| | | 1. Contracted
|
---|
| | | 2. Current
|
---|
| | | 3. To date
|
---|
Item Nbr Item Code | Unit Price | | 4. This Est
|
---|
Item Description | Units | Qty | Amount
|
---|
GROUP 6 BRIDGE AT STA. 10+80.50 | | |
|
0001 L006.00 | 500.00 | 2.000 | 1,000.00
|
COVER CROP SEEDING | ha | 2.000 | 1,000.00
|
| | 2.000 | 1,000.00
|
| | 0.000 | 0.00
|
| | |
|
0002 0001.10 | 1.40 | 2,508.000 | 3,511.20
|
BARRICADE, TYPE III | BDAY | 2,508.000 | 3,511.20
|
| | 1,854.000 | 2,595.60
|
| | 0.000 | 0.00
|
| | |
|
0003 0001.30 | 1.00 | 418.000 | 418.00
|
TYPE B HIGH INTENSITY WARNING LIGHT | LDAY | 418.000 | 418.00
|
| | 412.000 | 412.00
|
| | 0.000 | 0.00
|
| | |
|
0004 0001.90 | 0.40 | 4,598.000 | 1,839.20
|
SIGN DAY | EACH | 4,598.000 | 1,839.20
|
| | 2,133.000 | 853.20
|
| | 0.000 | 0.00
|
| | |
|
0005 0030.60 | 30,000.00 | 1.000 | 30,000.00
|
MOBILIZATION | LS | 1.000 | 30,000.00
|
| | 1.000 | 30,000.00
|
| | 0.000 | 0.00
|
| | |
|
0006 1009.00 | 2,500.00 | 1.000 | 2,500.00
|
GENERAL CLEARING AND GRUBBING | LS | 1.000 | 2,500.00
|
| | 1.000 | 2,500.00
|
| | 0.000 | 0.00
|
| | |
|
0007 1011.00 | 2.80 | 124.000 | 347.20
|
WATER | kL | 124.000 | 347.20
|
| | 79.500 | 222.60
|
| | 0.000 | 0.00
|
| | |
|
0008 1030.00 | 4.80 | 7,084.000 | 34,003.20
|
EARTHWORK MEASURED IN EMBANKMENT | m3 | 7,120.590 | 34,178.83
|
| | 7,120.590 | 34,178.83
|
| | 0.000 | 0.00
|
| | |
|
0009 1043.50 | 2.00 | 1,132.000 | 2,264.00
|
RIPRAP FILTER FABRIC | m2 | 1,132.000 | 2,264.00
|
| | 1,530.458 | 3,060.92
|
| | 0.000 | 0.00
|
| | |
|
0010 1300.24 | 50.00 | 49.500 | 2,475.00
|
600 mm DRIVEWAY CULVERT PIPE | m | 49.500 | 2,475.00
|
| | 49.500 | 2,475.00
|
| | 0.000 | 0.00
|
| | |
|
0011 2010.03 | 17.00 | 325.000 | 5,525.00
|
CRUSHED ROCK SURFACE COURSE | Mg | 325.000 | 5,525.00
|
| | 323.810 | 5,504.77
|
| | 0.000 | 0.00
|
| | |
|
0012 4050.01 | 5.30 | 231.000 | 1,224.30
|
EXCAVATION FOR PIPE, PIPE-ARCH CULVERTS, AND HEADWALLS | m3 | 231.000 | 1,224.30
|
| | 231.000 | 1,224.30
|
| | 0.000 | 0.00
|
| | |
|
0013 4300.24 | 75.00 | 96.500 | 7,237.50
|
600 mm CULVERT PIPE | m | 96.500 | 7,237.50
|
| | 96.500 | 7,237.50
|
| | 0.000 | 0.00
|
| | |
|
0014 4310.24 | 530.00 | 4.000 | 2,120.00
|
600 mm FLARED-END SECTION | EACH | 4.000 | 2,120.00
|
| | 4.000 | 2,120.00
|
| | 0.000 | 0.00
|
| | |
|
0015 6000.10 | 3,000.00 | 1.000 | 3,000.00
|
ABUTMENT NO.1 EXCAVATION | LS | 1.000 | 3,000.00
|
| | 1.000 | 3,000.00
|
| | 0.000 | 0.00
|
| | |
|
0016 6000.11 | 3,000.00 | 1.000 | 3,000.00
|
ABUTMENT NO.2 EXCAVATION | LS | 1.000 | 3,000.00
|
| | 1.000 | 3,000.00
|
| | 0.000 | 0.00
|
| | |
|
0017 6001.50 | 8,000.00 | 1.000 | 8,000.00
|
BENT NO.1 EXCAVATION | LS | 1.000 | 8,000.00
|
