Return to District Map


Nebraska Department of Roads
Estimate Summary to Contractor
Vendor ID:0810 ELK HORN CONSTRUCTION CO.
Contract ID:1164
Estimate Number:0008
Pay Period End Date:05.15.2002
Contract Location:
WESTON NORTHWESTEstimate Type:PROG
Contractor:
ELK HORN CONSTRUCTION CO.Date Let:03.29.2001
2243 ANDREW AVEDate Awarded:04.06.2001
PO BOX 580Date Contract Executed:06.06.2001
Date Notice to Proceed:06.06.2001
SERGEANT BLUFF IA 51054Date Work Began:
Phone:Date Physical Work Completed:
(712)943-4430Date Accepted:
Escrow Agent:
Surety Co:
EMPLOYERS MUTUAL CASUALTY COMPANY
Counties
SAUNDERS
Project Number PCT Fed State Project Number Description
12164 000  0.000 BRO-7078(16)  BRIDGE
Total to DatePrev to DateThis Estimate
Current Contract AmtTotal Earnings$308,155.10$299,944.77$8,210.33
$318,655.90Stockpiled Materials$.00$.00$.00
Original Contract AmtGross Earnings$308,155.10$299,944.77$8,210.33
$360,424.90Retainage$-3,081.55$-2,999.45$-82.10
Escrow Amount$.00$.00$.00
Percent CompleteSecurities Encumbered$.00$.00$.00
96.70%Net Earnings$305,073.55$296,945.32$8,128.23
Liquidated Damages$.00$.00$.00
Incentives$.00$.00$.00
Disincentives$.00$.00$.00
Other Contract Adj$.00$.00$.00
Appl of Training Adj$.00$.00$.00
Training Rates Adj$.00$.00$.00
Fuel Adj$.00$.00$.00
Bituminous Adj$.00$.00$.00
Autopay Adj$.00$.00$.00
Gasoline Adj$.00$.00$.00
Other Adj$.00$.00$.00
Price Adj$.00$.00$.00
Substandard Item Adj$.00$.00$.00
Asphalt Adj$.00$.00$.00
Diesel Fuel Adj$.00$.00$.00
Petrol Adj$.00$.00$.00
Total for Adjustments$.00$.00$.00
Payment$305,073.55$296,945.32$8,128.23
Project ManagerDiv. Head/Dist. Eng.
England, Jim05.16.2002Ruby, Richard (Rich)05.16.2002
Constr. Estimate Eng.Materials Eng.
Bartos, Steve05.16.2002
Controller Div. Processed
Burling, Laurie05.17.2002
Detailed breakdown of stockpiled materials
Est Nbr:0001
Item NbrItem CdItem DescAdj AmtInvoice Nbr
00086005.78 EXPANSION BEARING, TFE TYPE
S.P. Initial Payment1,469.84E20435
EXPANSION BEARING, ABUT. 1
00096005.83 FIXED BEARING
S.P. Initial Payment1,601.68E20435
FIXED BEARING ABUT. 2
00146080.00 STRUCTURAL STEEL FOR SUBSTRUCTURE
S.P. Initial Payment8,365.770-219-C
STEEL FOR SUBSTRUCTURE
Total for estimate 0001:11,437.29
Est Nbr:0003
Item NbrItem CdItem DescAdj AmtInvoice Nbr
00086005.78 EXPANSION BEARING, TFE TYPE
S.P. Adjustment-1,469.84E20435
EXPANSION BEARING, ABUT. 1
00096005.83 FIXED BEARING
S.P. Adjustment-1,601.68E20435
FIXED BEARING ABUT. 2
00146080.00 STRUCTURAL STEEL FOR SUBSTRUCTURE
S.P. Adjustment-2,425.500-219-C
STEEL FOR SUBSTRUCTURE
Total for estimate 0003:-5,497.02
Est Nbr:0004
Item NbrItem CdItem DescAdj AmtInvoice Nbr
00146080.00 STRUCTURAL STEEL FOR SUBSTRUCTURE
S.P. Adjustment-2,425.500-219-C
STEEL FOR SUBSTRUCTURE
Total for estimate 0004:-2,425.50
Est Nbr:0005
Item NbrItem CdItem DescAdj AmtInvoice Nbr
00146080.00 STRUCTURAL STEEL FOR SUBSTRUCTURE
S.P. Adjustment-939.330-219-C
STEEL FOR SUBSTRUCTURE
Total for estimate 0005:-939.33
Est Nbr:0007
Item NbrItem CdItem DescAdj AmtInvoice Nbr
00146080.00 STRUCTURAL STEEL FOR SUBSTRUCTURE
S.P. Adjustment-2,575.440-219-C
STEEL FOR SUBSTRUCTURE
Total for estimate 0007:-2,575.44
Total remaining for contract:0.00
1. Contracted
2. Current
3. To date
Item Nbr        Item CodeUnit Price4. This Est
Item DescriptionUnitsQtyAmount
GROUP 6 BRIDGE AT STA. 8+42.634
0001                          0001.10 1.601,248.0001,996.80
BARRICADE, TYPE III BDAY1,248.0001,996.80
1,080.0001,728.00
0.0000.00

