Contract Letting March 14, 2002

                                                    NEBRASKA DEPARTMENT OF ROADS                             DATE : 03/14/02
                                                                                                             PAGE : 2
                                                          VENDOR RANKING

     CALL ORDER   :  F24                     CONTRACT ID : 7753                         COUNTIES :  CHASE
     LETTING DATE : 03/14/02                DISTRICT    : 7
                                                                                           PROJECT(S) : STPE-1315(8)
     CONTRACT DESCRIPTION :
     ON A COUNTY ROAD SOUTH OF WAUNETA.

  --------------------------------------------------------------------------------------------------------------------------
      VENDOR NO.           BID NOTES
  --------------------------------------------------------------------------------------------------------------------------

  --------------------------------------------------------------------------------------------------------------------------
                                                                                                   TOTAL         % OVER
  RANK     VENDOR NO./NAME                                                                          BID           LOW BID
  --------------------------------------------------------------------------------------------------------------------------
   1   2853           SIMON CONTRACTORS AND SUBSIDIARIES                                     $    521,629.83     100.0000%
   2   2252           PAULSEN, INC.                                                          $    535,927.27     102.7409%
   3   0477           WESTERN ENGINEERING COMPANY, INC.                                      $    538,333.50     103.2022%
   4   0083           WERNER CONSTRUCTION, INC.                                              $    549,804.71     105.4013%
                                                    NEBRASKA DEPARTMENT OF ROADS                             DATE : 03/14/02
                                                                                                             PAGE : 3
                                                        TABULATION OF BIDS

     CALL ORDER   :  F24                    CONTRACT ID : 7753                        COUNTIES :  CHASE
     LETTING DATE : 03/14/02  1:30 PM       DISTRICT    : 7
                                                                                     PROJECT(S) : STPE-1315(8)