| | 1.000 | 8,000.00
|
| | 0.000 | 0.00
|
| | |
|
0018 6001.51 | 8,000.00 | 1.000 | 8,000.00
|
BENT NO.2 EXCAVATION | LS | 1.000 | 8,000.00
|
| | 1.000 | 8,000.00
|
| | 0.000 | 0.00
|
| | |
|
0019 6010.22 | 330.00 | 170.200 | 56,166.00
|
CLASS 47B-20 CONCRETE FOR BRIDGE | m3 | 170.200 | 56,166.00
|
| | 170.200 | 56,166.00
|
| | 0.000 | 0.00
|
| | |
|
0020 6010.26 | 320.00 | 212.700 | 68,064.00
|
CLASS 47BD-30 CONCRETE FOR BRIDGE | m3 | 212.700 | 68,064.00
|
| | 212.700 | 68,064.00
|
| | 0.000 | 0.00
|
| | |
|
0021 6020.00 | 1.30 | 27,650.000 | 35,945.00
|
REINFORCING STEEL FOR BRIDGE | kg | 27,650.000 | 35,945.00
|
| | 27,650.000 | 35,945.00
|
| | 0.000 | 0.00
|
| | |
|
0022 6040.00 | 12,000.00 | 1.000 | 12,000.00
|
REMOVE STRUCTURE | EACH | 1.000 | 12,000.00
|
AT STA. 10+82.9 | | 1.000 | 12,000.00
|
| | 0.000 | 0.00
|
| | |
|
0023 6080.00 | 5.00 | 1,040.000 | 5,200.00
|
STRUCTURAL STEEL FOR SUBSTRUCTURE | kg | 1,040.000 | 5,200.00
|
| | 1,040.000 | 5,200.00
|
| | 0.000 | 0.00
|
| | |
|
0024 6105.02 | 24.00 | 1,113.000 | 26,712.00
|
ROCK RIPRAP, TYPE B | Mg | 1,113.000 | 26,712.00
|
| | 1,476.522 | 35,436.53
|
| | 0.000 | 0.00
|
| | |
|
0025 6210.12 | 56.00 | 192.600 | 10,785.60
|
HP 250 mm X 62 kg STEEL PILING | m | 192.600 | 10,785.60
|
| | 154.480 | 8,650.88
|
| | 0.000 | 0.00
|
| | |
|
0026 6210.14 | 64.00 | 271.400 | 17,369.60
|
HP 310 mm X 79 kg STEEL PILING | m | 271.400 | 17,369.60
|
| | 249.590 | 15,973.76
|
| | 0.000 | 0.00
|
| | |
|
0027 6251.40 | 320.00 | 101.200 | 32,384.00
|
ROCK SOCKET | m | 101.200 | 32,384.00
|
| | 101.200 | 32,384.00
|
| | -1.280 | -409.60
|
| | |
|
0028 7020.00 | 1,300.00 | 4.000 | 5,200.00
|
BRIDGE APPROACH SECTIONS | EACH | 4.000 | 5,200.00
|
| | 4.000 | 5,200.00
|
| | 0.000 | 0.00
|
| | |
|
0029 7021.45 | 1,200.00 | 4.000 | 4,800.00
|
BREAKAWAY CABLE TERMINAL | EACH | 4.000 | 4,800.00
|
| | 4.000 | 4,800.00
|
| | 0.000 | 0.00
|
| | |
|
0601 6210.32 | 33.60 | 0.000 | 0.00
|
PAY CUT-OFF FOR 250 mm X 62 kg STEEL PILING | m | 20.000 | 672.00
|
| | 38.120 | 1,280.83
|
| | 0.000 | 0.00
|
| | |
|
0602 6210.34 | 38.40 | 0.000 | 0.00
|
PAY CUT-OFF FOR 310 mm X 79 kg STEEL PILING | m | 10.000 | 384.00
|
| | 21.810 | 837.50
|
| | 0.000 | 0.00
|
| | |
|
0603 6003.00 | 31.85 | 0.000 | 0.00
|
GRANULAR MATERIAL FOR BRIDGE FOUNDATIONS | m3 | 10.000 | 318.50
|
| | 6.064 | 193.14
|
| | 0.000 | 0.00
|
| | |
|
GROUP 6 BRIDGE AT STA. 10+80.50 | | Contracted | 391,090.80
|
| | Current | 392,640.93
|
| | In place | 397,516.36
|
| | This Estimate | -409.60
|
| | |
|
Totals for contract | | Contracted | 391,090.80
|
---|
| | Current | 392,640.93
|
---|
| | In place | 397,516.36
|
---|
| | This Estimate | -409.60
|
---|