Official State of Nebraska Web Site

 




Bridge Home

 

Regular Acrobat Reader Download
Help with PDF's for those with visual disabilities


Bridge Division
NDOR HYDRAULIC ANALYSIS GUIDELINES

NDOR Hydraulic Forms

NDOR HYDRAULIC ANALYSIS GUIDELINES

The hydraulic analysis will satisfy requirements of the FEDERAL-AID POLICY GUIDE, 23 CFR 650A (Location and Hydraulic Design of Encroachments on Flood Plains) and Federal Highway Administration Publication No. FHWA-IP-90-017 (Hydraulic Engineering Circular No. 18, Evaluating Scour at Bridges).

The hydraulic Engineer is required to define the most practical design for all hydraulic related issues. The analysis process evaluates, assesses and documents the impacts and consequences an encroachment has on the floodplain environment. The proposed design, countermeasure design and hydraulic related design parameters are defined by considering hydraulic constraints, cost, risks, regulatory requirements, channel behavior, environmental impacts, engineering requirements and social concerns.

Structure sizing is based on hydraulic requirements for floods up to Q100. High Risk sites may require sizing based on Q500 floods. The proposed structure is selected by hydraulically assessing NATURAL, EXISTING and ALTERNATE conditions.

Bridge foundation designs are checked for scour to verify the structure has a reasonable chance of surviving a Q500 flood.

The hydraulic study is based on surveyed cross-sections that define the 100-year floodplain. Normally, a minimum of one upstream cross-section, one downstream cross-section and one encroachment (bridge opening/road grade) cross-section is required. For minor action projects with minimal hydraulic risks, such as culvert extensions, approximate hydraulic calculations based on preliminary road survey data is acceptable. High risk, very complex sites may require the use of additional floodplain cross-sections and/or total station survey data.

Hydraulic Guidelines & Forms (PDF format) 900kb Updated
05-08-09

click to go to top of page

 

NDOR Hydraulic Forms

DR14A Project Information PDF Word 04-09
DR14B Bridge Plan Information PDF Word 04-09
DR14C Hydrology and Hydraulics PDF Word 04-09
DR14D Reference Information PDF Word 04-09
DR14E Risk Assessment PDF Word 04-09
DR14F Bridge Scour Information PDF Word 04-09
DR14G Culvert Information PDF Word 04-09
DR359A Preliminary Data Sheet PDF Word 06-09
DR359B Data Sheet (CBC) (Culvert to Culvert) PDF Word 04-09

DR359C Data Sheet (CBC) (Bridge to Culvert)

04-09
DR366 FEMA Certification and Compliance 04-09
DR385 Bridge Scour Report PDF Word 04-09
DR385B Bridge Scour Assessment PDF Word 04-09
DR385C Bridge Scour Plan of Action - format fixed PDF Word 04-09
DR385D Bridge Scour Worksheet PDF 04-09
 

click to go to top of page