENT NO.1 EXCAVATION LS 1.0008,000.00
1.0008,000.00
0.0000.00

0018                          6001.51 8,000.001.0008,000.00
BENT NO.2 EXCAVATION LS 1.0008,000.00
1.0008,000.00
0.0000.00

0019                          6010.22 330.00170.20056,166.00
CLASS 47B-20 CONCRETE FOR BRIDGE m3 170.20056,166.00
170.20056,166.00
0.0000.00

0020                          6010.26 320.00212.70068,064.00
CLASS 47BD-30 CONCRETE FOR BRIDGE m3 212.70068,064.00
212.70068,064.00
0.0000.00

0021                          6020.00 1.3027,650.00035,945.00
REINFORCING STEEL FOR BRIDGE kg 27,650.00035,945.00
27,650.00035,945.00
0.0000.00

0022                          6040.00 12,000.001.00012,000.00
REMOVE STRUCTURE EACH1.00012,000.00
AT STA. 10+82.9 1.00012,000.00
0.0000.00

0023                          6080.00 5.001,040.0005,200.00
STRUCTURAL STEEL FOR SUBSTRUCTURE kg 1,040.0005,200.00
1,040.0005,200.00
0.0000.00

0024                          6105.02 24.001,113.00026,712.00
ROCK RIPRAP, TYPE B Mg 1,113.00026,712.00
1,476.52235,436.53
0.0000.00

0025                          6210.12 56.00192.60010,785.60
HP 250 mm X 62 kg STEEL PILING m 192.60010,785.60
154.4808,650.88
0.0000.00

0026                          6210.14 64.00271.40017,369.60
HP 310 mm X 79 kg STEEL PILING m 271.40017,369.60
249.59015,973.76
0.0000.00

0027                          6251.40 320.00101.20032,384.00
ROCK SOCKET m 101.20032,384.00
101.20032,384.00
-1.280-409.60

0028                          7020.00 1,300.004.0005,200.00
BRIDGE APPROACH SECTIONS EACH4.0005,200.00
4.0005,200.00
0.0000.00

0029                          7021.45 1,200.004.0004,800.00
BREAKAWAY CABLE TERMINAL EACH4.0004,800.00
4.0004,800.00
0.0000.00

0601                          6210.32 33.600.0000.00
PAY CUT-OFF FOR 250 mm X 62 kg STEEL PILING m 20.000672.00
38.1201,280.83
0.0000.00

0602                          6210.34 38.400.0000.00
PAY CUT-OFF FOR 310 mm X 79 kg STEEL PILING m 10.000384.00
21.810837.50
0.0000.00

0603                          6003.00 31.850.0000.00
GRANULAR MATERIAL FOR BRIDGE FOUNDATIONS m3 10.000318.50
6.064193.14
0.0000.00

GROUP 6 BRIDGE AT STA. 10+80.50Contracted391,090.80
Current392,640.93
In place397,516.36
This Estimate-409.60

Totals for contractContracted391,090.80
Current392,640.93
In place397,516.36
This Estimate-409.60