====================================================================================================================================
                                          |(1) 2853                    |(2) 2252                    |(3) 0477
                                          |SIMON CONTRACTORS AND SUBSID|PAULSEN, INC.               |WESTERN ENGINEERING COMPANY,
LINE NO / ITEM CODE / ALT                 |                            |                            |
ITEM DESCRIPTION           QUANTITY       |  UNIT PRICE          AMOUNT|  UNIT PRICE          AMOUNT|  UNIT PRICE          AMOUNT
------------------------------------------+----------------------------+----------------------------+-------------------------------
SECTION 0001   GROUP 1 GRADING
                                          |                            |                            |
0001 L006.00                   5.000  ha  |     287.18000       1435.90|     134.00000        670.00|     140.00000         700.00
  COVER CROP SEEDING                      |                            |                            |
0002 0030.10                          LUMP|    4208.80000       4208.80|    4500.00000       4500.00|    3600.00000        3600.00
  MOBILIZATION                            |                            |                            |
0003 1000.00                   1.000  EACH|     408.27000        408.27|     500.00000        500.00|     600.00000         600.00
  LARGE TREE REMOVAL                      |                            |                            |
0004 1009.00                          LUMP|     575.81000        575.81|    2000.00000       2000.00|    2100.00000        2100.00
  GENERAL CLEARING AND GRUBBING           |                            |                            |
0005 1011.00                 888.000  kL  |       5.46000       4848.48|       2.80000       2486.40|       3.00000        2664.00
  WATER                                   |                            |                            |
0006 1030.00                7107.000  m3  |       5.21000      37027.47|       3.50000      24874.50|       3.60000       25585.20
  EARTHWORK MEASURED IN EMBANKMENT        |                            |                            |
0007 1300.18                  18.000  m   |      54.56000        982.08|      40.00000        720.00|      42.00000         756.00
  450 mm DRIVEWAY CULVERT PIPE            |                            |                            |
0008 1300.21                 101.000  m   |      62.21000       6283.21|      45.00000       4545.00|      47.00000        4747.00
  525 mm DRIVEWAY CULVERT PIPE            |                            |                            |
0009 1300.24                   9.000  m   |      62.80000        565.20|      52.00000        468.00|      55.00000         495.00
  600 mm DRIVEWAY CULVERT PIPE            |                            |                            |
     SECTION TOTALS                       |             $     56,335.22|             $     40,763.90|                $     41,247.20
------------------------------------------+----------------------------+----------------------------+-------------------------------
SECTION 0002   GROUP 4 CULVERTS
                                          |                            |                            |
0010 0030.40                          LUMP|    4887.79000       4887.79|    3750.00000       3750.00|    3000.00000        3000.00
  MOBILIZATION                            |                            |                            |
0011 4040.00                   4.000  EACH|     315.90000       1263.60|     200.00000        800.00|     200.00000         800.00
  REMOVE HEADWALLS FROM CULVERTS          |                            |                            |
0012 4044.00                   1.000  EACH|    1091.28000       1091.28|    4900.00000       4900.00|    5000.00000        5000.00
  PREPARATION OF STRUCTURE AT STA.        |                            |                            |
  20+99.64                                |                            |                            |
0013 4050.01                 106.000  m3  |      15.11000       1601.66|      44.00000       4664.00|      46.00000        4876.00
  EXCAVATION FOR PIPE, PIPE-ARCH CULVERTS,|                            |                            |
   AND HEADWALLS                          |                            |                            |
0014 4051.01                  26.000  m3  |      33.80000        878.80|      56.00000       1456.00|      60.00000        1560.00
  EXCAVATION FOR BOX CULVERTS             |                            |                            |
0015 4101.06                  14.400  m3  |     492.59000       7093.30|     524.00000       7545.60|     550.00000        7920.00
  CLASS 47B-20 OR AX-20 CONCRETE FOR BOX  |                            |                            |
  CULVERT                                 |                            |                            |
0016 4151.00                 949.000  kg  |       1.88000       1784.12|       1.92000       1822.08|       2.00000        1898.00
  REINFORCING STEEL FOR BOX CULVERT       |                            |                            |
                                                    NEBRASKA DEPARTMENT OF ROADS                             DATE : 03/14/02
                                                                                                             PAGE : 4
                                                        TABULATION OF BIDS

     CALL ORDER   :  F24                    CONTRACT ID : 7753                        COUNTIES :  CHASE
     LETTING DATE : 03/14/02  1:30 PM       DISTRICT    : 7
                                                                                     PROJECT(S) : STPE-1315(8)



