| Scottsbluff
NORTHWEST Viaduct Project Contacts:
Location:
These 3 projects begin at the intersection of Ave “I” and
Beltline Highway and extend to a new intersection with US-26 along the
south and west side of Scottsbluff.
Scope of Work: Construction will involve grading, drainage structures, Ave “I” intersection improvements, construction of a new 3-lane doweled concrete section with surfaced shoulders, curb & gutter, construction of a sidewalk, overlay of portions of the roadway & shoulders, reconstruction of the intersection of N-92 & 20th St to add left turn lanes, a new viaduct over the BNSF RR and US 26, and the relocation of the County Road 20/US-26 intersection, including the roadway lighting, to the west. Schedule: This project is currently in the 5-year Program. Proposed Accommodation of Traffic during Construction: Construction will be done under traffic. Temporary roads around work zones may be used during some phases of construction. A detour along 42nd St may be required during the viaduct girder seating. Other detour routes may be used. Right of Way: Acquisition of property for highway right-of-way will be required throughout the length of the project. Right of way may be required at the intersection of Ave “I” and US-26. Control of access will be acquired from Winters Creek Canal north to the new intersection of N-92/US-26. Wetlands: There may be wetlands located on this project. These may require mitigation. Cost: Scottsbluff
NW Viaduct - $6.0 Million, Beltline Hwy Riverside Dr. to Ave “I”
- $750,000, Beltline Hwy NW - $750,000 |
||