0002                          0001.30 1.00208.000208.00
TYPE B HIGH INTENSITY WARNING LIGHT LDAY208.000208.00
216.000216.00
0.0000.00

0003                          0001.90 0.552,288.0001,258.40
SIGN DAY EACH2,288.0001,258.40
1,404.000772.20
0.0000.00

0004                          0030.60 25,000.001.00025,000.00
MOBILIZATION LS 1.00025,000.00
1.00025,000.00
0.0000.00

0005                          1010.01 2.503,550.0008,875.00
EXCAVATION (ESTABLISHED QUANTITY) m3 0.0000.00
0.0000.00
-1,183.000-2,957.50

0006                          6000.10 3,750.001.0003,750.00
ABUTMENT NO.1 EXCAVATION LS 1.0003,750.00
1.0003,750.00
0.0000.00

0007                          6000.11 3,750.001.0003,750.00
ABUTMENT NO.2 EXCAVATION LS 1.0003,750.00
1.0003,750.00
0.0000.00

0008                          6005.78 600.004.0002,400.00
EXPANSION BEARING, TFE TYPE EACH4.0002,400.00
4.0002,400.00
0.0000.00

0009                          6005.83 600.004.0002,400.00
FIXED BEARING EACH4.0002,400.00
4.0002,400.00
0.0000.00

0010                          6010.22 500.0038.20019,100.00
CLASS 47B-20 CONCRETE FOR BRIDGE m3 38.20019,100.00
38.20019,100.00
0.0000.00

0011                          6010.26 500.0077.90038,950.00
CLASS 47BD-30 CONCRETE FOR BRIDGE m3 77.90038,950.00
84.42042,210.00
6.5203,260.00

0012                          6040.00 10,000.001.00010,000.00
REMOVE STRUCTURE EACH1.00010,000.00
AT STA. 8+43.92 1.00010,000.00
0.0000.00

0013                          6071.12 55,000.001.00055,000.00
STEEL SUPERSTRUCTURE LS 1.00055,000.00
AT STA. 8+42.634 1.00055,000.00
0.0000.00

0014                          6080.00 4.753,794.00018,021.50
STRUCTURAL STEEL FOR SUBSTRUCTURE kg 3,794.00018,021.50
3,794.00018,021.50
0.0000.00

0015                          6105.02 26.502,470.00065,455.00
ROCK RIPRAP, TYPE B Mg 0.0000.00
0.0000.00
-669.630-17,745.20

0016                          6131.50 1.2010,219.00012,262.80
EPOXY COATED REINFORCING STEEL kg 10,219.00012,262.80
10,219.00012,262.80
0.0000.00

0017                          6139.50 40.0029.0001,160.00
SUBSURFACE DRAINAGE MATTING m2 29.0001,160.00
29.0001,160.00
0.0000.00

0018                          6200.00 76.00182.40013,862.40
CONCRETE PILING m 182.40013,862.40
133.78010,167.28
0.0000.00

0019                          6310.00 125.00534.00066,750.00
STEEL SHEET PILING m2 534.00066,750.00
459.45057,431.25
0.0000.00

0020                          7020.00 1,150.004.0004,600.00
BRIDGE APPROACH SECTIONS EACH4.0004,600.00
4.0004,600.00
0.0000.00

0021                          7021.45 1,100.004.0004,400.00
BREAKAWAY CABLE TERMINAL EACH4.0004,400.00
4.0004,400.00
0.0000.00

0022                          8091.00 25.0049.0001,225.00
GRANULAR BACKFILL m3 49.0001,225.00
49.0001,225.00
0.0000.00

4001                          1010.01 3.250.0000.00
EXCAVATION (ESTABLISHED QUANTITY) m3 1,506.0004,894.50
EXCAVATION (EQ) (REVISED QTY & PRICE) 1,506.0004,894.50
1,506.0004,894.50

4002                          6105.02 31.000.0000.00
ROCK RIPRAP, TYPE B Mg 669.63020,758.53
ROCK RIPRAP, TYPE B (REVISED QTY & PRICE) 669.63020,758.53
669.63020,758.53

6001                          6200.50 45.600.0000.00
PAY CUT-OFF FOR CONCRETE PILING m 22.6301,031.93
ABUTMENT NO. 2 22.6301,031.93
0.0000.00

6002                          6200.50 45.600.0000.00
PAY CUT-OFF FOR CONCRETE PILING m 26.1801,193.81
PAY CUT-OFF FOR CONCRETE PILING ABUTMENT NO. 1 26.1801,193.81
0.0000.00

6003                          6310.15 75.000.0000.00
PAY CUT-OFF FOR STEEL SHEET PILING m2 39.2402,943.00
PAY CUT-OFF SHEET PILING AT ABUTMENT 1 39.2402,943.00
0.0000.00

6004                          6310.15 75.000.0000.00
PAY CUT-OFF FOR STEEL SHEET PILING m2 23.1901,739.25
ABUTMENT NO. 2 23.1901,739.25
0.0000.00

GROUP 6 BRIDGE AT STA. 8+42.634Contracted360,424.90
Current318,655.92
In place308,155.05
This Estimate8,210.33

Totals for contractContracted360,424.90
Current318,655.92
In place308,155.05
This Estimate8,210.33