====================================================================================================================================
                                          |(1) 2853                    |(2) 2252                    |(3) 0477
                                          |SIMON CONTRACTORS AND SUBSID|PAULSEN, INC.               |WESTERN ENGINEERING COMPANY,
LINE NO / ITEM CODE / ALT                 |                            |                            |
ITEM DESCRIPTION           QUANTITY       |  UNIT PRICE          AMOUNT|  UNIT PRICE          AMOUNT|  UNIT PRICE          AMOUNT
------------------------------------------+----------------------------+----------------------------+-------------------------------
0017 4305.36                  20.000  m   |     123.77000       2475.40|      93.00000       1860.00|      95.00000        1900.00
  900 mm ROUND EQUIVALENT CULVERT PIPE    |                            |                            |
0018 4305.48                  22.000  m   |     217.89000       4793.58|     142.00000       3124.00|     145.00000        3190.00
  1200 mm ROUND EQUIVALENT CULVERT PIPE   |                            |                            |
0019 4320.36                   4.000  EACH|     471.84000       1887.36|     350.00000       1400.00|     360.00000        1440.00
  900 mm ROUND EQUIVALENT FLARED-END      |                            |                            |
  SECTION                                 |                            |                            |
0020 4320.48                   4.000  EACH|     769.64000       3078.56|     600.00000       2400.00|     600.00000        2400.00
  1200 mm ROUND EQUIVALENT FLARED-END     |                            |                            |
  SECTION                                 |                            |                            |
     SECTION TOTALS                       |             $     30,835.45|             $     33,721.68|                $     33,984.00
------------------------------------------+----------------------------+----------------------------+-------------------------------
SECTION 0003   GROUP 9 BITUMINOUS
                                          |                            |                            |
0021 L001.01                   5.000  ha  |     516.92000       2584.60|    2080.00000      10400.00|    1800.00000        9000.00
  SEEDING, TYPE A                         |                            |                            |
0022 L032.75                  25.000  Mg  |     137.85000       3446.25|      95.00000       2375.00|      80.00000        2000.00
  MULCH                                   |                            |                            |
0023 0002.55                  88.260  StaM|      27.57000       2433.33|      20.80000       1835.81|      25.00000        2206.50
  OVERLAY BROKEN LINES                    |                            |                            |
0024 0002.76               11000.000  m   |       0.24000       2640.00|       0.24000       2640.00|       0.22000        2420.00
  PERMANENT PAVEMENT MARKING PAINT        |                            |                            |
0025 0030.90                          LUMP|   50000.00000      50000.00|   34000.00000      34000.00|   33000.00000       33000.00
  MOBILIZATION                            |                            |                            |
0026 2020.00                  36.000  m2  |       4.84000        174.24|       4.25000        153.00|       3.00000         108.00
  SPECIAL SURFACE COURSE FOR MAILBOX      |                            |                            |
  TURNOUTS                                |                            |                            |
0027 2021.00                   2.000  EACH|      57.44000        114.88|      50.00000        100.00|      60.00000         120.00
  MAILBOX POST                            |                            |                            |
0028 9005.35                9940.000  Mg  |      23.11000     229713.40|      25.45000     252973.00|      26.00000      258440.00
  ASPHALTIC CONCRETE, TYPE SP3(12.5)      |                            |                            |
0029 9009.00                1117.000  m2  |       4.33000       4836.61|       2.15000       2401.55|       3.00000        3351.00
  PLACEMENT OF ASPHALTIC CONCRETE FOR     |                            |                            |
  DRIVEWAYS AND INTERSECTIONS             |                            |                            |
0030 9021.01                 536.760  Mg  |     185.00000      99300.60|     199.35000     107003.11|     185.00000       99300.60
  PERFORMANCE GRADED BINDER (64-22)       |                            |                            |
0031 9034.00                1117.000  m2  |       1.58000       1764.86|       2.50000       2792.50|       3.00000        3351.00
  PREPARATION OF INTERSECTIONS AND        |                            |                            |
  DRIVEWAYS                               |                            |                            |
0032 9053.00                6580.000  L   |       0.37000       2434.60|       0.24000       1579.20|       0.30000        1974.00
  TACK COAT                               |                            |                            |
                                                    NEBRASKA DEPARTMENT OF ROADS                             DATE : 03/14/02
                                                                                                             PAGE : 5
                                                        TABULATION OF BIDS

     CALL ORDER   :  F24                    CONTRACT ID : 7753                        COUNTIES :  CHASE
     LETTING DATE : 03/14/02  1:30 PM       DISTRICT    : 7
                                                                                     PROJECT(S) : STPE-1315(8)



====================================================================================================================================
                                          |(1) 2853                    |(2) 2252                    |(3) 0477
                                          |SIMON CONTRACTORS AND SUBSID|PAULSEN, INC.               |WESTERN ENGINEERING COMPANY,
LINE NO / ITEM CODE / ALT                 |                            |                            |
ITEM DESCRIPTION           QUANTITY       |  UNIT PRICE          AMOUNT|  UNIT PRICE          AMOUNT|  UNIT PRICE          AMOUNT
------------------------------------------+----------------------------+----------------------------+-------------------------------
0033 9111.00                 795.000  kL  |       8.12000       6455.40|       2.55000       2027.25|       3.00000        2385.00
  WATER                                   |                            |                            |
0034 9170.00                  88.262  StaM|     117.83000      10399.91|     149.50000      13195.17|     175.00000       15445.85
  EARTH SHOULDER CONSTRUCTION             |                            |                            |
0035 9173.00                  44.131  StaM|     209.44000       9242.80|     400.00000      17652.40|     350.00000       15445.85
  SUBGRADE PREPARATION                    |                            |                            |
     SECTION TOTALS                       |             $    425,541.48|             $    451,127.99|                $    448,547.80
------------------------------------------+----------------------------+----------------------------+-------------------------------
SECTION 0004   GROUP 10 GENERAL ITEMS
                                          |                            |                            |
0036 0001.10                 966.000  BDAY|       2.87000       2772.42|       3.90000       3767.40|       4.00000        3864.00
  BARRICADE, TYPE III                     |                            |                            |
0037 0001.30                 138.000  LDAY|       4.37000        603.06|       4.85000        669.30|       4.00000         552.00
  TYPE B HIGH INTENSITY WARNING LIGHT     |                            |                            |
0038 0001.90                1518.000  EACH|       0.82000       1244.76|       1.50000       2277.00|       0.75000        1138.50
  SIGN DAY                                |                            |                            |
0039 0010.04                   1.000  EACH|    2297.44000       2297.44|    1100.00000       1100.00|    1500.00000        1500.00
  FIELD OFFICE                            |                            |                            |
0040 0030.00                          LUMP|    2000.00000       2000.00|    2500.00000       2500.00|    7500.00000        7500.00
  MOBILIZATION                            |                            |                            |
     SECTION TOTALS                       |             $      8,917.68|             $     10,313.70|                $     14,554.50
------------------------------------------+----------------------------+----------------------------+-------------------------------
     CONTRACT TOTALS                      |             $    521,629.83|             $    535,927.27|                $    538,333.50
====================================================================================================================================
                                                    NEBRASKA DEPARTMENT OF ROADS                             DATE : 03/14/02
                                                                                                             PAGE : 6
                                                        TABULATION OF BIDS

     CALL ORDER   :  F24                    CONTRACT ID : 7753                        COUNTIES :  CHASE
     LETTING DATE : 03/14/02  1:30 PM       DISTRICT    : 7
                                                                                     PROJECT(S) : STPE-1315(8)



====================================================================================================================================
                                          |(4) 0083                    |                            |
                                          |WERNER CONSTRUCTION, INC.   |                            |
LINE NO / ITEM CODE / ALT                 |                            |                            |
ITEM DESCRIPTION           QUANTITY       |  UNIT PRICE          AMOUNT|  UNIT PRICE          AMOUNT|  UNIT PRICE          AMOUNT
------------------------------------------+----------------------------+----------------------------+-------------------------------
SECTION 0001   GROUP 1 GRADING
                                          |                            |                            |
0001 L006.00                   5.000  ha  |     134.00000        670.00|                            |
  COVER CROP SEEDING                      |                            |                            |
0002 0030.10                          LUMP|    3500.00000       3500.00|                            |
  MOBILIZATION                            |                            |                            |
0003 1000.00                   1.000  EACH|     500.00000        500.00|                            |
  LARGE TREE REMOVAL                      |                            |                            |
0004 1009.00                          LUMP|    2000.00000       2000.00|                            |
  GENERAL CLEARING AND GRUBBING           |                            |                            |
0005 1011.00                 888.000  kL  |       2.80000       2486.40|                            |
  WATER                                   |                            |                            |
0006 1030.00                7107.000  m3  |       3.50000      24874.50|                            |
  EARTHWORK MEASURED IN EMBANKMENT        |                            |                            |
0007 1300.18                  18.000  m   |      40.00000        720.00|                            |
  450 mm DRIVEWAY CULVERT PIPE            |                            |                            |
0008 1300.21                 101.000  m   |      45.00000       4545.00|                            |
  525 mm DRIVEWAY CULVERT PIPE            |                            |                            |
0009 1300.24                   9.000  m   |      52.00000        468.00|                            |
  600 mm DRIVEWAY CULVERT PIPE            |                            |                            |
     SECTION TOTALS                       |             $     39,763.90|                            |
------------------------------------------+----------------------------+----------------------------+-------------------------------
SECTION 0002   GROUP 4 CULVERTS
                                          |                            |                            |
0010 0030.40                          LUMP|    2750.00000       2750.00|                            |
  MOBILIZATION                            |                            |                            |
0011 4040.00                   4.000  EACH|     200.00000        800.00|                            |
  REMOVE HEADWALLS FROM CULVERTS          |                            |                            |
0012 4044.00                   1.000  EACH|    4900.00000       4900.00|                            |
  PREPARATION OF STRUCTURE AT STA.        |                            |                            |
  20+99.64                                |                            |                            |
0013 4050.01                 106.000  m3  |      44.00000       4664.00|                            |
  EXCAVATION FOR PIPE, PIPE-ARCH CULVERTS,|                            |                            |
   AND HEADWALLS                          |                            |                            |
0014 4051.01                  26.000  m3  |      56.00000       1456.00|                            |
  EXCAVATION FOR BOX CULVERTS             |                            |                            |
0015 4101.06                  14.400  m3  |     524.00000       7545.60|                            |
  CLASS 47B-20 OR AX-20 CONCRETE FOR BOX  |                            |                            |
  CULVERT                                 |                            |                            |
0016 4151.00                 949.000  kg  |       1.92000       1822.08|                            |
  REINFORCING STEEL FOR BOX CULVERT       |                            |                            |
                                                    NEBRASKA DEPARTMENT OF ROADS                             DATE : 03/14/02
                                                                                                             PAGE : 7
                                                        TABULATION OF BIDS

     CALL ORDER   :  F24                    CONTRACT ID : 7753                        COUNTIES :  CHASE
     LETTING DATE : 03/14/02  1:30 PM       DISTRICT    : 7
                                                                                     PROJECT(S) : STPE-1315(8)



====================================================================================================================================
                                          |(4) 0083                    |                            |
                                          |WERNER CONSTRUCTION, INC.   |                            |
LINE NO / ITEM CODE / ALT                 |                            |                            |
ITEM DESCRIPTION           QUANTITY       |  UNIT PRICE          AMOUNT|  UNIT PRICE          AMOUNT|  UNIT PRICE          AMOUNT
------------------------------------------+----------------------------+----------------------------+-------------------------------
0017 4305.36                  20.000  m   |      93.00000       1860.00|                            |
  900 mm ROUND EQUIVALENT CULVERT PIPE    |                            |                            |
0018 4305.48                  22.000  m   |     142.00000       3124.00|                            |
  1200 mm ROUND EQUIVALENT CULVERT PIPE   |                            |                            |
0019 4320.36                   4.000  EACH|     350.00000       1400.00|                            |
  900 mm ROUND EQUIVALENT FLARED-END      |                            |                            |
  SECTION                                 |                            |                            |
0020 4320.48                   4.000  EACH|     600.00000       2400.00|                            |
  1200 mm ROUND EQUIVALENT FLARED-END     |                            |                            |
  SECTION                                 |                            |                            |
     SECTION TOTALS                       |             $     32,721.68|                            |
------------------------------------------+----------------------------+----------------------------+-------------------------------
SECTION 0003   GROUP 9 BITUMINOUS
                                          |                            |                            |
0021 L001.01                   5.000  ha  |    1754.00000       8770.00|                            |
  SEEDING, TYPE A                         |                            |                            |
0022 L032.75                  25.000  Mg  |      80.00000       2000.00|                            |
  MULCH                                   |                            |                            |
0023 0002.55                  88.260  StaM|      29.00000       2559.54|                            |
  OVERLAY BROKEN LINES                    |                            |                            |
0024 0002.76               11000.000  m   |       0.21000       2310.00|                            |
  PERMANENT PAVEMENT MARKING PAINT        |                            |                            |
0025 0030.90                          LUMP|   51000.00000      51000.00|                            |
  MOBILIZATION                            |                            |                            |
0026 2020.00                  36.000  m2  |       7.50000        270.00|                            |
  SPECIAL SURFACE COURSE FOR MAILBOX      |                            |                            |
  TURNOUTS                                |                            |                            |
0027 2021.00                   2.000  EACH|      50.00000        100.00|                            |
  MAILBOX POST                            |                            |                            |
0028 9005.35                9940.000  Mg  |      24.84000     246909.60|                            |
  ASPHALTIC CONCRETE, TYPE SP3(12.5)      |                            |                            |
0029 9009.00                1117.000  m2  |       3.50000       3909.50|                            |
  PLACEMENT OF ASPHALTIC CONCRETE FOR     |                            |                            |
  DRIVEWAYS AND INTERSECTIONS             |                            |                            |
0030 9021.01                 536.760  Mg  |     186.00000      99837.36|                            |
  PERFORMANCE GRADED BINDER (64-22)       |                            |                            |
0031 9034.00                1117.000  m2  |       2.50000       2792.50|                            |
  PREPARATION OF INTERSECTIONS AND        |                            |                            |
  DRIVEWAYS                               |                            |                            |
0032 9053.00                6580.000  L   |       0.26000       1710.80|                            |
  TACK COAT                               |                            |                            |
                                                    NEBRASKA DEPARTMENT OF ROADS                             DATE : 03/14/02
                                                                                                             PAGE : 8
                                                        TABULATION OF BIDS

     CALL ORDER   :  F24                    CONTRACT ID : 7753                        COUNTIES :  CHASE
     LETTING DATE : 03/14/02  1:30 PM       DISTRICT    : 7
                                                                                     PROJECT(S) : STPE-1315(8)



====================================================================================================================================
                                          |(4) 0083                    |                            |
                                          |WERNER CONSTRUCTION, INC.   |                            |
LINE NO / ITEM CODE / ALT                 |                            |                            |
ITEM DESCRIPTION           QUANTITY       |  UNIT PRICE          AMOUNT|  UNIT PRICE          AMOUNT|  UNIT PRICE          AMOUNT
------------------------------------------+----------------------------+----------------------------+-------------------------------
0033 9111.00                 795.000  kL  |       2.80000       2226.00|                            |
  WATER                                   |                            |                            |
0034 9170.00                  88.262  StaM|     140.00000      12356.68|                            |
  EARTH SHOULDER CONSTRUCTION             |                            |                            |
0035 9173.00                  44.131  StaM|     650.00000      28685.15|                            |
  SUBGRADE PREPARATION                    |                            |                            |
     SECTION TOTALS                       |             $    465,437.13|                            |
------------------------------------------+----------------------------+----------------------------+-------------------------------
SECTION 0004   GROUP 10 GENERAL ITEMS
                                          |                            |                            |
0036 0001.10                 966.000  BDAY|       3.50000       3381.00|                            |
  BARRICADE, TYPE III                     |                            |                            |
0037 0001.30                 138.000  LDAY|       3.50000        483.00|                            |
  TYPE B HIGH INTENSITY WARNING LIGHT     |                            |                            |
0038 0001.90                1518.000  EACH|       1.00000       1518.00|                            |
  SIGN DAY                                |                            |                            |
0039 0010.04                   1.000  EACH|    1500.00000       1500.00|                            |
  FIELD OFFICE                            |                            |                            |
0040 0030.00                          LUMP|    5000.00000       5000.00|                            |
  MOBILIZATION                            |                            |                            |
     SECTION TOTALS                       |             $     11,882.00|                            |
------------------------------------------+----------------------------+----------------------------+-------------------------------
     CONTRACT TOTALS                      |             $    549,804.71|                            |
====================================================================================================================================